CN104477525A - Steel pipe storage rack for construction - Google Patents
Steel pipe storage rack for construction Download PDFInfo
- Publication number
- CN104477525A CN104477525A CN201410726198.1A CN201410726198A CN104477525A CN 104477525 A CN104477525 A CN 104477525A CN 201410726198 A CN201410726198 A CN 201410726198A CN 104477525 A CN104477525 A CN 104477525A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- storage rack
- right support
- left socle
- pipe storage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses a steel pipe storage rack for building construction. The steel pipe storage rack is a rectangular frame and composed of a left support and a right support. Wheels are arranged below the left support and the right support, the left support and the right support are formed by connecting two steel pipe frames perpendicular to the ground by horizontal connecting rods, two groups of parallel support rods are arranged on the left support along the direction perpendicular to the steel pipe frames, two groups of parallel sleeves are arranged on the right support along the direction perpendicular to the steel pipe frames, and the support rods and the sleeves are connected through locking mechanisms. The steel pipe storage rack has the advantages of simple structure, convenience in steel pipe bundling, easy fixing at the preset position, high stability and convenience in use and transport and the like.
Description
Technical field
The present invention relates to a kind of storage rack field, especially a kind of building operation steel pipe storage rack.
Background technology
Along with the continuous expansion of industrial production scale, the demand of steel pipe is increasing, and it is widely used in every field.Steel pipe may be used for the occasions such as underfloor duct, oil, natural fuels, steam heating, power station, sewage treatment plant, thermal powerplant, plumbing.In actual production process, all can relate to depositing of steel pipe.If directly stacked on the ground, easily make moist for a long time and get rusty, have impact on the quality of steel pipe.Steel pipe just simply keeps flat by traditional storage rack, and steel pipe is easily staggered in together, takes inconvenience, is also not easy to tie up.Meanwhile, current storage rack can not adjust the length of storage rack in real time according to the quantity of stacking steel pipe, may cause transport and the inconvenience etc. of stacking.
In view of the defect of above-mentioned technology, be necessary to make improvements design in fact.
Summary of the invention
In order to overcome the defect of above-mentioned prior art, the object of this invention is to provide a kind of building operation steel pipe storage rack.
The present invention takes following technical scheme to realize: a kind of building operation steel pipe storage rack, and this support is rectangular frame, and it is combined by left socle and right support, is provided with roller below described left socle and described right support, described left socle be by perpendicular to ground two steel pipe frames by between horizontal brace rod be formed by connecting, described left socle is provided with two groups of strut bars be parallel to each other perpendicular to described steel pipe frame direction, described right support be by perpendicular to ground two steel pipe frames by between horizontal brace rod be formed by connecting, described right support is provided with two groups of sleeves be parallel to each other perpendicular to described steel pipe frame direction, described sleeve and described strut bar cooperatively interact, be interconnected by catch gear between described strut bar and described sleeve, described catch gear is made up of the spring tongue be arranged on described strut bar and the pin hole be arranged on described sleeve.
Particularly, described strut bar is provided with spacing rib.Described sleeve is provided with spacing rib.Described left socle and right support top are provided with clasp.Described spacing rib is made up of matrix part and the arc sections inwardly offered.
The present invention has following beneficial effect in sum: structure of the present invention is simple, facilitates steel pipe to tie up, is easily fixed on desired location, good stability; Can adjust length of the present invention in real time according to the steel pipe quantity of stacking by the cooperatively interacting of strut bar, sleeve and catch gear arranged, make full use of space efficiency, stability is better; By utilizing the clasp arranged conveniently can push away and puts tying up of steel pipe, can effectively prevent steel pipe in transportation because the factor such as to jolt skids off storage rack; The use of whole device is facilitated to transport by the roller arranged.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is left socle structural representation of the present invention;
Fig. 3 is right support structural representation of the present invention;
Wherein: 1, clasp; 2, spacing rib; 3, left socle; 4, roller; 5, strut bar; 6, catch gear; 601, spring tongue; 602, pin hole; 7, sleeve; 8, right support.
Detailed description of the invention
As shown in Figure 1, a kind of building operation steel pipe storage rack, this support is rectangular frame, and it is combined by left socle 3 and right support 8, is provided with roller 4, facilitates the use of whole device to transport below described left socle 3 and described right support 8; Described left socle 3 be by perpendicular to ground two steel pipe frames by between horizontal brace rod be formed by connecting, described left socle 3 is provided with two groups of strut bars be parallel to each other 5 perpendicular to described steel pipe frame direction, described right support 8 be by perpendicular to ground two steel pipe frames by between horizontal brace rod be formed by connecting, on described right support, 8 are provided with two groups of sleeves be parallel to each other 7 perpendicular to described steel pipe frame direction, described sleeve 7 cooperatively interacts with described strut bar 5, described strut bar 5 is provided with spacing rib 2, described sleeve is provided with spacing rib.
Preferably, be interconnected between described strut bar 5 and described sleeve 7 by catch gear 6, described catch gear 6 is made up of the spring tongue 601 be arranged on described strut bar 5 and the pin hole 602 be arranged on described sleeve 7.By the catch gear 6 arranged, can adjust the length of this device in real time according to the steel pipe stacked, make full use of space efficiency, the stability of steel tube stacking is better.
Preferably, preferably, described left socle 3 is provided with clasp 1 with right support 8 top, utilizes clasp 1 conveniently to push away and puts tying up of steel pipe.
Preferably, described spacing rib is made up of matrix part and the arc sections inwardly offered.
Structure of the present invention is simple, and facilitate steel pipe to tie up, steel pipe is easily fixed on desired location, and good stability not easily skids off storage rack.
The above is the embodiment of the present invention, therefore all equivalences done according to structure, feature and the principle described in the present patent application scope change or modify, and are included in patent claim of the present invention.
Claims (5)
1. a building operation steel pipe storage rack, is characterized in that: this support is rectangular frame, and it is combined by left socle and right support, is provided with roller below described left socle and described right support, described left socle be by perpendicular to ground two steel pipe frames by between horizontal brace rod be formed by connecting, described left socle is provided with two groups of strut bars be parallel to each other perpendicular to described steel pipe frame direction, described right support be by perpendicular to ground two steel pipe frames by between horizontal brace rod be formed by connecting, described right support is provided with two groups of sleeves be parallel to each other perpendicular to described steel pipe frame direction, described sleeve and described strut bar cooperatively interact, be interconnected by catch gear between described strut bar and described sleeve, described catch gear is made up of the spring tongue be arranged on described strut bar and the pin hole be arranged on described sleeve.
2. a kind of building operation steel pipe storage rack according to claim 1, is characterized in that: described strut bar is provided with spacing rib.
3. a kind of building operation steel pipe storage rack according to claim 1, is characterized in that: described strut bar is provided with spacing rib.
4. a kind of building operation steel pipe storage rack according to claim 1, is characterized in that: described left socle and right support top are provided with clasp.
5. a kind of building operation steel pipe storage rack according to Claims 2 or 3, is characterized in that: described spacing rib is made up of matrix part and the arc sections inwardly offered.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410726198.1A CN104477525A (en) | 2014-12-04 | 2014-12-04 | Steel pipe storage rack for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410726198.1A CN104477525A (en) | 2014-12-04 | 2014-12-04 | Steel pipe storage rack for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104477525A true CN104477525A (en) | 2015-04-01 |
Family
ID=52752175
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410726198.1A Pending CN104477525A (en) | 2014-12-04 | 2014-12-04 | Steel pipe storage rack for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104477525A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106829045A (en) * | 2017-04-07 | 2017-06-13 | 中国建筑第二工程局有限公司 | A kind of method that construction site reclaims steel pipe |
CN109573267A (en) * | 2017-09-29 | 2019-04-05 | 远大住宅工业(天津)有限公司 | The whole storage rack of precast concrete wall panel |
-
2014
- 2014-12-04 CN CN201410726198.1A patent/CN104477525A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106829045A (en) * | 2017-04-07 | 2017-06-13 | 中国建筑第二工程局有限公司 | A kind of method that construction site reclaims steel pipe |
CN106829045B (en) * | 2017-04-07 | 2018-10-30 | 中国建筑第二工程局有限公司 | A kind of method of construction site recycling steel pipe |
CN109573267A (en) * | 2017-09-29 | 2019-04-05 | 远大住宅工业(天津)有限公司 | The whole storage rack of precast concrete wall panel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204453369U (en) | A kind of building operation steel pipe storage rack | |
MX2010001997A (en) | Support structure for solar collector. | |
CN202783989U (en) | Binding device of steel pipe | |
CN203701544U (en) | Overturn-preventing scaffold | |
CN104477525A (en) | Steel pipe storage rack for construction | |
CN202206066U (en) | Electric power live crossing frame | |
CN203271140U (en) | Civil engineering pipe fitting shelf | |
CN203528519U (en) | Steel bar conveying pushing frame | |
CN204226851U (en) | Assembly type cable bearer | |
CN202346278U (en) | Moving trolley for gas tanks | |
CN202609307U (en) | Folding tire frame | |
CN103310952A (en) | Supporting device for transformer oil conservator | |
CN203571233U (en) | Large-span X-shaped spatial arch pipeline support | |
CN203255537U (en) | A-shaped glass frame | |
CN202152543U (en) | Exposed column template support combining structure | |
CN205063840U (en) | Whole rig of fortune that moves in ramp | |
CN103662380A (en) | Steel pipe storage rack | |
CN204579282U (en) | Detachable convenient colored case | |
CN205161337U (en) | Warmhouse booth skeleton convenient to dismantle | |
CN203624237U (en) | Roller locating device | |
CN203182419U (en) | Convenient disassembly and assembly flat wooden bench | |
CN104276340A (en) | Copper coil transport stand | |
CN204689004U (en) | For the rail flat car of steel pipe market | |
CN203946490U (en) | Detachable turnover rack | |
CN204007289U (en) | Heat exchanger tube fixture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |