CN104463697A - 含大规模风电电力系统的风险评估方法 - Google Patents
含大规模风电电力系统的风险评估方法 Download PDFInfo
- Publication number
- CN104463697A CN104463697A CN201410701366.1A CN201410701366A CN104463697A CN 104463697 A CN104463697 A CN 104463697A CN 201410701366 A CN201410701366 A CN 201410701366A CN 104463697 A CN104463697 A CN 104463697A
- Authority
- CN
- China
- Prior art keywords
- risk
- probability
- wind
- wind power
- frequency
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 20
- 238000012502 risk assessment Methods 0.000 title claims abstract description 18
- 238000010586 diagram Methods 0.000 claims abstract description 6
- 230000005611 electricity Effects 0.000 claims description 25
- 230000009194 climbing Effects 0.000 claims description 19
- 230000000694 effects Effects 0.000 claims description 4
- 230000005684 electric field Effects 0.000 claims description 2
- 238000011156 evaluation Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 240000004859 Gamochaeta purpurea Species 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 230000001172 regenerating effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Public Health (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Health & Medical Sciences (AREA)
- General Business, Economics & Management (AREA)
- Water Supply & Treatment (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Wind Motors (AREA)
Abstract
本发明提供一种含大规模风电电力系统的风险评估方法,主要包括以下步骤:获取风电和电力负荷的相关系数,计算得到反调峰的概率;计算极端天气爬坡率的概率,并且所述爬坡率的概率分布符合高影响低频率和低影响高频率原则;根据反调峰的概率及极端天气爬坡率的概率定义关键风险指标PRNS,RRNS及RI,并利用含风电的UC模型计算最优发电计划及备用增量,根据关键风险指标PRNS,RRNS及RI计算系统运行风险;循环计算N天的运行风险,对风险值大小进行分类,将风险值接近的归于同一区间,并计算各风险级别的发生频率,作出风险的后果-频率关系散点图。
Description
技术领域
本发明属于电力系统预测与控制技术领域,尤其涉及一种含大规模风电电力系统的风险评估方法。
背景技术
近年来,能源枯竭和环境污染情况日益严重,可再生能源逐渐受到了全世界的关注。风能是取之不尽的清洁能源,风力发电技术已经作为新能源发电中最成熟的技术开始了大规模的应用。
随着风力发电在电力系统中所占的比重越来越大,而由于风电本身的随机性和波动性,对电网的影响也是不可忽略,由于反调峰和极端天气的对电网的稳定性和鲁棒性有着不可忽略的影响,可对联合电力系统造成很大的风险,甚至造成巨大的经济损失。2012年中国的风电装机容量已经达到了45GW,比2011年增长了10%。全球的装机容量同时也达到了2825GW,比2011年增长了9%。
然而,风能具有不确定性,发电设施经常在不同工况下切换,再加上恶劣环境的影响,如何对联合发电系统进行风险评估,并根据评估结果对联合发电系统进行维修及维护,成为保证系统可靠运行的重要一环。
发明内容
综上所述,确有必要提供一种含大规模风电电力系统的风险评估方法。
一种含大规模风电电力系统的风险评估方法,主要包括以下步骤:获取风电和电力负荷的相关系数,计算得到反调峰的概率;计算极端天气爬坡率的概率,并且所述爬坡率的概率分布符合高影响低频率和低影响高频率原则;根据反调峰的概率及极端天气爬坡率的概率定义关键风险指标PRNS,RRNS及RI,并利用含风电的UC模型计算最优发电计划及备用增量,根据关键风险指标PRNS,RRNS及RI计算系统运行风险;循环计算N天的运行风险,对风险值大小进行分类,将风险值接近的归于同一区间,并计算各风险级别的发生频率,作出风险的后果-频率关系散点图。
先对于现有技术,本发明提供的含大规模风电电力系统的风险评估方法,通过综合考虑反调峰的概率及极端天气的影响,对联合发电系统的风险进行了准确评估,为发电系统维修及维护提供了重要参考。
附图说明
图1为本发明提供的含大规模风电电力系统的风险评估方法的流程图。
图2为本发明提供的风能和负荷相关系数概率分布。
图3为本发明提供的极端天气爬坡率的概率分布。
图4为本发明提供的A,B,C案例下计算的备用需求。
图5为本发明提供的风电电力系统的风险的频率和后果分布。
具体实施方式
下面根据说明书公式并结合具体实施例对本发明的技术方案进一步详细表述。
请参阅图1,本发明提供一种含大规模风电电力系统的风险评估方法,主要包括以下步骤:
步骤S10,获取风电和电力负荷的相关系数,计算得到反调峰的概率;
步骤S20,计算极端天气爬坡率的概率,且所述爬坡率的概率分布符合高影响低频率(HILF)和低影响高频率(LIHF)原则;
步骤S30,根据反调峰的概率及极端天气爬坡率的概率定义关键风险指标PRNS,RRNS及RI,利用含风电的UC模型(Unit Commitment Model)计算最优发电计划及备用增量,并根据关键风险指标PRNS,RRNS及RI计算系统运行风险;
步骤S40,循环计算N天的运行风险,对风险值大小进行分类,将风险值接近的归于同一区间,并计算各风险级别的发生频率,作出风险的后果-频率关系散点图。
在步骤S10中,如图2所示,可根据下式(1)获取出风电和负荷之间的相关系数,然后将该相关系数以0.1为步长得到反调峰的概率:
(1)
图2中相关系数为负的表明属于反调峰,可以得到除了冬季之外,反调峰的概率都大于调峰。
在步骤S20中,所述极端天气爬坡率可通过式(2)进行计算,得到爬坡率Ramp(t,T)的概率分布,如图3所示。
(2)
其中,t,T分别为运行时刻和调度间隔,PW代表对应时刻的风电场出力值。图3表明爬坡率的概率分布符合HILF和LIHF原则。
在步骤S30中,根据S10和S20计算出来的反调峰和极端天气爬坡率的影响,计算风险指数PRNS,ERNS及RI,以对包含大规模风电的电缆系统进行评估。所述风险指数PRNS,ERNS及RI可通过以下公式计算:
(3)
(4)
(5)
其中,It为0-1变量,代表是否存在爬坡容量不足事件,如果存在则为1,否则为0;N为一天的调度时刻数,一般取96(间隔为15min);Rt为爬坡容量不足值;为接入风电前的上调和下调备用容量;分别为切入风电后为了维持原有风险水平所需的备用容量;PLmax为该日的最大负荷值。
所述备用增量F可通过下式(6)计算:
(6)
其中,w代表常规机组单位出力费用、wwind代表单位弃风惩罚费用、wload代表单位切负荷损失费用、wR代表单位备用费用;f代表常规机组出力、fwind代表弃风电量、fload代表切负荷损失电量、fR代表备用容量。
在步骤S40中,循环计算N天的运行风险,对风险值大小进行分类,将风险值接近的归于同一区间,并计算各风险级别的发生频率,作出风险的后果-频率关系散点图。其具体步骤如下:
步骤S41:将N天所得到的所有运行风险值按照从小到大进行排序;
步骤S42:根据精度需求设置合适间隔,将区间[R1,Rn]等分m个区间;
步骤S43:计算每个区间含有的风险指标数量ni,则该值为风险级别i发生的频率。
具体的,对以下三种风险案例以具体的实施例通过S30定义的风险指数进行评估:
Case A,不包含风电的电力系统在飓风条件下的风险指数。
Case B,包含正常气候条件下的风电的电力系统在飓风条件下的风险指数。
Case C,包含非正常气候条件下的风电的电力系统在飓风条件下的风险指数。
通过式(6)计算出的A案例下的UC模型计算出来的备用增量是最优的,因此以A为基准,可以得到表1。
表1 A,B,C案例下的风险指数
该表表明在B,C中,电力系统的风险指数有明显的增加。通过式6计算出三种情况下的最优备用容量需求如图4所示。根据UC模型计算出来的备用需求和式5中计算的相对备用增量进行仿真,可以得到图5。由图4及图5可见,该风险评估结果符合HILF和LIHF模型。
本发明提供的含大规模风电电力系统的风险评估方法,通过综合考虑反调峰的概率及极端天气的影响,对关键的风险指标进行了准确定义,从而实现了对联合发电系统的风险的准确评估,为发电系统维修及维护提供了重要参考,也为联合发电系统的可靠运行提供了保障。
另外,本领域技术人员还可在本发明精神内作其它变化,当然这些依据本发明精神所作的变化,都应包含在本发明所要求保护的范围内。
Claims (7)
1.一种含大规模风电电力系统的风险评估方法,主要包括以下步骤:
获取风电和电力负荷的相关系数,计算得到反调峰的概率;
计算极端天气爬坡率的概率,且所述爬坡率的概率分布符合高影响低频率和低影响高频率原则;
根据反调峰的概率及极端天气爬坡率的概率定义关键风险指标PRNS,RRNS及RI,并利用含风电的UC模型计算最优发电计划及备用增量,根据关键风险指标PRNS,RRNS及RI计算系统运行风险;
循环计算N天的运行风险,对风险值大小进行分类,将风险值接近的归于同一区间,并计算各风险级别的发生频率,作出风险的后果-频率关系散点图。
2.如权利要求1所述的含大规模风电电力系统的风险评估方法,其特征在于,风电和负荷之间的相关系数通过下式获取:
。
3.如权利要求2所述的含大规模风电电力系统的风险评估方法,其特征在于,将该相关系数以0.1为步长得到反调峰的概率。
4.如权利要求1所述的含大规模风电电力系统的风险评估方法,其特征在于,所述极端天气爬坡率通过下式计算:
,
其中t,T分别为运行时刻和调度间隔,PW代表对应时刻的风电场出力值。
5.如权利要求1所述的含大规模风电电力系统的风险评估方法,其特征在于,所述风险指数PRNS,ERNS及RI通过以下公式计算:
;
;
;
其中,It为0-1变量,代表是否存在爬坡容量不足事件,存在则为1,否则为0;N为一天的调度时刻数;Rt为爬坡容量不足值;为接入风电前的上调和下调备用容量;分别为切入风电后为了维持原有风险水平所需的备用容量;PLmax为该日的最大负荷值。
6.如权利要求1所述的含大规模风电电力系统的风险评估方法,其特征在于,备用增量F通过下式计算:
;
其中,w代表常规机组单位出力费用、wwind代表单位弃风惩罚费用、wload代表单位切负荷损失费用、wR代表单位备用费用;f代表常规机组出力、fwind代表弃风电量、fload代表切负荷损失电量、fR代表备用容量。
7.如权利要求1所述的含大规模风电电力系统的风险评估方法,其特征在于,所述个风险级别的发生频率通过以下方式计算:
将N天所计算得到的所有运行风险值按照从小到大进行排序;
根据精度需求设置合适间隔,将区间[R1,Rn]等分m个区间;
计算每个区间含有的风险指标数量ni,则该值为风险级别i发生的频率。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410701366.1A CN104463697A (zh) | 2014-11-28 | 2014-11-28 | 含大规模风电电力系统的风险评估方法 |
US14/684,453 US20160154061A1 (en) | 2014-11-28 | 2015-04-13 | Method of assessing risk of power system with high penetration of wind power |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410701366.1A CN104463697A (zh) | 2014-11-28 | 2014-11-28 | 含大规模风电电力系统的风险评估方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104463697A true CN104463697A (zh) | 2015-03-25 |
Family
ID=52909686
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410701366.1A Pending CN104463697A (zh) | 2014-11-28 | 2014-11-28 | 含大规模风电电力系统的风险评估方法 |
Country Status (2)
Country | Link |
---|---|
US (1) | US20160154061A1 (zh) |
CN (1) | CN104463697A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105243517A (zh) * | 2015-11-12 | 2016-01-13 | 华北电力大学(保定) | 一种大型并网光伏电站可靠性评估方法 |
CN105356446A (zh) * | 2016-01-07 | 2016-02-24 | 江苏省电力公司南京供电公司 | 一种电力系统网络的风险评估方法 |
CN110571864A (zh) * | 2019-09-09 | 2019-12-13 | 重庆大学 | 一种计及风电预测误差时序相关性和机组启停调峰的含风电-光热电力系统机组组合方法 |
CN113988648A (zh) * | 2021-10-29 | 2022-01-28 | 广东电网有限责任公司 | 一种风电柔直系统风险值的计算方法及装置 |
CN115296338A (zh) * | 2022-08-23 | 2022-11-04 | 广西大学 | 基于多时间尺度分析的风电出力极端爬坡风险评估方法 |
CN115296338B (zh) * | 2022-08-23 | 2024-07-09 | 广西大学 | 基于多时间尺度分析的风电出力极端爬坡风险评估方法 |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107292415B (zh) * | 2017-05-02 | 2021-07-30 | 国网浙江省电力有限公司 | 一种智能表轮换时间的预测方法 |
CN108898273B (zh) * | 2018-05-29 | 2022-04-15 | 国网能源研究院有限公司 | 一种基于形态分析的用户侧负荷特征聚类评价方法 |
CN110688725B (zh) * | 2019-08-13 | 2022-09-27 | 国网山西省电力公司电力科学研究院 | 一种计及运行风险和需求响应的鲁棒机组组合方法 |
CN110472371A (zh) * | 2019-09-06 | 2019-11-19 | 西安交通大学 | 一种基于恢复力的电力系统元件重要度的评估方法 |
CN111200281B (zh) * | 2019-12-23 | 2021-06-08 | 北京交通大学 | 互联微网储能配置扩容优化方法 |
CN113327014A (zh) * | 2021-05-12 | 2021-08-31 | 广东电网有限责任公司佛山供电局 | 一种实时电网风险自动评估系统和方法 |
CN114896765A (zh) * | 2022-04-19 | 2022-08-12 | 国网甘肃省电力公司电力科学研究院 | 基于灵活时间边界的多场景切换风电序列模拟方法及装置 |
CN117745084B (zh) * | 2024-02-21 | 2024-05-31 | 国网山东省电力公司东营供电公司 | 一种极端气象下两阶段电力系统运行风险评估方法及系统 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103887813A (zh) * | 2014-01-21 | 2014-06-25 | 国家电网公司 | 基于风功率预测不确定度的风电系统运行的控制方法 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8215896B2 (en) * | 2010-12-20 | 2012-07-10 | General Electric Company | Apparatus and method for operation of an off-shore wind turbine |
US9460478B2 (en) * | 2012-12-17 | 2016-10-04 | Arizona Board Of Regents On Behalf Of Arizona State University | System and method for wind generation forecasting |
CN103259285B (zh) * | 2013-05-03 | 2015-04-29 | 国家电网公司 | 含大规模风电电力系统的短期运行优化方法 |
US8853877B1 (en) * | 2013-05-29 | 2014-10-07 | General Electric Company | System and method for controlling a wind farm |
WO2016040774A1 (en) * | 2014-09-11 | 2016-03-17 | Sheble Gerald B | Resource control by probability tree convolution production cost valuation by iterative equivalent demand duration curve expansion (aka. tree convolution) |
US9567978B2 (en) * | 2014-10-27 | 2017-02-14 | General Electric Company | System and method for adaptive rotor imbalance control |
US10282687B2 (en) * | 2015-10-07 | 2019-05-07 | University Of Utah Research Foundation | Systems and methods for managing power generation resources |
US10742055B2 (en) * | 2015-10-08 | 2020-08-11 | Con Edison Battery Storage, Llc | Renewable energy system with simultaneous ramp rate control and frequency regulation |
-
2014
- 2014-11-28 CN CN201410701366.1A patent/CN104463697A/zh active Pending
-
2015
- 2015-04-13 US US14/684,453 patent/US20160154061A1/en not_active Abandoned
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103887813A (zh) * | 2014-01-21 | 2014-06-25 | 国家电网公司 | 基于风功率预测不确定度的风电系统运行的控制方法 |
Non-Patent Citations (1)
Title |
---|
