CN104463474A - Initial complex equipment maintaining device supplying method based on task driving - Google Patents

Initial complex equipment maintaining device supplying method based on task driving Download PDF

Info

Publication number
CN104463474A
CN104463474A CN201410764020.6A CN201410764020A CN104463474A CN 104463474 A CN104463474 A CN 104463474A CN 201410764020 A CN201410764020 A CN 201410764020A CN 104463474 A CN104463474 A CN 104463474A
Authority
CN
China
Prior art keywords
maintenance
initial provision
complex equipment
maintenance supply
supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410764020.6A
Other languages
Chinese (zh)
Inventor
王哲
赵汝岩
姜学鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Naval Aeronautical Engineering Institute of PLA
Original Assignee
Naval Aeronautical Engineering Institute of PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Naval Aeronautical Engineering Institute of PLA filed Critical Naval Aeronautical Engineering Institute of PLA
Priority to CN201410764020.6A priority Critical patent/CN104463474A/en
Publication of CN104463474A publication Critical patent/CN104463474A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides an initial complex equipment maintaining device supplying method based on task driving. The initial complex equipment maintaining device specifically comprises the steps that using modes of a maintaining device are divided into normal task consumption and maintaining exchanging consumption according to the fight using and technical characteristics of complex equipment, accordingly, the maintaining equipment is correspondingly divided, a variety and number estimating and calculating method within an initial supplying period is correspondingly formulated according to the characteristics of the maintaining devices, and therefore a series consumption rate standard and a supplying technical file are formed for ordering and collecting of different levels of organs, troops and device studying and manufacturing units within the initial maintaining device supplying period.

Description

The complex equipment maintenance supply initial provision method that task based access control drives
Technical field
The present invention relates to a kind of complex equipment maintenance supply initial provision method that task based access control drives, belong to Military Hardware Maintenance safeguards technique field.
Background technology
Military Hardware Maintenance equipment initial provision planning problem, kind and the quantity of (in payment army 2 ~ 3 years) maintenance supply demand within the equipment initial provision phase is determined exactly according to certain Rule and constraint, formulate the supply standard forming series based on this, provide foundation can order goods, raise, store, consume and supplement for maintenance supply in the initial provision phase.
It is not one step completed that the supply standard of maintenance supply is formulated, but will through continuous amendment and perfect.Initial provision amount is for making equipment come into operation in initial 2 ~ 3 years, obtaining maintenance supply guarantee timely and arrange.At the general initial stage under arms, the work such as war preparedness, training, maintenance of equipment not yet enters the right path, lacking experience of operational support, and fault characteristic does not also enter the stabilization sub stage, determines that the condition of turnover reserve amount is also immature.Thus, be necessary to estimate the maintenance supply demand kind in the initial provision phase and quantity and calculate, to ensure that the equipment in this period normally uses.Meanwhile, more progressively revise supply standard by the consumption statistics of the maintenance supply in the initial provision phase, form the supply standard in the follow-up regular supply phase and proceed to regular supply.
Therefore maintenance supply initial provision planning problem lacks on the basis of necessary consumption data in fact exactly within the initial provision phase, adopt various method to estimate the kind of maintenance supply in this period and quantity and calculate, object meets the normal needs used of equipment in the initial provision phase.
At present, maintenance supply planning in the domestic and international initial provision phase mainly with security probability with on average ensure that the delay time at stop is for quantitative requirement, such as: security probability leash law, experience method of determining and calculating, Similarity Class like method, demand analysis method etc. mostly with above-mentioned two indices for optimal conditions is formulated.In initial provision phase maintenance supply determination program, mainly comprise the selection of kind defining method, quantity computation method selection, the standard formulation of demand defining method, Data Collection and analysis, hold and grind that contractor determines, provisioning technique paper formulation, supply the steps such as inventory is determined, maintenance supply supply programme.In specific construction practice, there is certain drawback in this method, be embodied in following some:
1. do not contain the four corner that maintenance supply uses.According to GJB4050 GJB 4050 " Military Hardware Maintenance material supporting General Requirement ", GJB 4355 " spare part planning requirement " relevant regulations, maintenance supply mainly meets weapon and normally uses, safeguard, equipment together required in repair procedures and material, generally comprise for ensureing equipment use technology and various components and parts for subsequent use, parts, for the accessory etc. of the use operation of equipping and daily servicing, electric tool needed for equipment repair and jack board, be used for during equipment repair measuring, the various instrument (device) of calibration, various oil plant needed for equipment repair and special fluid and starting material and Wiping material etc.But the kind calculated according to existing maintenance supply initial provision planing method and quantity, can only ensure that equipment repair uses.For complex equipment, lacked at technique preparation, detected in year, the conventional equipment consumed in tipping testing process, and this part equipment exactly complex equipment guarantee sufficiently high Combat readiness and mission reliability necessary.
2. do not have and the direct correlation of equipment execution status of task.Due to special combat mission and technical characterstic, multiple task mode such as complex equipment has needed to load transport, cave depot storage, grade turn on duty into, war preparedness, technology recovery, depot repair, wherein need a large amount of maintenance supply to carry out ensureing and supplying.But, current planing method is for foundation with the protection index of equipment Reliability index and equipment, have ignored the task mode implementation status outside removing maintenance, simultaneously, in the calculating of maintenance supply quantity, too much consider protection index and reliability index, have ignored the demand of operational exertion.
Summary of the invention
For solving above-mentioned two problems, the complex equipment maintenance supply initial provision planing method that a kind of task based access control drives is proposed, principle, method, content had both considered maintenance task demand to maintenance supply within the initial provision phase, again operational exertion is required the category incorporating maintenance supply planning, comprise the steps:
Step one: Task-decomposing;
Step 2: maintenance supply is classified;
Step 3: determine complex equipment operational exertion flow process;
Step 4: determine complex equipment maintenance support scheme;
Step 5: the kind estimating spare part needed for base level in the complex equipment initial provision phase;
Step 6: tentatively determine maintenance supply evaluation method and program in the initial provision phase;
Step 7: estimate and calculate all types of maintenance supply quantity, the correction of line number of going forward side by side amount;
Step 8: form initial provision technological document.
Accompanying drawing explanation
Fig. 1 is the maintenance supply initial provision planning system framework that task based access control drives.
Embodiment
To develop simultaneously embodiment below in conjunction with accompanying drawing 1, describe the present invention.
Step one: Task-decomposing, assumes a mission and technical characterstic according to complex equipment, determines the particular content framework of normal work to do and maintenance task.
Step 2: according to the particular content framework of normal work to do and maintenance task maintenance supply turned according to war preparedness that level consumes equipment, personnel training consumes equipment, maintenance consumes equipment, maintain and replace spare part four class divides.
Step 3: according to relevant operational exertion technological document, determine complex equipment operational exertion flow process.
Step 4: according to the supportability Analysis method step of FMECA-RCMA-MTA-LORA, on the basis of service condition of using for reference close model equipment, determines the maintenance support scheme of this complex equipment.
Step 5: according to complex equipment operational exertion flow process and maintenance support scheme, specifies to estimate that the war preparedness in the complex equipment initial provision phase needed for base level turns the kind that level consumes equipment, personnel training consumes equipment, maintenance consumes equipment, maintain and replace spare part according to the related request in GJB4355 " spares provisioning planning requirement ".
Step 6: tentatively determine for difference maintenance equipment type and different maintenance supply physical attribute the initial provision phase in maintenance supply evaluation method and program.
Step 7: estimate and calculate all types of maintenance supply quantity, utilizes the principles such as mathematical method is convenient according to maintenance to estimation spare part quantity, expense is harmonious, delivery cycle is moderate to carry out quantity correction.
Step 8: form initial provision technological document, according to above-mentioned steps achievement in research, manufacture after Cheng Yan unit confirms through office, army, JunDaiRoom, equipment, form complex equipment initial provision technical paper series, provide foundation as maintenance supply supply and guarantee.
The method that the present invention proposes can be used in determining complex equipment initial provision phase maintenance supply kind, quantity, the norm quota of consumption, raise the parameter such as method, configuration level, contribute to carrying out of maintenance supply safeguard work such as instructing the initial provision plan of complex equipment maintenance supply and supply decision to determine.

Claims (3)

1. the maintenance supply initial provision planing method of task based access control driving, comprises following eight steps:
Step one: Task-decomposing;
Step 2: maintenance supply is classified;
Step 3: determine complex equipment operational exertion flow process;
Step 4: determine complex equipment maintenance support scheme;
Step 5: the kind estimating spare part needed for base level in the complex equipment initial provision phase;
Step 6: tentatively determine maintenance supply evaluation method and program in the initial provision phase;
Step 7: estimate and calculate all types of maintenance supply quantity, the correction of line number of going forward side by side amount;
Step 8: form initial provision technological document.
2. the maintenance supply initial provision planing method of task based access control driving as claimed in claim 1, it is characterized in that, the using forestland of maintenance supply be divided into the consumption of normality task and keep in repair for changing consumption two class, correspondingly maintenance supply being divided on this basis.
3. the maintenance supply initial provision planing method of task based access control driving as claimed in claim 1, it is characterized in that, according to complex equipment operational exertion flow process and maintenance support scheme, estimation and the measuring method of kind and quantity in the initial provision phase is correspondingly formulated according to the feature of all kinds of maintenance supply, form serial norm quota of consumption standard and provisioning technique file, hold for office at different levels, army and equipment and grind manufacturer and carry out order in the maintenance supply initial provision phase, raise.
CN201410764020.6A 2014-12-11 2014-12-11 Initial complex equipment maintaining device supplying method based on task driving Pending CN104463474A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410764020.6A CN104463474A (en) 2014-12-11 2014-12-11 Initial complex equipment maintaining device supplying method based on task driving

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410764020.6A CN104463474A (en) 2014-12-11 2014-12-11 Initial complex equipment maintaining device supplying method based on task driving

Publications (1)

Publication Number Publication Date
CN104463474A true CN104463474A (en) 2015-03-25

Family

ID=52909471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410764020.6A Pending CN104463474A (en) 2014-12-11 2014-12-11 Initial complex equipment maintaining device supplying method based on task driving

Country Status (1)

Country Link
CN (1) CN104463474A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107054796A (en) * 2017-05-19 2017-08-18 中国人民解放军防化学院 A kind of quick packaging method of coring emergency and rescue equipment maintenance package
CN112862238A (en) * 2020-12-29 2021-05-28 烟台军星特种装备有限公司 Firearm firing guarantee system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107054796A (en) * 2017-05-19 2017-08-18 中国人民解放军防化学院 A kind of quick packaging method of coring emergency and rescue equipment maintenance package
CN112862238A (en) * 2020-12-29 2021-05-28 烟台军星特种装备有限公司 Firearm firing guarantee system

Similar Documents

Publication Publication Date Title
CN106845109B (en) A kind of exponential type has the calculation method of longevity part spare parts demand amount
CN105160513B (en) A kind of the safety inventory calculation method and system of equipment and spare part
US8671263B2 (en) Implementing optimal storage tier configurations for a workload in a dynamic storage tiering system
CN101853448A (en) Method for predicting spare part demand in equipment manufacturing process
CN109002944A (en) Method for predicting spare part requirements of rolling and packing workshop
CN107784374A (en) Forecasting Methodology, device and the equipment of Wind turbines spare parts demand
CN109544057A (en) A kind of automatic replenishing method, electronic equipment and storage medium
CN110555607A (en) method, terminal and storage medium for calculating and prompting peak load shifting index of power consumer
CN104572296B (en) A kind of method for predicting cloud platform storage resource increment
Shao et al. Optimization of three-echelon inventory project for equipment spare parts based on system support degree
CN109086950A (en) A kind of user's coulometric analysis prediction technique based on big data analysis
CN104463474A (en) Initial complex equipment maintaining device supplying method based on task driving
KR101360824B1 (en) Cost evaluation system for construction project considering organizational capability
CN115330136A (en) Product quality management system, method and related equipment
CN109214530B (en) Increment-based base-level maintenance project quantitative analysis system and method
CN109740814A (en) Prediction technique, device and electronic equipment
CN106251218A (en) The generation method and apparatus of investment combination mode
AU2005202059A1 (en) Automatic Inventory Management System
Aisyati et al. Periodic review model for determining inventory policy for aircraft consumable spare parts
CN103253558B (en) Elevator electric power control setup and elevator electric power control method
CN107688527A (en) Defect display methods and device
CN111027831A (en) Investment decision method and system based on economic evaluation model
Kularathna et al. Multi-objective optimisation using optimizer WSS to support operation and planning decisions of Melbourne water supply system
Zhou et al. Carbon allowance allocation on Chinese industrial sectors in 2030 under multiple indicators
KR20060117652A (en) Automatic inventory management system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150325