Argon-filled protection sealing welding method for argon arc welding for pipeline Download PDF

Info

Publication number
CN104475933A
CN104475933A CN201410632471.4A CN201410632471A CN104475933A CN 104475933 A CN104475933 A CN 104475933A CN 201410632471 A CN201410632471 A CN 201410632471A CN 104475933 A CN104475933 A CN 104475933A
Authority
CN
China
Prior art keywords
pipeline
argon
polyvinyl alcohol
welding
soluble film
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410632471.4A
Other languages
Chinese (zh)
Inventor
张鸿羽
吴兵
殷存德
张伟良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201410632471.4A priority Critical patent/CN104475933A/en
Publication of CN104475933A publication Critical patent/CN104475933A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/16Arc welding or cutting making use of shielding gas
    • B23K9/167Arc welding or cutting making use of shielding gas and of a non-consumable electrode
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/235Preliminary treatment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/04Tubular or hollow articles
    • B23K2101/10Pipe-lines

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Mechanical Engineering (AREA)
  • Arc Welding In General (AREA)

Abstract

The invention discloses an argon-filled protection sealing welding method for argon arc welding for a pipeline and belongs to the technical field of pipeline welding. The argon-filled protection sealing welding method for the argon arc welding for the pipeline includes that forming a groove at a welded junction of the pipeline to be welded, cleaning the inner sides of the pipeline at two sides of the welded junction, using a brush to uniformly smear hydrosol for fixing water-soluble films at the cleaned inner sides, uniformly bonding the polyvinyl alcohol water-soluble films at the inner sides of the pipeline with the hydrosol, fixing the pipeline to be welded, sealing the outer side of the welded junction through an aluminum foil adhesive tape, inserting an argon-filled pipe from the bottom of the polyvinyl alcohol water-soluble film of one side, forming an exhaust hole in the top of the polyvinyl alcohol water-soluble film at the same side, and welding the welded junction when filling argon to the sealed pipeline region. The argon-filled protection sealing welding method for the argon arc welding for the pipeline is easy to operate, the argon usage amount is saved, the weld joint quality is guaranteed, a procedure of removing a blockage device after constructing is omitted, the welding speed is greatly improved, and the cost is saved.

