It is a kind of to the dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection method of the types of CRTS III Download PDF

Info

Publication number
CN104457537B
CN104457537B CN201410595865.7A CN201410595865A CN104457537B CN 104457537 B CN104457537 B CN 104457537B CN 201410595865 A CN201410595865 A CN 201410595865A CN 104457537 B CN104457537 B CN 104457537B
Authority
CN
China
Prior art keywords
tensioning
meter reading
dual
percentage meter
tensioning system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410595865.7A
Other languages
Chinese (zh)
Other versions
CN104457537A (en
Inventor
苏雅拉图
于善毅
薛泽民
王海员
付民光
宋宗波
李军
张俊兵
郑保才
孙伯乐
李达昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGXI RAILWAY PASSENGER DEDICATED LINE CO., LTD.
China Railway No 3 Engineering Group Co Ltd
China State Railway Group Co Ltd
Original Assignee
ZHENGXI RAILWAY PASSENGER DEDICATED LINE Co Ltd
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGXI RAILWAY PASSENGER DEDICATED LINE Co Ltd, China Railway No 3 Engineering Group Co Ltd filed Critical ZHENGXI RAILWAY PASSENGER DEDICATED LINE Co Ltd
Priority to CN201410595865.7A priority Critical patent/CN104457537B/en
Publication of CN104457537A publication Critical patent/CN104457537A/en
Application granted granted Critical
Publication of CN104457537B publication Critical patent/CN104457537B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

The invention belongs to the dual-direction pre-tensioning system prestressed track plate prefabrication technical field of the plate-type non-fragment orbits of high-speed railway CRTS III, and in particular to a kind of to the dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection method of the types of CRTS III.The problem of solving to the types of CRTS III dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection, detection of the present invention to stretching bed seat deflection, determine in the dual-direction pre-tensioning system prestressed track plate prefabrication technical process control of the plate-type non-fragment orbits of CRTS III, the influence that effective prestress is deformed to stretching bed seat, intensity, bending rigidity to the stretch-drawing beam of each installation need effective checking, ensure the tensioning quality of track slab prestress muscle with this.

