- CN104444766B CN104444766B CN201410725134.XA CN201410725134A CN104444766B CN 104444766 B CN104444766 B CN 104444766B CN 201410725134 A CN201410725134 A CN 201410725134A CN 104444766 B CN104444766 B CN 104444766B
- Authority
- CN
- China
- Prior art keywords
- handle
- rope
- column
- bottom plate
- hook
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004804 winding Methods 0.000 claims abstract description 5
- 239000004677 Nylon Substances 0.000 claims description 4
- 229920001778 nylon Polymers 0.000 claims description 4
- 239000003822 epoxy resin Substances 0.000 claims description 3
- 229920000647 polyepoxide Polymers 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 10
- 229910052573 porcelain Inorganic materials 0.000 description 6
- 238000010276 construction Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 3
- 238000009413 insulation Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 229920000742 Cotton Polymers 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000012966 insertion method Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/08—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
- Insulators (AREA)
Abstract
本发明公开了一种电力变压器绝缘套管吊装装置,包括挂钩、底板、绳索、两个绳索调节柄,所述挂钩固定于底板的中心位置上,绳索调节柄包括柄头、柄柱,所述柄头与柄柱固定连接,所述底板两端对称设有两个通孔,所述绳索调节柄的柄柱置于通孔内,所述柄头位于底板上挂钩所在的一侧,所述柄头的外圆大于通孔的孔径,所述绳索调节柄的柄柱带有螺旋形绳索缠绕槽,所述绳索缠绕于柄柱上。本发明的有益效果是满足大型套管的斜插吊装作业,方便挂钩、拆卸,进行吊装时的角度随时可以调整,避免套管的损坏。
The invention discloses a hoisting device for an insulating bushing of a power transformer, which includes a hook, a base plate, a rope, and two rope adjustment handles, the hook is fixed on the center of the base plate, and the rope adjustment handle includes a handle head and a handle column. The handle head is fixedly connected with the handle column, two through holes are symmetrically arranged at both ends of the base plate, the handle column of the rope adjustment handle is placed in the through hole, the handle head is located on the side where the hook is located on the base plate, the The outer circle of the handle head is larger than the aperture of the through hole, and the handle post of the rope adjustment handle has a spiral rope winding groove, and the rope is wound on the handle post. The invention has the beneficial effects of satisfying obliquely inserting and hoisting operations of large bushings, facilitating hooking and dismounting, and the angle during hoisting can be adjusted at any time to avoid damage to the bushing.
Description
技术领域technical field
本发明涉及一种电力变压器的绝缘套管吊装装置,属于电力设备技术领域。The invention relates to an insulating bushing hoisting device for a power transformer, which belongs to the technical field of power equipment.
背景技术Background technique
变压器套管是将变压器内部高、低压引线引到变压器油箱外部的主要绝缘装置。变压器绕组的引出线必须穿过绝缘套管,使引出线之间及引出线与变压器外壳之间绝缘,同时起固定引出线的作用。变压器套管也是变压器载流元件之一,在变压器运行中,长期通过负载电流。随着我国电力工业的发展,供电量逐年上升,电力变压器也逐渐向高电压、大容量方向发展。因此,对于高压套管的技术要求也越来越高,高压套管的各部位绝缘距离逐渐减小。目前,大型电力变压器的高压套管多为瓷质套管,且自重重、体积大。在对高压套管进行安装时,采用传统的斜插式吊装十分困难,容易造成吊装过程损坏瓷质套管。The transformer bushing is the main insulation device that leads the high and low voltage leads inside the transformer to the outside of the transformer oil tank. The lead-out wires of the transformer winding must pass through the insulating sleeve to insulate between the lead-out wires and between the lead-out wires and the transformer shell, and at the same time play the role of fixing the lead-out wires. The transformer bushing is also one of the current-carrying components of the transformer. During the operation of the transformer, the load current passes through it for a long time. With the development of my country's electric power industry, the power supply is increasing year by year, and power transformers are gradually developing towards high voltage and large capacity. Therefore, the technical requirements for the high-voltage bushing are getting higher and higher, and the insulation distance of each part of the high-voltage bushing is gradually reduced. At present, the high-voltage bushings of large-scale power transformers are mostly porcelain bushings, which are heavy and bulky. When installing the high-voltage bushing, it is very difficult to use the traditional oblique insertion method for hoisting, and it is easy to cause damage to the porcelain bushing during the hoisting process.
传统吊装的不足具体有以下四个方面:The shortcomings of traditional hoisting specifically include the following four aspects:
1.传统斜插式的吊装方法技术难度相当大,即使对于具有多年经验的老师傅来说,也需要经过多次调试才能达到要求。在套管长度过长的情况下,吊装难度更加大,调试更加困难,费时费力。1. The traditional oblique hoisting method is quite technically difficult. Even for a master with many years of experience, it takes many times of debugging to meet the requirements. When the casing length is too long, the hoisting and debugging are more difficult, time-consuming and labor-intensive.
2.现场设备各种各样,对于高压套管的绝缘间距的要求也各种各样,这就造成了高压套管与变压器本体的角度也是各不相同。每一个角度都需要现场不断地调整,才能满足不断变化的施工要求,造成了时间的大量浪费。2. There are various on-site equipment, and the requirements for the insulation distance of the high-voltage bushing are also various, which causes the angles between the high-voltage bushing and the transformer body to be different. Every angle needs to be constantly adjusted on site to meet the ever-changing construction requirements, resulting in a lot of time wasted.
3.安全性问题:在多次的调试过程中,套管起起落落,极容易造成套管的损坏。3. Safety issues: During the repeated debugging process, the bushing rises and falls, which is very easy to cause damage to the bushing.
4.吊装过程中,还要注意在尼龙吊带与套管瓷件相接触的部分垫上软纸板或棉布等物,以防尼龙吊带受力后损坏套管瓷件。4. During the hoisting process, it is also necessary to pad soft cardboard or cotton cloth on the part where the nylon sling is in contact with the casing porcelain part, so as to prevent the nylon sling from damaging the casing porcelain part after being stressed.
发明内容Contents of the invention
本发明的目的在于提供一种电力变压器绝缘套管吊装装置,满足大型电力变压器的高压套管及户内GIS的进线套管的安装作业流程要求,取代小链条葫芦进行角度调节的吊装方法,克服传统吊装装置的不足。The purpose of the present invention is to provide a hoisting device for insulating bushings of power transformers, which can meet the requirements of the installation operation process of high-voltage bushings of large-scale power transformers and incoming line bushings of indoor GIS, and replace the hoisting method of small chain hoists for angle adjustment. Overcome the shortcomings of traditional hoisting devices.
本发明的目的通过以下技术方案予以实现:The purpose of the present invention is achieved through the following technical solutions:
一种电力变压器绝缘套管吊装装置,包括挂钩1、底板2、绳索3、两个绳索调节柄4,所述挂钩1固定于底板2的中心位置上,所述两个绳索调节柄4结构一致,所述绳索调节柄4包括柄头5、柄柱6,所述柄头5与柄柱6固定连接,所述底板2两端对称设有两个通孔,所述绳索调节柄4的柄柱6置于通孔内,所述柄头5位于底板2上挂钩1所在的一侧,所述柄头5的外圆大于通孔的孔径,所述绳索调节柄4的柄柱6带有螺旋形绳索缠绕槽7,所述绳索3缠绕于柄柱6上。A power transformer insulating bushing hoisting device, comprising a hook 1, a bottom plate 2, a rope 3, and two rope adjustment handles 4, the hook 1 is fixed on the center of the bottom plate 2, and the two rope adjustment handles 4 have the same structure , the rope adjustment handle 4 includes a handle head 5 and a handle column 6, the handle head 5 is fixedly connected with the handle column 6, two through holes are symmetrically arranged at both ends of the bottom plate 2, the handle of the rope adjustment handle 4 The column 6 is placed in the through hole, the handle 5 is located on the side of the hook 1 on the bottom plate 2, the outer circle of the handle 5 is larger than the aperture of the through hole, and the handle post 6 of the rope adjustment handle 4 has a The helical rope winding groove 7, the rope 3 is wound on the handle post 6.
本发明的目的还可以通过以下技术措施来进一步实现:The object of the present invention can also be further realized by the following technical measures:
前述一种电力变压器绝缘套管吊装装置,其中绳索调节柄4还包括一个凸型柱8,所述凸型柱8位于柄头5与柄柱6之间,在所述凸型柱8所处的相应位置,底板2的通孔内部带有一个凹型圆槽9,所述凸型柱8可配合在凹型圆槽9内旋转。The aforementioned lifting device for insulating bushings of power transformers, wherein the rope adjustment handle 4 also includes a convex post 8, the convex post 8 is located between the handle head 5 and the handle post 6, and the convex post 8 is located At the corresponding position, there is a concave circular groove 9 inside the through hole of the bottom plate 2, and the convex column 8 can be fitted to rotate in the concave circular groove 9.
前述一种电力变压器绝缘套管吊装装置,其中柄头5的上部设一旋转手柄11。The above-mentioned hoisting device for insulating bushings of power transformers, wherein a rotary handle 11 is arranged on the top of the crown 5 .
前述一种电力变压器绝缘套管吊装装置,其中底板2为环氧树脂板制成。The above-mentioned hoisting device for insulating bushings of power transformers, wherein the bottom plate 2 is made of epoxy resin plate.
前述一种电力变压器绝缘套管吊装装置,其中绳索3为尼龙绳。The above-mentioned hoisting device for the insulating bushing of a power transformer, wherein the rope 3 is a nylon rope.
与现有技术相比,本发明的有益效果是:满足大型套管的斜插吊装作业,方便挂钩、拆卸,进行吊装时的角度随时可以调整,避免套管的损坏。Compared with the prior art, the beneficial effect of the present invention is that it meets the oblique insertion and hoisting operation of large casings, facilitates hooking and disassembly, and the angle during hoisting can be adjusted at any time to avoid damage to the casings.
附图说明Description of drawings
图1是本发明的结构图;Fig. 1 is a structural diagram of the present invention;
图2是本发明绳索调节柄实施例图;Fig. 2 is the embodiment diagram of the rope adjustment handle of the present invention;
图3是本发明的带旋转手柄的绳索调节柄实施例图。Fig. 3 is a diagram of an embodiment of the rope adjustment handle with a rotary handle of the present invention.
具体实施方式detailed description
下面结合附图和具体实施例对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
采用传统方法起吊绝缘套管时,如瓷套较轻,施工人员会凭经验绑扎吊带在瓷裙上的位置,确定起吊角度,这个角度一旦确定,就不能调节,除非重新绑扎,一般通过人力推动,可以微调角度,如110套管及以下,采用此种方法较多,也比较容易,可以节省安装时间。220套管由于重量比较大,人力推不动,就不能用此种方法。因此需要采用本发明的电力变压器绝缘套管吊装装置。When using the traditional method to lift the insulating sleeve, if the porcelain bushing is relatively light, the construction personnel will bind the position of the sling on the porcelain skirt based on experience to determine the lifting angle. Once the angle is determined, it cannot be adjusted unless it is re-bound. Generally, it is pushed by manpower , the angle can be fine-tuned, such as 110 casing and below, this method is often used, and it is relatively easy, which can save installation time. The 220 casing is relatively heavy and cannot be pushed by manpower, so this method cannot be used. Therefore need to adopt the power transformer insulating bushing hoisting device of the present invention.
如图1所示,本发明电力变压器绝缘套管吊装装置,包括挂钩1、底板2、绳索3、两个绳索调节柄4,所述挂钩1固定于底板2的中心位置上,所述两个绳索调节柄4结构一致。简便型的绳索调节柄4结构如图2所示,包括柄头5、柄柱6,所述柄头5与柄柱6固定连接,所述底板2两端对称设有两个通孔,所述绳索调节柄4的柄柱6置于通孔内,所述柄头5位于底板2上挂钩1所在的一侧,所述柄头5的外圆大于通孔的孔径,所述绳索调节柄4的柄柱6带有螺旋形绳索缠绕槽7,所述绳索3缠绕于柄柱6上。简便型绳索调节柄4结构简单、安装方便,但存在从底板一侧脱落的可能,为了更加安全,可以采用图1所示的绳索调节柄4,其中绳索调节柄4还包括一个凸型柱8,所述凸型柱8位于柄头5与柄柱6之间,在所述凸型柱8所处的相应位置,底板2的通孔内部带有一个凹型圆槽9,所述凸型柱8可配合在凹型圆槽9内旋转。这样,绳索调节柄4就不会从底板中脱落。As shown in Figure 1, the power transformer insulating bushing hoisting device of the present invention includes a hook 1, a bottom plate 2, a rope 3, and two rope adjustment handles 4, the hook 1 is fixed on the center of the bottom plate 2, and the two The rope adjustment handle 4 has the same structure. The simple rope adjustment handle 4 has a structure as shown in Figure 2, including a handle head 5 and a handle column 6, the handle head 5 is fixedly connected to the handle column 6, and two through holes are symmetrically arranged at both ends of the bottom plate 2, so that The handle column 6 of the rope adjustment handle 4 is placed in the through hole, the handle head 5 is located on the side where the hook 1 is located on the bottom plate 2, the outer circle of the handle head 5 is larger than the aperture of the through hole, and the handle head 5 is larger than the aperture of the through hole. The handle 6 of 4 has a helical rope winding groove 7, and the rope 3 is wound on the handle 6. The simple rope adjustment handle 4 is simple in structure and easy to install, but there is a possibility of falling off from the side of the bottom plate. For greater safety, the rope adjustment handle 4 shown in Figure 1 can be used, wherein the rope adjustment handle 4 also includes a convex column 8 , the convex column 8 is located between the handle head 5 and the handle column 6, and at the corresponding position where the convex column 8 is located, there is a concave circular groove 9 inside the through hole of the bottom plate 2, and the convex column 8 can be matched to rotate in the concave circular groove 9. In this way, the rope adjustment handle 4 will not fall off from the bottom plate.
在使用本发明的绝缘套管吊装装置时,施工前先检查需安装的套管是否存在问题,然后将挂钩1挂在吊车上,绳索3从柄柱6上引出,两根绳索固定在套管10两端相应的位置,启动吊车,将套管缓缓掉起,找准整个套管的重心,在接近升高座的位置,施工人员通过旋转柄头5,带动柄柱6一起旋转,不同的旋转方向分别是放松或缩短绳索,通过调节两根绳索的长断,找准角度,然后将套管缓慢的送入升高座,与之连接,固定。为了方便施工操作,如图3所示,在柄头5的上部设一旋转手柄11,便于灵活进行旋转。When using the insulating bushing hoisting device of the present invention, check whether there is any problem with the bushing to be installed before construction, then hang the hook 1 on the crane, the rope 3 is drawn from the handle post 6, and the two ropes are fixed on the bushing 10 At the corresponding positions at both ends, start the crane, slowly drop the casing, and find the center of gravity of the entire casing. At the position close to the raised seat, the construction personnel rotate the handle head 5 to drive the handle column 6 to rotate together. Different The direction of rotation is to loosen or shorten the rope respectively. By adjusting the length and breakage of the two ropes, the angle is found, and then the casing is slowly sent into the rising seat, connected with it, and fixed. In order to facilitate the construction operation, as shown in Figure 3, a rotating handle 11 is arranged on the top of the crown 5, which is convenient to rotate flexibly.
电力变压器绝缘套管吊装装置的底板2为环氧树脂板制成,将挂钩1与其它部件绝缘,可以防止意外的触电事故。The bottom plate 2 of the power transformer insulating bushing hoisting device is made of an epoxy resin plate, which insulates the hook 1 from other parts, and can prevent accidental electric shock accidents.
除上述实施例外,本发明还可以有其他实施方式,凡采用等同替换或等效变换形成的技术方案,均落在本发明要求的保护范围内。In addition to the above-mentioned embodiments, the present invention can also have other implementations, and all technical solutions formed by equivalent replacement or transformation fall within the scope of protection required by the present invention.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410725134.XA CN104444766B (en) | 2014-12-03 | 2014-12-03 | Electric power transformer insulated sleeve hoisting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410725134.XA CN104444766B (en) | 2014-12-03 | 2014-12-03 | Electric power transformer insulated sleeve hoisting device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104444766A CN104444766A (en) | 2015-03-25 |
CN104444766B true CN104444766B (en) | 2016-10-12 |
Family
ID=52891641
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410725134.XA Expired - Fee Related CN104444766B (en) | 2014-12-03 | 2014-12-03 | Electric power transformer insulated sleeve hoisting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104444766B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105417372A (en) * | 2015-11-05 | 2016-03-23 | 云南省送变电工程公司 | Method for obliquely inserting and mounting high-voltage bushing once through intelligent protractor |
CN105819348B (en) * | 2016-05-13 | 2019-04-23 | 中国航空工业集团公司西安飞机设计研究所 | a lifting device |
CN106315390A (en) * | 2016-09-14 | 2017-01-11 | 四川航泰航空装备有限公司 | Universal heavy object suspending equipment for airplane |
CN107381325A (en) * | 2017-07-06 | 2017-11-24 | 烟台烟大众智知识产权服务有限公司 | A kind of structural lumber lifts by crane apparatus |
CN113566913A (en) * | 2020-04-29 | 2021-10-29 | 无锡市百韧机械科技有限公司 | Take gaseous ultrasonic flowmeter measuring device of self calibration function |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB816566A (en) * | 1956-10-09 | 1959-07-15 | Quiggin & Company Ltd | An improved load-gripping device for use in the lifting and lowering of timber |
DE3511655A1 (en) * | 1985-03-29 | 1986-10-02 | Georg 8200 Rosenheim Uttscheid | Device for the uniform lifting and lowering of an elongated load |
CA2154422C (en) * | 1994-08-29 | 2005-05-24 | Hans G. Blochle | Cable-clamping device for a synthetic fibre cable |
JP2788228B2 (en) * | 1996-06-12 | 1998-08-20 | 基司 久門 | Article hanging jig |
CN201607212U (en) * | 2010-03-16 | 2010-10-13 | 中国地质大学(武汉) | Drill hook displacement detection device |
CN203295044U (en) * | 2013-06-24 | 2013-11-20 | 山西天宝风电法兰有限公司 | Hoisting device for loading wind power flanges |
CN203877731U (en) * | 2014-04-24 | 2014-10-15 | 马鞍山十七冶工程科技有限责任公司 | Hoisting and dragging device used in PHC (Pre-stress High-strength Concrete) pipe pile construction site |
CN204310679U (en) * | 2014-12-03 | 2015-05-06 | 国家电网公司 | Electric power transformer insulated sleeve hoisting device |
-
2014
- 2014-12-03 CN CN201410725134.XA patent/CN104444766B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104444766A (en) | 2015-03-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104444766B (en) | Electric power transformer insulated sleeve hoisting device | |
CN203201216U (en) | Vertical rod centralizer | |
CN204310679U (en) | Electric power transformer insulated sleeve hoisting device | |
CN105162039A (en) | Portable grounding wire transmitter and using method | |
CN204441087U (en) | Transformer high-voltage bushing lead-in wire mounting bracket | |
CN201188519Y (en) | Special support for maintaining 10KV overhead line | |
CN205397843U (en) | Dry -type air -core reactor lifts by crane specialized tool | |
CN204271532U (en) | Transfer Rope Hoist | |
CN203398628U (en) | Portable insulator replacing tool | |
CN106241484A (en) | Earth lead support | |
CN205687433U (en) | A kind of on-load tap changers of transformers boom hoisting | |
CN103199461B (en) | Transmission line lightning conducter elevating method | |
CN204802882U (en) | Transformer on -load voltage regulating switch lifts by crane instrument | |
CN203284128U (en) | Hoisting tool of main mechanism of switch blade | |
CN203932808U (en) | Replacing insulator under electrified wire lifting device | |
CN106241681A (en) | A kind of removable portable load dispatcher well well cover opening device | |
CN207339089U (en) | Line fixing device more than bypass cable | |
CN206820365U (en) | A device for replacing line weight hammers | |
CN205973428U (en) | Testing transformer's supplementary hoist device | |
CN203932825U (en) | In 10kV power distribution network, charged vertical bottle is changed device | |
CN204884850U (en) | Sleeve pipe lead wire lifting mechanism | |
CN202424016U (en) | Pulley device for electric power circuit maintenance | |
CN105305316B (en) | A kind of mountain region effort-saving circuit line lifter | |
CN204215891U (en) | A kind of open current transformer | |
CN204243605U (en) | Special hook for replacement of tension string composite insulators on transmission lines |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161012 Termination date: 20161203 |
|