Description

A kind of pipeline argon arc welding argon-filled protection seal weld method
Technical field
The invention belongs to pipeline welding technical field, specifically a kind of pipeline argon-filled protection Tig Welding method utilizing polyvinyl alcohol water soluble film to make sealing mold.
Background technology
In current industrial special pipeline construction field, argon tungsten-arc welding because its weldquality is high, distortion and stress little and be widely used, its pipe welding port mostly utilizes argon gas as protective gas to carry out welding procedure.During welding, usually take pipe ends blind plate is carried out to shutoff, in pipeline, rushes the construction method of argon gas.But large for caliber, that length is long pipeline, not oxidized in order to ensure the pipe welding seam back side, often adopt long-time jumbo argon filling, increase construction cost, waste the time, and welding quality can not be guaranteed; For some bending more pipeline sections, easily produce dead mouth, cannot argon-filled protection be carried out; And the dismounting of plugging device is also quite wasted time and energy after welding.
Summary of the invention
The present invention is directed to the problems referred to above that prior art exists, a kind of pipeline argon arc welding argon-filled protection seal weld method is provided.
A kind of pipeline argon arc welding argon-filled protection seal weld method concrete steps provided by the present invention are as follows:
(1) groove is first accomplished fluently by the weld bond place of pipeline to be welded, the polyvinyl alcohol water soluble film being greater than described pipe diameter 220mm is cut out according to the diameter of described pipeline, clear up the insides of pipes at 200mm place, described weld bond both sides, guarantee without oil dustless, then with brush, the hydrosol being used for fixing water soluble film is spread upon this place uniformly, the application width of the described hydrosol is 50mm, described polyvinyl alcohol water soluble film is evenly pasted onto the brush coating place of described insides of pipes, and with clean brush, described polyvinyl alcohol water soluble film is fixed.
(2) described pipeline to be welded is fixed, seal with aluminum foil and adhesive tape outside described weld bond, the bottom of argon gas gas tube from polyvinyl alcohol water soluble film described in side is inserted, described in the same side, the top of polyvinyl alcohol water soluble film is provided with steam vent, argon gas is rushed in closed conduit region, detect argon gas inside concentration with apparatus for determination of oxygen, reach the normal weld flow of argon bottle valve regulated to 8-12L/min after requirement purity.
(3) carry out the welding of described weld bond, during welding, described aluminum foil and adhesive tape is torn on side weld limit, has welded rear described pipeline and has carried out water flowing pressure testing, and described polyvinyl alcohol water soluble film understands natural decomposition in water filling after 20 minutes, without the need to removing.
The inventive method is simple to operate, has saved argon gas use amount, ensure that weldquality, eliminates the dismounting operation of the rear plugging device of construction, greatly improves speed of welding, saved cost.
Accompanying drawing explanation
Fig. 1: the inventive method is used for the structural representation of pipeline welding;
A-A direction structure schematic diagram in Fig. 2: Fig. 1.
In figure: 1, pipeline; 2, polyvinyl alcohol water soluble film; 3, argon gas gas tube; 4, steam vent; 5, aluminum foil and adhesive tape.
Detailed description of the invention
The inventive method is applied in the Pipe installing engineering of certain steel plant, and its concrete implementation step is:
(1) groove is first accomplished fluently by the weld bond place of one group of extraordinary pipeline 1 to be welded, the polyvinyl alcohol water soluble film 2 being greater than pipe diameter 220mm is cut out according to the diameter of pipeline 1, the insides of pipes at cleaning 200mm place, weld bond both sides, guarantee without oil dustless, then with brush, the hydrosol of fixing polyvinyl alcohol water soluble film 2 is spread upon this place uniformly, glue application width is 50mm, the polyvinyl alcohol water soluble film 2 cut is attached to brush coating place inside pipeline 1 uniformly, and is fixed by film with clean brush; Because polyvinyl alcohol water soluble film 2 can bear the high temperature of 300 DEG C, after tested during construction the temperature at distance weld bond 200mm place lower than 300 DEG C, therefore temperature when it can bear welding.
(2) pipeline is fixed, with aluminum foil and adhesive tape 5 good seal outside its weld bond; The bottom of argon gas gas tube 3 from one side polyvinyl alcohol water soluble film 2 is inserted, a steam vent 4 is being opened with top on one side, in closed conduit, rush argon gas, detect argon gas inside concentration with apparatus for determination of oxygen, after reaching requirement by argon bottle valve regulated to welding normal discharge (8-12L/min).
(3) butt welding mouth carries out normal welding, and during welding, sealed aluminum foil belt 5 is torn on side weld limit, delayedly should stop argon gas after having welded; weld bond is adequately protected; welded rear pipeline and carried out water flowing pressure testing, polyvinyl alcohol water soluble film 2 understands natural decomposition in water filling after 20 minutes, removes without the need to special messenger.
A kind of pipeline argon arc welding argon-filled protection seal construction method that application the present invention proposes is constructed to certain enterprise's pipeline, has saved six day duration altogether, has often carried and can make a profit the previous day 800,000 yuan, for owner creates good economic benefit.The construction of application the method, makes pipeline welding quality obtain very large lifting, has saved Master Cost, labour cost, period of construction cost etc. about 8.5 ten thousand yuan simultaneously.

Claims (1)

1. a pipeline argon arc welding argon-filled protection seal weld method, is characterized in that the method concrete steps are as follows:
(1) groove is first accomplished fluently by the weld bond place of pipeline to be welded, the polyvinyl alcohol water soluble film being greater than described pipe diameter 220mm is cut out according to the diameter of described pipeline, clear up the insides of pipes at 200mm place, described weld bond both sides, guarantee without oil dustless, then with brush, the hydrosol being used for fixing water soluble film is spread upon this place uniformly, the application width of the described hydrosol is 50mm, described polyvinyl alcohol water soluble film is evenly pasted onto the brush coating place of described insides of pipes, and with clean brush, described polyvinyl alcohol water soluble film is fixed;
(2) described pipeline to be welded is fixed, seal with aluminum foil and adhesive tape outside described weld bond, the bottom of argon gas gas tube from polyvinyl alcohol water soluble film described in side is inserted, described in the same side, the top of polyvinyl alcohol water soluble film is provided with steam vent, argon gas is rushed in closed conduit region, detect argon gas inside concentration with apparatus for determination of oxygen, reach the normal weld flow of argon bottle valve regulated to 8-12L/min after requirement purity;
(3) carry out the welding of described weld bond, during welding, described aluminum foil and adhesive tape is torn on side weld limit, has welded rear described pipeline and has carried out water flowing pressure testing, and described polyvinyl alcohol water soluble film understands natural decomposition in water filling after 20 minutes, without the need to removing.
CN201410632471.4A 2014-11-11 2014-11-11 Argon-filled protection sealing welding method for argon arc welding for pipeline Pending CN104475933A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410632471.4A CN104475933A (en) 2014-11-11 2014-11-11 Argon-filled protection sealing welding method for argon arc welding for pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410632471.4A CN104475933A (en) 2014-11-11 2014-11-11 Argon-filled protection sealing welding method for argon arc welding for pipeline

Publications (1)

Publication Number Publication Date
CN104475933A true CN104475933A (en) 2015-04-01

Family

ID=52750608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410632471.4A Pending CN104475933A (en) 2014-11-11 2014-11-11 Argon-filled protection sealing welding method for argon arc welding for pipeline

Country Status (1)

Country Link
CN (1) CN104475933A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104913128A (en) * 2015-05-26 2015-09-16 中国五冶集团有限公司 Turbine lubrication oil pipeline connecting method
CN105458471A (en) * 2016-01-19 2016-04-06 四川石油天然气建设工程有限责任公司 Pipeline connector welding method
CN108637513A (en) * 2018-05-16 2018-10-12 四川石油天然气建设工程有限责任公司 A kind of welding method of petroleum gas long-distance transmission pipeline
CN108655545A (en) * 2017-03-28 2018-10-16 五冶集团上海有限公司 The water soluble paper touches the application in mouthful argon arc welding in long range industrial pipeline transition joint
CN110695496A (en) * 2019-10-18 2020-01-17 中国电建集团山东电力建设第一工程有限公司 Argon filling method for high alloy steel header pipe seat weld crater and welding method
CN110842332A (en) * 2019-09-27 2020-02-28 天津理工大学 Aluminum-plastic composite air bag for pipeline welding argon filling plugging and preparation method thereof
CN110899912A (en) * 2019-10-29 2020-03-24 沪东中华造船(集团)有限公司 Argon filling method for argon arc welding butt joint of pipelines
CN112792444A (en) * 2020-09-17 2021-05-14 葫芦岛渤船工贸通和防腐有限公司 Method for welding reversing interface of steam pipeline and main engine
CN114952062A (en) * 2022-06-20 2022-08-30 北京卅伯曼科技有限公司 Protective welding method for medical gas pipeline

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3736400A (en) * 1971-08-31 1973-05-29 Gilbreth Co Apparatus for damming pipe ends for welding
JPH05245633A (en) * 1991-03-15 1993-09-24 Mitsubishi Heavy Ind Ltd Shielding gas welding method for pipes
US5390846A (en) * 1993-08-11 1995-02-21 Thode; Jonathan E. Welding gas purging apparatus and method
JPH0910933A (en) * 1995-06-28 1997-01-14 Ishikawajima Harima Heavy Ind Co Ltd Water-soluble paper plug for welding piping
CN102601499A (en) * 2012-03-22 2012-07-25 中国石油天然气第六建设公司 Method for protecting welding of petrochemical stainless steel pipeline by local argon filling
CN103658938A (en) * 2012-09-18 2014-03-26 张明林 Right angle welding process for large-diameter pipeline
CN104128696A (en) * 2014-06-30 2014-11-05 中国化学工程第十四建设有限公司 Titanium pipeline argon arc welding process method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3736400A (en) * 1971-08-31 1973-05-29 Gilbreth Co Apparatus for damming pipe ends for welding
JPH05245633A (en) * 1991-03-15 1993-09-24 Mitsubishi Heavy Ind Ltd Shielding gas welding method for pipes
US5390846A (en) * 1993-08-11 1995-02-21 Thode; Jonathan E. Welding gas purging apparatus and method
JPH0910933A (en) * 1995-06-28 1997-01-14 Ishikawajima Harima Heavy Ind Co Ltd Water-soluble paper plug for welding piping
CN102601499A (en) * 2012-03-22 2012-07-25 中国石油天然气第六建设公司 Method for protecting welding of petrochemical stainless steel pipeline by local argon filling
CN103658938A (en) * 2012-09-18 2014-03-26 张明林 Right angle welding process for large-diameter pipeline
CN104128696A (en) * 2014-06-30 2014-11-05 中国化学工程第十四建设有限公司 Titanium pipeline argon arc welding process method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104913128A (en) * 2015-05-26 2015-09-16 中国五冶集团有限公司 Turbine lubrication oil pipeline connecting method
CN105458471A (en) * 2016-01-19 2016-04-06 四川石油天然气建设工程有限责任公司 Pipeline connector welding method
CN108655545A (en) * 2017-03-28 2018-10-16 五冶集团上海有限公司 The water soluble paper touches the application in mouthful argon arc welding in long range industrial pipeline transition joint
CN108637513A (en) * 2018-05-16 2018-10-12 四川石油天然气建设工程有限责任公司 A kind of welding method of petroleum gas long-distance transmission pipeline
CN110842332A (en) * 2019-09-27 2020-02-28 天津理工大学 Aluminum-plastic composite air bag for pipeline welding argon filling plugging and preparation method thereof
CN110695496A (en) * 2019-10-18 2020-01-17 中国电建集团山东电力建设第一工程有限公司 Argon filling method for high alloy steel header pipe seat weld crater and welding method
CN110899912A (en) * 2019-10-29 2020-03-24 沪东中华造船(集团)有限公司 Argon filling method for argon arc welding butt joint of pipelines
CN112792444A (en) * 2020-09-17 2021-05-14 葫芦岛渤船工贸通和防腐有限公司 Method for welding reversing interface of steam pipeline and main engine
CN114952062A (en) * 2022-06-20 2022-08-30 北京卅伯曼科技有限公司 Protective welding method for medical gas pipeline

Similar Documents

Publication Publication Date Title
CN104475933A (en) Argon-filled protection sealing welding method for argon arc welding for pipeline
CN201815806U (en) Local argon gas filling device in large- and medium-sized pipelines
CN202001772U (en) Air bag for inner plugging for leakage of pipeline
CN201728481U (en) Local argon charging device in medium and small-sized pipelines
CN108406060A (en) The stainless tube welding method of back side argon-filled protection
CN101701653A (en) Connecting method for line plastic-steel tube
CN208147110U (en) The stainless steel pipes welder of back side argon-filled protection
CN103357998B (en) Dual-metal clad steel pipe welding method
CN201289423Y (en) Leak detection structure for composite board equipment
CN203649620U (en) Argon arc welding connecting pipe
CN203171132U (en) Large-diameter pipeline welding back gas protective cover
CN207094059U (en) A kind of threeway closure plate weld leakage is met an urgent need tape-pressure leakage clogging device
CN203413252U (en) Device for connecting inner and outer anticorrosive steel plastic composite pipes
CN203979895U (en) Testing device for pipeline plugging effect under pressure
CN204373245U (en) A kind of solar water heater pressure-bearing enamel inner container heat exchanger
CN206001188U (en) A kind of closing device for protective conduit clean cavity degree
CN105436041A (en) Steel-pipe internal-coating glass fiber reinforced plastic mouth-repairing apparatus
CN108131506A (en) The construction method that a kind of steel pipe is connect with FRP sand tube
CN206875017U (en) A kind of emergent closure shunting device of petroleum pipeline
CN201799763U (en) Split type stainless steel pipeline welding back filled argon protection device
CN203579028U (en) Multipurpose pulse argon protection device
CN208107390U (en) A kind of spigot-and-socket steel pipe sealing structure
CN204934908U (en) A kind of pipeline band water welded airbag
CN106197861B (en) A kind of composite metal plate leak detection attachment device
CN220102448U (en) Winding pipe butt joint device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication