CN104446018B CN201410671505.0A CN201410671505A CN104446018B CN 104446018 B CN104446018 B CN 104446018B CN 201410671505 A CN201410671505 A CN 201410671505A CN 104446018 B CN104446018 B CN 104446018B
Authority
CN
China
Prior art keywords
kiln
plane
coordinate
dimensionals
kiln body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410671505.0A
Other languages
Chinese (zh)
Other versions
CN104446018A (en
Inventor
赵佳佳
赵磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201410671505.0A priority Critical patent/CN104446018B/en
Publication of CN104446018A publication Critical patent/CN104446018A/en
Application granted granted Critical
Publication of CN104446018B publication Critical patent/CN104446018B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Two vertical limestone kilns of thorax many plane three-dimensionals coordinate proposed by the invention is just being looked for, levelling method, and its concrete technical scheme is: the tower crane 1, selecting QTZ315 model; 2, selection group is to the paving location of platform; 3, the assembled process of kiln shell adopts the vertical seam clamp of adjustment perps; 4, kiln body is looked for and is just adopted many plane three-dimensionals coordinate method; Looking in positive process at kiln body, box ring beam upper surface absolute altitude is reference plane, and oo is kiln installation medullary ray, and o o and o " o " is that housing installs auxiliary medullary ray, and x, y are auxiliary concentric planimetric rectangular coordinates axis; 6, taking 0 °, 90 °, 180 °, the 270 ° orthogonal lines of design of basis plane as benchmark. Two vertical limestone kilns of thorax many plane three-dimensionals coordinate proposed by the invention is just being looked for, levelling method, more accurately feasible just looking for for vertical kiln body provides a kind of, leveling method, effectively improve the installation quality of vertical kiln body, accomplish not only safe but also economical further, reduce construction cost.

