CN104468515B CN201410604802.3A CN201410604802A CN104468515B CN 104468515 B CN104468515 B CN 104468515B CN 201410604802 A CN201410604802 A CN 201410604802A CN 104468515 B CN104468515 B CN 104468515B
Authority
CN
China
Prior art keywords
data
router
result
route distinguisher
result data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410604802.3A
Other languages
Chinese (zh)
Other versions
CN104468515A (en
Inventor
汪晋宽
薄志谦
徐大青
王林
韩英华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xuji Group Co Ltd
State Grid Hubei Electric Power Co Ltd
Xuchang XJ Software Technology Co Ltd
Northeastern University Qinhuangdao Branch
Original Assignee
State Grid Corp of China SGCC
Xuji Group Co Ltd
State Grid Hubei Electric Power Co Ltd
Xuchang XJ Software Technology Co Ltd
Northeastern University Qinhuangdao Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xuji Group Co Ltd, State Grid Hubei Electric Power Co Ltd, Xuchang XJ Software Technology Co Ltd, Northeastern University Qinhuangdao Branch filed Critical State Grid Corp of China SGCC
Priority to CN201410604802.3A priority Critical patent/CN104468515B/en
Publication of CN104468515A publication Critical patent/CN104468515A/en
Application granted granted Critical
Publication of CN104468515B publication Critical patent/CN104468515B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L47/00Traffic control in data switching networks
    • H04L47/50Queue scheduling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Power Engineering (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses a kind of intelligent transformer substation communication method and system based on information centre's network, methods described includes:S1, upstream router A sends data access message to customer end A, and the heading includes data access request and unique Route Distinguisher, and unique Route Distinguisher is the information name comprising authorization attribute;S2, upstream router A forwards data access message to substation data source, data source returning result message is to the router in substation data transmission network, and the header of the result message includes the data access request of response, is supplied to the result data and unique Route Distinguisher of customer end A;S3, detects the authorization attribute of unique Route Distinguisher, if authorization attribute is mandate or delegable, and router has caching function, then router is stored to result data, and forwards result data to customer end A.The present invention can reduce redundant data, improve network resource utilization and electric power data efficiency of transmission.

