CN104453226A - 二次结构构造柱模板支设定位装置 - Google Patents
二次结构构造柱模板支设定位装置 Download PDFInfo
- Publication number
- CN104453226A CN104453226A CN201410791498.8A CN201410791498A CN104453226A CN 104453226 A CN104453226 A CN 104453226A CN 201410791498 A CN201410791498 A CN 201410791498A CN 104453226 A CN104453226 A CN 104453226A
- Authority
- CN
- China
- Prior art keywords
- secondary structure
- wall
- opposite side
- constructional column
- walling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410791498.8A CN104453226B (zh) | 2014-12-19 | 2014-12-19 | 二次结构构造柱模板支设定位装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410791498.8A CN104453226B (zh) | 2014-12-19 | 2014-12-19 | 二次结构构造柱模板支设定位装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104453226A true CN104453226A (zh) | 2015-03-25 |
CN104453226B CN104453226B (zh) | 2016-08-24 |
Family
ID=52899915
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410791498.8A Active CN104453226B (zh) | 2014-12-19 | 2014-12-19 | 二次结构构造柱模板支设定位装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104453226B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105839918A (zh) * | 2016-04-20 | 2016-08-10 | 中国建筑第八工程局有限公司 | 用于装配式混凝土结构的现浇段模板加固结构及方法 |
CN106836797A (zh) * | 2017-02-18 | 2017-06-13 | 荆门创佳机械科技有限公司 | 一种快捷方便的边构造柱模板 |
CN108118904A (zh) * | 2018-01-07 | 2018-06-05 | 中铁四局集团建筑工程有限公司 | 一种构造柱施工方法 |
CN110761441A (zh) * | 2019-10-16 | 2020-02-07 | 中国二十冶集团有限公司 | 构造柱预制马牙槎混凝土模块施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009257035A (ja) * | 2008-04-21 | 2009-11-05 | Murakami Komuten:Kk | 柱型枠ユニット、柱型枠ユニット用横締付け枠および場所打ち鉄筋コンクリート柱の施工方法 |
KR200446775Y1 (ko) * | 2009-02-21 | 2009-12-03 | 주식회사 신영 | 콘크리트 기둥용 형틀 조임구 |
CN202509764U (zh) * | 2011-12-23 | 2012-10-31 | 山西四建集团有限公司 | 构造柱模板支模结构 |
CN203334661U (zh) * | 2013-06-29 | 2013-12-11 | 平煤神马建工集团有限公司土建处 | 一种砖混结构构造柱无架眼支模施工装置 |
CN203441100U (zh) * | 2013-09-05 | 2014-02-19 | 靖崇祥 | 构造柱的支模结构 |
CN204456853U (zh) * | 2014-12-19 | 2015-07-08 | 山西省第三建筑工程公司 | 二次结构构造柱模板支设定位装置 |
-
2014
- 2014-12-19 CN CN201410791498.8A patent/CN104453226B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009257035A (ja) * | 2008-04-21 | 2009-11-05 | Murakami Komuten:Kk | 柱型枠ユニット、柱型枠ユニット用横締付け枠および場所打ち鉄筋コンクリート柱の施工方法 |
KR200446775Y1 (ko) * | 2009-02-21 | 2009-12-03 | 주식회사 신영 | 콘크리트 기둥용 형틀 조임구 |
CN202509764U (zh) * | 2011-12-23 | 2012-10-31 | 山西四建集团有限公司 | 构造柱模板支模结构 |
CN203334661U (zh) * | 2013-06-29 | 2013-12-11 | 平煤神马建工集团有限公司土建处 | 一种砖混结构构造柱无架眼支模施工装置 |
CN203441100U (zh) * | 2013-09-05 | 2014-02-19 | 靖崇祥 | 构造柱的支模结构 |
CN204456853U (zh) * | 2014-12-19 | 2015-07-08 | 山西省第三建筑工程公司 | 二次结构构造柱模板支设定位装置 |
Non-Patent Citations (1)
Title |
---|
李军: "填充墙构造柱模板加固方法的探讨", 《山西建筑》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105839918A (zh) * | 2016-04-20 | 2016-08-10 | 中国建筑第八工程局有限公司 | 用于装配式混凝土结构的现浇段模板加固结构及方法 |
CN106836797A (zh) * | 2017-02-18 | 2017-06-13 | 荆门创佳机械科技有限公司 | 一种快捷方便的边构造柱模板 |
CN108118904A (zh) * | 2018-01-07 | 2018-06-05 | 中铁四局集团建筑工程有限公司 | 一种构造柱施工方法 |
CN110761441A (zh) * | 2019-10-16 | 2020-02-07 | 中国二十冶集团有限公司 | 构造柱预制马牙槎混凝土模块施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104453226B (zh) | 2016-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105888108B (zh) | 内置定位预制件钢筋混凝土剪力墙及施工方法 | |
CN204456853U (zh) | 二次结构构造柱模板支设定位装置 | |
CN105569330B (zh) | 建筑外框大截面异形柱加固型模板及其施工方法 | |
CN207513157U (zh) | 一种伸缩缝剪力墙模板 | |
CN104453226A (zh) | 二次结构构造柱模板支设定位装置 | |
CN204983662U (zh) | 一种对拉螺杆与钢管排架组合单侧支模装置 | |
CN107083804B (zh) | 一种墙体构造柱插筋施工方法 | |
WO2018160143A2 (en) | Precast reinforced concrete heavy duty retaining wall | |
CN203441100U (zh) | 构造柱的支模结构 | |
CN103485537A (zh) | 超高层水平二次结构预埋钢筋施工方法及其结构 | |
CN106567538B (zh) | 一种卫生间混凝土翻边的定位模具 | |
CN107100366A (zh) | 一种用于高层建筑钢筋混凝土楼梯支模的施工方法 | |
CN203891462U (zh) | 清水混凝土独立柱支模装置 | |
CN106088579B (zh) | 钢筋混凝土墙体模板的搭设方法 | |
CN104295093B (zh) | 框架结构双柱间变形缝浇筑支模系统的施工方法 | |
CN104120874A (zh) | 一种脚手架装配式连墙件 | |
CN204139631U (zh) | 建筑工地用可快速拆装的防护栏杆 | |
CN207469596U (zh) | 一种梁柱外缘免拆混凝土模具 | |
CN205742988U (zh) | 模板一字拼缝防爆模组件 | |
CN211421829U (zh) | 十字墙交叉处构造柱混凝土浇筑模板体系 | |
CN204781345U (zh) | 一种二次结构拉结筋预埋件施工结构 | |
WO2014076716A1 (en) | A wall system of parallelepiped precast building panel | |
CN106760509A (zh) | 一种t形构造柱马牙槎不损坏墙体的支模方法 | |
CN106193578A (zh) | 一种基于凹槽式矩管的配模系统及施工工艺 | |
CN202039862U (zh) | 混凝土曲面定型模板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 046011 Technology Management Department of the third provincial construction company, No.22, Shengjian lane, Taihang West Street, Changzhi City, Shanxi Province Patentee after: SHANXI THIRD CONSTRUCTION Co.,Ltd. Address before: 046011 Technology Management Department of the third provincial construction company, No.22, Shengjian lane, Taihang West Street, Changzhi City, Shanxi Province Patentee before: SHANXI NO.3 CONSTRUCTION ENGINEERING Co.,Ltd. |
|
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: No.266 Taihang East Street, Changzhi City, Shanxi Province 046000 Patentee after: SHANXI THIRD CONSTRUCTION Co.,Ltd. Address before: 046011 Technology Management Department of the third provincial construction company, No.22, Shengjian lane, Taihang West Street, Changzhi City, Shanxi Province Patentee before: SHANXI THIRD CONSTRUCTION Co.,Ltd. |