Description

Two vertical limestone kilns of thorax many plane three-dimensionals coordinate is just being looked for, levelling method
Technical field
The present invention relates to metallurgical equipment field engineering field, particularly two vertical limestone kilns of thorax many plane three-dimensionals coordinate just looking for, levelling method.
Background technology
At present, occurring that a kind of floor space is little in metallurgy industry, cost is low, the vertical limestone kiln of two thoraxes that throughput is strong, but since the complexity of kiln body structure, full working aloft. Setting accuracy for kiln shell is difficult to ensure, especially respectively saves kiln shell upper and lower ends planeness and center line of kiln body, the inner masonry project of kiln body; Spray gun is to the calcination point of kiln body simultaneously, drastically influence the life-span of kiln body.
Summary of the invention
Technical problem to be solved by this invention is to provide that two vertical limestone kilns of thorax many plane three-dimensionals coordinate is just being looked for, levelling method, more accurately feasible just looking for for vertical kiln body provides a kind of, leveling method, effectively improve the installation quality of vertical kiln body, accomplish not only safe but also economical further, reduce construction cost.
For achieving the above object, two vertical limestone kilns of thorax many plane three-dimensionals coordinate that the present invention proposes just is being looked for, levelling method, and its concrete technical scheme is:
1, the tower crane of QTZ315 model is selected, tower crane is 13.3m to kiln body width between centers, the biggest lifting capacity is 16t, the assembled height of kiln body is no more than 3m, the place at kiln shell rinforcement bar up 150mm is selected to carry out segmentation, both can meet the lifting ability of tower crane, and be possible to prevent kiln shell simultaneously and deform in hoisting process;
2, selection group is to the paving location of platform, kiln shell physical dimension selection group is to the assembled size of platform, assembly platform is laid in 10m × 12m, it is levelling that platform base adopts i shaped steel to do base water level, H250*250 shaped steel and the 22# joist steel that framework adopts 8 12m length laid by platform, 22# joist steel plays the effect of being fixedly connected with, and flat surface adopts wide 2m thickness to be δ=12 steel plate, and the distance at Platform center distance tower crane center is 13m;
3, the assembled process of kiln shell adopts the vertical seam clamp of adjustment perps, the angle steel adjuster of adjustment transverse joint or pressing plate adjuster, the oval adjuster of adjustment kiln shell out of roundness, the adjustment kiln shell verticality instruments such as line pendant and angle square ensure the integral assembling precision of kiln body;
4, kiln body is looked for and is just adopted many plane three-dimensionals coordinate method, first basis plane is selected to set up reference plane and auxiliary plane, the method set up: axis vertically upward is set to z-axis, with spirit-leveling instrument and transit instrument as the x of plane right-angle coordinate and auxiliary concentric plane right-angle coordinate, y-axis;
5, look in positive process at kiln body, absolute altitude 17.1m, 26.03m, 34.136m, 37.85m, 41.15m and 44.91m are respectively auxiliary plane absolute altitude, box ring beam upper surface absolute altitude is reference plane, setting kiln installation medullary ray and housing install auxiliary medullary ray, every bar medullary ray distance between two points is that 4400mm, x, y are for assisting concentric planimetric rectangular coordinates axis;
6, taking 0 °, 90 °, 180 °, the 270 ° orthogonal lines of design of basis plane as benchmark, x, y line meets at z-axis, and projects to each section of kiln shell upper surface, after each section of kiln shell is in place, measure, with spirit-leveling instrument and standard scale, the absolute altitude that this kiln shell installs end face, measure its upper surface planeness; Check the corresponding points of 0 °, 90 °, 180 °, 270 ° by thread-drawing therapy, control its coordinate point, check kiln shell circular arc degree with radian plate.
Two vertical limestone kilns of thorax many plane three-dimensionals coordinate proposed by the invention is just being looked for, levelling method, more accurately feasible just looking for for vertical kiln body provides a kind of, leveling method, effectively improve the installation quality of vertical kiln body, accomplish not only safe but also economical further, reduce construction cost.
Accompanying drawing explanation
Fig. 1 is many plane three-dimensionals setting coordinate schematic diagram.
Embodiment
FIGS, two vertical limestone kilns of thorax many plane three-dimensionals coordinate is just being looked for, levelling method, and its concrete technical scheme is:
1, the tower crane of QTZ315 model is selected, tower crane is 13.3m to kiln body width between centers, the biggest lifting capacity is 16t, the assembled height of kiln body is no more than 3m, the place at kiln shell rinforcement bar up 150mm is selected to carry out segmentation, both can meet the lifting ability of tower crane, and be possible to prevent kiln shell simultaneously and deform in hoisting process;
2, selection group is to the paving location of platform, kiln shell physical dimension selection group is to the assembled size of platform, assembly platform is laid in 10m × 12m, it is levelling that platform base adopts i shaped steel to do base water level, H250*250 shaped steel and the 22# joist steel that framework adopts 8 12m length laid by platform, 22# joist steel plays the effect of being fixedly connected with, and flat surface adopts wide 2m thickness to be δ=12 steel plate, and the distance at Platform center distance tower crane center is 13m;
3, the assembled process of kiln shell adopts the vertical seam clamp of adjustment perps, the angle steel adjuster of adjustment transverse joint or pressing plate adjuster, the oval adjuster of adjustment kiln shell out of roundness, the adjustment kiln shell verticality instruments such as line pendant and angle square ensure the integral assembling precision of kiln body;
4, kiln body is looked for and is just adopted many plane three-dimensionals coordinate method, first basis plane is selected to set up reference plane and auxiliary plane, the method set up: axis vertically upward is set to z-axis, with spirit-leveling instrument and transit instrument as the x of plane right-angle coordinate and auxiliary concentric plane right-angle coordinate, y-axis;
5, look in positive process at kiln body, absolute altitude 17.1m, 26.03m, 34.136m, 37.85m, 41.15m and 44.91m are respectively auxiliary plane absolute altitude, box ring beam upper surface absolute altitude is reference plane, oo is kiln installation medullary ray, o o and o " o " is that housing installs auxiliary medullary ray, distance between oo, between o o, between o " o " is 4400mm, and x, y are auxiliary concentric planimetric rectangular coordinates axis;
6, taking 0 °, 90 °, 180 °, the 270 ° orthogonal lines of design of basis plane as benchmark, x, y line meets at z-axis, and projects to each section of kiln shell upper surface, after each section of kiln shell is in place, measure, with spirit-leveling instrument and standard scale, the absolute altitude that this kiln shell installs end face, measure its upper surface planeness; Check the corresponding points of 0 °, 90 °, 180 °, 270 ° by thread-drawing therapy, control its coordinate point, check kiln shell circular arc degree with radian plate.
Two vertical limestone kilns of thorax many plane three-dimensionals coordinate proposed by the invention is just being looked for, levelling method, more accurately feasible just looking for for vertical kiln body provides a kind of, leveling method, effectively improve the installation quality of vertical kiln body, accomplish not only safe but also economical further, reduce construction cost.

Claims (1)

1. pair vertical limestone kiln of thorax many plane three-dimensionals coordinate just looking for, levelling method, its concrete technical scheme is:
1) tower crane of QTZ315 model, is selected, tower crane is 13.3m to kiln body width between centers, the biggest lifting capacity is 16t, the assembled height of kiln body is no more than 3m, the place at kiln shell rinforcement bar up 150mm is selected to carry out segmentation, both can meet the lifting ability of tower crane, and be possible to prevent kiln shell simultaneously and deform in hoisting process;
2), selection group is to the paving location of platform, kiln shell physical dimension selection group is to the assembled size of platform, assembly platform is laid in 10m × 12m, it is levelling that platform base adopts i shaped steel to do base water level, H250*250 shaped steel and the 22# joist steel that framework adopts 8 12m length laid by platform, 22# joist steel plays the effect of being fixedly connected with, and flat surface adopts wide 2m thickness to be δ=12 steel plate, and the distance at Platform center distance tower crane center is 13m;
3), the assembled process of kiln shell adopts the vertical seam clamp of adjustment perps, the angle steel adjuster of adjustment transverse joint or pressing plate adjuster, the oval adjuster of adjustment kiln shell out of roundness, the adjustment kiln shell verticality instruments such as line pendant and angle square ensure the integral assembling precision of kiln body;
4), kiln body is looked for and is just adopted many plane three-dimensionals coordinate method, first basis plane is selected to set up reference plane and auxiliary plane, the method set up: axis vertically upward is set to z-axis, with spirit-leveling instrument and transit instrument as the x of plane right-angle coordinate and auxiliary concentric plane right-angle coordinate, y-axis;
5), look in positive process at kiln body, absolute altitude 17.1m, 26.03m, 34.136m, 37.85m, 41.15m and 44.91m are respectively auxiliary plane absolute altitude, box ring beam upper surface absolute altitude is reference plane, oo is kiln installation medullary ray, o o and o " o " is that housing installs auxiliary medullary ray, distance between oo, between o o, between o " o " is 4400mm, and x, y are auxiliary concentric planimetric rectangular coordinates axis;
6), taking 0 °, 90 °, 180 °, the 270 ° orthogonal lines of design of basis plane as benchmark, x, y line meets at z-axis, and projects to each section of kiln shell upper surface, after each section of kiln shell is in place, measure, with spirit-leveling instrument and standard scale, the absolute altitude that this kiln shell installs end face, measure its upper surface planeness; Check the corresponding points of 0 °, 90 °, 180 °, 270 ° by thread-drawing therapy, control its coordinate point, check kiln shell circular arc degree with radian plate.
CN201410671505.0A 2014-11-21 2014-11-21 Two vertical limestone kilns of thorax many plane three-dimensionals coordinate is just being looked for, levelling method Active CN104446018B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410671505.0A CN104446018B (en) 2014-11-21 2014-11-21 Two vertical limestone kilns of thorax many plane three-dimensionals coordinate is just being looked for, levelling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410671505.0A CN104446018B (en) 2014-11-21 2014-11-21 Two vertical limestone kilns of thorax many plane three-dimensionals coordinate is just being looked for, levelling method

Publications (2)

Publication Number Publication Date
CN104446018A CN104446018A (en) 2015-03-25
CN104446018B true CN104446018B (en) 2016-06-15

Family

ID=52892868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410671505.0A Active CN104446018B (en) 2014-11-21 2014-11-21 Two vertical limestone kilns of thorax many plane three-dimensionals coordinate is just being looked for, levelling method

Country Status (1)

Country Link
CN (1) CN104446018B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105945565A (en) * 2016-04-29 2016-09-21 中冶天工集团天津有限公司 Kiln shell assembly adjusting device and applying method thereof
CN106322997B (en) * 2016-08-31 2018-04-20 中国十五冶金建设集团有限公司 Copper making refines grate installation method
CN106395671B (en) * 2016-09-30 2018-08-24 中冶天工集团天津有限公司 The method for carrying out resistance to material vertical transport using vertical transport equipment on kiln
CN107954614B (en) * 2017-12-13 2020-05-01 中化二建集团有限公司 Manufacturing and mounting method for energy-saving type Maerz lime kiln shell

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4032121A (en) * 1974-02-22 1977-06-28 Vereinigte Osterreichische Eisen- Und Stahlwerek-Alpine Montan Aktiengesellschaft Process for the production of iron from iron ores and apparatus for carrying out said process
CN101749940A (en) * 2008-12-18 2010-06-23 鞍钢建设集团有限公司 Adjustment method for center line of rotary kiln cylinders
CN103801921B (en) * 2012-11-14 2016-06-01 五冶集团上海有限公司 Vertical sleeve kiln kiln shell installation method
CN103486850B (en) * 2013-10-08 2015-05-20 中国十九冶集团有限公司 Butt joint method for giant rotary kiln barrels

Also Published As

Publication number Publication date
CN104446018A (en) 2015-03-25

Similar Documents

Publication Publication Date Title
CN104446018B (en) Two vertical limestone kilns of thorax many plane three-dimensionals coordinate is just being looked for, levelling method
CN102733545B (en) Section steel column for high-rise building section steel concrete combination structure, and construction method thereof
CN103114732B (en) Cast steel penetration pipe node space positioning method
CN103087731B (en) A kind of Laser measurement installation method of coke dry quenching furnace furnace shell
CN104060839B (en) Be exclusively used in large stadium metal curtain wall steel construction vertical keel construction control method
CN102943565A (en) Construction method of large-sized arc-shaped wall
CN103174302A (en) Construction method for large-diameter barrel cabin top
CN102680942A (en) Blast furnace frame measuring positioning method based on total station
CN106223623B (en) Steel construction box arched roof truss installation method
CN103759719B (en) Point position frock and measurement detect the method for annular track girder installation accuracy reference point
CN102966041A (en) Spatial stay-cable positioning method of multispan continuous S-shaped landscape bridge
CN113668873A (en) Mounting method of inclined support steel column
CN104973810B (en) Twin-chamber limekiln masonry measuring and positioning method
CN103173582A (en) Method for integral in-position mounting of blast-furnace five-way ball and eduction tubes thereof aloft
CN102530726A (en) Adjusting method for level adjustment of hanging tool for spacecraft
CN103953052A (en) Pile-beam-arch steel pipe column construction method
CN107265295B (en) Spherical storage tank equatorial plate lifting-eye location and hanging method
CN103603506A (en) Inner-support and reverse-construction-technique column perpendicularity controller
CN103451338A (en) Method for installing ascending tubes and five-way balls of blast furnace gas systems
CN103333973A (en) Preferential locating installation method of blast furnace five-way ball
CN109297453B (en) Linear measurement method for arc-shaped template of lining trolley
CN106320186B (en) A kind of skewback embedded anchor bar positioning system and construction method
CN204510846U (en) Be exclusively used in large stadium metal curtain wall steel work lateral keel auxiliary locator
CN103487040B (en) The measuring method that a kind of steel column is installed
CN103572870B (en) A kind of overlength high obliquity curtain wall batter post and mounting method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant