CN104452827A - Concrete dam base spring opening processing method - Google Patents

Concrete dam base spring opening processing method Download PDF

Info

Publication number
CN104452827A
CN104452827A CN201410548989.XA CN201410548989A CN104452827A CN 104452827 A CN104452827 A CN 104452827A CN 201410548989 A CN201410548989 A CN 201410548989A CN 104452827 A CN104452827 A CN 104452827A
Authority
CN
China
Prior art keywords
concrete
dam
spring
steel pipe
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410548989.XA
Other languages
Chinese (zh)
Other versions
CN104452827B (en
Inventor
黄维
王樱畯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201410548989.XA priority Critical patent/CN104452827B/en
Publication of CN104452827A publication Critical patent/CN104452827A/en
Application granted granted Critical
Publication of CN104452827B publication Critical patent/CN104452827B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/16Restraining of underground water by damming or interrupting the passage of underground water by placing or applying sealing substances
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/40Foundations for dams across valleys or for dam constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to a concrete dam base spring opening processing method which aims to eliminate potential safety hazards left by dam base spring openings, overcome the defect of dam seepage proofing left by the spring opening problem, improve construction efficiency and lower risks. According to the technical scheme, a concrete dam base or a concrete building basic face is arranged, multiple spring openings are formed in the dam base or the basic face, the concrete dam base or the concrete building basic face is dug or cleaned, the spring openings in the downstream portion of the concrete dam base or the concrete building basic face are only provided with horizontal steel pipes in an embedded mode, a solidification grouting slurry inlet pipe and an exhaust and slurry outlet pipe are arranged in an embedded mode, the concrete dam base or the concrete building basic face is poured, a vertical steel pipe is backfilled with self-compaction concrete, solidification grouting is conducted through the solidification grouting slurry inlet pipe embedded in the vertical steel pipe, the spring openings are sealed, and concrete is poured continuously. The processing method is suitable for design and construction of basic processing engineering of various concrete dams or concrete buildings.

Description

A kind of processing method of Concrete Dam spring
Technical field
The present invention relates to a kind of processing method of Concrete Dam spring, be applicable to the design and construction of various concrete dam or concrete structure foundation treatment engineering.
Background technology
Concrete dam is generally built based on bedrock surface.For part concrete dam, it is comparatively common phenomenon that the dam foundation grows spring, and some engineering foundation planes find that there is tens places and even more spring, conventional processing method generally adopts pipe laying that gush water is guided to dam downstream.
Such way Problems existing is, the Dam Base Surface spring that particularly upstream is grown easily is linked up with storehouse water, underground water, if do not add closed only carrying-off to have larger potential safety hazard, foundation plane leaves more weak area.For high dam, owing to bearing, head is high, water pressure is large, and the dam foundation grows more spring, and to fail the risk of thoroughly process larger.
How can be processed comparatively thoroughly the spring that Concrete Dam or concrete structure base surface are grown by certain measure, be an important technology in the construction of engineering foundation Treatment Design.
Summary of the invention
The technical problem to be solved in the present invention is: the processing method providing a kind of Concrete Dam spring for the problems referred to above, eliminate the potential safety hazard that dam body spring stays, and the defect of the seepage control of dam aspect to stay because of spring problem, improve efficiency of construction, reduce risk.
Technical scheme of the present invention is: a kind of spring processing method of Concrete Dam, has Concrete Dam or concrete structure base surface, and the described dam foundation or base surface grow spring, many places, and this method to the treatment step at spring is:
A, excavation, cleaning Concrete Dam or concrete structure base surface, reach the requirement of concreting, at spring, place buries vertical steel pipe underground, and covers this spring; Arrange that the level of connecting with vertical steel pipe is to steel pipe, form ejectment water total system, and by spring ejectment to dam downstream; In level, by-pass valve control is set to steel pipe outlet section, and makes valve be in opening;
B, level is only buried underground to steel pipe for the spring of Concrete Dam or concrete structure base surface downstream part, and level disconnects to the draining total system in steel pipe and step a, directly leads to outside dam;
Bury consolidation grouting inlet pipe underground in c, most of vertical steel pipe, in remaining vertical steel pipe, bury consolidation grouting inlet pipe and the double outlet pipe of exhaust underground;
The first floor concrete of d, the concreting dam dam foundation or concrete structure base surface and second layer concrete, and stay enough intermittent times according to construction requirement building between this two layer concrete;
E, have after more than 50% intensity until concrete, close the by-pass valve control of level to steel pipe outlet section, backfill self-compacting concrete in vertical steel pipe, label is identical with structural concrete;
F, implement consolidation grouting by the consolidation grouting inlet pipe buried underground in vertical steel pipe, spring is closed;
G, continue to build third layer and above structural concrete.
The height of described first floor concrete and the two-layer sum of second layer concrete reaches 3m.
The diameter of described consolidation grouting inlet pipe and the double outlet pipe of exhaust is 28mm, pipe shaft arranges a flower hole every 50cm.
The invention has the beneficial effects as follows: 1, two-layer in concreting, when highly reaching about 3m, enough cover heavily owing to having, vertical and level can be utilized to carry out self-compacting concrete to pipe laying to the spring that the dam foundation is grown and grouting is closed, completely eliminate the potential safety hazard that dam body spring stays, its treatment effect is better than the way that conventional pipe laying draws dam body; 2, for the spring that the concrete dam body upstream dam foundation is grown, give overall treatment by the method, after process, seepage control of dam system can keep integrality, can not leave the defect of seepage control of dam aspect because of spring problem; 3, the spring in Concrete Dam downstream, can leave small part conveniently processing method, and namely pipe laying draws dam body, does the uplift pressure effectively can cutting down the dam foundation like this, stressed favourable to dam structure; 4, construct simple and convenient, in implementation process, in dam body, bury some vertical and levels underground to steel pipe, after concreting is two-layer, carry out self-compacting concrete backfill and consolidation grouting process.
Accompanying drawing explanation
Fig. 1 is the elevational schematic view of Concrete Dam spring process.
Detailed description of the invention
As shown in Figure 1, the present embodiment is a kind of spring processing method of Concrete Dam, spring, many places 2 place that Concrete Dam or concrete structure base surface 1 are grown buries vertical steel pipe 6 and level underground to steel pipe 7, level causes dam downstream to steel pipe 7, generally can adopt DN300 steel pipe (diameter of steel tube generally suitably can adjust according to water yield size), in pipe, establish grouting system; Treat that concreting is two-layer, when height sum reaches about 3m, in vertical steel pipe 6, backfill is with label self-compacting concrete, then adopts pre-buried grout pipe to carry out consolidation grouting to spring and closes; Dam body downstream can leave a small amount of spring 2, and namely processing method conveniently draws dam body with pipe laying.Concrete implementation step is as follows:
A, excavation, cleaning Concrete Dam or concrete structure base surface 1, make it reach the requirement of concreting, at spring 2, place buries vertical steel pipe 6 underground, and steel pipe covers spring 2; Layout level, to steel pipe 7, is connected with vertical steel pipe 6, forms ejectment water total system, and by spring ejectment to dam downstream; In level, by-pass valve control 10 is set to steel pipe 7 outlet section, makes it be in opening;
B, spring 2 place a small amount of in dam foundation downstream only bury level underground to steel pipe 7, be not connected, and directly lead to outside dam with above-mentioned draining total system;
C, in most of vertical steel pipe 6, bury consolidation grouting inlet pipe 8 underground, in small part vertical steel pipe, 6 bury consolidation grouting inlet pipe 8 and the double outlet pipe 9 of exhaust underground, this grouting inlet pipe, exhaust are held concurrently, and outlet pipe diameter is 28mm, pipe shaft all arranges a flower hole every 50cm, and consolidation grouting inlet pipe 8 and exhaust are held concurrently, the lower end of outlet pipe 9 is about 20mm and 10mm respectively from the distance of Concrete Dam or concrete structure base surface 1;
First floor concrete 3 and second layer concrete 4, the two layer height sum of d, concreting dam or concrete structure structure about reach 3m, and stay enough intermittent times according to construction requirement building (aspect 5) between this two layer concrete;
E, have after more than 50% intensity until concrete, the by-pass valve control 10 that the level of closedown is arranged to steel pipe 7 outlet section, in vertical steel pipe 6, backfills self-compacting concrete, label is identical with structural concrete;
F, implement consolidation grouting by the consolidation grouting inlet pipe 8 buried underground in steel pipe, spring 2 is closed;
G, continue to build third layer and above structural concrete.

Claims (3)

1. a spring processing method for Concrete Dam, has Concrete Dam or concrete structure base surface (1), and the described dam foundation or base surface grow spring, many places (2), and this method to the treatment step at spring is:
A, excavation, cleaning Concrete Dam or concrete structure base surface (1), reach the requirement of concreting, buries vertical steel pipe (6) underground, and cover this spring at spring (2) place; Arrange that the level of connecting with vertical steel pipe (6) is to steel pipe (7), form ejectment water total system, and by spring ejectment to dam downstream; In level, by-pass valve control (10) is set to steel pipe (7) outlet section, and makes valve be in opening;
B, level is only buried underground to steel pipe (7) for the spring (2) of Concrete Dam or concrete structure base surface (1) downstream part, and level disconnects to the draining total system in steel pipe and step a, directly leads to outside dam;
Bury consolidation grouting inlet pipe (8) underground in c, most of vertical steel pipe (6), in remaining vertical steel pipe (6), bury consolidation grouting inlet pipe (8) and the double outlet pipe (9) of exhaust underground;
The first floor concrete (3) of d, the concreting dam dam foundation or concrete structure base surface (1) and second layer concrete (4), and stay enough intermittent times according to construction requirement building between this two layer concrete;
E, have after more than 50% intensity until concrete, close the by-pass valve control (10) of level to steel pipe (7) outlet section, backfill self-compacting concrete in vertical steel pipe (6), label is identical with structural concrete;
F, implement consolidation grouting by the consolidation grouting inlet pipe (8) buried underground in vertical steel pipe (6), spring (2) are closed;
G, continue to build third layer and above structural concrete.
2. the spring processing method of a kind of Concrete Dam according to claim 1, is characterized in that: described first floor concrete (3) and the height of second layer concrete (4) two-layer sum reach 3m.
3. the spring processing method of a kind of Concrete Dam according to claim 1, is characterized in that: the diameter of described consolidation grouting inlet pipe (8) and the double outlet pipe (9) of exhaust is 28mm, pipe shaft arranges a flower hole every 50cm.
CN201410548989.XA 2014-10-16 2014-10-16 A kind of processing method at Concrete Dam spring Active CN104452827B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410548989.XA CN104452827B (en) 2014-10-16 2014-10-16 A kind of processing method at Concrete Dam spring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410548989.XA CN104452827B (en) 2014-10-16 2014-10-16 A kind of processing method at Concrete Dam spring

Publications (2)

Publication Number Publication Date
CN104452827A true CN104452827A (en) 2015-03-25
CN104452827B CN104452827B (en) 2016-06-29

Family

ID=52899527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410548989.XA Active CN104452827B (en) 2014-10-16 2014-10-16 A kind of processing method at Concrete Dam spring

Country Status (1)

Country Link
CN (1) CN104452827B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351655A (en) * 2021-12-09 2022-04-15 长江勘测规划设计研究有限责任公司 Construction method for raising structure of back slope limited combined gravity dam
CN114908808A (en) * 2022-04-24 2022-08-16 武汉市市政建设集团有限公司 Leakage stopping device and method for leakage of deep water cofferdam bottom sealing concrete

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02197625A (en) * 1989-01-25 1990-08-06 Taisei Corp Retaining continuous wall rear-side surface water pressure processing method
CN101245886A (en) * 2008-03-13 2008-08-20 武汉京冶地基基础工程有限责任公司 Processing method for deep building pit piping
CN102041810A (en) * 2010-12-22 2011-05-04 中国水电顾问集团华东勘测设计研究院 Construction method for pouring dam foundation concrete in zone with centralized water gushing
CN103061349A (en) * 2013-01-28 2013-04-24 浙江华东建设工程有限公司 Processing method for foundation pit piping
CN103967028A (en) * 2014-05-27 2014-08-06 江苏南通三建集团有限公司 Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02197625A (en) * 1989-01-25 1990-08-06 Taisei Corp Retaining continuous wall rear-side surface water pressure processing method
CN101245886A (en) * 2008-03-13 2008-08-20 武汉京冶地基基础工程有限责任公司 Processing method for deep building pit piping
CN102041810A (en) * 2010-12-22 2011-05-04 中国水电顾问集团华东勘测设计研究院 Construction method for pouring dam foundation concrete in zone with centralized water gushing
CN103061349A (en) * 2013-01-28 2013-04-24 浙江华东建设工程有限公司 Processing method for foundation pit piping
CN103967028A (en) * 2014-05-27 2014-08-06 江苏南通三建集团有限公司 Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孙国润: "蓟县电厂翻转机房深基础施工", 《城市》 *
熊德森: "岩溶地区坝基涌泉的成因分析及处理", 《贵州水力发电》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351655A (en) * 2021-12-09 2022-04-15 长江勘测规划设计研究有限责任公司 Construction method for raising structure of back slope limited combined gravity dam
CN114908808A (en) * 2022-04-24 2022-08-16 武汉市市政建设集团有限公司 Leakage stopping device and method for leakage of deep water cofferdam bottom sealing concrete

Also Published As

Publication number Publication date
CN104452827B (en) 2016-06-29

Similar Documents

Publication Publication Date Title
CN206346209U (en) A kind of quick solution dewatering well piping plugging structure
CN103572747A (en) Method for burying drainage-seepage body of reverse filtering pipe in tailing dam
CN205314107U (en) Sectional type slip casting pipe device that foundation stabilization used
CN102227998A (en) Concealed conduit system for both irrigation and drainage of farmland
CN201650362U (en) Maintainable tunnel drainage system
CN103132488B (en) Reverse osmosis water treatment method and reverse osmosis drainage system for face rockfill dam in construction period
CN105625430B (en) A kind of narrow and small construction area high -pressure water cutting soil body pile extracting method
CN102758639B (en) Anti-blowout long tube grouting method for limited-space tunnels
CN104452827A (en) Concrete dam base spring opening processing method
CN104404960B (en) A kind of underground diaphragm wall seam grouting device and constructional method
CN103615044A (en) Inner sleeve blocking method for leakage of small-diameter concrete drainage pipeline
CN204356738U (en) Concrete panel dam upstream surface structure for preventing panel from being empty
CN104480905B (en) Upstream face structure of concrete panel dam for preventing panel from being hollow and construction method
CN208717950U (en) A kind of subway enters and leaves and wears waterline supportive structure under line shield method
CN202559321U (en) Diversion tunnel plug concrete drainage pipe device
CN204132095U (en) A kind of field-crop water layer irrigation and drainage integral system
CN207003594U (en) A kind of composite bar oozes structure
CN205134332U (en) Municipal administration delivery pipeline hole groove supporting construction
CN204510291U (en) Reduce pressure under a kind of ultra-deep underground space structure base plate drainage system
CN204626434U (en) Manual hole digging pile water stopping structure
CN204282366U (en) A kind of diaphragm wall seam grouting device
CN104018475B (en) A kind of embedded penstock backfill grouting structure and grouting process thereof
CN112538859A (en) Construction method of steel pipe pile anti-sliding continuous wall
CN206279547U (en) Base pit dewatering well structure
CN206205109U (en) A kind of underground workshop seepage drainage manifold arrangement