CN104480944A - Unearthed ramp structure and construction method thereof - Google Patents

Unearthed ramp structure and construction method thereof Download PDF

Info

Publication number
CN104480944A
CN104480944A CN201410694862.9A CN201410694862A CN104480944A CN 104480944 A CN104480944 A CN 104480944A CN 201410694862 A CN201410694862 A CN 201410694862A CN 104480944 A CN104480944 A CN 104480944A
Authority
CN
China
Prior art keywords
unearthed
ramp
brace summer
brace
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410694862.9A
Other languages
Chinese (zh)
Other versions
CN104480944B (en
Inventor
熊壮
李欣荣
孟宪忠
胡志军
吴学军
刘佳
田旭
任书华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
First Construction Co Ltd of China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Group the Fifth Construction Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201410694862.9A priority Critical patent/CN104480944B/en
Publication of CN104480944A publication Critical patent/CN104480944A/en
Application granted granted Critical
Publication of CN104480944B publication Critical patent/CN104480944B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention provides a unearthed ramp structure and a construction method thereof, wherein the unearthed ramp structure comprises the following components: the foundation pit, one end connect in there is slope soil-out ramp and one end of foundation pit export connect in there is not slope soil-out ramp of slope soil-out ramp, there is not slope soil-out ramp other end to connect in the haul road, there is not slope soil-out ramp outside to be provided with three supporting beam that is used for the foundation pit to strut, two lateral walls symmetry subsides of soil-out ramp are equipped with steel sheet pile and a plurality of steel pipe and embrace the roof beam, a plurality of steel pipe embrace roof beam one end and are fixed in supporting beam, the other end support hold in the steel sheet pile. According to the invention, by adopting the slope arrangement in a slope-free mode, the influence of the slope range at two sides of the slope on the construction of the supporting beam is reduced, the alternate construction of the supporting beam and the slope is avoided, the construction continuity is ensured, the construction speed is accelerated, and the risk caused by long-term exposure of the foundation pit is also reduced.

Description

Unearthed pits rampway structure and construction method thereof
Technical field
The present invention relates to the technical field of pit earthwork construction, particularly one is unearthed pits rampway structure and construction method thereof.
Background technology
In foundation pit construction process, for the safety and surrounding environment ensureing foundation pit construction, main body underground structure is without prejudice, usually need to take supporting and protection structure, precipitation and soil excavation and backfill, comprise prospecting, design, construction, monitoring and detection etc.The construction technology of pit earthwork excavation generally has two kinds: put slope excavation (non-support excavation) and excavation (having supporting excavation) under support system protection; And for the latter, along with the excavation of foundation ditch is more and more darker, area is increasing, design and the construction of foundation pit enclosure structure become increasingly complex.
At the deep foundation ditch adopting brace summer to go along with sb. to guard him in soil excavation process, along with the increase of cutting depth, be unearthed both sides, ramp to put slope increasing extent large, on the one hand, put slope scope can be formed with the main bearing member of brace summer and intersect, the part angle brace of be unearthed on the other hand ramp and brace summer exists superimposed, therefore, how to ensure not do at angle brace to continue to use ramp to be unearthed and reduce to put slope scope, reduce ramp and put the heavy difficult point that slope is soil excavation on the impact that brace summer is constructed.
Summary of the invention
The object of the invention is to propose a kind of pits rampway structure and construction method thereof of being unearthed, ramp two can be reduced and be sidelong the impact that slope scope construct on brace summer, avoid the interspersed construction in brace summer and ramp, ensure the continuity of constructing.
For achieving the above object, the present invention proposes a kind of pits rampway structure that is unearthed, comprise: foundation ditch, one end be connected to the outlet of described foundation ditch have side slope be unearthed ramp and one end be connected to described in have side slope to be unearthed being unearthed ramp without side slope of ramp, describedly be connected to transport routes without the side slope ramp other end that is unearthed, described have three brace summers for pattern foundation pit supporting structure without side slope ramp arranged outside of being unearthed, beam embraced by be sticked steel sheet pile and multiple steel pipe of the two lateral wall symmetries in described unearthed ramp, described brace summer is fixed in described multiple steel pipe Bao Liang one end, the other end is held in described steel sheet pile.
Further, in above-mentioned unearthed pits rampway structure, described three brace summers comprise the first brace summer, the second brace summer and the 3rd brace summer that set gradually, and described second brace summer and the 3rd brace summer are fixed in described multiple steel pipe Bao Liang one end, and the other end is held in described steel sheet pile.
Further, in above-mentioned unearthed pits rampway structure, the local distribution of described first brace summer, the second brace summer and the 3rd brace summer is in the both sides in ramp of being unearthed without side slope.
Further, in above-mentioned unearthed pits rampway structure, steel pipe described in each is embraced beam and is comprised the multiple horizontal steel pipe and multiple longitudinal steel pipe that are fixed on the second brace summer or the 3rd brace summer, one end of described multiple horizontal steel pipe is vertically fixed on described multiple longitudinal steel pipe, with the second brace summer or the 3rd brace summer of being fixedly clamped; The other end of described multiple horizontal steel pipe is held in described steel sheet pile.
Separately, the present invention also provides a kind of construction method of above-mentioned unearthed pits rampway structure, comprises the following steps:
Step S1: the two lateral wall symmetries in ramp of being unearthed without side slope are sticked steel sheet pile, and described brace summer is fixed in multiple steel pipe Bao Liang one end, and the other end is held in described steel sheet pile;
Step S2: detect the angle brace axle power that there is the position that overlaps in described brace summer and unearthed ramp, when described angle brace axle power be less than ramp banket lateral pressure when, the angle brace of the brace summer at coincidence position is not constructed;
Step S3: when the large face earthwork outward transport of foundation ditch is complete, excavates unearthed ramp and the construction of angle brace of intersection brace summer.
The present invention is arranged by taking the ramp without side slope mode, decrease ramp two and be sidelong the impact that slope scope constructs on brace summer, avoid the interspersed construction in brace summer and ramp, ensure that the continuity of construction, accelerate speed of application, also reduce the risk that foundation ditch long term exposure produces.
Accompanying drawing explanation
Fig. 1 is that the present invention is unearthed the overall schematic of pits rampway structure;
Fig. 2 is that the present invention is unearthed the generalized section of pits rampway structure;
Fig. 3 is that the present invention is unearthed the schematic flow sheet of pits rampway structure construction method.
Detailed description of the invention
The preferred embodiments of the present invention are described in detail below in conjunction with accompanying drawing.
Refer to Fig. 1 and Fig. 2, Fig. 2 is that the present invention is unearthed the generalized section of pits rampway structure.The present invention is unearthed that pits rampway structure comprises foundation ditch 100, one end is connected to the outlet of described foundation ditch 100 have side slope be unearthed ramp 1 and one end be connected to described in have side slope to be unearthed being unearthed ramp 2 without side slope of ramp 1, describedly be connected to transport routes 200 without side slope ramp 2 other end that is unearthed, described have three brace summers 3 for pattern foundation pit supporting structure without side slope ramp 2 arranged outside of being unearthed, beam 5 embraced by be sticked steel sheet pile 4 and multiple steel pipe of the two lateral wall symmetries in described unearthed ramp 1, described multiple steel pipe is embraced beam 5 one end and is fixed on described brace summer 3, and the other end is held in described steel sheet pile 4.Described brace summer 3 is as the vertical supporting in ramp 2 of being unearthed without side slope, and described steel sheet pile 4 is as the cross binding in ramp 2 of being unearthed without side slope.
Wherein, described three brace summers 3 comprise the first brace summer 32, second brace summer 34 and the 3rd brace summer 36 that set gradually, and described multiple steel pipe is embraced beam 5 one end and is fixed on described second brace summer 34 and the 3rd brace summer 36, and the other end is held in described steel sheet pile 4.
The local distribution of described first brace summer 32, second brace summer 34 and the 3rd brace summer 36 is in the both sides in ramp 2 of being unearthed without side slope, and all do not construct with the angle brace of three brace summers 3 of ramp 2 overlapping part that is unearthed without side slope, it is the impact of second and third road brace summer being constructed in order to avoid there being side slope ramp to put slope scope without one of object that side slope ramp is arranged, two of object is that the angle brace of unearthed ramp and three brace summers 3 has lap, in order to avoid crossed construction, take the method that angle brace does not temporarily do.When pits rampway structure design is unearthed in the present invention, need to carry out comparing calculation to the angle brace axle power of described unearthed ramp 1 supported on both sides beam 3 and ramp lateral pressure of banketing, when ramp banket lateral pressure be less than the angle brace axle power of described brace summer 3 time, consider that angle brace does not temporarily do under ramp; Like this, on the one hand, the mode adopting the straight wall of steel sheet pile to go along with sb. to guard him makes the smooth construction of the second brace summer 34 and the 3rd brace summer 36, and form cross binding thereon, with opposing because angle brace does not form closed lateral force, ensure the stability of brace summer, thus reduce ramp to the impact of main brace summer; On the other hand, also ensure integrality and the continuity of brace summer construction, avoid back cutting fill slope road three times.
Steel pipe described in each is embraced beam 5 and is comprised the multiple horizontal steel pipe 52 and multiple longitudinal steel pipe 54 that are fixed on the second brace summer 34 or the 3rd brace summer 36, one end of described multiple horizontal steel pipe 52 is vertically fixed on described multiple longitudinal steel pipe 54, and to be fixedly clamped, multiple horizontal steel pipe 52 and multiple longitudinal steel pipe 54 described in the second brace summer 34 or the 3rd brace summer 36(are fixed by fastener); The other end of described multiple horizontal steel pipe 52 is held in described steel sheet pile 4, to shore the second brace summer 34 of steel sheet pile 4 and both sides or the 3rd brace summer 36, play the effect in fixing ramp of being unearthed, thus be down to minimum by slope scope being sidelong in ramp two without side slope mode on the impact that brace summer is constructed.
The present invention is unearthed in pits rampway structure, after needing to wait until the large face earthwork outward transport treating foundation ditch 100, carry out the excavation of the ramp soil body and the construction of intersection three brace summers 3 again, to be unearthed ramp 2 without side slope by adopting, the impact of being sidelong slope scope to avoid ramp two and constructing on brace summer, ensures the continuity of construction.
See also Fig. 1 to Fig. 3, Fig. 3 is the schematic flow sheet of the construction method of above-mentioned unearthed pits rampway structure, said method comprising the steps of:
Step S1: the two lateral wall symmetries in ramp 2 of being unearthed without side slope are sticked steel sheet pile 4, and multiple steel pipe is embraced beam 4 one end and be fixed on described brace summer 3, the other end is held in described steel sheet pile 4;
Step S2: detect the angle brace axle power that there is the position that overlaps in described brace summer and unearthed ramp 1, when described angle brace axle power be less than ramp banket lateral pressure when, the angle brace of the brace summer 3 at coincidence position is not constructed;
Step S3: when the large face earthwork outward transport of foundation ditch 100 is complete, excavates unearthed ramp 1 and the construction of angle brace of intersection brace summer 3.
It should be noted that, when brace summer 3 carries out operation, need on brace summer 3 earthing 300mm.
In addition, in work progress, need to strengthen the stress monitoring to respective regions brace summer, when angle brace of only filling a vacancy reaches design strength, lower road soil excavation can be carried out; Carry out brace summer angle brace when filling a vacancy, under the angle brace that should ensure to fill a vacancy, the earthwork is not excavated, to ensure the counter-pressure of the soil body to space enclosing structure.
Compared to prior art, the present invention is arranged by taking the ramp without side slope mode, decrease ramp two and be sidelong the impact that slope scope constructs on brace summer, avoid the interspersed construction in brace summer and ramp, ensure that the continuity of construction, accelerate speed of application, also reduce the risk that foundation ditch long term exposure produces.
Here description of the invention and application is illustrative, not wants by scope restriction of the present invention in the above-described embodiments.Distortion and the change of embodiment disclosed are here possible, are known for the replacement of embodiment those those of ordinary skill in the art and the various parts of equivalence.Those skilled in the art are noted that when not departing from spirit of the present invention or substantive characteristics, the present invention can in other forms, structure, layout, ratio, and to realize with other assembly, material and parts.When not departing from the scope of the invention and spirit, can other distortion be carried out here to disclosed embodiment and change.

