CN104467190A - Intelligent processing method capable of protecting operation report of two ends of circuit in online management system - Google Patents

Intelligent processing method capable of protecting operation report of two ends of circuit in online management system Download PDF

Info

Publication number
CN104467190A
CN104467190A CN201410826686.XA CN201410826686A CN104467190A CN 104467190 A CN104467190 A CN 104467190A CN 201410826686 A CN201410826686 A CN 201410826686A CN 104467190 A CN104467190 A CN 104467190A
Authority
CN
China
Prior art keywords
report
main website
end action
information
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410826686.XA
Other languages
Chinese (zh)
Other versions
CN104467190B (en
Inventor
钱海
邱金辉
贾松江
姜健琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ZEXIN ELECTRIC POWER TECHNOLOGY Co Ltd
LIAONING ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Original Assignee
SHANGHAI ZEXIN ELECTRIC POWER TECHNOLOGY Co Ltd
LIAONING ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ZEXIN ELECTRIC POWER TECHNOLOGY Co Ltd, LIAONING ELECTRIC POWER Co Ltd, State Grid Corp of China SGCC filed Critical SHANGHAI ZEXIN ELECTRIC POWER TECHNOLOGY Co Ltd
Priority to CN201410826686.XA priority Critical patent/CN104467190B/en
Publication of CN104467190A publication Critical patent/CN104467190A/en
Application granted granted Critical
Publication of CN104467190B publication Critical patent/CN104467190B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to an intelligent processing method capable of protecting the operation report of the two ends of a circuit in an online management system. The online management system comprises a main station and multiple substations. The method comprises the steps that the substations send a message to the main station; the main station judges whether the message is relevant to the circuit; if the message is relevant to the circuit, the main station judges whether the message is a line fault event in a power grid and generates the two-end operation report if yes, and the process is ended if not; if the message is irrelevant to the circuit, the main station processes the message. By the adoption of the method, fault messages generated by relevant protective recorder devices in transformer substations at the two ends of a fault line can be automatically converted into a complete two-end operation report more accurately and reliably after the power grid line fails.

Description

The intelligent processing method of line double-end action report in protection online management system
Technical field
The present invention relates to electrical network field, particularly relate to electric grid secondary equipment monitor and management, specifically refer to a kind of intelligent processing method protecting line double-end action report in online management system.
Background technology
The requirement of State Grid Corporation of China to power network schedule automation level is in recent years more and more higher, and relay protection information is collected online and is also able to fast development with monitoring thereupon.Relaying protection online management system mainly based on protective relaying device action behavior information concentrated collection during electric network fault, teletransmission and finish message, analysis, is made up of substation and main website two parts.Collection and the teletransmission of information are responsible in substation, and main website is responsible for the unified of information and arranges and analyze, for professional's judge and process power grid accident provide decision support.
Protection information on-line operation and management system are based on the collection of protection information, arrangement and analyze, and can see accurate, complete action report fast after user expects electric network fault most at main website end.Because prior art is too desirable for secondary device action report method for sorting after fault, cause often occurring information leak return, mistake returns and the problem such as maintainability difference, expected result cannot be obtained in actual applications, be mainly manifested in the following aspects:
1, protect crucial trip event by manual sort, workload is large, not easy care;
Artificially event information is classified; a protective device is by 100 case points; a transformer station is by 50 protective devices; net is economized and is adjusted main website generally by access 200 substations; then main website end total event is counted as 100*50*200=1000000 bar; medium scale main website the common event is counted and is all reached 1,000,000; if these information all carry out information classification artificially; workload is very large; follow-up continuous protection reorganization and expansion work in addition; workload impersonal force can be, and actual motion effect does not reach expection.
2, cause information in report to omit problem because on-the-spot secondary device clock is inconsistent
With the time of Article 1 critical event for the information of benchmark to different device is filed, require that the whole network protection and oscillograph equipment clock must be highly consistent; But in fact; because there are each side's reasons such as early having late, device self time adjustment function defect and management protection and the oscillograph device time of putting into operation in transformer station; cause secondary device in each transformer station pair time very inaccurate; even if the distinct device in same transformer station differs several hours, even the phenomenon such as several years is very general, and this is general knowledge well known in the art.Protection in transformer station is as the main operational outfit of protection power grid security, and operate when generally all forbidding that external system carries out soft pair to it in operating standard, unification is upgraded to all protective devices or transformed, very unrealistic again; Therefore from existing situation, in transformer station, the clock of running protection device is difficult to be consistent, when protecting inaccurate clock, then with the temporal information of equipment for foundation, the filing bag of formation will inevitably occur that information is omitted.
3, leak due to distinct device, different rate of information throughput difference and the information that causes return, mistake returns problem
Protective device information transmission to the process of main website is: protection-> substation-> main website; protection producer, type, the information category of transmission and substation producer is related to all different in this; grid collapses in a flash; the amount of information produced is very large; network storm and each implementation and technological means uneven, the speed of final collection information is difficult to consistent.The time that prior art receives Article 1 critical event with main website starts timing, the relevant information received in follow-up X second is included into a fault bag, X receives the information relevant to this fault after second again, then report cannot be included into, X arranges too short, occurs information dropout, arranges long, then twice shorter for interval continuous fault may be included into same report, finally cause leakage to be returned, mistake returns phenomenon.
4, the report generated is too many, and electrical network true fault bag is submerged wherein, cannot correct identification problem
Power grid construction and reorganization and expansion frequent; each transformer station need carry out a lot of dosage test to all kinds of reorganization and expansion protective device every day; after dosage, in protection, the data sent also comprise crucial trip event, and whether most of protective device cannot identify during carry information be in a transport protocol test data.Existing relevant filing way, automatically Trouble Report can be generated equally after main website end receives these Test Information every day, test data and true fault data cannot be identified, cause the test data fault bag that there is a large amount of non-genuine accident in main website end Trouble Report list, and the frequency that electrical network true fault occurs is very low, and (a general area occurs several times for 1 year, maximum tens times), after operation a period of time like this, true accident bag by a large amount of " rubbish Trouble Report " flood, subsequent analysis application very inconvenience.
5, line fault ranging information disappearance or range measurement inaccurate, affect fault fast positioning and recovery.
6, need special messenger's screen of staring on duty to check, do not support that intelligent terminal is applied.
Summary of the invention
The object of the invention is the shortcoming overcoming above-mentioned prior art, provide a kind of can guarantee Guangdong power system after more accurately and reliably the fault message that protection oscillograph device relevant in the transformer station of faulty line two ends produces is generated automatically the intelligent processing method of line double-end action report in the online management system of the protection of comparatively perfect both-end action report.
To achieve these goals, in protection online management system of the present invention, the intelligent processing method of line double-end action report has following formation:
The intelligent processing method of line double-end action report in this protection online management system, its main feature is, online management system comprises main website and several substation, it is characterized in that, described method comprises the following steps:
(1) substation described in sends information to described main website;
(2) whether the information described in the main station judging described in is relevant with circuit;
(3) if described information is relevant with circuit, then whether the described information described in main station judging is the line fault event in electrical network;
(4) if described information is the line fault event in electrical network, then described main website generates both-end action report;
(5) if described information is not the line fault event in electrical network, then terminate and exit;
(6) if described information and circuit have nothing to do, then main website processes for this information.
Further, described step (1) is specially:
Described substation sends the information comprising device information time of origin in electrical network, substation time of reception, event description, device numbering and device model to described main website.
Further, described main website generates both-end action report, specifically comprises the following steps:
(4.1) whether the filing business of the circuit that the main station judging described in is corresponding with this line fault event exists;
(4.2) if the filing business of the circuit corresponding with this line fault event does not exist, then whether described this circuit of main station judging exists the trip time;
(4.3) if this circuit exists trip event, then new report bag is generated;
