CN104452737B - A kind of soft base fast processing constructional method of dyke - Google Patents
A kind of soft base fast processing constructional method of dyke Download PDFInfo
- Publication number
- CN104452737B CN104452737B CN201410689588.6A CN201410689588A CN104452737B CN 104452737 B CN104452737 B CN 104452737B CN 201410689588 A CN201410689588 A CN 201410689588A CN 104452737 B CN104452737 B CN 104452737B
- Authority
- CN
- China
- Prior art keywords
- battery lead
- lead plate
- dyke
- shape battery
- fast processing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/11—Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/17—Geometrical or physical properties including an electric conductive element
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Soil Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Underground Or Underwater Handling Of Building Materials (AREA)
- Revetment (AREA)
Abstract
The present invention discloses a kind of soft base fast processing constructional method of dyke, dykes and dams Soft Soils Consolidation in A technical field, by adopting, Y shape battery lead plate increases the specific surface area of electrode and the soil body to the soft base fast processing constructional method of dyke of the present invention, accelerate the electrolysis of electrode, hydrolysis, oxidation and dehydration reaction, expand reinforcing scope, it is to increase consolidation effect; Adopt nonmetal drill stem conversion connector to connect drilling rod and Y shape battery lead plate, avoid drilling rod and electrolysis, hydrolysis, oxidation and dehydration reaction also occur, it is possible to reduce material unaccounted-for (MUF) and reduce power supply loss; By conversion electric power positive and negative electrode, it is possible to use Y shape battery lead plate fully so that gelling can both be formed at positive and negative electrode two ends and add solid; In addition, adopting program construction technology simple, workable, economic benefit is obvious, obvious processing effect.
Description
Technical field
The invention belongs to dykes and dams Soft Soils Consolidation in A technical field, it is specifically related to a kind of soft base fast processing of dyke and executes
Work method.
Background technology
The settlement issues of soft clay ground, directly affects the normal operation of the stable of dyke embankment and road. The current process technology about soft soil base sedimentation mainly contains: replacement cushion method, swelling soil mix ash method, removing silt for replacement method, Lime Flyash Pile Method, loading preloading, overload pre-compaction method, combined vacuum and surcharge preloading method, deep mixing method, jet grounting and chemical consolidation method etc. Often kind of method has its advantage separately, but also there is respective limitation. Generally speaking, working procedure is many, long in time limit, and is applicable to the place that foundation surface does not have any structures more.
Prior art has following method: 1) by arranging weak soil compaction stake at even interval, highway embankment both sides, roadbed bed course inserts slip casting steel pipe, bed course and weak soil compaction stake form entirety admittedly to form slurry by slip casting, shared top embankment load, the method construction technology is complicated, need existing embankment side slope to be excavated, destroy the stability of existing embankment, need to carry out supporting time necessary, for the restriction of dyke engineering due to workyard condition, the method is also not suitable for, and the method is forming the protuberance easily causing embankment in the solid bed course process of slurry; 2) light soils is utilized to replace the constructional method of original embankment filled soil, effectively eliminate the settlement after construction of filler self, decrease the annex stress to ground, finally reach the target reducing Embankment Subsidence, the method construction process is comparatively complicated, and not from the strength problem of the ground truly solving weak soil, and it is not suitable for the soft base engineering of dyke, because under the effect of river course current, the stability of dyke is had important impact by the intensity of dike base, the standard that the sedimentation and deformation of dyke itself just controls; 3) for the combined electrode of reinforced soft soil ground, this electrode is welded by four sheet type metal sheets, this electrode does not in use need the soil layer reinforced to reinforce owing to whole process is metal for part yet, causes waste of material and processing costs to be increased; 4) arranging that in soft rock irony electrode carries out the method for soft rock reinforcing, the method adopts single root iron staff as electrode, there is cementing stake diameter less, and consolidation effect is not obvious.
In sum, generally there is construction technology complexity in treatment process conventional at present, reinforces costly, surrounding enviroment is required high, really can not effectively solve the strength problem of soft clay ground.
Summary of the invention
Goal of the invention: it is an object of the invention to provide a kind of soft base fast processing constructional method of dyke, the method can be strengthened the dikes when not affecting ground normal traffic soft base, economical rationality simultaneously.
Technical scheme: for achieving the above object, the present invention adopts following technical scheme:
A kind of soft base fast processing constructional method of dyke, comprises the following steps:
1) reconnoitring according to earthquake, it is determined that need position and the thickness of reinforcing soft soil layer bottom dyke, dyke is arranged on pan soil layer, and pan soil layer is on the top of weak soil layer; ;
2) levelling of the land, surveying setting-out, sets up fence and warning board at workyard periphery;
3) driller insertion, is connected wire with Y shape battery lead plate through drilling rod and X-over, and one end of X-over is connected with drilling rod, and the other end is connected with Y shape battery lead plate; In dyke both sides by rig respectively to inserting some row's Y shape battery lead plates bottom dyke in the weak soil layer needing to reinforce;
4) after Y shape battery lead plate has inserted, according to the circuit often arranging positive electrode, the requirement at negative potential interval connects Y shape battery lead plate and wire, connecting direct supply, the voltage of power supply is 0 ~ 220 volt, and electric current is 0 ~ 300 ampere; When outward current is less than 20 amperes, original positive electrode N, negative potential S are exchanged;
5) repeating step 4) until the intensity of weak soil reaches design requirements stops energising, extract Y shape battery lead plate.
Described X-over is cylindrical non-metal insulating material.
Described Y shape battery lead plate is welded by three trapezoidal iron sheets, and Y shape battery lead plate top is welded together by the acute angle of trapezoidal iron sheet.
Described Y shape battery lead plate width is 5cm ~ 15cm, and thickness is 0.5 ~ 1.0cm, and length is 100 ~ 300cm.
The adjacent distance between Y shape battery lead plate is 200 ~ 300cm.
Useful effect: compared with prior art, by adopting, Y shape battery lead plate increases the specific surface area of electrode and the soil body to the soft base fast processing constructional method of dyke of the present invention, accelerate the electrolysis of electrode, hydrolysis, oxidation and dehydration reaction, expand reinforcing scope, it is to increase consolidation effect; Adopt nonmetal drill stem conversion connector to connect drilling rod and Y shape battery lead plate, avoid drilling rod and electrolysis, hydrolysis, oxidation and dehydration reaction also occur, it is possible to reduce material unaccounted-for (MUF) and reduce power supply loss; By conversion electric power positive and negative electrode, it is possible to use Y shape battery lead plate fully so that gelling can both be formed at positive and negative electrode two ends and add solid; In addition, adopting program construction technology simple, workable, economic benefit is obvious, obvious processing effect.
Accompanying drawing explanation
Fig. 1 is the structural representation of dyke soft base fast processing when constructing;
Fig. 2 is the schematic cross section of Fig. 1;
Fig. 3 is the structural representation of Y shape battery lead plate.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described further.
As shown in Fig. 1 ~ 3, in figure, N is the positive pole (negative pole) of direct supply; S is the negative pole (positive pole) of direct supply; Dyke 1 is arranged on pan soil layer 6, pan soil layer 6 is on the top of weak soil layer 2, in dyke 1 both sides respectively to inserting Y shape battery lead plate 4 bottom dyke 1, ensureing that Y shape battery lead plate 4 is inserted in the weak soil layer 2 needing reinforcing, the adjacent distance between Y shape battery lead plate 4 is 200 ~ 300cm.
The soft base fast processing constructional method of dyke, comprises the following steps:
1) reconnoitre according to earthquake, it is determined that bottom dyke 1, need position and the thickness of reinforcing soft soil layer 2;
2) levelling of the land, surveying setting-out, sets up fence and warning board at workyard periphery;
3) driller insertion, is connected wire 7 with Y shape battery lead plate 4 through drilling rod 3 and X-over 5, connects drilling rod 3, X-over 5 and Y shape battery lead plate 4 simultaneously; In dyke 1 both sides by rig respectively to inserting some row's Y shape battery lead plates 4 bottom dyke, ensure that battery lead plate 4 is inserted in the weak soil layer 2 needing reinforcing;
4) after Y shape battery lead plate 4 has inserted, according to the circuit often arranging positive electrode, the requirement at negative potential interval connects Y shape battery lead plate 4 and wire 7, connecting direct supply, the voltage of power supply is 0 ~ 220 volt, and electric current is 0 ~ 300 ampere; When outward current is less than 20 amperes, original positive electrode N, negative potential S are exchanged;
5) repeating step 4) until the intensity of weak soil 2 reaches design requirements stops energising, extract Y shape battery lead plate 4.
Wherein, X-over 5 is cylindrical non-metal insulating material; Y shape battery lead plate 4 is welded by three trapezoidal iron sheets 8, and the top of Y shape battery lead plate 4 is welded together by the acute angle of trapezoidal iron sheet; Adopt segmentation array mode when length is longer, linked together by spiral shell tooth; Y shape battery lead plate 4 width is 5cm ~ 15cm, and thickness is 0.5 ~ 1.0cm, and length is determined according to the thickness reinforcing soil layer, is 100 ~ 300cm. The adjacent distance between Y shape battery lead plate 4 is 200 ~ 300cm.
Claims (4)
1. the soft base fast processing constructional method of dyke, it is characterised in that, comprise the following steps:
1) reconnoitre according to earthquake, determine that dyke (1) bottom needs position and the thickness of reinforcing soft soil layer (2), dyke (1) is arranged on pan soil layer (6), and pan soil layer (6) is on weak soil layer (2) top;
2) levelling of the land, surveying setting-out, sets up fence and warning board at workyard periphery;
3) driller insertion, wire (7) is connected through drilling rod (3) and X-over (5) with Y shape battery lead plate (4), one end of X-over (5) is connected with drilling rod (3), and the other end is connected with Y shape battery lead plate (4); In dyke (1) both sides by rig respectively to inserting some rows Y shape battery lead plate (4) bottom dyke in the weak soil layer (2) needing to reinforce;
4) after Y shape battery lead plate (4) has inserted, according to the circuit often arranging positive electrode, the requirement at negative potential interval connects Y shape battery lead plate (4) and wire (7), connecting direct supply, the voltage of power supply is 0~220 volt, and electric current is 0~300 ampere; When outward current is less than 20 amperes, original positive electrode N, negative potential S are exchanged;
5) repeating step 4) until the intensity of weak soil (2) reaches design requirements stops energising, extract Y shape battery lead plate (4); Described Y shape battery lead plate (4) is welded by three trapezoidal iron sheets (8), and Y shape battery lead plate (4) top is welded together by the acute angle of trapezoidal iron sheet.
2. the soft base fast processing constructional method of dyke according to claim 1, it is characterised in that: described X-over (5) is cylindrical non-metal insulating material.
3. the soft base fast processing constructional method of dyke according to claim 1, it is characterised in that: described Y shape battery lead plate (4) width is 5cm~15cm, and thickness is 0.5~1.0cm, and length is 100~300cm.
4. the soft base fast processing constructional method of dyke according to claim 1, it is characterised in that: the adjacent distance between Y shape battery lead plate (4) is 200~300cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410689588.6A CN104452737B (en) | 2014-11-26 | 2014-11-26 | A kind of soft base fast processing constructional method of dyke |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410689588.6A CN104452737B (en) | 2014-11-26 | 2014-11-26 | A kind of soft base fast processing constructional method of dyke |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104452737A CN104452737A (en) | 2015-03-25 |
CN104452737B true CN104452737B (en) | 2016-06-15 |
Family
ID=52899437
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410689588.6A Active CN104452737B (en) | 2014-11-26 | 2014-11-26 | A kind of soft base fast processing constructional method of dyke |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104452737B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104846711B (en) * | 2015-05-11 | 2017-11-03 | 河海大学 | The electroosmosis method reinforced for soil-slope |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2868793B1 (en) * | 2004-04-09 | 2006-07-07 | Electricite De France | SOIL PROCESSING METHOD WITH USE OF AT LEAST ONE COAXIAL MONOPOLAR ELECTRODE SYSTEM AND DEVICE FOR IMPLEMENTING THE SAME |
CN100516376C (en) * | 2007-07-05 | 2009-07-22 | 中国科学院武汉岩土力学研究所 | Testing device for reinforcing soft soil model by electrochemical piling method |
CN101319612B (en) * | 2008-07-23 | 2011-12-28 | 中国科学院武汉岩土力学研究所 | Electrochemical stabilization method for soft rock |
CN101713187B (en) * | 2009-10-27 | 2012-02-08 | 中国科学院武汉岩土力学研究所 | Soft soil electrochemically reinforced cross plate combination electrode |
CN101701458B (en) * | 2009-10-27 | 2011-04-13 | 中国科学院武汉岩土力学研究所 | Triangularly arranged compound electrode of soft soil electrochemistry solidification |
CN101886382B (en) * | 2010-06-22 | 2012-05-23 | 中铁第四勘察设计院集团有限公司 | Soft foundation reinforcing method of existing railway or highway subgrade construction |
CN102409663B (en) * | 2011-11-02 | 2013-09-25 | 河海大学 | Method for processing soft foundation by combining electrochemical grouting with slurry-cemented discrete material pile |
CN102864712B (en) * | 2012-10-16 | 2014-11-26 | 中铁第四勘察设计院集团有限公司 | Method and structure for micro-disturbance renovating of existing high speed railway subgrade deformation disease |
CN103821060B (en) * | 2014-03-06 | 2015-09-16 | 河海大学 | A kind of construction method of existing highway soft foundation Treating technology |
-
2014
- 2014-11-26 CN CN201410689588.6A patent/CN104452737B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104452737A (en) | 2015-03-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103967031B (en) | A kind of caisson of consolidated subsoil and stake combination foundation and construction method thereof | |
CN103321244B (en) | Sand foundation existing building sets up the construction method of basement | |
CN102425082A (en) | Subgrade strengthening structure for highly karstified station turnout zone on high-speed railway | |
CN102888834B (en) | A kind of construction method of major diameter broken stone pile | |
CN104895055A (en) | Building grouting pile foundation construction method | |
CN204199335U (en) | A kind of pressure release well reducing PHC tube pile construction soil compaction effect | |
CN102926400B (en) | Combined earth retaining wall structure and construction method thereof | |
CN202117068U (en) | Micropile plate-type composite foundation | |
CN104532714B (en) | Roadbed structure for treating deep soft soil karst foundation | |
CN204940298U (en) | A kind of Composite Enclosure Structure of base pit engineering | |
CN104452737B (en) | A kind of soft base fast processing constructional method of dyke | |
CN203007940U (en) | Tubular pile protection structure in side slope hammering construction | |
CN202730796U (en) | Existing retaining wall rib plate type unloading reinforcing structure | |
CN201502065U (en) | Anchor rod joint excavation compound basis | |
CN204780975U (en) | A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit | |
CN101691765B (en) | Double-ash well pole stress relief coordination and rectification method for complex foundation | |
CN111042161A (en) | Slope collapse high slope flexible processing structure and construction method thereof | |
CN217500288U (en) | High-energy-level dynamic compaction and replacement and tubular pile combined foundation structure for deep soil filling field | |
CN202787275U (en) | Tubular soil nailing wall of novel pneumatic impact anchor | |
CN106869198B (en) | Method for reinforcing loose soil subsidence space area by using cross beam to reinforce tower foundation | |
CN210507517U (en) | Combined member suitable for retaining wall heightening | |
CN201738286U (en) | Tetrapod pier type structure | |
CN111395082B (en) | Light roadbed structure above operation tunnel, design and construction method | |
CN212801549U (en) | H-shaped double-row steel sheet pile supporting structure | |
CN106087946A (en) | A kind of carbonate rock boulder strong rammer is combined to change to fill changes foundation reinforcement method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |