CN104463496A CN201410820091.3A CN201410820091A CN104463496A CN 104463496 A CN104463496 A CN 104463496A CN 201410820091 A CN201410820091 A CN 201410820091A CN 104463496 A CN104463496 A CN 104463496A
Authority
CN
China
Prior art keywords
file
smart card
data
various piece
demand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410820091.3A
Other languages
Chinese (zh)
Inventor
黄林辉
袁外平
杨军
张翠武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Eastcompeace Technology Co Ltd
Original Assignee
Eastcompeace Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Eastcompeace Technology Co Ltd filed Critical Eastcompeace Technology Co Ltd
Priority to CN201410820091.3A priority Critical patent/CN104463496A/en
Publication of CN104463496A publication Critical patent/CN104463496A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a smart card project requirement information processing method. The method comprises the steps of responding to a smart card project requirement information file built by a user, selecting operations of processors of file parts of the smart card project requirement file, and sending processing notifications to the processers of the file parts; responding to the processors to process the file parts according to the requirement information, and uploading operations of the processed file parts; detecting data of the processed file parts according to preset rules; when the data pass detection, auditing the data by means of auditing rules corresponding to the file parts; after all the file parts in the project requirement file are audited, requirement release is carried out. According to the smart card project requirement information processing method, smart card project requirement information processing can be efficiently and conveniently completed.