Description

It is a kind of to the dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection of the types of CRTS III Method
Technical field
The invention belongs to the dual-direction pre-tensioning system prestressed track plate prefabrication technology of the plate-type non-fragment orbits of high-speed railway CRTS III Field, and in particular to a kind of to the dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection method of the types of CRTS III.
Background technology
The plate-type non-fragment orbits of CRTS III are the newest nothings brand-new, with entirely autonomous intellectual property developed of China Tiny fragments of stone, coal, etc. track structure system, the type pretensioning prestressed concrete track plates of CRTS III are the weights of the plate-type ballastless track structures of CRTS III Part is wanted, is laid in factorial praluction, then to scene.
In order to ensure the vertically and horizontally deformed bar tensioning in track plates to design load, while ensureing every presstressed reinforcing steel Uniform force, should have enough intensity, rigidity and stability, vertical, horizontal Deformation control to stretching bed seat requirement:Design load The lower pedestal deflection of effect should be considered as a whole with stretch-drawing beam deformation, and the suggestion of both comprehensive deformations is not more than 1mm(Pedestal and crossbeam Controlled by 0.5mm), it is more beneficial for stretching force uniformity.Vertical Deformation control:Avoid because its differential settlement causes template to become Shape.
For in the dual-direction pre-tensioning system prestressed track plate prefabrication technical process control of the plate-type non-fragment orbits of CRTS III, pedestal Influence to effective prestress is deformed very crucial, therefore, to the intensity of the stretching bed seat of each installation, rigidity and steady The qualitative effective checking of needs, ensures the tensioning quality of track slab prestress muscle with this.It is particularly two-way to frame-type steel construction The deformation observation of prestressed stretch-draw pedestal is particularly important.
The content of the invention
The problem of present invention is in order to solve to the types of CRTS III dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection, There is provided a kind of to the dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection method of the types of CRTS III.
It is a kind of to the dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection method of the types of CRTS III, specific steps are such as Under:1)Dial gauge mounting bracket, side 5, altogether 20, and check stability are installed on the inside of framework anchor beam.
2)Whole presstressed reinforcing steels and connector are installed.Presstressed reinforcing steel is the construction muscle for being embedded into track plates, and connector is phase The frock of connection between adjacent two track plates and between track plates and tensioning beam.
3)Dial gauge is installed, checked after installation site and stability, reading is carried out and makes a record.
4)By the stressing sequence of pre-tensioned plate, pretension first is carried out by the 30% of stretching force to fixing end.
5)It is quiet to stop 10 minutes after the completion of the process of pretension 30%, start percentage meter reading and make a record.
6)Design proof stress is stretched to, two-way simultaneous tensioning is answered by regulation, quiet to stop 2min, latch frame anchor beam starts Record percentage meter reading.
7)Control stress for prestressing point 3h, 5h, 10h, 12h, 15h record percentage meter reading, while recording jack tension power Decline amount.
8)A jack oil return is put after 15h to " zero " controling power, percentage meter reading is recorded.
Technical measures
1st, calibration
Periodic verification and correction are made in observation process to all instruments used;
2nd, it is fixed
1. console used, equipment will be fixed.2. observation personnel will fix.3. the condition monitored(Proof stress)Basic phase The same method 4. observed, point position are fixed.
3rd, deformation observation required precision
Deformation observation required precision is mainly defined by percentage meter reading.
4th, data analysis and assessment
Assumed condition:Designer is designed to continuous beam to stretching bed seat, and to reduce span, centre sets fulcrum(Buttress), by Then continuous beam, mid span moment and amount of deflection are smaller than simply supported beam, and middle buttress should be fixed(It is rigid), should not occur position Move, stretching bed seat is then considered by two length sections respectively, it is then the position for surveying each measuring point under various stresses that dial gauge, which is installed, Move, reflection stretching bed seat deformation.
If 3. the percentage meter reading of span centre fulcrum is designated as, 1., 5. the percentage meter reading of two ends fulcrum is designated as respectively, 1. and 3. Between percentage meter reading be designated as 2., 3. and 5. between percentage meter reading be designated as 4..
(1)First verify that the deformation of span centre fulcrum 3.(Displacement)It is consistent with the deformation of two ends fulcrum 1., 5., i.e., 3.-(① +⑤)/ 2 < 0.5mm.
(2)If meeting(1)Requirement, then verify 4.-(③+⑤)/ 2 < 0.5mm and 2.-(③+①)/ 2 < 0.5mm.
Explanation:It is above-mentioned that 1., 2., 3., 4., 5. etc. five data are whole tensioning(100% tensioning)The reading of 15 hours is waited afterwards What the reading that number subtracts original state was drawn.
5th, stability analysis:
By the analysis of data logger, after whole tensioning terminates, same measurement point should be less than in the change of different time 0.1mm, can assert that pedestal has preferable stability.
Observe whether pedestal returns to original state after first round pulling test, for the first time may not exclusively, explanation can be with Eliminate pedestal welding and deformation is installed;
After second wheel pulling test, pedestal returns to the second wheel pulling test original state, can determine that as elastic deformation.Together The data of Shi Yaoyu first round pulling tests are analyzed.
Each stretching bed seat is installed after terminating, anchored end, stretching end are observed, it is considered to the tensioning of each pedestal Beam has the constraint buttress for preventing deformation in span centre, and by normally saying, the correspondence position in the middle of each two mould should occur for maximum distortion Put, dial gauge should be arranged in the inboard beams of pedestal, the observed quantity of displacement is used as using span centre and end relative deformation.
Detection of the present invention to stretching bed seat deflection, determines that the plate-type non-fragment orbits of CRTS III are dual-direction pre-tensioning system prestressed In track plate prefabrication technical process control, the influence that effective prestress is deformed to stretching bed seat is opened to each installation Drawing the intensity of crossbeam, bending rigidity needs effective checking, ensures the tensioning quality of track slab prestress muscle with this.
Brief description of the drawings
Fig. 1 is dial gauge scheme of installation.
Embodiment
It is a kind of to the dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection method of the types of CRTS III, specific steps are such as Under:1)Dial gauge mounting bracket is installed on the inside of the framework anchor beam of square, dial gauge mounting bracket is arranged on framework anchor beam On the mattess in outside, mounting bracket sets stable, do not contacted with framework anchor beam can, the uniform cloth in side of framework anchor beam If 5, altogether 20, and check stability;
2)Whole presstressed reinforcing steels and connector are installed;
3)Dial gauge is installed to dial gauge mounting bracket, checked after installation site and stability, carries out reading and does easy to remember Record;
4)By the stressing sequence of pre-tensioned plate, pretension first is carried out by the 30% of stretching force to fixing end;
5)It is quiet to stop 10 minutes after the completion of the process of pretension 30%, start percentage meter reading and make a record;
6)Design proof stress is stretched to, two-way simultaneous tensioning is answered by regulation, quiet to stop 2min, latch frame anchor beam starts Record percentage meter reading;
7)Control stress for prestressing point 3h, 5h, 10h, 12h, 15h record percentage meter reading, while recording jack tension power Decline amount;
8)A jack oil return is put after 15h to " zero " controling power, percentage meter reading is recorded;
9)Carry out data and stability analysis.
If 3. the percentage meter reading of span centre fulcrum is designated as, 1., 5. the percentage meter reading of two ends fulcrum is designated as respectively, 1. and 3. Between percentage meter reading be designated as 2., 3. and 5. between percentage meter reading be designated as 4.,
In step 9,1)First verify that the deformation of span centre fulcrum 3. and the deformation of two ends fulcrum 1., 5. are consistent, both 3.- (①+⑤)/ 2 < 0.5mm;
2)If meeting above-mentioned requirements, verify 4.-(③+⑤)/ 2 < 0.5mm and 2.-(③+①)/ 2 < 0.5mm;
It is above-mentioned that 1., 2., 3., 4., 5. five data are to wait after whole tensioning the reading of 15 hours to subtract original state What reading was drawn.
Two-wheeled be more than or equal to by above-mentioned 1)-9)Step complete to pre-stress rail plate stretching bed seat deformation detection.
First, staff organization is observed
1st, form should be made a record(Time, position, recorder);
2nd, percentage meter reading and 4 people of record(East, south are responsible for by 2 people, and northwest has 2 people to be responsible for, and 2 are carried out when reading and record It is mutually compound);
3rd, oily top pressure force value records 1 people;
4th, the locking of oil top tensioning leading screw and 8 people of release;
5th, 1 people of scene unified command, the operation that take charge cable tensios control platform and each oil push up tensioning leading screw operating personnel refers to Order.
6th, technology is responsible for 1 people, according to(One)Flow, commander read dial gauge.Basis, the weldering of framework anchor beam are observed simultaneously Connect, connecting portion(Displacement, destroy, snap, crack).
2nd, technical measures
1st, calibration
Periodic verification and correction are made in observation process to all instruments used;
2nd, it is fixed
Console used, equipment will be fixed.Observation personnel will fix.The condition of monitoring(Proof stress)It is essentially identical.See The method of survey, point position are fixed.
3rd, deformation observation required precision
Deformation observation required precision is mainly defined by percentage meter reading.
4th, data analysis and assessment
Assumed condition:Designer is designed to continuous beam to stretching bed seat, and to reduce span, centre sets fulcrum(Buttress), by Then continuous beam, mid span moment and amount of deflection are smaller than simply supported beam, and middle buttress should be fixed(It is rigid), should not occur position Move, stretching bed seat is then considered by two length sections respectively, it is then the position for surveying each measuring point under various stresses that dial gauge, which is installed, Move, reflection stretching bed seat deformation.
As shown in Figure 1.
1)First verify that the deformation of span centre fulcrum 3.(Displacement)It is consistent with the deformation of two ends fulcrum 1., 5., both 3.-(①+ ⑤)/ 2 < 0.5mm.
2)If meeting above-mentioned requirements, using 4.-(③+⑤)/ 2 < 0.5mm;②-(③+①)/ 2 < 0.5mm.
Explanation:It is above-mentioned that 1., 2., 3., 4., 5. etc. five data are whole tensioning(100% tensioning)The reading of 15 hours is waited afterwards What the reading that number subtracts original state was drawn.
5th, stability analysis:
By the analysis of data logger, after whole tensioning terminates, same measurement point should be less than in the change of different time 0.1mm, can assert that pedestal has preferable stability.
Observe whether pedestal returns to original state after first round pulling test, for the first time may not exclusively, explanation can be with Eliminate pedestal welding and deformation is installed;
After second wheel pulling test, pedestal returns to the second wheel pulling test original state, can determine that as elastic deformation.Together The data of Shi Yaoyu first round pulling tests are analyzed.
Record data is as shown in the table:
3rd, safety measure
1. the anchoring of all presstressed reinforcing steels and connector, which will be installed to twist, is affixed to position;
2. all connectors will be installed in place
3. there should be safety guard above prestressing force, prevent that tensioning from holding weighing apparatus time cunning eye and hurting sb.'s feelings
4. having warning sign during observation, answer someone on duty, nearby should not be to stress pedestal stacked items, particularly coagulation handwoven cloth Truck is should not the traveling on stretching bed seat.