Description

A kind of intelligent transformer substation communication method and system based on information centre's network
Technical field
The present invention relates to a kind of intelligent transformer substation communication method and system based on information centre's network, belong to intelligent power transformation Stand network communication field.
Background technology
The construction of intelligent grid comprising the sending out of power system, it is defeated, become, match somebody with somebody, with and six links of scheduling, each link can produce Raw mass data.Power communication and transmission network covering every field, are presented the development trend of ubiquitous interconnection, ubiquitous data Network carrying production management, weather information, office information system and scientific research etc. are applied.With technology of Internet of things and cloud computing technology In the extensive use of power industry, future electrical energy data network will cover plant stands at different levels, control centre, power supply unit, electric power business The Room, electric charging station, electric intelligent cell etc..
In transformer substation system, to meet to equipment condition monitoring, fault detection and location, harmonic detecting and the quality of power supply The demand such as administer, transformer station is mounted with that a large amount of species are various, standard differs, poor compatibility and a series of costly of maintenance upgrade Equipment.These equipment have real time data amount less, requirement of real-time is not high, rely on magnanimity historical information, analysis amount of calculation is huge Big the characteristics of.With carrying forward vigorously for intelligent substation and gradually forming for electric power big data environment, intelligent substation systems at different levels The data of system are exponentially increased sharply, it is necessary to which the data to transformer station PB grades carry out unified monitoring, analysis and fault diagnosis processing.Adopt The data dissemination techniques of collection are all located at application layer, there is mass of redundancy data transmission, and network resource utilization is not high.Also, it is existing Some intelligent transformer substation information communication constructions are based on conventional TCP/IP architecture, in the side such as flexibility, fault-tolerance, high efficiency The competitive relation that face is present between certain defect, network internal agreement causes the IP layers of serious lifting for hindering network performance, Hinder the development of the new opplications such as power network mobile access point, distributed information processing and Streaming Media.
The content of the invention
It is an object of the present invention to provide a kind of intelligent transformer substation communication method and system based on information centre's network, Redundant data can be reduced, network resource utilization and electric power data efficiency of transmission is improved.
In order to solve the above technical problems, the present invention is adopted the following technical scheme that:
A kind of intelligent transformer substation communication method based on information centre's network, comprises the following steps:
S1, upstream router A sends data access message to customer end A, and the heading of the data access message includes Data access request and unique Route Distinguisher, unique Route Distinguisher are the information name comprising authorization attribute;
S2, upstream router A forward data access message to substation data source, and data source returning result message is arrived Router in substation data transmission network, the header of the result message includes the data access request of response, is supplied to The result data of customer end A and unique Route Distinguisher;
S3, detects the authorization attribute of unique Route Distinguisher, if authorization attribute is mandate or delegable, and router With caching function, then router is stored to result data, and forwards result data to customer end A;
S4, the access message of customer end B upstream result data described in router B forwarding steps S3;
S5, detects the whether forwarded over result datas of upstream router B, if forwarded over, just detection upstream router B Whether the result data, if so, then directly the result data is forwarded to customer end B by upstream router B, if not having if being stored with Have, then detect whether other routers are stored with the result data on forward-path according to distance, from closest The result data is obtained in router, and is transmitted to customer end B;If without forwarded over, going to step S6;
S6, the detection upstream router B whether forwarded over result data of upstream router, repeat step S5, until Untill the router for finding the result data that is stored with.
In the foregoing intelligent transformer substation communication method based on information centre's network, the authorization attribute also includes not awarding Power;The high data of level of security, the authorization attribute of its unique Route Distinguisher is mandate;Level of security is general and reaches threshold value Data, the authorization attribute of its unique Route Distinguisher is delegable;The low data of level of security, its unique Route Distinguisher Authorization attribute is unauthorized.
In the foregoing intelligent transformer substation communication method based on information centre's network, according to ieee standard " IEEE Standard 2030Guide for Smart Grid Interoperability of Energy Technology and Information Technology operation with the Electric Power System(EPS)and End- Data level and Forwarding Delay requirement are determined the level of security of data in Use Applications and Loads " Justice.
In the foregoing intelligent transformer substation communication method based on information centre's network, if the mandate category of unique Route Distinguisher Property is delegable, then the result data can be stored as content/service end by receiving the client of the result data.
In the foregoing intelligent transformer substation communication method based on information centre's network, described information name is also comprising forwarding category Property, if content/service end storage data forwarding attribute for allow forwarding, allow from content/service end forward data to In being needed in other clients in substation data transmission network, i.e. content/service end responsivesubstation data transmission network The data access message of other clients of the data stored in appearance/service end.
In the foregoing intelligent transformer substation communication method based on information centre's network, the threshold value is united according to a certain unit The number of times of the accessed request of data and the number for the client for initiating data access request are set in timing.
A kind of intelligent substation communication system based on information centre's network for realizing preceding method, including:
Request module one, for customer end A, upstream router A sends data access message, the data access message Heading include data access request and unique Route Distinguisher, unique Route Distinguisher be the letter comprising authorization attribute Cease name;
Module is returned, data access message is forwarded to substation data source, the return of data source for upstream router A As a result message is to the router in substation data transmission network, and the data access that the header of the result message includes responding please Seek, be supplied to the result data and unique Route Distinguisher of customer end A;
Unloading module, the authorization attribute for detecting unique Route Distinguisher, if authorization attribute is awarded to authorize or entrusting Power, and router has caching function, then router is stored to result data, and forwards result data to customer end A;
Request module two, the data access message for the customer end B upstream router B transmissions result data;
Forwarding module one is detected, for detecting the whether forwarded over result datas of upstream router B, if forwarded over, Just whether detection upstream router B is stored with the result data, if so, then directly forwarding the result by upstream router B Data are to customer end B, if not having, and detect whether other routers are stored with the result on forward-path according to distance Data, obtain the result data, and be transmitted to customer end B from closest router;If without forwarded over, just turned To detection forwarding module two;
Detection forwarding module two, the whether forwarded over result data of upstream router for detecting upstream router B, Detection forwarding module one is gone to, untill the router for the result data that is stored with is found.
The foregoing intelligent substation communication system based on information centre's network also includes memory module, for when unique When the authorization attribute of Route Distinguisher is delegable, receiving the client of the result data can deposit as content/service end Store up the result data.
The foregoing intelligent substation communication system based on information centre's network also includes allowing forwarding module, for described Information name also includes forwarding attribute, when the forwarding attribute for the data that content/service end is stored is allows forwarding, it is allowed to from interior Appearance/service end forwards data to other clients in substation data transmission network, i.e. content/service end responsivesubstation number According to the data access message of other clients of the data for needing to store on content/service end in transmission network.
Compared with prior art, for intelligent grid the characteristics of, the present invention sets up a kind of based on information centre's network architecture Intelligent substation communication system, the name based on content route and forwarded through generating, transmission of electricity, power transformation, distribution, electricity consumption With scheduling links data, specifically with advantages below:
1st, the authorization attribute of unique Route Distinguisher is set according to the level of security and threshold value of data, by authorization attribute come Determine whether forwarding data can be by client or router duplications, therefore security is good, safe granularity can be coarse to fine;
2nd, when having loss of data or destruction, data recovery request can be initiated, the router for having the data can be responded Request, is conducive to data recovery when loss of data or destruction;
3rd, client is obtained after data, allows client to store the data according to authorization attribute and forwarding attribute, and can make It is other clients providing data services for content/service end.
To sum up, the present invention can realize shared resources and utilization to real-time and non-real-time information stream, be adapted to future The requirements for access of intelligent grid magnanimity information, the challenge that reply electric power big data is brought can be beneficial to information centre's network separation meter Calculate, storage, communication, contact using with information, centered on information, redundant data is few, while using in router increased Data buffer storage improves data transmission efficiency, using being named to content and route based on content name is fundamentally carried The network capacity of high intelligent substation, supports comprehensive, lean failure monitoring and OA operation analysis, so as to promote intelligence The fast development of transformer station gives full play to the economic value of data to tackle gradually forming for future electrical energy big data environment.
Brief description of the drawings
Fig. 1 is the method flow diagram of the embodiment of the present invention 1;
Fig. 2 is the method flow diagram of the embodiment of the present invention 2;
Fig. 3 is the method flow diagram of the embodiment of the present invention 3;
Fig. 4 is the method flow diagram of the embodiment of the present invention 4;
Fig. 5 is the system structure diagram of the present invention;
Fig. 6 is the communication construction figure of the present invention.
Reference:1- request modules one, 2- returns to module, 3- unloading modules, 4- request modules two, 5- detection forwarding moulds Block one, 6- detection forwarding modules two, 7- memory modules, 8- allows forwarding module.
The present invention is further illustrated with reference to the accompanying drawings and detailed description.
Embodiment
Embodiments of the invention 1:A kind of intelligent transformer substation communication method based on information centre's network, as shown in figure 1, bag Include following steps:
S1, upstream router A sends data access message to customer end A, and the heading of the data access message includes Data access request and unique Route Distinguisher, unique Route Distinguisher are the information name comprising authorization attribute.
Wherein, the authorization attribute includes mandate, delegable and unauthorized;The high data of level of security, its is unique The authorization attribute of Route Distinguisher is mandate;Level of security is general and reaches the data of threshold value, the mandate of its unique Route Distinguisher Attribute is delegable;The low data of level of security, the authorization attribute of its unique Route Distinguisher is unauthorized.
The level of security of the data is according to ieee standard " IEEE Standard 2030Guide for Smart Grid Interoperability of Energy Technology and Information Technology operation with the Electric Power System(EPS)and End-Use Applications and Data level and Forwarding Delay requirement are defined in Loads ".
The threshold value is the number of times and initiation data access according to the accessed request of data in a certain unit timing statisticses What the number of the client of request was set.
S2, upstream router A forward data access message to substation data source, and data source returning result message is arrived Router in substation data transmission network, the header of the result message includes the data access request of response, is supplied to The result data of customer end A and unique Route Distinguisher.
S3, detects the authorization attribute of unique Route Distinguisher, if authorization attribute is mandate or delegable, and router With caching function, then router is stored to result data, and forwards result data to customer end A.
Embodiments of the invention 2:A kind of intelligent transformer substation communication method based on information centre's network, as shown in Fig. 2 bag Include following steps:
S1, customer end B sends the access message of result data described in embodiment 1 to its upstream router B;
S2, detects the whether forwarded over result datas of upstream router B, if forwarded over, just detection upstream router B Whether the result data, if so, then directly the result data is forwarded to customer end B by upstream router B, if not having if being stored with Have, then whether be stored with the result data according to other routers on distance detection forward-path from the close-by examples to those far off, from distance The result data is obtained in nearest router, and is transmitted to customer end B;If without forwarded over, going to step S3;
S3, the detection upstream router B whether forwarded over result data of upstream router, repeat step S2, until Untill the router for finding the result data that is stored with.
Embodiments of the invention 3:A kind of intelligent transformer substation communication method based on information centre's network, as shown in figure 3, bag Include following steps:
S1, upstream router A sends data access message to customer end A, and the heading of the data access message includes Data access request and unique Route Distinguisher, unique Route Distinguisher are the information comprising authorization attribute and forwarding attribute Name.
Wherein, the authorization attribute also includes mandate, delegable and unauthorized;The high data of level of security, its is unique Route Distinguisher authorization attribute for authorize;Level of security is general and reach the data of threshold value, and its unique Route Distinguisher is awarded Attributes is delegable;The low data of level of security, the authorization attribute of its unique Route Distinguisher is unauthorized.
The level of security of the data is according to ieee standard " IEEE Standard 2030Guide for Smart Grid Interoperability of Energy Technology and Information Technology operation with the Electric Power System(EPS)and End-Use Applications and Data level and Forwarding Delay requirement are defined in Loads ".
The threshold value is the number of times and initiation data access according to the accessed request of data in a certain unit timing statisticses What the number of the client of request was set.
S2, upstream router A forward data access message to substation data source, and data source returning result message is arrived Router in substation data transmission network, the header of the result message includes the data access request of response, is supplied to The result data of customer end A and unique Route Distinguisher.
S3, detects the authorization attribute of unique Route Distinguisher, if authorization attribute is mandate or delegable, and router With caching function, then router is stored to result data, and forwards result data to customer end A.
S4, customer end A detects the authorization attribute and forwarding attribute of unique Route Distinguisher, when authorization attribute is delegable When, customer end A can store the result data as content/service end;And during when forwarding attribute to allow to forward, it is allowed to Data are forwarded to respond change to other clients in substation data transmission network, i.e. content/service end from content/service end The data access message of other clients of the data of content/service end storage is needed in power station data transmission network.
Embodiments of the invention 4:A kind of intelligent transformer substation communication method based on information centre's network, as shown in figure 4, bag Include following steps:
S1, customer end B sends the access message of result data described in embodiment 3, the access to its upstream router B The heading of message includes data access request and unique Route Distinguisher, and unique Route Distinguisher is to include authorization attribute Information name.
Wherein, the authorization attribute includes mandate, delegable and unauthorized;The high data of level of security, its is unique The authorization attribute of Route Distinguisher is mandate;Level of security is general and reaches the data of threshold value, the mandate of its unique Route Distinguisher Attribute is delegable;The low data of level of security, the authorization attribute of its unique Route Distinguisher is unauthorized.
The level of security of the data is according to ieee standard " IEEE Standard 2030Guide for Smart Grid Interoperability of Energy Technology and Information Technology operation with the Electric Power System(EPS)and End-Use Applications and Data level and Forwarding Delay requirement are defined in Loads ".
The threshold value is the number of times and initiation data access according to the accessed request of data in a certain unit timing statisticses What the number of the client of request was set.
S2, detects the whether forwarded over result datas of upstream router B, if forwarded over, just detection upstream router B Whether the result data, if so, then directly the result data is forwarded to customer end B by upstream router B, if not having if being stored with Have, then whether be stored with the result data according to other routers on distance detection forward-path from the close-by examples to those far off, from distance The result data is obtained in nearest router, and is transmitted to customer end B;If without forwarded over, going to step S3.
S3, the detection upstream router B whether forwarded over result data of upstream router, repeat step S2, until Untill the router for finding the result data that is stored with.
S4, customer end B detects the authorization attribute and forwarding attribute of unique Route Distinguisher, when authorization attribute is delegable When, customer end B can store the result data as content/service end;And during when forwarding attribute to allow to forward, it is allowed to Data are forwarded to respond change to other clients in substation data transmission network, i.e. content/service end from content/service end The data access message of other clients of the data of content/service end storage is needed in power station data transmission network.
Embodiment 1 and 3 is to be directed to some data in substation data transmission network to access first, and embodiment 2 It is for the data that had accessed in a network with 4.
In embodiment 1~4, reach that threshold value can be using following methods definition:Timing statisticses are set to one week, in statistics In, the requested number of times k of statistics content, and initiate the client of access request quantity M (different client, Repeatedly request is not included same client), the two exceedes setting value, that is, reaches threshold value.
Embodiments of the invention 5:A kind of intelligence change based on information centre's network for realizing the methods described of embodiment 1~4 Power station communication system, as shown in figure 5, including:
Request module 1, for customer end A, upstream router A sends data access message, the data access message Heading include data access request and unique Route Distinguisher, unique Route Distinguisher be the letter comprising authorization attribute Cease name;
Module 2 is returned to, for upstream router A forwarding data access messages to substation data source, data source is returned Result message is returned to the router in substation data transmission network, the header of the result message includes the data access of response Ask, be supplied to the result data and unique Route Distinguisher of customer end A;
Unloading module 3, the authorization attribute for detecting unique Route Distinguisher, if authorization attribute is awarded to authorize or entrusting Power, and router has caching function, then router is stored to result data, and forwards result data to customer end A;
Request module 24, the data access message for the customer end B upstream router B transmissions result data;
Forwarding module 1 is detected, for detecting the whether forwarded over result datas of upstream router B, if forwarded over, Just whether detection upstream router B is stored with the result data, if so, then directly forwarding the result by upstream router B Data are to customer end B, if not having, and detect whether other routers are stored with the result on forward-path according to distance Data, obtain the result data, and be transmitted to customer end B from closest router;If without forwarded over, just turned To detection forwarding module 26;
Detect forwarding module 26, the whether forwarded over number of results of upstream router for detecting upstream router B According to, go to detection forwarding module 1, untill the router for the result data that is stored with is found.
System also includes memory module 7, for when the authorization attribute of unique Route Distinguisher is delegable, receiving institute The result data can be stored as content/service end by stating the client of result data.
System also includes allowing forwarding module 8, forwarding attribute is also included for described information name, when content/service end When the forwarding attribute of the data of storage is allows to forward, it is allowed to forward data to substation data transmission network from content/service end Need what is stored on content/service end in other clients in network, i.e. content/service end responsivesubstation data transmission network The data access message of other clients of data.
Embodiments of the invention 6:A kind of intelligence change based on information centre's network for realizing the methods described of embodiment 1~4 Power station communication system, as shown in fig. 6, including information gathering layer, the substation data transmission network based on information centre's network and Intelligent substation application layer;The real time data that information gathering layer collection intelligent substation is produced in the process of running, based on information The substation data transmission network of central site network includes client, content/service end, router and traditional routing with caching Device;A large amount of real time datas and intelligence that transmission network transmission intelligent substation based on information centre's network is produced in the process of running Can transformer station's accumulative historical data in the process of running, and by these data are according to the frequent degree used and authorize feelings Condition is respectively used to be scheduled intelligent substation management, monitoring and other application clothes in the router storage with caching Business, provides data, such as information gathering layer includes relay protection setting and fault location for the various application in substations of application layer, Harmonic wave and the quality of power supply, malfunction monitoring diagnosis and monitoring of equipment and wind light generation prediction and operation management etc..
Router is received after the data access message of customer end B, and this message is transmitted to content/service end J by the route, J utilizes the demand of result message response customer end B.After data needed for customer end B is received, if the authorization attribute of the data is committee Support is authorized, then upstream router registration shows oneself there are the data to customer end B, after succeeding in registration, and customer end B can be as depositing There is the content/service end of the data;And when forwarding attribute to allow during forwarding, customer end B can need the number in response to network According to other clients demand.
Intelligent substation based on information centre's network will be provided by publish/subscribe normal form storage and multi-party communication, Data forwarding etc. is serviced.For news release-subscription, publisher completes to authorize registration first with clear and definite name, in name Indicate that permission delegable is registered and forwarded.Name mainly includes publisher's mark and characteristic, and publisher's identification division is content The unique mark that can be recognized with service, characteristic part is the section name specified by publisher, for description content and service.Client End C and E completes commission and is registered as subscriber, by content name come fetched evidence, and content/service end L sends message, route Device receives and replicates and forward after the message.

Claims (7)

1. a kind of intelligent transformer substation communication method based on information centre's network, it is characterised in that comprise the following steps:
S1, upstream router A sends data access message to customer end A, and the heading of the data access message includes data Access request and unique Route Distinguisher, unique Route Distinguisher are the information name comprising authorization attribute;
S2, upstream router A forward data access message to substation data source, data source returning result message to power transformation The router stood in data transmission network, the header of the result message includes the data access request of response, is supplied to client Hold A result data and unique Route Distinguisher;
S3, detects the authorization attribute of unique Route Distinguisher, if authorization attribute has for mandate or delegable, and router Caching function, then router is stored to result data, and forwards result data to customer end A;Wherein, level of security is high Data, the authorization attribute of its unique Route Distinguisher is mandate;Level of security is general and reaches the data of threshold value, its unique road It is delegable by the authorization attribute identified;The threshold value is time according to the accessed request of data in a certain unit timing statisticses What the number of the client of number and initiation data access request was set;
S4, the access message of customer end B upstream result data described in router B forwarding steps S3;
S5, detects the whether forwarded over result datas of upstream router B, if forwarded over, and just whether detection upstream router B Be stored with the result data, if so, the result data is directly then forwarded to customer end B by upstream router B, if not having, Then detect whether other routers are stored with the result data on forward-path according to distance, from closest route The result data is obtained in device, and is transmitted to customer end B;If without forwarded over, going to step S6;
S6, the detection upstream router B whether forwarded over result data of upstream router, repeat step S5, until finding It is stored with untill the router of the result data.
2. the intelligent transformer substation communication method according to claim 1 based on information centre's network, it is characterised in that:It is described Authorization attribute also includes unauthorized;The low data of level of security, the authorization attribute of its unique Route Distinguisher is unauthorized.
3. the intelligent transformer substation communication method according to claim 1 or 2 based on information centre's network, it is characterised in that: If the authorization attribute of unique Route Distinguisher is delegable, the client for receiving the result data can be as content/clothes End is engaged in store the result data.
4. the intelligent transformer substation communication method according to claim 3 based on information centre's network, it is characterised in that:It is described Information name also includes forwarding attribute, if the forwarding attribute of the data of content/service end storage allows from interior to allow forwarding Appearance/service end forwards data to other clients in substation data transmission network.
5. a kind of intelligent substation communication based on information centre's network for realizing Claims 1 to 4 any one methods described System, it is characterised in that including:
Request module one (1), for customer end A, upstream router A sends data access message, the data access message Heading includes data access request and unique Route Distinguisher, and unique Route Distinguisher is the information comprising authorization attribute Name;
Module (2) is returned, data access message is forwarded to substation data source, the return of data source for upstream router A As a result message is to the router in substation data transmission network, and the data access that the header of the result message includes responding please Seek, be supplied to the result data and unique Route Distinguisher of customer end A;
Unloading module (3), the authorization attribute for detecting unique Route Distinguisher, if authorization attribute is awarded to authorize or entrusting Power, and router has caching function, then router is stored to result data, and forwards result data to customer end A;Its In, the high data of level of security, the authorization attribute of its unique Route Distinguisher is mandate;Level of security is general and reaches threshold value Data, the authorization attribute of its unique Route Distinguisher is delegable;The threshold value is according to number in a certain unit timing statisticses According to accessed request number of times and initiate data access request client number set;
Request module two (4), the data access message for the customer end B upstream router B transmissions result data;
Forwarding module one (5) is detected, for detecting the whether forwarded over result datas of upstream router B, if forwarded over, just Whether detection upstream router B is stored with the result data, if so, then directly forwarding the number of results by upstream router B According to customer end B, if not having, detect whether other routers are stored with the number of results on forward-path according to distance According to obtaining the result data from closest router, and be transmitted to customer end B;If without forwarded over, gone to Detect forwarding module two (6);
Detection forwarding module two (6), the whether forwarded over result data of upstream router for detecting upstream router B, Detection forwarding module one (5) is gone to, untill the router for the result data that is stored with is found.
6. the intelligent substation communication system according to claim 5 based on information centre's network, it is characterised in that:Also wrap Memory module (7) is included, for when the authorization attribute of unique Route Distinguisher is delegable, receiving the visitor of the result data Family end can store the result data as content/service end.
7. the intelligent substation communication system according to claim 6 based on information centre's network, it is characterised in that:Also wrap Permission forwarding module (8) is included, forwarding attribute is also included for described information name, when turning for the data that content/service end is stored When hair attribute is allows to forward, it is allowed to forward data to other clients in substation data transmission network from content/service end End, i.e., need other clients of data stored on content/service end in content/service end responsivesubstation data transmission network The data access message at end.
CN201410604802.3A 2014-10-31 2014-10-31 A kind of intelligent transformer substation communication method and system based on information centre's network Expired - Fee Related CN104468515B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410604802.3A CN104468515B (en) 2014-10-31 2014-10-31 A kind of intelligent transformer substation communication method and system based on information centre's network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410604802.3A CN104468515B (en) 2014-10-31 2014-10-31 A kind of intelligent transformer substation communication method and system based on information centre's network

Publications (2)

Publication Number Publication Date
CN104468515A CN104468515A (en) 2015-03-25
CN104468515B true CN104468515B (en) 2017-10-24

Family

ID=52913887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410604802.3A Expired - Fee Related CN104468515B (en) 2014-10-31 2014-10-31 A kind of intelligent transformer substation communication method and system based on information centre's network

Country Status (1)

Country Link
CN (1) CN104468515B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106211136B (en) * 2016-08-31 2021-07-13 上海交通大学 Naming-based secure communication method in smart power grid

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2562978A1 (en) * 2011-08-12 2013-02-27 Alcatel Lucent Content router of a content centric network
CN103581019A (en) * 2013-10-10 2014-02-12 北京交通大学 Information center network mobility management method based on content popularity
CN103927318A (en) * 2013-11-07 2014-07-16 广西电网公司电力科学研究院 Intelligent power utilization interaction system and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2562978A1 (en) * 2011-08-12 2013-02-27 Alcatel Lucent Content router of a content centric network
CN103581019A (en) * 2013-10-10 2014-02-12 北京交通大学 Information center network mobility management method based on content popularity
CN103927318A (en) * 2013-11-07 2014-07-16 广西电网公司电力科学研究院 Intelligent power utilization interaction system and method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
A Survey of Naming and Routing in Information-Centric Networks;MF Bari等;《IEEE Communications Magazine》;20121231;全文 *
IEEE Guide for Smart Grid Interoperability of Energy Technology and Information Technology Operation with the Electric Power System (EPS),End-Use Applications, and Loads;C Committee等;《IEEE standards》;20111231;全文 *
张国强等.信息中心网络中的内置缓存技术研究.《软件学报》.2013,全文. *

Also Published As

Publication number Publication date
CN104468515A (en) 2015-03-25

Similar Documents

Publication Publication Date Title
Zhang et al. Digital twin empowered content caching in social-aware vehicular edge networks
Adekanbi Optimization and digitization of wind farms using internet of things: A review
Ren et al. Blockchain-based VEC network trust management: A DRL algorithm for vehicular service offloading and migration
Shapsough et al. Using IoT and smart monitoring devices to optimize the efficiency of large-scale distributed solar farms
Dong et al. NOMA-based energy-efficient task scheduling in vehicular edge computing networks: A self-imitation learning-based approach
WO2022127234A1 (en) Cloud platform-based network comprehensive monitoring method and system
CN112398946A (en) Source network load storage scheduling control system and configuration method
CN104966330A (en) Remote machine room intelligent inspection system based on cloud computer
CN113703969A (en) Power distribution Internet of things system capable of achieving multi-source data processing based on edge computing
JP6779800B2 (en) Distributed control system, distributed control method, distributed control system of power system and control method of power resources
CN113078675B (en) Self-organizing communication method and device for distributed adjustable resource clusters in power distribution station
CN113515514A (en) Multi-level edge computing system architecture based on cloud edge cooperation and implementation method thereof
CN103501345B (en) A kind of control method of remote centralized control system
Mi et al. Software-defined green 5G system for big data
CN112098718A (en) Power management system based on Internet of things and block chain
Wang et al. Review on offloading of vehicle edge computing
CN110717664A (en) CPS production system for service-oriented production process based on mobile edge calculation
CN107708086B (en) Mobile energy supplement method for wireless sensor and actuator network
CN107071056A (en) A kind of distributed energy internet information front end safety communicating method
CN204302779U (en) The Internet of Things comprehensive monitoring system of switching station
Liu Research on the development of intelligent logistics based on 5g technology
CN104468515B (en) A kind of intelligent transformer substation communication method and system based on information centre's network
CN104360665A (en) Internet of Things comprehensive monitoring system for switching station
CN110099116B (en) Big data-based subnet security evaluation method
CN116366692A (en) High-performance intelligent edge terminal system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20161011

Address after: No. 1298 Xuchang City, Henan province 461000 XJ Avenue

Applicant after: Xuji Group Co., Ltd.

Applicant after: Northeastern University Qinhuangdao Branch

Applicant after: Xuchang Xuji Software Technology Co., Ltd.

Applicant after: State Grid Corporation of China

Applicant after: STATE GRID HUBEI ELECTRIC POWER COMPANY

Address before: 066004 Qinhuangdao economic and Technological Development Zone, Hebei, No. 143 Taishan Road

Applicant before: Northeastern University Qinhuangdao Branch

Applicant before: Xuji Group Co., Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171024

Termination date: 20201031

CF01 Termination of patent right due to non-payment of annual fee