Claims (5)

1. a unearthed pits rampway structure, it is characterized in that, it comprises: foundation ditch, one end be connected to the outlet of described foundation ditch have side slope be unearthed ramp and one end be connected to described in have side slope to be unearthed being unearthed ramp without side slope of ramp, describedly be connected to transport routes without the side slope ramp other end that is unearthed, described have three brace summers for pattern foundation pit supporting structure without side slope ramp arranged outside of being unearthed, beam embraced by be sticked steel sheet pile and multiple steel pipe of the two lateral wall symmetries in described unearthed ramp, described brace summer is fixed in described multiple steel pipe Bao Liang one end, and the other end is held in described steel sheet pile.
2. unearthed pits rampway structure according to claim 1, it is characterized in that, described three brace summers comprise the first brace summer, the second brace summer and the 3rd brace summer that set gradually, described second brace summer and the 3rd brace summer are fixed in described multiple steel pipe Bao Liang one end, and the other end is held in described steel sheet pile.
3. unearthed pits rampway structure according to claim 2, is characterized in that, the local distribution of described first brace summer, the second brace summer and the 3rd brace summer is in the both sides in ramp of being unearthed without side slope.
4. unearthed pits rampway structure according to claim 2, it is characterized in that, steel pipe described in each is embraced beam and is comprised the multiple horizontal steel pipe and multiple longitudinal steel pipe that are fixed on the second brace summer or the 3rd brace summer, one end of described multiple horizontal steel pipe is vertically fixed on described multiple longitudinal steel pipe, with the second brace summer or the 3rd brace summer of being fixedly clamped; The other end of described multiple horizontal steel pipe is held in described steel sheet pile.
5. a construction method for the unearthed pits rampway structure as described in any one of claim 1-4, is characterized in that, said method comprising the steps of:
Step S1: the two lateral wall symmetries in ramp of being unearthed without side slope are sticked steel sheet pile, and described brace summer is fixed in multiple steel pipe Bao Liang one end, and the other end is held in described steel sheet pile;
Step S2: detect the angle brace axle power that there is the position that overlaps in described brace summer and unearthed ramp, when described angle brace axle power be less than ramp banket lateral pressure when, the angle brace of the brace summer at coincidence position is not constructed;
Step S3: when the large face earthwork outward transport of foundation ditch is complete, excavates unearthed ramp and the construction of angle brace of intersection brace summer.
CN201410694862.9A 2014-11-27 2014-11-27 Unearthed ramp structure and construction method thereof Expired - Fee Related CN104480944B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410694862.9A CN104480944B (en) 2014-11-27 2014-11-27 Unearthed ramp structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410694862.9A CN104480944B (en) 2014-11-27 2014-11-27 Unearthed ramp structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN104480944A true CN104480944A (en) 2015-04-01
CN104480944B CN104480944B (en) 2016-04-06

Family

ID=52755542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410694862.9A Expired - Fee Related CN104480944B (en) 2014-11-27 2014-11-27 Unearthed ramp structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN104480944B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105298147A (en) * 2015-10-13 2016-02-03 中建一局集团建设发展有限公司 Ultra-deep foundation pit spiral descending quick material transportation passage and construction method thereof
CN110872841A (en) * 2019-11-29 2020-03-10 深圳宏业基岩土科技股份有限公司 Construction method of earthwork transportation ramp for inner support foundation pit
CN111851509A (en) * 2020-07-22 2020-10-30 深圳市工勘岩土集团有限公司 Temporary channel construction method based on deep foundation pit inner support structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0655099B1 (en) * 1993-06-10 1998-03-25 Ballast-Nedam Beton- en Waterbouw B.V. Method for building a structure in the ground
CN101067300A (en) * 2007-06-01 2007-11-07 天津一建建筑工程有限公司 Deep foundation pits rampway structure
CN102691300A (en) * 2012-04-18 2012-09-26 浙江省建工集团有限责任公司 Construction method of foundation pit earthwork
CN203716156U (en) * 2014-02-28 2014-07-16 中国建筑第四工程局有限公司 Pit-in-pit city gate hole type excavation construction structure in deep foundation pit
CN203716046U (en) * 2014-02-25 2014-07-16 中国建筑第四工程局有限公司 Steel trestle for earthwork transportation of foundation pit
CN203846796U (en) * 2014-05-27 2014-09-24 中国建筑第四工程局有限公司 Temporary soil discharge slope for top-down construction of basement
CN104131579A (en) * 2014-05-27 2014-11-05 中国建筑第四工程局有限公司 Method for quickening earthwork digging and transporting in top-down construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0655099B1 (en) * 1993-06-10 1998-03-25 Ballast-Nedam Beton- en Waterbouw B.V. Method for building a structure in the ground
CN101067300A (en) * 2007-06-01 2007-11-07 天津一建建筑工程有限公司 Deep foundation pits rampway structure
CN102691300A (en) * 2012-04-18 2012-09-26 浙江省建工集团有限责任公司 Construction method of foundation pit earthwork
CN203716046U (en) * 2014-02-25 2014-07-16 中国建筑第四工程局有限公司 Steel trestle for earthwork transportation of foundation pit
CN203716156U (en) * 2014-02-28 2014-07-16 中国建筑第四工程局有限公司 Pit-in-pit city gate hole type excavation construction structure in deep foundation pit
CN203846796U (en) * 2014-05-27 2014-09-24 中国建筑第四工程局有限公司 Temporary soil discharge slope for top-down construction of basement
CN104131579A (en) * 2014-05-27 2014-11-05 中国建筑第四工程局有限公司 Method for quickening earthwork digging and transporting in top-down construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘佳: "大型深基坑土方开挖技术", 《海峡科学》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105298147A (en) * 2015-10-13 2016-02-03 中建一局集团建设发展有限公司 Ultra-deep foundation pit spiral descending quick material transportation passage and construction method thereof
CN110872841A (en) * 2019-11-29 2020-03-10 深圳宏业基岩土科技股份有限公司 Construction method of earthwork transportation ramp for inner support foundation pit
CN111851509A (en) * 2020-07-22 2020-10-30 深圳市工勘岩土集团有限公司 Temporary channel construction method based on deep foundation pit inner support structure

Also Published As

Publication number Publication date
CN104480944B (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN106761785B (en) A kind of subway tunnel shield originates construction technology
Tan et al. Zoned excavation of an oversized pit close to an existing metro line in stiff clay: Case study
CN104234056B (en) For preventing the liquefy construction method of regional underground pipe gallery distortion of high water level
KR101179770B1 (en) Soil protection against build structure and the method
CN103510520A (en) Sectionalized construction method of deep and large foundation pit
CN104480944B (en) Unearthed ramp structure and construction method thereof
CN102828517B (en) Hierarchical control construction method of foundation pit excavation at entrance and exit of station
CN104947681A (en) Super large super deep basement ground pit construction method
CN104131565A (en) Construction method of using down-top method for excavating earthworks in top-down construction
CN104895121B (en) Transverse partition method for reducing ground surface settlement and building structure deformation of underground structure construction
CN204715366U (en) A kind of large-area deep foundation pit subregion is along the support system under inverse operating mode
CN107313430A (en) The deep big foundation pit subregion construction method of three face Nearby Structures
CN203904971U (en) Reinforcement cage protective device capable of controlling necking, bar leakage and mud inclusion of underground diaphragm wall
CN102691510B (en) Butt section lining structure in shield tunnel
CN103132465A (en) Underground box culvert constructing method closely attached to pile foundation bearing platform
CN111764373A (en) Construction method of underground continuous wall under condition of non-removable underground barrier
CN204456131U (en) A kind of structural floor that utilizes is as the structural system of horizontal support
CN105544620A (en) Damping ditch with pressure relief device and shockproof plates and construction method for damping ditch
CN107299635A (en) A kind of soft soil foundation slope collapse support reinforcement method
CN102943923A (en) Anti-floating box culvert structure for pipelines in soft soil
CN107940102B (en) Underground raw water pipeline protection construction method
CN104047273B (en) Power station dissipation and scouring wall and construction method thereof
CN105544552B (en) The device and method of deep foundation pit reinforced concrete inner support bed die soft soil foundation backing plate
CN212298107U (en) Miniature pile frame type pipeline anti-seismic protection structure
JP2013160029A (en) Tunnel structure and method for constructing the same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170612

Address after: 100024 Beijing City No. 1 North Chaoyang District Dingfuzhuang Luban building

Co-patentee after: CHINA CONSTRUCTION FIRST Group Corp.,Ltd.

Patentee after: CHINA CONSTRUCTION FIRST GROUP THE FIFTH CONSTRUCTION Co.,Ltd.

Co-patentee after: THE FIRST CONSTRUCTION CO., LTD. OF CHINA CONSTRUCTION FIRST Group

Address before: 100024 Beijing City No. 1 North Chaoyang District Dingfuzhuang Luban building

Co-patentee before: CHINA CONSTRUCTION FIRST Group Corp.,Ltd.

Patentee before: CHINA CONSTRUCTION FIRST GROUP THE FIFTH CONSTRUCTION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160406

Termination date: 20191127