Claims (3)

1. it is a kind of to the dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection method of the types of CRTS III, it is characterised in that:Tool Body step is as follows:
1)Dial gauge mounting bracket is installed on the inside of the framework anchor beam framework of square, dial gauge mounting bracket is arranged on framework On mattess on the inside of anchor beam, mounting bracket sets stable, and prestressed part referred to as frame is born on stretching bed seat top Frame anchor beam, mounting bracket must not be contacted with the framework anchor beam of stress, and 5 percentages are uniformly laid in side on the inside of four framework anchor beams Table, altogether 20, and check stability;
2)Whole presstressed reinforcing steels and connector are installed;
3)Dial gauge is installed to dial gauge mounting bracket, checked after installation site and stability, carries out reading and makes a record;
4)All dial gauges are respectively mounted completion, after inspection passes through, and follow procedure carries out initial tensioning to track plates, and initial tensioning is by thousand Jin withstands on fixing end and single tendon stretch is carried out to presstressed reinforcing steel, and stretching force is the 30% of design stretching force;
5)It is quiet to stop 10 minutes after the completion of initial tensioning process, start percentage meter reading and make a record;
6)After the completion of percentage meter reading and record, start whole tensioning, whole tensioning uses integral tension, using framework anchor beam to whole All vertically and horizontally presstressed reinforcing steels of individual pedestal, which are synchronized, is stretched to design stretching force, quiet to stop 2min, locks stretch-draw jack, opens Begin record percentage meter reading;
7)Stretching bed seat holds lotus under the conditions of control stress for prestressing, and percentage meter reading is recorded respectively at 3h, 5h, 10h, 12h, 15h Change, while recording jack tension power declines situation;
8)A jack oil return is put after 15h to " zero " controling power, percentage meter reading is recorded;
9)Carry out data and stability analysis.
2. according to claim 1 to the dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection side of the types of CRTS III Method, it is characterised in that:In step 9)In, if 3. the percentage meter reading of span centre fulcrum is designated as, the percentage meter reading point of two ends fulcrum Be not designated as 1., 5., 1. and 3. between percentage meter reading be designated as 2., 3. and 5. between percentage meter reading be designated as 4.,(1)First Verify that the deformation of span centre fulcrum 3. is consistent with the deformation of two ends fulcrum 1., 5., i.e., 3.-(① + ⑤)/ 2 < 0.5mm;
(2)If meeting above-mentioned requirements, verify 4.-(③ + ⑤)/ 2 < 0.5mm and 2.-(③ + ①)/ 2 < 0.5mm ;It is above-mentioned that 1., 2., 3., 4., 5. five data are to wait after whole tensioning the reading of 15 hours to subtract the reading of original state What number was drawn.
3. according to claim 2 to the dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection side of the types of CRTS III Method, it is characterised in that:Two-wheeled be more than or equal to by above-mentioned 1)-9)What step was completed deforms to pre-stress rail plate stretching bed seat Detection.
CN201410595865.7A 2014-10-30 2014-10-30 It is a kind of to the dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection method of the types of CRTS III Active CN104457537B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410595865.7A CN104457537B (en) 2014-10-30 2014-10-30 It is a kind of to the dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection method of the types of CRTS III

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410595865.7A CN104457537B (en) 2014-10-30 2014-10-30 It is a kind of to the dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection method of the types of CRTS III

Publications (2)

Publication Number Publication Date
CN104457537A CN104457537A (en) 2015-03-25
CN104457537B true CN104457537B (en) 2017-07-18

Family

ID=52903980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410595865.7A Active CN104457537B (en) 2014-10-30 2014-10-30 It is a kind of to the dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection method of the types of CRTS III

Country Status (1)

Country Link
CN (1) CN104457537B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824784A (en) * 2010-04-30 2010-09-08 成都普罗米新科技有限责任公司 Track slab detection frame and detection method thereof
CN101851884A (en) * 2010-03-23 2010-10-06 中国建筑股份有限公司 Construction method for paving CRTS I-type plate-type ballastless track plate in severe cold area
CN201865012U (en) * 2010-10-25 2011-06-15 中建二局第三建筑工程有限公司 Self-locking track slab anti-displacement device
CN202885760U (en) * 2012-10-29 2013-04-17 苏州市中瑞模具有限公司 Deformation detection tool

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3315101B2 (en) * 1999-10-29 2002-08-19 株式会社カネコ Track measuring instrument for track laying and track slab measuring instrument

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101851884A (en) * 2010-03-23 2010-10-06 中国建筑股份有限公司 Construction method for paving CRTS I-type plate-type ballastless track plate in severe cold area
CN101824784A (en) * 2010-04-30 2010-09-08 成都普罗米新科技有限责任公司 Track slab detection frame and detection method thereof
CN201865012U (en) * 2010-10-25 2011-06-15 中建二局第三建筑工程有限公司 Self-locking track slab anti-displacement device
CN202885760U (en) * 2012-10-29 2013-04-17 苏州市中瑞模具有限公司 Deformation detection tool

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
②连接钢筋的张拉;邓昌大等;《高速铁路无咋轨道》;中国铁道出版社;20120131;第390页倒数第1-6行、第391页第1-2行、图9 *
3.6 预应力钢筋张拉;中铁第五勘察设计院集团有限公司等;《高速铁路(客运专线)工程设计与施工技术论文集》;中国铁道出版社;20100531;第104页倒数第1-6行、第105页第1-5行、图2.138 *
38.如何检测II型板的实际膨胀量;刘世安等;《客运专线铁路CRTS II型板式无砟轨道水泥乳化沥青砂浆疑难问题解答》;中国铁道出版社;20090228;第39页第5~26行 *

Also Published As

Publication number Publication date
CN104457537A (en) 2015-03-25

Similar Documents

Publication Publication Date Title
Edwards et al. Quantification of concrete railway sleeper bending moments using surface strain gauges
Esslinger et al. The railway accident of Eschede–technical background
KR101154489B1 (en) Apparatus for loading test of railroad bridge, method for calculating load carrying capacity of railroad bridge and method for measuring drooping of railroad bridge
CN105842153A (en) Testing apparatus and method for coefficient of friction resistance of prestressed pipe
Gao et al. Field measurements and proposed analysis of concrete crosstie bending moments
Ataei et al. Dynamic load testing of a railway masonry arch bridge: A case study of Babak Bridge
Klug et al. Monitoring of railway deformations using distributed fiber optic sensors
Parivallal et al. Evaluation of in-situ stress in masonry structures by flat jack technique
CN104457537B (en) It is a kind of to the dual-direction pre-tensioning system prestressed rail plate tension pedestal deformation detection method of the types of CRTS III
KR100305107B1 (en) an process of loading teste for loading structure use of transferable loading-apparatus
Bujňák et al. Assessment of railway steel bridge structures
Simon et al. Long-term measurement of strain in concrete: durability and accuracy of embedded vibrating wire strain gauges
Butler et al. Development of self-sensing concrete sleepers for next-generation rail infrastructure
Toyooka et al. Effects of track structure on seismic behavior of isolation system bridges
Pak et al. Condition monitoring of VFT‐Rail® slab‐track railway bridges
CN204263341U (en) A kind of to CRTS III type dual-direction pre-tensioning system prestressed rail plate tension beam deformation checkout gear
Jankowski et al. Experimental and Numerical Examination of the Fastening System’s Rail Clip Type SB-4
CN110308268A (en) Prestressed concrete frame loss of prestress recognition methods
Alrasyid et al. Experimental and analytical assessment of 60 m steel truss bridge
Aspar et al. Direct Analysis of a Steel Railway Bridge via Monitoring System of an Instrumented Structure.
RU2743650C1 (en) Method for determination of actual temperature of anchoring of rail bed
Zhu et al. On the study of the in-situ thermal stress measurement using a Hole-Drilling method
CN109211499B (en) Device and method for detecting rigidity of ballast bed
He et al. Analysis of dynamic coupling between spans of two multi–span bridges using ambient vibration measurements
Ataei et al. Finite element model calibration of Babak bridge by dynamic load tests

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: ZHENGZHOU-XI'AN RAILWAY PASSENGER LINE LLC

Effective date: 20150630

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Suyalatu

Inventor after: Yu Shanyi

Inventor after: Xue Zemin

Inventor after: Wang Haiyuan

Inventor after: Fu Minguang

Inventor after: Song Zongbo

Inventor after: Li Jun

Inventor after: Zhang Junbing

Inventor before: Suyalatu

Inventor before: Yu Shanyi

Inventor before: Xue Zemin

Inventor before: Wang Haiyuan

Inventor before: Fu Minguang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SUYA LATU YU SHANYI XUE ZEMIN WANG HAIYUAN FU MINGUANG TO: SUYA LATU YU SHANYI XUE ZEMIN WANG HAIYUAN FU MINGUANG SONG ZONGBO LI JUN ZHANG JUNBING

TA01 Transfer of patent application right

Effective date of registration: 20150630

Address after: 030001 Yingze street, Shanxi, No. 269, No.

Applicant after: China Railway Third Engineering Co., Ltd.

Applicant after: ZHENGXI RAILWAY PASSENGER DEDICATED LINE CO., LTD.

Address before: 030001 Yingze street, Shanxi, No. 269, No.

Applicant before: China Railway Third Engineering Co., Ltd.

CB03 Change of inventor or designer information

Inventor after: Suyalatu

Inventor after: Sun Bole

Inventor after: Li Dachang

Inventor after: Yu Shanyi

Inventor after: Xue Zemin

Inventor after: Wang Haiyuan

Inventor after: Fu Minguang

Inventor after: Song Zongbo

Inventor after: Li Jun

Inventor after: Zhang Junbing

Inventor after: Zheng Baocai

Inventor before: Suyalatu

Inventor before: Yu Shanyi

Inventor before: Xue Zemin

Inventor before: Wang Haiyuan

Inventor before: Fu Minguang

Inventor before: Song Zongbo

Inventor before: Li Jun

Inventor before: Zhang Junbing

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170906

Address after: 100844 Fuxing Road, Beijing, Haidian District, No. 10

Co-patentee after: China Railway Third Engineering Co., Ltd.

Patentee after: CHINA RAILWAY CORPORATION

Co-patentee after: ZHENGXI RAILWAY PASSENGER DEDICATED LINE CO., LTD.

Address before: 030001 Yingze street, Shanxi, No. 269, No.

Co-patentee before: ZHENGXI RAILWAY PASSENGER DEDICATED LINE CO., LTD.

Patentee before: China Railway Third Engineering Co., Ltd.