Description

Smart card projects requirement information processing method and system
Technical field
The present invention relates to electronic technology field, particularly relate to a kind of smart card projects requirement information processing method and system.
Background technology
Along with the development of smart card, the kind of smart card is more and more, function is also more and more abundanter.Growing out of nothing of each smart card all experienced by the process of a Water demand.
But existing project demands information processing method compares dispersion, and much all do not form a complete system.The efficiency of project demands information processing can be caused so very low.Or utilize existing project structure information handling system, but current project structure information handling system framework is larger, control is many, therefore existing project structure information handling system processing speed is slow, and it is higher for the learning cost of this belfry, and will be applied in the process of developing in field belonging to oneself and also have many regulations, be inconvenient to use, the demand of the personalization of industry-by-industry can not be met.
Therefore, completing the process of smart card projects demand information how efficiently, easily, is those skilled in the art's technical issues that need to address.
Summary of the invention
The object of this invention is to provide a kind of smart card projects requirement information processing method, the method can complete the process of smart card projects demand information efficiently, easily; Another object of the present invention is to provide a kind of smart card projects demand information disposal system.
For solving the problems of the technologies described above, the invention provides a kind of smart card projects requirement information processing method and comprising:
Response user sets up smart card projects demand information file, selects the operation of the handler of various piece file in described smart card projects demand file, and notifies to handler's transmission processing of described various piece file;
Respond each handler according to demand information described partial document is processed, and the operation of partial document after upload process;
Data in partial document after described process are detected according to pre-defined rule;
When detection by after, utilize the corresponding auditing rule of various piece file to audit data;
When various piece file in project demands file all audit by time, carry out demand issue.
Wherein, smart card projects requirement information processing method also comprises: the account of login and password.
Wherein, describedly according to pre-defined rule, detection carried out to the data in the partial document after described process comprise:
Determine the pre-defined rule of the data in the partial document after described process;
According to the data type of described pre-defined rule to the data in described partial document, data length, data area detects.
Wherein, the described corresponding auditing rule of various piece file that utilizes is carried out examination & verification by rear data comprise detection:
Determine the auditing rule that described various piece file is corresponding;
Normal data in data in partial document after described process and described auditing rule is compared;
When comparative result is in degree of confidence, then examination & verification is passed through.
Wherein, smart card projects requirement information processing method also comprises: carry out smart card projects demand information updating.
Wherein, smart card projects requirement information processing method also comprises: carry out the inquiry of smart card projects demand information.
The invention provides a kind of smart card projects demand information disposal system to comprise:
First respond module, setting up smart card projects demand information file for responding user, selecting the operation of the handler of various piece file in described smart card projects demand file, and notify to handler's transmission processing of described various piece file;
Second respond module, for respond each handler according to demand information described partial document is processed, and the operation of partial document after upload process;
Detection module, for detecting according to pre-defined rule the data in the partial document after described process;
Auditing module, is audited by rear data detection for utilizing the corresponding auditing rule of various piece file;
Release module, for all audit when various piece file in project demands file by time, carry out demand issue.
Wherein, described first respond module comprises:
First response unit, setting up smart card projects demand information file for responding user, selecting the operation of the handler of various piece file in described smart card projects demand file;
Search unit, for the email address of the handler by data base querying various piece file;
Transmitting element, for utilizing described email address to each handler's transmission processing notice.
Wherein, smart card projects demand information disposal system also comprises:
Update module, for carrying out renewal rewards theory to smart card projects demand information.
Wherein, smart card projects demand information disposal system also comprises:
Enquiry module, for carrying out the inquiry of smart card projects demand information.
Based on technique scheme, smart card projects requirement information processing method provided by the present invention comprises: response user sets up smart card projects demand information file, select the operation of the handler of various piece file in described smart card projects demand file, and notify to handler's transmission processing of described various piece file; Respond each handler according to demand information described partial document is processed, and the operation of partial document after upload process; Data in partial document after described process are detected according to pre-defined rule; When detection by after, utilize the corresponding auditing rule of various piece file to audit data; When various piece file in project demands file all audit by time, carry out demand issue; The method is passed through in advance by handler's information acquisition of various piece file in smart card information file, preliminary detection is carried out by the file that will upload, get rid of the described partial document not meeting basic demand, can pinpoint the problems as early as possible like this, improve the processing speed of project demands information; Partial document after being detected by first pass is audited data utilizing the corresponding auditing rule of various piece file, only have when all partial documents all pass through examination & verification, demand information after this smart card projects demand information process just can be issued, and the accuracy of demand analysis so also can be made high.The method can complete the process of smart card projects demand information efficiently, easily.
Accompanying drawing explanation
The process flow diagram of the smart card projects requirement information processing method that Fig. 1 provides for the embodiment of the present invention;
The structured flowchart of the smart card projects demand information disposal system that Fig. 2 provides for the embodiment of the present invention;
The structured flowchart of the first respond module that Fig. 3 provides for the embodiment of the present invention;
The structured flowchart of another smart card projects demand information disposal system that Fig. 4 provides for the embodiment of the present invention;
The structured flowchart of the smart card projects demand information disposal system again that Fig. 5 provides for the embodiment of the present invention.
Embodiment
The object of this invention is to provide a kind of smart card projects requirement information processing method, the method can complete the process of smart card projects demand information efficiently, easily; Another object of the present invention is to provide a kind of smart card projects demand information disposal system.
For making the object of the embodiment of the present invention, technical scheme and advantage clearly, below in conjunction with the accompanying drawing in the embodiment of the present invention, technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
Please refer to Fig. 1, the process flow diagram of the smart card projects requirement information processing method that Fig. 1 provides for the embodiment of the present invention; The method can comprise:
Step s100, response user set up smart card projects demand information file, select the operation of the handler of various piece file in described smart card projects demand file, and notify to handler's transmission processing of described various piece file;
Wherein, in field of intelligent cards, project demands message file can comprise technology industrialization demand process file, demand data process file, magnetic stripe demand process file, card demand process file, visualization requirement process file, packaging and logistics demand process file etc.; Handler's appointment can be carried out according to smart card projects demand information file various piece process here file, such as demand data process file selects Li Ming to process etc., after corresponding complete user formulates the handler of various piece file, handler's transmission processing notice of every part can be given, wherein, this process notice can be undertaken by mail, also can be undertaken by note, or phone carries out.
These modes are that the database contacted by the handler arranged at first determines, if what deposit in such as database is handler's email address, so will send with the form of mail, if each contact data is all deposited in a database, then user can be had to select send mode flexibly.
Step s110, respond each handler according to demand information described partial document is processed, and the operation of partial document after upload process;
The data such as wherein, each handler, when receiving the partial document of process, carries out related work according to the specific requirement of each part, such as, can comprise magnetic stripe kind inside magnetic stripe demand process file, magnetic stripe size need to process.After the handler of various piece file completes process, the file completed is uploaded.
Step s120, the data in the partial document after described process to be detected according to pre-defined rule;
Wherein, handler to be processed and the file uploaded carries out primary detection, namely this detection is rough detection, can only detect data, such as, can comprise magnetic stripe kind inside magnetic stripe demand process file, the data such as magnetic stripe size need to process, naturally the pre-defined rule of this part can limit each data, such as in magnetic stripe size, the data type representing magnetic stripe size can be set, such as integer, and be necessary for positive number etc., can the data in the partial document after process be detected by these pre-defined rules.
When there are data and do not meet the situation of pre-defined rule, then can return error message, this error message can comprise again, the address of corrupt data, type of error etc.The handler that facilitates of the benefit done like this corrects, and improves treatment effeciency.Save the time of hand inspection.
When not when there is mistake, just review process can be entered by rough detection.
Step s130, when detection by after, utilize the corresponding auditing rule of various piece file to audit data;
Wherein, for smart card, various piece file all can have its corresponding auditing rule, is audited by these auditing rule, ensures the accuracy of file.Such as comprise magnetic stripe kind by inside magnetic stripe demand process file, the data such as magnetic stripe size carry out the restriction of scope, and the regulation of magnetic behavior etc., when these data in this partial document and the normal data in auditing rule compare, when comparative result shows that they exist larger error, then show to make mistakes, again process.When the error existed is in the scope that auditing rule is predetermined, then can carry out the examination & verification of the next item down, after only having all the elements in this partial document all to pass through examination & verification, this partial document just belongs to examination & verification to be passed through.
Step s140, when various piece file in project demands file all audit by time, carry out demand issue.
Wherein, only have when various piece file in smart card projects demand file all audit by time, carry out demand issue.The accuracy in order to ensure demand process like this.
Wherein, demand issue can be when various piece file in smart card projects demand file all audit pass through time, obtain examination & verification and pass through information, automatically this project demands is issued, also can be when examination & verification by after, being given by information, demand issue can being carried out by relevant responsible official when receiving by information.
Based on technique scheme, smart card projects requirement information processing method provided by the present invention, the method is passed through in advance by handler's information acquisition of various piece file in smart card information file, preliminary detection is carried out by the file that will upload, get rid of the described partial document not meeting basic demand, can pinpoint the problems as early as possible like this, improve the processing speed of project demands information; Partial document after being detected by first pass is audited data utilizing the corresponding auditing rule of various piece file, only have when all partial documents all pass through examination & verification, demand information after this smart card projects demand information process just can be issued, and the accuracy of demand analysis so also can be made high.The method can complete the process of smart card projects demand information efficiently, easily.
Optionally, smart card projects requirement information processing method also comprises: the account and the password that arrange login.
Wherein, in order to ensure the security of operating system and the protection to smart card projects demand information; prevent from revealing important information; therefore need to carry out login password setting; and the setting of the account logged in; prevent the unauthorized person system of entering from carrying out illegal operation, ensure the security of system and the protection to secret of the trade.
Optionally, described handler's transmission processing of various piece file notice of giving comprises:
By the email address of the handler of data base querying various piece file;
Utilize described email address to each handler's transmission processing notice.
Optionally, describedly according to pre-defined rule, detection carried out to the data in the partial document after described process comprise:
Determine the pre-defined rule of the data in the partial document after described process;
Wherein, in field of intelligent cards, project demands message file can comprise technology industrialization demand process file, demand data process file, magnetic stripe demand process file, card demand process file, visualization requirement process file, packaging and logistics demand process file etc.; Therefore to pre-set the pre-defined rule of each partial data, therefore here before detecting, first will determine the pre-defined rule of the data in the partial document after processing.
According to the data type of described pre-defined rule to the data in described partial document, data length, data area detects.
Wherein, Data Detection is carried out according to the content of pre-defined rule; Wherein, pre-defined rule can comprise the data type of data, data length, data area etc.
Optionally, the described corresponding auditing rule of various piece file that utilizes is carried out examination & verification by rear data comprise detection:
Determine the auditing rule that described various piece file is corresponding;
Wherein, same as above, in the process of smart card demand, each partial document can have corresponding auditing rule, and because the content of every part process is different, therefore the content of auditing rule all will be carried out prespecified according to corresponding partial document.Make, each partial document all can have its corresponding auditing rule.
Normal data in data in partial document after described process and described auditing rule is compared;
Wherein, the content in the partial document after process and the content in auditing rule being compared, when there are differences, just can obtain difference between the two between the two.This difference can as comparative result.
When comparative result is in degree of confidence, then examination & verification is passed through.
Wherein, different during requirement standard to all data in each partial document, degree of confidence here needs to determine according to actual conditions, also can enter upgrade, to guarantee the feasibility of data according to actual conditions.
Optionally, smart card projects requirement information processing method also comprises: carry out smart card projects demand information updating.
Wherein, when can work as the amendment of smart card projects demand needs, upgrade request can be initiated by needing part department belonging to the demand of amendment, and select the demand needing upgrading; Amendment demand information or after again uploading new demand bag, the demand bag of amendment reenters demand bag auditing flow, and audit by rear, demand is updated successfully.
Optionally, smart card projects requirement information processing method also comprises: carry out the inquiry of smart card projects demand information.
Wherein, the smart card projects demand information issued or processing can be inquired about, progress can be understood more timely, or understand the situation having issued demand information.
Based on technique scheme, smart card projects requirement information processing method provided by the present invention, the method is passed through in advance by handler's information acquisition of various piece file in smart card information file, preliminary detection is carried out by the file that will upload, get rid of the described partial document not meeting basic demand, can pinpoint the problems as early as possible like this, improve the processing speed of project demands information; Partial document after being detected by first pass is audited data utilizing the corresponding auditing rule of various piece file, only have when all partial documents all pass through examination & verification, demand information after this smart card projects demand information process just can be issued, and the accuracy of demand analysis so also can be made high.And just can be logged in by account and password, improve the security of system, and the security of demand information.The method can efficiently, convenient, safe complete the process of smart card projects demand information.
Embodiments provide smart card projects requirement information processing method, can by said method can efficiently, convenient, safe complete the process of smart card projects demand information.
Be introduced the smart card projects demand information disposal system that the embodiment of the present invention provides below, smart card projects demand information disposal system described below can mutual corresponding reference with above-described smart card projects requirement information processing method.
Please refer to Fig. 2, the structured flowchart of the smart card projects demand information disposal system that Fig. 2 provides for the embodiment of the present invention; This structured flowchart can comprise:
First respond module 100, setting up smart card projects demand information file for responding user, selecting the operation of the handler of various piece file in described smart card projects demand file, and notify to handler's transmission processing of described various piece file;
Second respond module 200, for respond each handler according to demand information described partial document is processed, and the operation of partial document after upload process;
Detection module 300, for detecting according to pre-defined rule the data in the partial document after described process;
Auditing module 400, is audited by rear data detection for utilizing the corresponding auditing rule of various piece file;
Release module 500, for all audit when various piece file in project demands file by time, carry out demand issue.
Optionally, please refer to Fig. 3, the structured flowchart of the first respond module that Fig. 3 provides for the embodiment of the present invention; This module can comprise:
First response unit 110, setting up smart card projects demand information file for responding user, selecting the operation of the handler of various piece file in described smart card projects demand file;
Search unit 120, for the email address of the handler by data base querying various piece file;
Transmitting element 130, for utilizing described email address to each handler's transmission processing notice.
Optionally, please refer to Fig. 4, the structured flowchart of another smart card projects demand information disposal system that Fig. 4 provides for the embodiment of the present invention; This structured flowchart can also comprise:
Update module 600, for carrying out renewal rewards theory to smart card projects demand information.
Optionally, please refer to Fig. 5, the structured flowchart of the smart card projects demand information disposal system again that Fig. 5 provides for the embodiment of the present invention; This structured flowchart can also comprise:
Enquiry module 700, for carrying out the inquiry of smart card projects demand information.
Optionally, the structured flowchart of another smart card projects demand information disposal system that provides of the embodiment of the present invention; This structured flowchart can also comprise:
Crypto module, for arranging account and the password of login.
Optionally, can also all or combination in any comprise above-mentioned crypto module, enquiry module 700, update module 600.
In instructions, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiments, between each embodiment identical similar portion mutually see.For device disclosed in embodiment, because it corresponds to the method disclosed in Example, so description is fairly simple, relevant part illustrates see method part.
Professional can also recognize further, in conjunction with unit and the algorithm steps of each example of embodiment disclosed herein description, can realize with electronic hardware, computer software or the combination of the two, in order to the interchangeability of hardware and software is clearly described, generally describe composition and the step of each example in the above description according to function.These functions perform with hardware or software mode actually, depend on application-specific and the design constraint of technical scheme.Professional and technical personnel can use distinct methods to realize described function to each specifically should being used for, but this realization should not thought and exceeds scope of the present invention.
The software module that the method described in conjunction with embodiment disclosed herein or the step of algorithm can directly use hardware, processor to perform, or the combination of the two is implemented.Software module can be placed in the storage medium of other form any known in random access memory (RAM), internal memory, ROM (read-only memory) (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technical field.
Above smart card projects requirement information processing method provided by the present invention and system are described in detail.Apply specific case herein to set forth principle of the present invention and embodiment, the explanation of above embodiment just understands method of the present invention and core concept thereof for helping.It should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention, can also carry out some improvement and modification to the present invention, these improve and modify and also fall in the protection domain of the claims in the present invention.

Claims (10)

1. a smart card projects requirement information processing method, is characterized in that, comprising:
Response user sets up smart card projects demand information file, selects the operation of the handler of various piece file in described smart card projects demand file, and notifies to handler's transmission processing of described various piece file;
Respond each handler according to demand information described partial document is processed, and the operation of partial document after upload process;
Data in partial document after described process are detected according to pre-defined rule;
When detection by after, utilize the corresponding auditing rule of various piece file to audit data;
When various piece file in project demands file all audit by time, carry out demand issue.
2. project demands information processing method as claimed in claim 1, is characterized in that, also comprise: the account and the password that arrange login.
3. project demands information processing method as claimed in claim 1, is characterized in that, describedly carries out detection to the data in the partial document after described process according to pre-defined rule and comprises:
Determine the pre-defined rule of the data in the partial document after described process;
According to the data type of described pre-defined rule to the data in described partial document, data length, data area detects.
4. project demands information processing method as claimed in claim 1, is characterized in that, describedly utilizes the corresponding auditing rule of various piece file to carry out examination & verification to detection by rear data to comprise:
Determine the auditing rule that described various piece file is corresponding;
Normal data in data in partial document after described process and described auditing rule is compared;
When comparative result is in degree of confidence, then examination & verification is passed through.
5. project demands information processing method as claimed in claim 1, is characterized in that, also comprise: carry out smart card projects demand information updating.
6. project demands information processing method as claimed in claim 1, is characterized in that, also comprise and carry out the inquiry of smart card projects demand information.
7. a smart card projects demand information disposal system, is characterized in that, comprising:
First respond module, setting up smart card projects demand information file for responding user, selecting the operation of the handler of various piece file in described smart card projects demand file, and notify to handler's transmission processing of described various piece file;
Second respond module, for respond each handler according to demand information described partial document is processed, and the operation of partial document after upload process;
Detection module, for detecting according to pre-defined rule the data in the partial document after described process;
Auditing module, is audited by rear data detection for utilizing the corresponding auditing rule of various piece file;
Release module, for all audit when various piece file in project demands file by time, carry out demand issue.
8. project demands information handling system as claimed in claim 7, it is characterized in that, described first respond module comprises:
First response unit, setting up smart card projects demand information file for responding user, selecting the operation of the handler of various piece file in described smart card projects demand file;
Search unit, for the email address of the handler by data base querying various piece file;
Transmitting element, for utilizing described email address to each handler's transmission processing notice.
9. project demands information handling system as claimed in claim 7, is characterized in that, also comprise:
Update module, for carrying out renewal rewards theory to smart card projects demand information.
10. project demands information handling system as claimed in claim 7, is characterized in that, also comprise:
Enquiry module, for carrying out the inquiry of smart card projects demand information.
CN201410820091.3A 2014-12-22 2014-12-22 Smart card project requirement information processing method and system Pending CN104463496A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410820091.3A CN104463496A (en) 2014-12-22 2014-12-22 Smart card project requirement information processing method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410820091.3A CN104463496A (en) 2014-12-22 2014-12-22 Smart card project requirement information processing method and system

Publications (1)

Publication Number Publication Date
CN104463496A true CN104463496A (en) 2015-03-25

Family

ID=52909493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410820091.3A Pending CN104463496A (en) 2014-12-22 2014-12-22 Smart card project requirement information processing method and system

Country Status (1)

Country Link
CN (1) CN104463496A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105512825A (en) * 2015-12-15 2016-04-20 中国建设银行股份有限公司 Business requirement analysis result detection method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080201552A1 (en) * 2007-02-21 2008-08-21 Fuji Xerox Co., Ltd. Computer-readable medium storing program for controlling archiving of electronic doucument, document management system, document management method, and computer data signal
CN101739409A (en) * 2008-11-26 2010-06-16 英业达集团(天津)电子技术有限公司 Management system and method of electronic files
US20110087785A1 (en) * 2009-10-13 2011-04-14 Xerox Corporation Systems and methods for distributing work among a plurality of workers
CN103645893A (en) * 2013-11-29 2014-03-19 广州视源电子科技股份有限公司 Software requirement checking method and requirement checking system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080201552A1 (en) * 2007-02-21 2008-08-21 Fuji Xerox Co., Ltd. Computer-readable medium storing program for controlling archiving of electronic doucument, document management system, document management method, and computer data signal
CN101739409A (en) * 2008-11-26 2010-06-16 英业达集团(天津)电子技术有限公司 Management system and method of electronic files
US20110087785A1 (en) * 2009-10-13 2011-04-14 Xerox Corporation Systems and methods for distributing work among a plurality of workers
CN103645893A (en) * 2013-11-29 2014-03-19 广州视源电子科技股份有限公司 Software requirement checking method and requirement checking system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105512825A (en) * 2015-12-15 2016-04-20 中国建设银行股份有限公司 Business requirement analysis result detection method and device

Similar Documents

Publication Publication Date Title
US11108863B2 (en) Tag operating system
KR102151862B1 (en) Service processing method and device
CN106133743B (en) System and method for optimizing the scanning of pre-installation application program
US20200364525A1 (en) Rf tag operating system with iot connector core
US9548987B1 (en) Intelligent remediation of security-related events
US10432622B2 (en) Securing biometric data through template distribution
CN111800450B (en) Multidimensional tag namespaces for cloud resource management
CN109409050B (en) Protection system including machine learning snapshot evaluation
CN103425736A (en) Web information recognition method, device and system
US20210056530A1 (en) Method and system for supporting promotion of use of digital local currency
US20160343101A1 (en) Customer identity verification
CN106250876A (en) A kind of fingerprint identification method and terminal
US11928741B1 (en) Systems and methods for detecting items at a property
US20230244680A1 (en) Systems and methods for expedited large file processing
CN107147711A (en) Application service update method and device
CN106464502A (en) Methods and systems for authentication of a communication device
WO2019157122A1 (en) Rf tag operating system with iot connector core
CN106250111A (en) A kind of wallpaper acquisition methods and terminal
CN109918385A (en) Tripartite's account checking method, electronic device and readable storage medium storing program for executing
CN105659247A (en) Context-aware proactive threat management system
CN104463496A (en) Smart card project requirement information processing method and system
CN112541645A (en) Data processing method and system along with vehicle product project development and related device
CN115757075A (en) Task abnormity detection method and device, computer equipment and storage medium
CN114625756A (en) Data query method and device and server
CN107909382A (en) User grouping management method, server and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150325