(4.4) if this circuit does not exist trip event, then step (4.1) is continued;
(4.5) if the filing business of the circuit corresponding with line fault event exists, then whether described main station judging exists the report bag corresponding with this line fault event;
(4.6) if there is the report bag corresponding with this line fault event, then by this line fault event synchronization to this report bag;
(4.7) if there is no corresponding with this line fault event report bag, then continue step (4.2).
Further, further comprising the steps of after described step (4.3):
(4.3.1) main website described in by this line fault event synchronization to this new report bag;
(4.3.2) whether the cycle that the main station judging described in sends information to display module arrives;
If (4.3.3) send the cycle arrival of information to display module, then described main website generates the new report sent to display module;
If the cycle (4.3.4) to display module transmission information does not arrive, then described main station judging arranges the need of exiting both-end action report;
If (4.3.5) need to exit both-end action report to arrange, then described main website terminates and exits;
If (4.3.6) do not need to exit both-end action report to arrange, then continue step (1).
Again further, further comprising the steps of after described step (4.6):
(4.6.1) main website described in generates the new report sent to display module.
Further, whether described main station judging exists the report bag corresponding with this line fault event, specifically comprises the following steps:
(4.5.1) whether the main station judging described in also exists other report bag;
(4.5.2) if there is no other reports are wrapped, then continue step (4.2);
If (4.5.3) also there is other report bag, whether the substation time of reception of this line fault event of described main station judging is in the threshold time of report bag; Described report bag threshold time is for being greater than the difference of report bag time and the first setting-up time and being less than and reporting bag time and the first setting-up time sum;
If (4.5.4), the substation time of reception of line fault event is in the threshold time of report bag, then whether the device information time of origin of described this line fault event of main station judging is in the threshold time of device information; The threshold time of described device information is greater than the difference of device information time of origin and the second setting-up time and is less than device information time of origin and the second setting-up time sum
If (4.5.5) the device information generation event of this line fault event is in the threshold time of device information, then continue step (4.6);
If (4.5.6) the device information generation event of this line fault event is not in the threshold time of device information; Then continue step (4.5.1);
If (4.5.7) the substation time of reception of line fault event is not in the threshold time of report bag, then continue step (4.7).
Further, further comprising the steps of before described step (1):
(0.1) main website described in communicates with described substation;
(0.2) when the main website described in and described substation carry out soft pair.
Further, further comprising the steps of after described step (6):
(6.1) during soft pair of the main station judging described in, whether the cycle arrives;
(6.2) if soft pair of described main website time the cycle arrive, then continue step (0.2);
(6.3) if soft pair of described main website time the cycle do not arrive, then whether described main station judging exits online management;
(6.4) if exit online management, then terminate and exit;
(6.5) if do not exit online management, then step (0.1) is continued.
Further, further comprising the steps of before described step (0.1):
(0-1) main website described in loads and sets up the topological relation with each equipment in each substation and each substation and electrical network;
(0-2) the main website load events aspect of model storehouse described in, and the relation table of apparatus for establishing model and each event.
Further, further comprising the steps of after described step (4):
(4.a) main website described in receives the data message that EMS module gathers;
(4.b) data message that described EMS module gathers is synchronized in both-end action report by the main website described in, and judges whether there is real line fault in electrical network;
If (4.c) there is real line fault in electrical network, then described main website obtains the ranging information of this real line fault further; Otherwise continue step (4.e);
(4.d) main website described in notifies that user's both-end action report generates;
(4.e) described both-end action report stores and shows in display module classification by the main website described in.
Further, described main website obtains the ranging information of this real line fault further, comprises the following steps:
(4.c.1) main website described in obtains the data of small echo range finder module;
(4.c.2) main website described in is by both-end action report extremely described for the data syn-chronization of the little broken range finder module got.
Further, described main website notifies that user's both-end action report generates, is specially:
By the mode of note or mail, described main website notifies that user's both-end action report generates.
Further, further comprising the steps of after described step (4.e):
(4.e.1) main website described in obtains an existing both-end action report;
(4.e.2) whether the life cycle of this both-end action report of the main station judging described in arrives;
If (4.e.3) life cycle of this both-end action report does not arrive, then continue step (4.e.1);
If (4.e.4) life cycle of this both-end action report arrives, then from described main website, remove this both-end action report;
(4.e.5) main station judging described in arranges the need of exiting both-end action report;
If (4.e.6) need to exit both-end action report to arrange, then terminate and exit;
If (4.e.7) do not need to exit both-end action report to arrange, then continue step (4.e.1).
Have employed the intelligent processing method of line double-end action report in the protection online management system in this invention, more accurate after guaranteeing Guangdong power system, reliably by protection relevant in the transformer station of faulty line two ends, the fault message that oscillograph device produces generates comparatively perfect both-end action report automatically, intelligently filters the very first time are pushed to multiple terminal demonstration, professional is facilitated to analyze two ends protection act situation fast, check, pass judgment on both sides protection act behavior correctness and timely tracing trouble, recover electrical network normally to run, to apply after the intelligent processing method of line double-end action report in protection online management system of the present invention comparatively prior art in efficiency, practicality and economic benefit aspect have clear superiority.
Accompanying drawing explanation
Fig. 1 is the flow chart of steps of the intelligent processing method of line double-end action report in protection online management system of the present invention.
Fig. 2 is the arrangement flow chart of both-end action report of the present invention.
Fig. 3 is the storage node structure schematic diagram of both-end action report of the present invention.
Fig. 4 is the arrangement flow chart of steps of volume both-end action report of the present invention.
Embodiment
In order to more clearly describe technology contents of the present invention, conduct further description below in conjunction with specific embodiment.
After Guangdong power system, the relevant protection device of circuit two ends transformer station understands action simultaneously and record trouble process.After present invention can be implemented in Guangdong power system accurately, the automatic both-end action report fault message that secondary device relevant in the transformer station of faulty line two ends produces being carried out automatic archiving, form information completely reliably; and be pushed to multiple terminal (i.e. display device of the present invention) in the very first time; professional is facilitated to analyze two ends protection act situation, check; pass judgment on both sides protection act behavior correctness and quick diagnosis fault, recover electrical network and normally run.
Online management system is made up of substation and main website.The sample and transform of information is responsible in substation, main website is responsible for receiving each substation information and comprehensively carries out arranging and analyze, form comparatively perfect, reliable both-end action report, and the very first time is pushed to multiple terminal (i.e. display device of the present invention).
In addition, display device of the present invention is not limited only to display, and refers to and a kind ofly can show or point out user's both-end equipment that action report has generated by the both-end action report generated in the present invention.
Referring to shown in Fig. 1, is the flow chart of steps of the intelligent processing method of line double-end action report in protection online management system of the present invention.
Described method comprises the following steps:
(1) substation described in sends information to described main website;
(2) whether the information described in the main station judging described in is relevant with circuit;
(3) if described information is relevant with circuit, then whether the described information described in main station judging is the line fault event in electrical network;
(4) if described information is the line fault event in electrical network, then described main website generates both-end action report;
(5) if described information is not the line fault event in electrical network, then terminate and exit;
(6) if described information and circuit have nothing to do, then main website processes for this information.
Described step (1) is specially:
Described substation sends the information comprising device information time of origin in electrical network, substation time of reception, event description, device numbering and device model to described main website.
Wherein, for the timing differential solving different protective device in transformer station is comparatively large, the inaccurate problem of information filing, the present invention introduces dual-time source way, a temporal information carried when being and sending data after protective device action itself, i.e. device information time of origin; Another is substation receives information time from protective device, i.e. substation time of reception.
Transmission protocol between substation and main website, when making information from substation Shang Song main website, supports the time of transmission substation itself.Substation from every bar event that protective device and oscillograph receive all with device information time of origin, after substation receives, prime information basis increases the timestamp information of substation itself, namely substation receives the time of this information, and then by information by the stipulations of expansion deliver to main website, the information increasing its temporal is preserved by substation on the spot simultaneously, wherein, it is in order to information backup that information is preserved by substation, when in main website during this information dropout, this information of preserving in substation makes user still can view, in addition, in a preferred embodiment, the information received is stored to database or high in the clouds by described substation or main website, safer to make information preserve.
In addition, main website needs to judge that whether the information received is relevant with circuit, if had nothing to do with circuit, then described main website processes this information according in main website to the processing mode of this information.
Refer to shown in Fig. 2, after main website receives every bar information from each substation, first resolving information, and according to device model and some table information thereof, obtain event description corresponding to this information, device numbering, device model, device information time of origin, substation time of reception.Described main website generates both-end action report, specifically comprises the following steps:
(4.1) whether the filing business of the circuit that the main station judging described in is corresponding with this line fault event exists;
Wherein, according to the device numbering in information and the topological relation (namely step (0-1)) hereinafter set up; obtain the circuit number that it is protected; and then whether report in internal memory arranges the business of searching this circuit number in service lists (i.e. both-end action report of the present invention) and exists; if do not exist; then carry out the latest report bag generating process of step (4.2), otherwise the dual-time source of carrying out step (4.6) judges process.
(4.2) if the filing business of the circuit corresponding with this line fault event does not exist, then whether described this circuit of main station judging exists the trip time;
(4.3) if this circuit exists trip event, then new report bag is generated;
Wherein, major key is generated by " device model _ event description " form; search during the device model set up in internal memory and event description MAP show; if it is true for returning results; then under this equipment institute protection circuit numbered node, generate the latest report node that is title with present event substation time of reception; add this device node in latest report bag, add this information again under device node, otherwise end process.To be reported in internal memory storage node structure as shown in Figure 3.
(4.4) if this circuit does not exist trip event, then step (4.1) is continued;
(4.5) if the filing business of the circuit corresponding with line fault event exists, then whether described main station judging exists the report bag corresponding with this line fault event;
Wherein, whether described main station judging exists the report bag corresponding with this line fault event, specifically comprises the following steps:
(4.5.1) whether the main station judging described in also exists other report bag;
(4.5.2) if there is no other reports are wrapped, then continue step (4.2);
If (4.5.3) also there is other report bag, whether the substation time of reception of this line fault event of described main station judging is in the threshold time of report bag; Described report bag threshold time is for being greater than the difference of report bag time and the first setting-up time and being less than and reporting bag time and the first setting-up time sum;
If (4.5.4), the substation time of reception of line fault event is in the threshold time of report bag, then whether the device information time of origin of described this line fault event of main station judging is in the threshold time of device information; The threshold time of described device information is greater than the difference of device information time of origin and the second setting-up time and is less than device information time of origin and the second setting-up time sum
If (4.5.5) the device information generation event of this line fault event is in the threshold time of device information, then continue step (4.6);
If (4.5.6) the device information generation event of this line fault event is not in the threshold time of device information; Then continue step (4.5.1);
If (4.5.7) the substation time of reception of line fault event is not in the threshold time of report bag, then continue step (4.7).
According to " substation time of reception " in reception event, traversal search report bag belonging to this event (the substation time of reception of this event the report bag time ± N second within the scope of, wherein N is the first set point); If found, then finding in the device numbered node under report bag belonging to present event, " device information time of origin " in further decision event whether within this deuterzooid device information scope time (comparatively under this device node the device information time of origin of Article 1 event within ± M second, wherein M is the second set point), if in scope, then judge the relevant information of present event as this fault, and under this information is included into this device node; If not in scope, this fault non-is then described, continues already present Next Report bag in traversal internal memory by same way, if traversal terminates, this event is not included in any one report bag yet, then carry out the latest report bag product process of step (4.3).
In addition, the problem of dual-time source mechanism solution is as follows:
Owing to there is cycle soft time adjustment function support in the present invention, basically identical after " the substation time of reception " that ensure that on each substation of synchronization in carry information reaches main website.Substation time of reception ± (N can be arranged N mechanism second, the information transmission time difference of generally causing due to a variety of causes can not more than 30 minutes, therefore generally arrange about 1800 seconds), avoid the larger problem of different secondary equipment time difference in transformer station on the one hand, ensure that the distinct device information be associated in same secondary line fault can be included in same report bag by main website accurately; On the other hand, also efficiently solve because substation is sent from the message delay that dissimilar devices communicating mode difference, different types of information transmission rate speed are distinguished and implementation not first-class reason in different substations causes in prior art, thus the main website end report mistake caused is returned, is leaked the problem of returning.
Device information time of origin ± (M can be arranged M mechanism second; general protective device generation continuous several times tripping operation interval is not less than 20 seconds; therefore generally get 20 seconds); ensure that and the tripping operation information of the same primary fault under same secondary device can be included into accurately in same report bag, efficiently solve may occur in prior art by repeatedly continuously different tripping operation be included into the problem of same report.
(4.6) if there is the report bag corresponding with this line fault event, then by this line fault event synchronization to this report bag;
(4.7) if there is no corresponding with this line fault event report bag, then continue step (4.2).
In addition, refer to shown in Fig. 2, further comprising the steps of after described step (4.3):
(4.3.1) main website described in by this line fault event synchronization to this new report bag;
(4.3.2) whether the cycle that the main station judging described in sends information to display module arrives;
If (4.3.3) send the cycle arrival of information to display module, then described main website generates the new report sent to display module;
If the cycle (4.3.4) to display module transmission information does not arrive, then described main station judging arranges the need of exiting both-end action report;
If (4.3.5) need to exit both-end action report to arrange, then described main website terminates and exits;
If (4.3.6) do not need to exit both-end action report to arrange, then continue step (1).
In addition, refer to shown in Fig. 2, further comprising the steps of after described step (4.6):
(4.3.3) main website described in generates the new report sent to display module.
Wherein, the mode combined with filing automatic continuous after fault is filed when present invention employs fault in time.It is very fast due to protective device event class information being sent, be generally in level second and send, consider that both-end many covers protective device send simultaneously, therefore first after L second (L is traditionally arranged to be 60 seconds) the report bag of ArchivalEvent category information is put in storage fast and is notified interface display, so that operations staff understands the basic situation of fault fast; But now in background memory, the life cycle of this report does not terminate, then continuous wait N second, so as to collect delayed on the information sent.In archiving process subsequently, often increase in this report bag or upgrade an information, backstage all can be put in storage in time and be sent fault bag Notification of Changes to foreground, so that the up-to-date report content of display is refreshed at interface in time.Both ensure that the most newly reported promptness, simultaneously also solved compared with prior art the problem that lag information cannot correctly file.
In addition, refer to shown in Fig. 1, in order to ensure the normal work of system, further comprising the steps of before described step (1):
(0.1) main website described in communicates with described substation;
(0.2) when the main website described in and described substation carry out soft pair.
After electric network fault, user is generally a minute rank to generating the time requirement of Trouble Report, when the mode cycle is to each substation system pair when main website adopts soft message pair in the present invention, guarantees that main station system and the time of substation system reach second extremely consistent.
Further comprising the steps of after described step (6):
(6.1) during soft pair of the main station judging described in, whether the cycle arrives;
(6.2) if soft pair of described main website time the cycle arrive, then continue step (0.2);
(6.3) if soft pair of described main website time the cycle do not arrive, then whether described main station judging exits online management;
(6.4) if exit online management, then terminate and exit;
(6.5) if do not exit online management, then step (0.1) is continued.
Further comprising the steps of before described step (0.1):
(0-1) main website described in loads and sets up the topological relation with each equipment in each substation and each substation and electrical network;
Wherein, according to grid equipment annexation; set up the plant stand relevant to circuit two ends, circuit breaker, protection and oscillograph incidence relation, guarantee that using arbitrary device to number can number to other relevant apparatus in topological relation by fast finding, for follow-up both-end report arrangement lays the foundation.
(0-2) the main website load events aspect of model storehouse described in, and the relation table of apparatus for establishing model and each event.
Even if because different manufacturing firm, different protect types are all each variant to the description of same event information; for correct identification protecting tripping operation information; in advance according to the raw information point table that each protection producer provides; the dependent event that can characterize the true tripping operation of protection is extracted; form " true trip event " aspect of model storehouse; and apparatus for establishing model and event description MAP show in program internal memory, as shown in table 1 below:
Table 1. device model and event description MAP show
Major key (character string: device model _ trip event) Value (integer)
RCS-931_ jumps A 1
RCS-931_ jumps B 1
RCS-931_ jumps C 1
RCS-931_ reclosing 1
The I section of action of RCS-931_ distance 1
The action of RCS-931_ distance II section 1
The action of RCS-931_ distance III section 1
RCS-931_ distance accelerated motion 1
RCS-931_ zero sequence accelerates motion 1
The action of PSL-603_ phase spacing I section 1
The action of PSL-603_ phase spacing II section 1
The action of PSL-603_ phase spacing III section 1
The action of PSL-603_ ground distance I section 1
The action of PSL-603_ ground distance II section 1
The action of PSL-603_ ground distance III section 1
PSL-603_ protects A to jump out mouth 1
PSL-603_ protects B to jump out mouth 1
PSL-603_ protects C to jump out mouth 1
Mouth is jumped out in PSL-603_ protection three 1
CSC-122B_ overcurrent I section exports 1
CSC-122B_ overcurrent II section exports 1
Domestic and international common equipment is set up complete by this feature model library in advance by model, the secondary device model that 220kV and above transformer station use is relatively fixing, when having new model equipment access from now on, only relate to and the trip event of new model equipment is added feature database, existing model device is without the need to again safeguarding.This aspect of model storehouse have once generate, effect that successive projects project is directly multiplexing and general, and along with time integral, this feature model library can come comprehensively.In the follow-up reorganization and expansion of transformer station and system maintenance etc., more existing craft carries out class indication treatment technology by protective device platform, and not only maintenance workload greatly reduces, and is more conducive to persistence, applied generalization.
In addition, in online management system of the present invention, the intelligent processing method of line double-end action report can realize the categorical filtering process of both-end action report:
(1) during circuit true fault; the relevant protection at general circuit two ends all can produce tripping operation information; and when protection dosage being tested in transformer station; equipment reorganization and expansion is all generally to single device dosage test in station; new website is at most also test the relevant device dosage of circuit one end when building, therefore whether available line two ends relevant device all produces tripping operation information as one of foundation judging whether true fault.