HAIBO LI 等: "Risk assessment of power system with high penetration of wind power considering negative peak shaving and extreme weather conditions", 《PES GENERAL MEETING | CONFERENCE & EXPOSITION,2014 IEEE》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105243517A (zh) * | 2015-11-12 | 2016-01-13 | 华北电力大学(保定) | 一种大型并网光伏电站可靠性评估方法 |
CN105356446A (zh) * | 2016-01-07 | 2016-02-24 | 江苏省电力公司南京供电公司 | 一种电力系统网络的风险评估方法 |
CN105356446B (zh) * | 2016-01-07 | 2017-10-03 | 江苏省电力公司南京供电公司 | 一种电力系统网络的风险评估方法 |
CN110571864A (zh) * | 2019-09-09 | 2019-12-13 | 重庆大学 | 一种计及风电预测误差时序相关性和机组启停调峰的含风电-光热电力系统机组组合方法 |
CN113988648A (zh) * | 2021-10-29 | 2022-01-28 | 广东电网有限责任公司 | 一种风电柔直系统风险值的计算方法及装置 |
CN115296338A (zh) * | 2022-08-23 | 2022-11-04 | 广西大学 | 基于多时间尺度分析的风电出力极端爬坡风险评估方法 |
CN115296338B (zh) * | 2022-08-23 | 2024-07-09 | 广西大学 | 基于多时间尺度分析的风电出力极端爬坡风险评估方法 |
Also Published As
Publication number | Publication date |
---|---|
US20160154061A1 (en) | 2016-06-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104463697A (zh) | 含大规模风电电力系统的风险评估方法 | |
CN103475021B (zh) | 一种基于统计模型的风电场弃风电量确定方法 | |
CN101858312B (zh) | 风力发电机组实时运行状态评估系统及评估方法 | |
CN103400302B (zh) | 一种风电基地连锁故障风险感知预警方法 | |
WO2019218671A1 (zh) | 一种海岛微电网综合优化配置方法及装置 | |
CN102831321A (zh) | 一种基于蒙特卡洛方法的风电场风险评估方法 | |
CN106779377B (zh) | 风电消纳过程评估方法 | |
CN104951899A (zh) | 含大规模可再生能源的配电公司多时间尺度优化调度方法 | |
CN104882905A (zh) | 一种考虑暂态安全约束的新能源接纳能力评估方法 | |
CN103679282A (zh) | 风电功率爬坡的预测方法 | |
CN111859812B (zh) | 天气影响下的海上风电场及柔直并网系统可靠性评估方法 | |
CN103825272A (zh) | 一种基于解析法的含分散风电的配电网可靠性确定方法 | |
CN103488864A (zh) | 一种风光储联合发电系统风险的评估方法 | |
CN105140967B (zh) | 一种含新能源电力系统调峰需求的评估方法 | |
CN104484728B (zh) | 一种电网安全综合指标体系架构方法 | |
George et al. | Risk quantification associated with wind energy intermittency in California | |
CN108039728B (zh) | 提升电网清洁能源消纳能力的实时调度方法 | |
CN104636993B (zh) | 配电系统可靠性算法 | |
Gonçalves et al. | Extreme weather events on energy systems: a comprehensive review on impacts, mitigation, and adaptation measures | |
CN103488865A (zh) | 一种储能装置容量的计算方法 | |
CN104156614B (zh) | 一种基于静态安全域的电力系统风险评估方法 | |
CN106485593B (zh) | 一种电网侧新能源发电受限原因分析方法 | |
Okorie et al. | Assessment of the reliability performance of Shiroro hydro-electric power station, Minna, Niger State | |
CN108229764B (zh) | 用于多类型电源联合运行的协调控制仿真分析方法及装置 | |
CN103955755A (zh) | 采用复合数据源基于自学习多项式核函数支持向量机的风电功率短期预测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150325 |