CN104453041B - A kind of installation method of assembled heat insulation curtain wall panel - Google Patents
A kind of installation method of assembled heat insulation curtain wall panel Download PDFInfo
- Publication number
- CN104453041B CN104453041B CN201410791542.5A CN201410791542A CN104453041B CN 104453041 B CN104453041 B CN 104453041B CN 201410791542 A CN201410791542 A CN 201410791542A CN 104453041 B CN104453041 B CN 104453041B
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- counterpart
- heat insulation
- insulation curtain
- cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The present invention provides a kind of installation method of assembled heat insulation curtain wall panel, including step:1)Support member is fixed on cylinder;2)First counterpart is placed on support member, the first counterpart is operated, make its towards/away from the motion of cylinder direction, to change the distance between the first counterpart and cylinder, when distance reaches requirement, the first counterpart is fixed on support member;3)The heat insulation curtain wall board for being provided with the second counterpart is arranged on the first counterpart close to the first counterpart, and by the socket of the second counterpart, heat insulation curtain wall board is arranged on cylinder.The installation method of the present invention, by changing installation site of first counterpart on support member, so as to change the distance between the first counterpart and cylinder, make the spacing distance between heat insulation curtain wall board and cylinder adjustable, thus have a wide range of application, disclosure satisfy that the installation requirements for needing to adjust the heat insulation curtain wall board of spacing distance between cylinder.
Description
Technical field
The present invention relates to a kind of installation method of assembled heat insulation curtain wall panel, belong to insulation curtain wall method of plate installation technology neck
Domain.
Background technology
The curtain wall panel with heat insulation function is set to avoid setting warming plate in skin face as metope, because
And it is quick for installation, efficiency of construction is high.The method of installation curtain wall panel is usually in the prior art:Column is set, set on column
Polylith curtain wall panel, is then fixed on column as wall, forms building interior space by attachment structure by attachment structure.
But the shortcoming of this installation method is that curtain wall panel is inconvenient to dismantle after being fixed on column by attachment structure, and curtain wall
Spacing distance between plate and column is difficult to adjust, it is difficult to meet the curtain wall of spacing distance between needs adjustment curtain wall panel and column
The installation requirements of plate.
Chinese patent literature CN101046122A discloses a kind of cellular curtain wall dry hanging assembly and its installation method, such as
Shown in Fig. 1, above-mentioned dry hanging assembly includes supporting parts 02 and slides suspension member 03;Supporting parts 02 are bolted on column 01
On, slide the one end of suspension member 03 and be provided with n-type groove, the other end is provided with H type grooves, slide suspension member 03 by the way that n-type groove is buckled in
It is connected, is connected by the way that H types groove is inserted into the inside of cellular board 05 with cellular board 05 with supporting parts 02 on supporting parts 02;Slide suspension member
It is located by connecting between 03 and supporting parts 02 using positioning screw 04, during screwed in place screw 04, slides suspension member 03 and be fixed on support
On part 02, when unscrewing positioning screw 04, sliding suspension member 03 can freely slide on supporting parts 02.When needing to dismantle single honeycomb
During plate 05, the absorption of cellular board 05 is fixed first by sucker instrument, and cellular board 05 moved up slightly, then using being located at
Positioning screw 04 is unscrewed in the gap of the both sides of cellular board 05, then will slide suspension member 03 to away from cellular board using plectrum instrument
05 direction is stirred, until H types groove is separated with cellular board 05, is removed cellular board 05 finally by sucker instrument;Work as needs
When the cellular board 05 that maintenance is finished is reinstalled, the absorption of cellular board 05 is fixed first by sucker instrument, and make honeycomb
Be used for and the H types groove of plate 05 insert the position being connected and alignd with H type grooves, then utilize the seam positioned at the both sides of cellular board 05
Gap is stirred using plectrum instrument by suspension member 03 is slided to the side close to cellular board 05, until H types groove coordinates with cellular board 05
Insertion connection, positioning screw 04 is then tightened, slip suspension member 03 is fixed on supporting parts 02, finally remove sucker instrument.
Although the dry hanging assembly and its installation method disclosed in above-mentioned patent document can realize cellular board veneer from curtain
Freely dismantling and installing in wall entirety, is easy to maintenance, but still have following technological deficiency:Because supporting parts and slip suspension member are equal
It is to be integrally formed part, and slip suspension member is contacted by n-type groove with supporting parts laminating, therefore it is fixed on the honeycomb slided on suspension member
Spacing distance between plate and column can not be adjusted as needed, cause the dry hanging assembly application in above-mentioned technical proposal
Scope is narrower, it is impossible to meet the installation requirements of the cellular board of spacing distance between needs adjustment and column.
The content of the invention
Therefore, thermal screen can not be adjusted it is an object of the invention to the installation method for overcoming heat insulation curtain wall board in the prior art
The technological deficiency of spacing distance between wallboard and column, can be conveniently between adjustment heat insulation curtain wall board and column so as to provide one kind
The installation method of the assembled heat insulation curtain wall panel of spacing distance.
Therefore, the present invention provides a kind of installation method of assembled heat insulation curtain wall panel, comprise the following steps:
1)Support member is fixed on cylinder;
2)First counterpart is placed on support member, and operates the first counterpart as needed, makes described first to coordinate
Part towards/away from cylinder direction motion, to change the distance between first counterpart and described cylinder, described the
When the distance between one counterpart and the cylinder reach necessary requirement, stop the motion of the first counterpart, described first is matched somebody with somebody
Component is fixed on the support member;
3)The heat insulation curtain wall board of the second counterpart will be provided with close to first counterpart, and by second counterpart
Socket is arranged on first counterpart, so that the heat insulation curtain wall board is arranged on the cylinder.
The matching part of first counterpart and second counterpart is provided with gap, in the step 3)In, operation
The heat insulation curtain wall board, make second counterpart on first counterpart towards/away from the cylinder direction motion, with
Change the distance between second counterpart and described cylinder, institute is reached in the distance of second counterpart and the cylinder
When needing to ask, stop the motion of the second counterpart.
First counterpart includes level board and the plate being fixedly connected with the level board, in the step 2)In,
By adjusting the distance between the placement location change plate and the cylinder of the level board on the support member, lead to
Crossing the level board being fixed on the support member makes first counterpart be fixed on the support member.
First counterpart framework of the plate and level board formation L-shaped.
Second counterpart is the open slot being located in the heat insulation curtain wall board, in the step 3)In, by by institute
Stating open slot and being socketed on the plate makes the heat insulation curtain wall board be arranged on the cylinder.
The width of the open slot internal cavities is more than the thickness of the plate to form the gap, in the step 3)
In, operate the heat insulation curtain wall board, make the open slot on the plate towards/away from cylinder direction movement, to change
Become the distance between relatively described cylinder of the open slot.
The open slot is "Ji" type open slot;In the step 3)In, in addition to by the "Ji" type open slot
Horizontal crimping the step of be fixedly connected with the level board.
The support member includes vertical gripper shoe and the horizontal supporting plate being connected with the vertical gripper shoe, in the step
1)In, the vertical gripper shoe is fixed on the cylinder, in the step 2)In, the level board is fixed on the water
In flat supporting plate.
The support frame of the horizontal supporting plate and vertical gripper shoe formation L-shaped.
The support member also includes triangular support plate, two sides of the triangular support plate respectively with the vertical branch
Fagging is fixedly connected with the horizontal supporting plate.
In the step 3)In, in addition between the two neighboring heat insulation curtain wall board supporting vertically is set
The step of.
The supporting includes elastic bearing plate, and the elastic bearing plate is provided with the flange protruded along horizontal direction,
In the step 3)In, in the gap that the flange is placed on to the two neighboring heat insulation curtain wall board.
A kind of installation method of assembled heat insulation curtain wall panel of the present invention has advantages below:
1. the installation method of the assembled heat insulation curtain wall panel of the present invention, by changing peace of first counterpart on support member
Holding position, so as to change the distance between the first counterpart and cylinder, makes to be provided with the second counterpart and by the way that second is coordinated
Part and the socket of the first counterpart are installed and the spacing distance between heat insulation curtain wall board and cylinder on cylinder is adjustable, thus
The installation method of assembled heat insulation curtain wall panel of the present invention has a wide range of application, and disclosure satisfy that needs adjust the spacing distance between cylinder
Heat insulation curtain wall board installation requirements.
2. the installation method of the assembled heat insulation curtain wall panel of the present invention, in the auxiliary section of the first counterpart and the second counterpart
Position is provided with gap, in step 3)In, by operating heat insulation curtain wall board, make the second counterpart on the first counterpart towards/it is remote
Cylinder direction is moved, and to change the distance between the second counterpart and cylinder, and and then is changed between heat insulation curtain wall board and cylinder
Spacing distance, it is thus possible to the spacing distance between more accurate fine setting heat insulation curtain wall board and cylinder;By above-mentioned fine setting,
Make the spacing distance between heat insulation curtain wall board and cylinder stably and controllable, also help guarantee and be arranged on multiple insulation curtain walls on cylinder
Flat linking between plate, strengthens integral installation effect.
3. the present invention assembled heat insulation curtain wall panel installation method, set the first counterpart include level board and with level
The plate of plate connection, by adjusting placement location of the level board on support member i.e. adjustable distance between plate and cylinder,
By the way that level board is fixed on support member the first counterpart can be made to be fixed on support member, thus easy to adjust, fixation side
Just.As to the further optimization design form of the first counterpart, plate and level board can also be designed l-shaped or T-shaped
First counterpart framework, enables level board to be preferably fixedly connected with support member, and makes plate in the vertical direction more preferable
Coordinate with the second counterpart and be socketed, so as to be supported and fixed on heat insulation curtain wall board is stronger on cylinder.
4. the installation method of the assembled heat insulation curtain wall panel of the present invention, sets the second counterpart to be located in heat insulation curtain wall board
Open slot, in step 3)In, open slot, which is socketed on plate, makes heat insulation curtain wall board be arranged on cylinder, the setting of open slot
It is easy to the Fast Installation of heat insulation curtain wall board;In addition, setting the thickness that the width of open slot inner chamber is more than plate to form gap, make
Open slot on plate towards/away from the movement of cylinder direction, you can change the distance between open slot counter-cylinder, that is, change
Become the distance between heat insulation curtain wall board and cylinder, so as to conveniently realize the spacing distance between heat insulation curtain wall board and column
Fine setting.
5. the present invention assembled heat insulation curtain wall panel installation method, set support member include vertical gripper shoe and with it is vertical
The horizontal supporting plate of supporting plate connection, vertical gripper shoe is suitable to be fixedly connected with cylinder, and horizontal supporting plate is suitable to match somebody with somebody with level board
Close and install.
6. the installation method of the assembled heat insulation curtain wall panel of the present invention, two sides of above-mentioned triangular support plate are respectively with erecting
Allotment fagging is fixedly connected with horizontal supporting plate.Set triangular support plate two sides respectively with vertical gripper shoe and level branch
Fagging is fixedly connected, and can strengthen the weight capacity of horizontal supporting plate, vertical gripper shoe is had more support level supporting plates
Dynamics so that horizontal supporting plate can bear heavier heat insulation curtain wall board and keep firm.
7. the installation method of the assembled heat insulation curtain wall panel of the present invention, in addition to vertically in two neighboring thermal screen
The step of supporting is set between wallboard.Supporting is set to include elastic bearing plate, elastic bearing plate is provided with the horizontal direction
Prominent flange, flange is located at the inner space between two adjacent heat insulation curtain wall boards, realizes two pieces of thermal screens of vertical direction
The flexible undertaking of wallboard, is easy to implement tiling of the polylith heat insulation curtain wall board on cylinder and installs.The design of flange realizes two pieces
The flexible undertaking of heat insulation curtain wall board, when being deformed when heat insulation curtain wall board is produced and expanded with heat and contract with cold, can be made by the Light deformation of flange
Obtaining adjacent heat insulation curtain wall board will not mutually pull in deformation process, it is ensured that the connective stability of adjacent heat insulation curtain wall board.
Brief description of the drawings
Fig. 1 is the structural representation after dry hanging assembly is combined with cellular curtain wall in the prior art.
Fig. 2 is the overall structure diagram of assembled heat insulation curtain wall board mounting structure in embodiment 1.
Fig. 3 is Fig. 2 A direction views.
Fig. 4 is the left view of the first supporting plate in Fig. 2.
Fig. 5 is Fig. 4 right view.
Fig. 6 is the left view of the second supporting plate in Fig. 2.
Fig. 7 is Fig. 6 right view.
Fig. 8 is the left view of bearing plate in Fig. 2.
Fig. 9 is Fig. 8 right view.
In figure:01- columns, 02- supporting parts, 03- slides suspension member, 04- positioning screws, 05- cellular boards;1- support members, 12-
Vertical gripper shoe, 13- horizontal supporting plates, 14- triangular support plates, 2- heat insulation curtain wall boards, 20- open slots, 32- plates, 33- water
Flat board, 51- bearing plates, 52- flanges, 8- cylinders.
Embodiment
A kind of installation method of the assembled heat insulation curtain wall panel provided below in conjunction with the accompanying drawings the present invention does further detailed
Describe in detail bright.
Embodiment 1
The present embodiment provides a kind of installation method of assembled heat insulation curtain wall panel, using specific mounting structure, such as Fig. 2-3
Shown, the mounting structure is including the support member 1 being adapted to mount on cylinder 8, the first counterpart on support member 1,
And it is located at the second counterpart for being socketed installation on heat insulation curtain wall board 2 with the first counterpart.
As illustrated in figures 4-5, above-mentioned support member 1 includes the vertical gripper shoe 12 for being suitable to be fixed on above-mentioned cylinder 8, and with erecting
The horizontal supporting plate 13 that allotment fagging 12 is connected.The framework of support member 1 of vertical gripper shoe 12 and the formation L-shaped of horizontal supporting plate 13.
As shown in fig. 6-7, the first counterpart includes level board 33, and the plate 32 being fixedly connected with level board 33.Plate
32 form the first counterpart framework of L-shaped with level board 33.Level board 33 is weldingly fixed on the above-mentioned top of horizontal supporting plate 13.
As shown in Fig. 2 the second counterpart is the open slot 20 being located on heat insulation curtain wall board 2, open slot 20 is "Ji" type
Open slot.
When carrying out the installation of heat insulation curtain wall board 2 using above-mentioned mounting structure, comprise the following steps:
1)The vertical gripper shoe 12 of support member 1 is weldingly fixed on the proper height of column 8 so that the water of support member 1
Flat supporting plate 13 is in horizontality;
2)First counterpart is placed on horizontal supporting plate 13 so that the level board 33 and horizontal support of the first counterpart
Plate 13 coordinates;
3)Heat insulation curtain wall board 2 is coordinated on plate 32 by the grafting of open slot 20;
4)According to the distance between heat insulation curtain wall board 2 and column 8 demand, determine level board 33 on horizontal supporting plate 13
Fixed position, if position is not met, on horizontal supporting plate 13 after mobile level board 33, position suitable, by level board 33
It is weldingly fixed on horizontal supporting plate 13, completes the assembling of curtain wall panel.
The installation method of the present embodiment, can flexibly be adjusted by adjusting installation site of the level board 33 on support member 1
The whole spacing distance being socketed by open slot 20 between the heat insulation curtain wall board 2 being arranged on plate 32 and cylinder 8, thus apply model
Enclose wide, disclosure satisfy that the installation requirements for needing to adjust the heat insulation curtain wall board 2 of spacing distance between cylinder 8.
Improved as one kind to above-mentioned installation method, the later fine setting of horizontal supporting plate 13 is fixed on for level board 33
Demand, improves the matching relationship of open slot 20 and plate 32, and the internal void width of open slot 20 is designed as to be more than plate 32
Thickness, so as to form gap therebetween.Such heat insulation curtain wall board when mounted, even if level board 33 with level
Supporting plate 13 is fixed together, it is impossible to carries out the adjustment of macroscopical distance, by operation aperture groove 20 open slot 20 can also be made to exist
On plate 32 towards/away from the direction of cylinder 8 movement, further to finely tune the spacing distance between heat insulation curtain wall board 2 and cylinder 8,
So that the mounting structure of improved the present embodiment more can accurately adjust the interval between heat insulation curtain wall board 2 and cylinder 8
Distance;By above-mentioned fine setting, make the spacing distance between heat insulation curtain wall board 2 and cylinder 8 stably and controllable, also help installed in post
Flat linking on body 8 between multiple heat insulation curtain wall boards 2, strengthens integral installation effect.After above-mentioned fine setting has been carried out, also wrap
The step of being fixedly connected with the horizontal crimping of "Ji" type open slot with level board 33 is included, so as to which "Ji" type will be provided with
The heat insulation curtain wall board 2 of open slot is fixedly secured on column 8.
As the further improvement to above-mentioned installation method, triangular support plate 14, triangular support plate can also be used
14 two sides are fixedly connected with vertical gripper shoe 12 and horizontal supporting plate 13 respectively.The benefit for being located at triangular support plate 13 exists
In the weight capacity of horizontal supporting plate 13 can be strengthened, make vertical gripper shoe 12 that there is the power of more support level supporting plates 13
Degree, so that horizontal supporting plate 13 can bear the heat insulation curtain wall board 2 of more weight and keep firm.As shown in figure 5, triangular support
Plate 13 can also be set in echelon, two trapezoidal hypotenuses is fixed respectively with vertical gripper shoe 12 and horizontal supporting plate 13 and connected
Connect.Triangular support plate 13 can be installed at the scene, can also be shifted to an earlier date and vertical gripper shoe 12 and horizontal support before the mounting
Plate 13 is welded to connect, and can realize goal of the invention.
As the further improvement to above-mentioned installation method, when carrying out the installation of multiple heat insulation curtain wall boards, using spy
Different supporting carries out the connection of adjacent heat insulation curtain wall board, as Figure 8-9, and supporting includes elastic bearing plate 51, elasticity
Bearing plate 51 is provided with the flange 52 protruded along horizontal direction, and flange 52 is located in the gap of adjacent heat insulation curtain wall board 2.It is above-mentioned
The design of flange 52 so that realize the flexible undertaking of two pieces of heat insulation curtain wall boards 2, time-varying of expanding with heat and contract with cold is produced in heat insulation curtain wall board
During shape, by the Light deformation of flange 52 adjacent heat insulation curtain wall board 2 can be caused mutually not pullled in deformation process, it is ensured that
The connective stability of adjacent heat insulation curtain wall board.
The level board 33 and plate 32 of the above-mentioned counterpart of composition first can also have other link position relations, such as be formed
The first T-shaped counterpart framework, it is the same with the first counterpart framework of L-type, it can realize the convenience with horizontal supporting plate 13
Connection and the technique effect for preferably supporting heat insulation curtain wall board 2 from vertical direction.
Connected mode between above-mentioned level board 33 and horizontal supporting plate 13 can have a variety of, as long as disclosure satisfy that level board
33 can be fixed on level branch when being moved to target location on horizontal supporting plate 13 towards the/direction movement away from cylinder 8
On fagging 13.It such as can be bolt connection or other attachment structures are set between level board 33 and horizontal supporting plate 13.
In addition, four sides are by the one of the 20 groups of welderings of "Ji" type open slot built in the corner of assembled heat insulation curtain wall panel
Individual box, plays a part of stable and strengthens in the corner of heat insulation curtain wall board 2, strengthen the intensity of the edge of heat insulation curtain wall board 2.
In order to realize building industrialization, assembling is built, coordinates quick build to build with steel construction or concrete post
Thing, based on this, the assembled heat insulation curtain wall panel that the present embodiment is related to is to collect heat-insulating property in the wallboard of wall body, be with main body or
The out-hung panel of the supporting installation of person's concrete post, the assembled heat insulation curtain wall panel of the present embodiment is by steel frame, built-in three-dimensional steel
Muscle truss is simultaneously constituted with inside and outside cement screedn, inorganic foamed cement core.
Obviously, above-described embodiment is only intended to clearly illustrate example, and the not restriction to embodiment.For
For those of ordinary skill in the art, other various forms of changes or change can also be made on the basis of the above description
It is dynamic.There is no necessity and possibility to exhaust all the enbodiments.And the obvious change or change thus extended out
Among moving still in the protection domain of the invention.
Claims (10)
1. a kind of installation method of assembled heat insulation curtain wall panel, it is characterised in that:Comprise the following steps:
1) support member (1) is fixed on cylinder (8);
2) the first counterpart is placed on support member (1), and operates the first counterpart as needed, make first counterpart
Towards/away from the motion of the cylinder (8) direction, to change the distance between first counterpart and described cylinder (8), in institute
When stating the distance between the first counterpart and described cylinder (8) and reaching necessary requirement, stop the motion of the first counterpart, will be described
First counterpart is fixed on the support member (1);
3) heat insulation curtain wall board (2) of the second counterpart will be provided with close to first counterpart, and by second counterpart
Socket is arranged on first counterpart, so that the heat insulation curtain wall board (2) is arranged on the cylinder (8);
In the step 3) in, in addition between the two neighboring heat insulation curtain wall board (2) supporting vertically is set
The step of;
The supporting includes elastic bearing plate (51), the elastic bearing plate (51) be provided with along horizontal direction protrude it is convex
Edge (52), in the step 3) in, in the gap that the flange (52) is placed on to the two neighboring heat insulation curtain wall board (2),
The flexible undertaking of two pieces of heat insulation curtain wall boards (2) of vertical direction is realized, polylith heat insulation curtain wall board (2) is easy to implement on cylinder (8)
Tiling install;It can make it that adjacent heat insulation curtain wall board (2) will not be in deformation process by the Light deformation of the flange (52)
Mutually pull, it is ensured that the connective stability of adjacent heat insulation curtain wall board (2).
2. the installation method of assembled heat insulation curtain wall panel according to claim 1, it is characterised in that:First counterpart
Gap is provided with the matching part of second counterpart, in the step 3) in, the heat insulation curtain wall board (2) is operated, makes institute
State the second counterpart on first counterpart towards/away from the cylinder (8) direction motion, with change it is described second coordinate
The distance between part and the cylinder (8), when the distance of second counterpart and the cylinder (8) reaches necessary requirement,
Stop the motion of the second counterpart.
3. the installation method of assembled heat insulation curtain wall panel according to claim 2, it is characterised in that:First counterpart
The plate (32) being fixedly connected including level board (33) and with the level board (33), in the step 2) in, by adjusting
State placement location of the level board (33) on the support member (1) change between the plate (32) and the cylinder (8) away from
From making first counterpart be fixed on the support member by the way that the level board (33) is fixed on the support member (1)
(1) on.
4. the installation method of assembled heat insulation curtain wall panel according to claim 3, it is characterised in that:The plate (32) and
The level board (33) forms the first counterpart framework of L-shaped or the first counterpart framework of T-shaped.
5. the installation method of assembled heat insulation curtain wall panel according to claim 3, it is characterised in that:Second counterpart
To be located at the open slot (20) in the heat insulation curtain wall board (2), in the step 3) in, by the way that the open slot (20) is socketed
The heat insulation curtain wall board (2) is set to be arranged on the cylinder (8) on the plate (32).
6. the installation method of assembled heat insulation curtain wall panel according to claim 5, it is characterised in that:The open slot (20)
The width of internal cavities is more than the thickness of the plate (32) to form the gap, in the step 3) in, operate described protect
Warm curtain wall panel (2), make the open slot (20) on the plate (32) towards/away from the cylinder (8) direction movement, to change
Become the distance between relatively described cylinder (8) of the open slot (20).
7. the installation method of assembled heat insulation curtain wall panel according to claim 6, it is characterised in that:The open slot (20)
For "Ji" type open slot;In the step 3) in, in addition to by the horizontal crimping of the "Ji" type open slot and the water
The step of flat board (33) is fixedly connected.
8. the installation method of assembled heat insulation curtain wall panel according to claim 6, it is characterised in that:The support member (1)
The horizontal supporting plate (13) being connected including vertical gripper shoe (12) and with the vertical gripper shoe (12), in the step 1) in,
The vertical gripper shoe (12) is fixed on the cylinder (8), in the step 2) in, the level board (33) is fixed on
On the horizontal supporting plate (13).
9. the installation method of assembled heat insulation curtain wall panel according to claim 8, it is characterised in that:The horizontal supporting plate
(13) and the vertical gripper shoe (12) formation L-shaped support member (1) framework.
10. the installation method of assembled heat insulation curtain wall panel according to claim 8 or claim 9, it is characterised in that:The support member
(1) also include triangular support plate (14), two sides of the triangular support plate (14) respectively with the vertical gripper shoe
(12) it is fixedly connected with the horizontal supporting plate (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410791542.5A CN104453041B (en) | 2014-12-19 | 2014-12-19 | A kind of installation method of assembled heat insulation curtain wall panel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410791542.5A CN104453041B (en) | 2014-12-19 | 2014-12-19 | A kind of installation method of assembled heat insulation curtain wall panel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104453041A CN104453041A (en) | 2015-03-25 |
CN104453041B true CN104453041B (en) | 2017-08-25 |
Family
ID=52899734
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410791542.5A Active CN104453041B (en) | 2014-12-19 | 2014-12-19 | A kind of installation method of assembled heat insulation curtain wall panel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104453041B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114016748A (en) * | 2021-11-02 | 2022-02-08 | 青岛中科坤泰装配建筑科技有限公司 | Assembly type wall tile process convenient for dry hanging |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03202535A (en) * | 1989-12-28 | 1991-09-04 | Misawa Ceramics Kk | Fitting metal of wall panel |
CN101956439B (en) * | 2010-10-26 | 2013-05-08 | 苏州柯利达建筑装饰工程有限公司 | Cell-type hollow joint stone curtain wall |
CN201901964U (en) * | 2010-12-22 | 2011-07-20 | 泛华建设集团有限公司 | Three-dimensional adjustable and disconnectable curtain wall |
CN202117181U (en) * | 2011-05-06 | 2012-01-18 | 李庭丰 | Expansion joint device |
CN203160473U (en) * | 2013-02-19 | 2013-08-28 | 深圳市方大装饰工程有限公司 | Stone curtain wall connected by aluminum alloy pendants |
-
2014
- 2014-12-19 CN CN201410791542.5A patent/CN104453041B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104453041A (en) | 2015-03-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204645336U (en) | A kind of mounting plug-in type aluminum facade | |
KR20140137273A (en) | Combination Structure of Panel for External of Building and Method for Constructing thereof | |
CN104453041B (en) | A kind of installation method of assembled heat insulation curtain wall panel | |
KR20150005983A (en) | Flexible wall system | |
KR200492408Y1 (en) | Prefabricated partition | |
CN103225427A (en) | Plug and fast mounting clean operation room assisted room and mounting technology thereof | |
CN110847534A (en) | Stone toilet wall assembly and mounting method thereof | |
RU2514029C1 (en) | Device to fix suspended facing panels on building facades in hidden manner | |
KR101090852B1 (en) | An device for fixing the decoration panel | |
CN103061544A (en) | Plug fast-installation auxiliary room for clean operating rooms and installation process thereof | |
KR101136794B1 (en) | Connecting apparatus for bricklaying interval for masonry construction | |
KR20190001595U (en) | None Caulking System Ceiling and None Caulking System Wall Partition | |
KR20150045807A (en) | Mounting apparatus for open-joint type finishing panel | |
CN208379824U (en) | Prefabricated panel and wall panel assembly | |
CN108867979B (en) | Ceiling cuts off integrative system | |
CN204370640U (en) | A kind of mounting structure of assembled heat insulation curtain wall panel | |
JP2014518963A (en) | Module internal partition for structural frame building | |
CN208235743U (en) | Door top component | |
KR101303473B1 (en) | decoration panel unit of building outer wall | |
KR20080111880A (en) | Three-dimensional fabricated connector for curtain wall and construction method thereof | |
CN207646863U (en) | A kind of civil chain architecture structure | |
CN103225359A (en) | High-rise energy-saving unit stone curtain wall | |
EP2551421A1 (en) | A photovoltaic module which can be installed on a vertical and/or inclined wall | |
KR20090106200A (en) | Fixing member for concrete pannel and structure of concrete pannel having the same | |
RU138684U1 (en) | FASTENING ASSEMBLY ON THE BUILDING DESIGN OF THE FACING PANELS CONNECTED BETWEEN |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100070 Beijing Fengtai District Fufengqiao South Zhonghe Road, No. 1 North Building, Fifth Floor Patentee after: Taikong Intelligent Construction Co.,Ltd. Address before: 100070 Beijing Fengtai District Fufengqiao South Zhonghe Road, No. 1 North Building, Fifth Floor Patentee before: Beijing Taikong Panel Industry Corp. |
|