(2) situation of part relevant device information Bu Shangsong main website may also be there is when substation system exception or with equipment component communication abnormality, for avoiding this kind of situation to cause main website to judge by accident, special introducing the second basis for estimation.During circuit true fault, not only protection can produce tripping operation information, generally also changes along with circuit-breaker status; And when carrying out dosage test to protective device in transformer station, although protection produces in tripping operation information and send, its circuit-breaker status be associated can not change; Therefore circuit-breaker status can be adopted as another foundation judging to protect whether truly tripping operation.Circuit breaker real-time status and displacement information data are collected mainly through EMS system; protection information management system does not gather circuit-breaker status information; therefore the present invention takes to carry out communication interface mode with EMS system obtains circuit-breaker status; namely after often generating a latest report bag in internal memory filing business; the circuit breaker numbering that this line fault is associated is obtained according to topological relation; then the instant state displacement information obtaining corresponding circuit breaker from EMS system, and then judge whether true tripping operation.
After being judged by above-mentioned two kinds of modes, if truly tripped, then this fault bag is designated true electric network fault bag; Otherwise be designated test data fault bag, and basis for estimation is added in report.
Further comprising the steps of after described step (4):
(4.a) main website described in receives the data message that EMS module gathers;
(4.b) data message that described EMS module gathers is synchronized in both-end action report by the main website described in, and judges whether there is real line fault in electrical network;
If (4.c) there is real line fault in electrical network, then described main website obtains the ranging information of this real line fault further; Otherwise continue step (4.e);
(4.d) main website described in notifies that user's both-end action report generates;
(4.e) described both-end action report stores and shows in display module classification by the main website described in.
In online management system of the present invention line double-end action report intelligent processing method in increase fault localization information accurately in both-end action report, in prior art, the acquisition of line fault ranging information is generally by two kinds of approach: 1. claimed or oscillograph device automatically on give; 2 zero main website ends carry out analytical calculation according to both-end recorded wave file.Because substation field relates to the protective device put into operation various years, comparatively early period do not support send range finding, even if to send ranging information on supporting, result is also single end distance measurement result, and error is larger.If calculated by main website end, not only relate to the work of a large amount of line parameter circuit value configuring maintenance, simultaneously higher to the clock synchronization requirement of two ends generation recorded wave file, the accuracy of parameter and algorithm etc. all can affect the precision of final result.Undesirable through practical application effect, therefore above-mentioned two kinds of modes all do not possess practicality very much.
Small echo ranging system is all the time as the Main Means calculating both-end distance measuring, and range measurement is accurate and precision is high.To adopt directly in the present invention and mode that small echo ranging system interface obtains range measurement is carried out.Specific practice is: using the substation of small echo distance measurement Master station system as protection information online management system; connect and synchrolock model with small echo ranging system; on the one hand can the cycle by soft message mode to small echo ranging system pair time; guarantee the clock of native system and small echo ranging system second level consistent; the communications status of native system and small echo ranging system when can supervise in real time on the other hand, so that abnormal rear timely recovery.After main website end often generates one " true fault report ", according to the numbering of faulty line immediately to this circuit number of small echo ranging system request at that time moment ± K second in range measurement information, if got, range measurement is included into report, otherwise every ten seconds obtain once, support circulation W time, until obtain range measurement.
Namely the manner avoids a large amount of repetition modeling of identical services, configuration effort, also ensure that the required precision of range measurement simultaneously, and practical application effect is good, and comparatively prior art greatly promotes in construction difficulty, practicality, accuracy and economy etc.Described main website obtains the ranging information of this real line fault further, comprises the following steps:
(4.c.1) main website described in obtains the data of small echo range finder module;
(4.c.2) main website described in is by both-end action report extremely described for the data syn-chronization of the little broken range finder module got.
Described main website notifies that user's both-end action report generates, is specially:
By the mode of note or mail, described main website notifies that user's both-end action report generates.
(1) report stores and shows and all presses " true electric network fault bag " and " test data fault bag " classification process, both the demand of consulting true fault bag had fast been solved, also meet user whether correct by the analysis of test data fault bag, judgment device optimum configurations, put into operation in order to avoid delay equipment on schedule.
(2) there is the basis for estimation of report classification in each report, substantially increase the perfection and practicability of action report.
(3) only to " the true electric network fault bag " that generate, support that IMU crosses note and the fault profile information very first time is sent to relevant designated person by mail two kinds of modes, even if on duty without special messenger, also the very first time can understand grid fault conditions, substantially increase compared with prior art the promptness that related personnel understands information.
In addition, referring to shown in Fig. 4, is the arrangement flow chart of steps of volume both-end action report of the present invention.In online management system of the present invention line double-end action report intelligent processing method in can upgrade each both-end action report in main website internal memory, further comprising the steps of after described step (4.e):
(4.e.1) main website described in obtains an existing both-end action report;
(4.e.2) whether the life cycle of this both-end action report of the main station judging described in arrives;
If (4.e.3) life cycle of this both-end action report does not arrive, then continue step (4.e.1);
If (4.e.4) life cycle of this both-end action report arrives, then from described main website, remove this both-end action report;
(4.e.5) main station judging described in arranges the need of exiting both-end action report;
If (4.e.6) need to exit both-end action report to arrange, then terminate and exit;
If (4.e.7) do not need to exit both-end action report to arrange, then continue step (4.e.1).
Have employed the intelligent processing method of line double-end action report in the protection online management system in this invention, more accurate after guaranteeing Guangdong power system, reliably by protection relevant in the transformer station of faulty line two ends, the fault message that oscillograph device produces, the Trouble Report that automatic generation is comparatively perfect, intelligently filters the very first time are pushed to multiple terminal demonstration, professional is facilitated to analyze two ends protection act situation fast, check, pass judgment on both sides protection act behavior correctness and timely tracing trouble, recover electrical network normally to run, to apply after the intelligent processing method of line double-end action report in protection online management system of the present invention comparatively prior art in efficiency, practicality and economic benefit aspect have clear superiority.
In this description, the present invention is described with reference to its specific embodiment.But, still can make various amendment and conversion obviously and not deviate from the spirit and scope of the present invention.Therefore, specification and accompanying drawing are regarded in an illustrative, rather than a restrictive.

Claims (13)

1. the intelligent processing method of line double-end action report in online management system, online management system comprises main website and several substation, it is characterized in that, described method comprises the following steps:
(1) substation described in sends information to described main website;
(2) whether the information described in the main station judging described in is relevant with circuit;
(3) if described information is relevant with circuit, then whether the described information described in main station judging is the line fault event in electrical network;
(4) if described information is the line fault event in electrical network, then described main website generates both-end action report;
(5) if described information is not the line fault event in electrical network, then terminate and exit;
(6) if described information and circuit have nothing to do, then main website processes for this information.
2. the intelligent processing method of line double-end action report in online management system according to claim 1, it is characterized in that, described step (1) is specially:
Described substation sends the information comprising device information time of origin in electrical network, substation time of reception, event description, device numbering and device model to described main website.
3. the intelligent processing method of line double-end action report in online management system according to claim 1, is characterized in that, described main website generates both-end action report, specifically comprises the following steps:
(4.1) whether the filing business of the circuit that the main station judging described in is corresponding with this line fault event exists;
(4.2) if the filing business of the circuit corresponding with this line fault event does not exist, then whether described this circuit of main station judging exists the trip time;
(4.3) if this circuit exists trip event, then new report bag is generated;
(4.4) if this circuit does not exist trip event, then step (4.1) is continued;
(4.5) if the filing business of the circuit corresponding with line fault event exists, then whether described main station judging exists the report bag corresponding with this line fault event;
(4.6) if there is the report bag corresponding with this line fault event, then by this line fault event synchronization to this report bag;
(4.7) if there is no corresponding with this line fault event report bag, then continue step (4.2).
4. the intelligent processing method of line double-end action report in online management system according to claim 3, is characterized in that, further comprising the steps of after described step (4.3):
(4.3.1) main website described in by this line fault event synchronization to this new report bag;
(4.3.2) whether the cycle that the main station judging described in sends information to display module arrives;
If (4.3.3) send the cycle arrival of information to display module, then described main website generates the new report sent to display module;
If the cycle (4.3.4) to display module transmission information does not arrive, then described main station judging arranges the need of exiting both-end action report;
If (4.3.5) need to exit both-end action report to arrange, then described main website terminates and exits;
If (4.3.6) do not need to exit both-end action report to arrange, then continue step (1).
5. the intelligent processing method of line double-end action report in online management system according to claim 4, is characterized in that, further comprising the steps of after described step (4.6):
(4.6.1) main website described in generates the new report sent to display module.
6. the intelligent processing method of line double-end action report in online management system according to claim 3, it is characterized in that, whether described main station judging exists the report bag corresponding with this line fault event, specifically comprises the following steps:
(4.5.1) whether the main station judging described in also exists other report bag;
(4.5.2) if there is no other reports are wrapped, then continue step (4.2);
If (4.5.3) also there is other report bag, whether the substation time of reception of this line fault event of described main station judging is in the threshold time of report bag; Described report bag threshold time is for being greater than the difference of report bag time and the first setting-up time and being less than and reporting bag time and the first setting-up time sum;
If (4.5.4), the substation time of reception of line fault event is in the threshold time of report bag, then whether the device information time of origin of described this line fault event of main station judging is in the threshold time of device information; The threshold time of described device information is greater than the difference of device information time of origin and the second setting-up time and is less than device information time of origin and the second setting-up time sum
If (4.5.5) the device information generation event of this line fault event is in the threshold time of device information, then continue step (4.6);
If (4.5.6) the device information generation event of this line fault event is not in the threshold time of device information; Then continue step (4.5.1);
If (4.5.7) the substation time of reception of line fault event is not in the threshold time of report bag, then continue step (4.7).
7. the intelligent processing method of line double-end action report in online management system according to claim 1, is characterized in that, further comprising the steps of before described step (1):
(0.1) main website described in communicates with described substation;
(0.2) when the main website described in and described substation carry out soft pair.
8. the intelligent processing method of line double-end action report in online management system according to claim 7, is characterized in that, further comprising the steps of after described step (6):
(6.1) during soft pair of the main station judging described in, whether the cycle arrives;
(6.2) if soft pair of described main website time the cycle arrive, then continue step (0.2);
(6.3) if soft pair of described main website time the cycle do not arrive, then whether described main station judging exits online management;
(6.4) if exit online management, then terminate and exit;
(6.5) if do not exit online management, then step (0.1) is continued.
9. the intelligent processing method of line double-end action report in online management system according to claim 7, is characterized in that, further comprising the steps of before described step (0.1):
(0-1) main website described in loads and sets up the topological relation with each equipment in each substation and each substation and electrical network;
(0-2) the main website load events aspect of model storehouse described in, and the relation table of apparatus for establishing model and each event.
10. the intelligent processing method of line double-end action report in online management system according to claim 1, is characterized in that, further comprising the steps of after described step (4):
(4.a) main website described in receives the data message that EMS module gathers;
(4.b) data message that described EMS module gathers is synchronized in both-end action report by the main website described in, and judges whether there is real line fault in electrical network;
If (4.c) there is real line fault in electrical network, then described main website obtains the ranging information of this real line fault further; Otherwise continue step (4.e);
(4.d) main website described in notifies that user's both-end action report generates;
(4.e) described both-end action report stores and shows in display module classification by the main website described in.
In 11. online management systems according to claim 10, the intelligent processing method of line double-end action report, is characterized in that, described main website obtains the ranging information of this real line fault further, comprises the following steps:
(4.c.1) main website described in obtains the data of small echo range finder module;
(4.c.2) main website described in is by both-end action report extremely described for the data syn-chronization of the little broken range finder module got.
In 12. online management systems according to claim 10, the intelligent processing method of line double-end action report, is characterized in that, described main website notifies that user's both-end action report generates, is specially:
By the mode of note or mail, described main website notifies that user's both-end action report generates.
In 13. online management systems according to claim 10, the intelligent processing method of line double-end action report, is characterized in that, further comprising the steps of after described step (4.e):
(4.e.1) main website described in obtains an existing both-end action report;
(4.e.2) whether the life cycle of this both-end action report of the main station judging described in arrives;
If (4.e.3) life cycle of this both-end action report does not arrive, then continue step (4.e.1);
If (4.e.4) life cycle of this both-end action report arrives, then from described main website, remove this both-end action report;
(4.e.5) main station judging described in arranges the need of exiting both-end action report;
If (4.e.6) need to exit both-end action report to arrange, then terminate and exit;
If (4.e.7) do not need to exit both-end action report to arrange, then continue step (4.e.1).
CN201410826686.XA 2014-12-25 2014-12-25 Intelligent processing method capable of protecting operation report of two ends of circuit in online management system Active CN104467190B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410826686.XA CN104467190B (en) 2014-12-25 2014-12-25 Intelligent processing method capable of protecting operation report of two ends of circuit in online management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410826686.XA CN104467190B (en) 2014-12-25 2014-12-25 Intelligent processing method capable of protecting operation report of two ends of circuit in online management system

Publications (2)

Publication Number Publication Date
CN104467190A true CN104467190A (en) 2015-03-25
CN104467190B CN104467190B (en) 2017-01-18

Family

ID=52912765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410826686.XA Active CN104467190B (en) 2014-12-25 2014-12-25 Intelligent processing method capable of protecting operation report of two ends of circuit in online management system

Country Status (1)

Country Link
CN (1) CN104467190B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105932777A (en) * 2016-05-31 2016-09-07 国网山东省电力公司济南供电公司 Intelligent processing method for transmission line fault and apparatus thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001013196A (en) * 1999-06-30 2001-01-19 Hitachi Ltd One terminal decision type accident point estimation device
CN102916407A (en) * 2012-08-23 2013-02-06 山西省电力公司大同供电分公司 Relay protection and fault information management system for regional power grid
CN103048589A (en) * 2012-12-18 2013-04-17 福建省电力有限公司 Device time mark fault-tolerance processing method in grid fault diagnosis

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001013196A (en) * 1999-06-30 2001-01-19 Hitachi Ltd One terminal decision type accident point estimation device
CN102916407A (en) * 2012-08-23 2013-02-06 山西省电力公司大同供电分公司 Relay protection and fault information management system for regional power grid
CN103048589A (en) * 2012-12-18 2013-04-17 福建省电力有限公司 Device time mark fault-tolerance processing method in grid fault diagnosis

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105932777A (en) * 2016-05-31 2016-09-07 国网山东省电力公司济南供电公司 Intelligent processing method for transmission line fault and apparatus thereof
CN105932777B (en) * 2016-05-31 2019-03-01 国网山东省电力公司济南供电公司 A kind of transmission line malfunction intelligent processing method and its device

Also Published As

Publication number Publication date
CN104467190B (en) 2017-01-18

Similar Documents

Publication Publication Date Title
US10739396B2 (en) Enhanced disturbance management of a power grid system
US20200293033A1 (en) Knowledge-based systematic health monitoring system
CN101458286B (en) Phasor measuring set based on in situ spectroscopic analysis and applied wide domain measuring system
CN105606957B (en) A kind of distribution network failure analysis method specially become based on fault detector and public affairs
US10733901B2 (en) Dynamic dispatcher training simulator
CN105093033A (en) Power grid multi-source information-based fault integrated analysis system and analysis method
CN105116248B (en) Relay protection device of intelligent substation automated closed-loop test method
CN106124935A (en) Middle and low voltage network Fault Locating Method
CN106771883A (en) A kind of multi-source information distribution fault localization method and system based on cloud
Chen et al. The use of big data for outage management in distribution systems
CN104301137A (en) Method and system for analyzing influences of electric power communication faults on services
CN106254022A (en) Time supervision based on clock synchronization apparatus and time delay query software system platform
CN104467186A (en) Full network fault recording data parameter-free accurate synchronizing method
CN104201782A (en) Transformer substation troubleshooting system
Cirio et al. Wide area monitoring in the Italian power system: architecture, functions and experiences
CN103576014B (en) The clock monitor device of transformer station and monitoring method
Kezunovic et al. Merging PMU, operational, and non-operational data for interpreting alarms, locating faults and preventing cascades
CN104467190A (en) Intelligent processing method capable of protecting operation report of two ends of circuit in online management system
Shah et al. Review of power quality monitoring web-based techniques
CN104104292B (en) Real-time power generator excitation system state wide area acquisition system
Chen et al. On-line islanding detection application in the realtime dynamics monitoring system
Chowdhury Synchronization for smart grid infrastructure
Castello et al. Power quality data platform for analysis and location of voltage dips: A preliminary study
CN105067949B (en) Method for synchronizing time and system based on circuit both end voltage phase contrast
Pan et al. Fault location determination method for relay protection communication system based on power grid operation and maintenance multi-source data

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 110006 No. 18, Ningbo Road, Heping District, Liaoning, Shenyang

Applicant after: Liaoning Electric Power Company Limited

Applicant after: SHANGHAI ZEXIN ELECTRIC POWER TECHNOLOGY CO., LTD.

Applicant after: State Grid Corporation of China

Address before: 110006 No. 18, Ningbo Road, Heping District, Liaoning, Shenyang

Applicant before: Liaoning Electric Power Company Limited

Applicant before: SHANGHAI ZEXIN ELECTRIC POWER TECHNOLOGY CO., LTD.

Applicant before: State Grid Corporation of China

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant