Portable drilling equipment Download PDFInfo
- Publication number
- CN104439403A CN104439403A CN201410670006.XA CN201410670006A CN104439403A CN 104439403 A CN104439403 A CN 104439403A CN 201410670006 A CN201410670006 A CN 201410670006A CN 104439403 A CN104439403 A CN 104439403A
- Authority
- CN
- China
- Prior art keywords
- outer tube
- electric hammer
- adjusting gear
- tube
- interior pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25H—WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
- B25H1/00—Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
- B25H1/0021—Stands, supports or guiding devices for positioning portable tools or for securing them to the work
- B25H1/0035—Extensible supports, e.g. telescopic
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25D—PERCUSSIVE TOOLS
- B25D16/00—Portable percussive machines with superimposed rotation, the rotational movement of the output shaft of a motor being modified to generate axial impacts on the tool bit
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25D—PERCUSSIVE TOOLS
- B25D2216/00—Details of portable percussive machines with superimposed rotation, the rotational movement of the output shaft of a motor being modified to generate axial impacts on the tool bit
- B25D2216/0007—Details of percussion or rotation modes
- B25D2216/0023—Tools having a percussion-and-rotation mode
Abstract
The invention discloses portable drilling equipment and belongs to the technical field of building construction and architectural decoration. The portable drilling equipment solves the problems that cross operation cannot be conducted during existing drilling construction, time consumed for drilling is long and the risk that staff get injured is high in the construction process. According to the technical scheme, the portable drilling equipment comprises an outer tube, an inner tube, an adjusting gear, an electric hammer mounting frame and an electric hammer, wherein a track cavity is formed in the outer tube, and a mounting hole is formed in the outer tube; a linear rack is arranged on the outer wall of the inner tube, and the inner tube is mounted in the track cavity of the outer tube; the adjusting gear is mounted on the outer tube through a rotating shaft, the rotating shaft penetrates through the mounting hole, the adjusting gear is meshed with the linear rack, and the adjusting gear drives the inner tube to move along the track cavity when the adjusting gear is rotated; the electric hammer mounting frame is detachably connected with the upper end of the inner tube; the electric hammer is fixed to the electric hammer mounting frame, and a drill is vertically upward.
Description
Technical field
The invention belongs to construction, construction and decoration technical field, relate to a kind of portable perforating equipment.
Background technology
Furred ceiling, refers to the top finishing of house living environment.Briefly, just referring to the finishing of ceiling, is one of pith of interior decoration.Furred ceiling has insulation, heat insulation, sound insulation, the effect of sound absorption, be also electrically, air conditioner, communication and the engineering such as fire prevention, warning line equipment hidden layer.Furred ceiling occupies considerable status in whole indoor decoration, makes suitable decoration to room top surface, can not only beautify indoor environment, can also build colourful interior space artistic image.
During interior decoration ceiling construction, house top plate punching installs first link that keel are constructions.First existing construction needs to set up scaffold at the construction field (site), then stands in the enterprising having sexual intercourse roofing board of scaffold by punching personnel and punches.
Inventor finds that in prior art, at least there are the following problems: the first, and scaffold takes up room greatly, makes cannot carry out other work post construction in construction room, and be difficult to carry out cross-operation, the construction period can be greatly affected.The second, must scaffold be set up before punching, because scaffold is built loaded down with trivial details, add the time spent by punching.3rd, punching personnel stand on scaffold and punch, and there is danger of falling, work progress injury to personnel has a big risk.
Summary of the invention
In view of this, the embodiment of the present invention provides a kind of portable perforating equipment, and main purpose solves existing punching construction cannot carry out cross-operation, the problem that the time length spent by punching and work progress injury to personnel have a big risk.
In order to solve the problems of the technologies described above, present invention employs following technical scheme:
On the one hand, embodiments provide a kind of portable perforating equipment, this equipment comprises:
Outer tube, described outer tube is rail cavity; Outer tube offers installing hole;
Interior pipe, described outer wall of inner tube has Linear rack; Interior pipe is arranged in the rail cavity of outer tube;
Adjusting gear, described adjusting gear is arranged on described outer tube by rotating shaft, and rotating shaft is through described installing hole, and adjusting gear engages with described Linear rack, and during rotation adjusting gear, adjusting gear drives interior pipe to move along rail cavity;
Electric hammer installing rack, the upper end of described electric hammer installing rack and interior pipe removably connects;
Electric hammer, described electric hammer is fixed on electric hammer installing rack, and drill bit straight up.
Portable perforating equipment as above, also comprises extension tube, and the lower end of extension tube and the upper end of interior pipe removably connect, and upper end and described electric hammer installing rack removably connect.
Portable perforating equipment as above, further, described extension tube is aluminium alloy or glass steel material.
Portable perforating equipment as above, also comprises air level, and it is fixed on the outer wall of described outer tube by link, makes it keep vertical direction for calibrating outer tube.
Portable perforating equipment as above, also comprises outer pipe holder, and outer pipe holder is fixed on outer tube bottom, keeps vertical state for supporting outer tube.
Portable perforating equipment as above, further, described outer pipe holder comprises:
First installing ring, is fixed on the bottom of outer tube;
Second installing ring, is set in the bottom of outer tube, and is positioned at below the first installing ring;
Leg, its quantity is three, and one end of leg is hinged on the first installing ring respectively;
Support arm, its quantity is three, and one end of support arm is hinged on the second installing ring respectively, and the leg of the other end respectively with corresponding is hinged.
Portable perforating equipment as above, further, the power line of electric hammer is connected with gauge tap, and described gauge tap is arranged on described outer tube.
Portable perforating equipment as above, further, the length of outer tube is 100 ~ 150cm; The length of interior pipe is 80 ~ 120cm; The length of Linear rack is 70 ~ 110cm.
Portable perforating equipment as above, further, the axis extended line of outer tube and the dead in line of drill bit.
Compared with prior art, beneficial effect of the present invention is:
1, devise interconnective outer tube and interior pipe, and interior pipe is arranged in the rail cavity of outer tube; Make adjusting gear drive interior pipe to move along rail cavity by rotating adjusting gear, thus obtain required electric hammer height, and then realize house top plate punching.Operating personnel just can punch smoothly without the need to setting up the large scaffold that takes up room, thus have deducted scaffold lease and manually set up expense, and construction cost is low.
2, construction safety: punch operation personnel operate construction with standing, has stopped punch on the scaffold falling from high altitude that exists of operating personnel dangerous.
3, more job site demand is met.When the maximum length after interior pipe and outer tube regulate can not meet the demand of construction height, increase extension tube, the lower end of extension tube and the upper end of interior pipe removably connect, and upper end and described electric hammer installing rack removably connect, easy accessibility.Extension tube can have many, and the length of every root is all not identical, to meet more job site demand.
4, air level makes it keep vertical direction for calibrating outer tube.Air level is fixed on the outer wall of described outer tube by link, and the level surface of air level is vertical with the axial direction of outer tube.
Accompanying drawing explanation
Accompanying drawing described herein is used to provide a further understanding of the present invention, and form a application's part, schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
A kind of portable perforating Whole Equipment schematic diagram that Fig. 1 provides for the embodiment of the present invention;
A kind of adjusting gear that Fig. 2 provides for the embodiment of the present invention and scheme of installation thereof;
The outer pipe holder schematic diagram of one that Fig. 3 provides for the embodiment of the present invention.
In accompanying drawing, the list of parts representated by each label is as follows:
1, outer tube, 2, interior pipe, 22, Linear rack, 3, adjusting gear, 32, installing hole, 4, electric hammer installing rack, 5, electric hammer, 6, extension tube, 7, air level, 8, outer pipe holder, the 81, first installing ring, the 82, second installing ring, 83, leg, 84, support arm, 9, gauge tap, 92, power line.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in further detail, but not as a limitation of the invention.
The embodiment of the present invention needs the problem solved to be that existing punching construction cannot carry out cross-operation, and the time length spent by punching and work progress injury to personnel have a big risk.
A kind of portable perforating equipment, it comprises:
Outer tube, described outer tube is rail cavity; Outer tube offers installing hole;
Interior pipe, described outer wall of inner tube has Linear rack; Interior pipe is arranged in the rail cavity of outer tube;
Adjusting gear, described adjusting gear is arranged on described outer tube by rotating shaft, and rotating shaft is through described installing hole, and adjusting gear engages with described Linear rack, and during rotation adjusting gear, adjusting gear drives interior pipe to move along rail cavity;
Electric hammer installing rack, the upper end of described electric hammer installing rack and interior pipe removably connects;
Electric hammer, described electric hammer is fixed on electric hammer installing rack, and drill bit straight up.
The use procedure of portable perforating equipment of the present invention is as follows: at the construction field (site), punching personnel stand in ground and punch device are placed into predetermined punch position, interior pipe is made to increase in rail cavity by rotating adjusting gear, observe electric hammer drill height, when drill bit starts punching close to electric hammer work during house top board, when rotating further adjusting gear, drill bit reaches the predetermined punching degree of depth and completes punching.Rotating adjusting gear makes interior pipe decline in rail cavity, moves punch device and repeats said process to next punch position.
Portable perforating equipment advantage of the present invention is: take up room compared with the scaffold in existing method little, and can other work post construct in job site simultaneously, carry out cross-operation, shorten the construction period.Punching personnel stand in ground and punch, and to avoid on scaffold construction and there is the danger that personnel fall.
Further, in order to make portable perforating equipment adapt to higher job site needs, the present invention also provides following embodiment, and as depicted in figs. 1 and 2, punch device comprises:
Outer tube 1, described outer tube is rail cavity; Outer tube offers installing hole 32;
Interior pipe 2, described outer wall of inner tube has Linear rack 22; Interior pipe is arranged in the rail cavity of outer tube;
Adjusting gear 3, described adjusting gear 3 is arranged on described outer tube 1 by rotating shaft, and rotating shaft is through described installing hole 32, and adjusting gear 3 engages with described Linear rack 22, and during rotation adjusting gear, adjusting gear 3 drives interior pipe 2 to move along rail cavity;
Electric hammer installing rack 4, described electric hammer installing rack 4 removably connects with the upper end of interior pipe;
Electric hammer 5, described electric hammer 5 is fixed on electric hammer installing rack 4, and drill bit straight up.
Extension tube 6, the lower end of extension tube and the upper end of interior pipe removably connect, and upper end and described electric hammer installing rack 4 removably connect.
Removably connect in concrete implementation process and there is multiple implementation.A kind of screw socket that is detachably connected as of embodiment connects, and the upper end of extension tube 6 is fixed with bolt, and lower end is the screw socket of indent; The upper end of interior pipe 2 is the bolt suitable with extension tube lower end screw socket; Be the screw socket suitable with terminal bolt in extension tube bottom electric hammer installing rack.Another kind of embodiment be detachably connected as Flange joint, the two ends of extension tube 6 are separately installed with flange; The upper end of interior pipe is the flange suitable with end flanges under extension tube; Be the flange suitable with extension tube upper flanges bottom electric hammer installing rack.Utilize bolt and nut adjacent flanges to be fixed, realize removably connecting.
In concrete implementation process, described extension tube is aluminium alloy or glass steel material.
Further, in order to make outer tube make it keep vertical direction, and then make portable perforating equipment keep vertical direction, the present invention also provides following embodiment, and punch device comprises: outer tube 1, and described outer tube is rail cavity; Outer tube offers installing hole 32; Interior pipe 2, described outer wall of inner tube has Linear rack 22; Interior pipe is arranged in the rail cavity of outer tube; Adjusting gear 3, described adjusting gear 3 is arranged on described outer tube 1 by rotating shaft, and rotating shaft is through described installing hole 32, and adjusting gear 3 engages with described Linear rack 22, and during rotation adjusting gear, adjusting gear 3 drives interior pipe 2 to move along rail cavity; Electric hammer installing rack 4, described electric hammer installing rack 4 removably connects with the upper end of interior pipe; Electric hammer 5, described electric hammer 5 is fixed on electric hammer installing rack 4, and drill bit straight up.
Also comprise air level 7, it is fixed on the outer wall of described outer tube 1 by link, makes it keep vertical direction for calibrating outer tube.Air level 7 is fixed on the outer wall of described outer tube by link, and the level surface of air level is vertical with the axial direction of outer tube.Air level is regulated to make level surface maintenance level just can ensure the axial direction vertical ground of outer tube.
Further, in order to prevent punch device from toppling over, save the curable grip of punching personnel, the present invention also provides following embodiment: punch device also comprises outer pipe holder 8, and outer pipe holder 8 is fixed on outer tube bottom, keeps vertical state for supporting outer tube.
As shown in Figure 3, described outer pipe holder 8 comprises:
First installing ring 81, is fixed on the bottom of outer tube;
Second installing ring 82, is set in the bottom of outer tube, and is positioned at below the first installing ring;
Leg 83, its quantity is three, and one end of leg is hinged on the first installing ring respectively; Pin joint is by the first installing ring decile.
Support arm 84, its quantity is three, and one end of support arm is hinged on the second installing ring respectively, and pin joint is by the first installing ring decile; The leg of the other end respectively with corresponding of support arm is hinged.
Use punch device carries out punching front support leg and support arm is in folded state.During punching, pull out leg, support arm is launched gradually, support arm pulls the second installing ring to move up close to the first installing ring simultaneously.When leg is opened, by three leg stable support punch devices, punching personnel can loose one's grip and carry out other operations.
Further, the operation of the personnel control electric hammer 5 that conveniently punches, the present invention also provides following embodiment: as shown in Figure 1, and the power line 92 of electric hammer is connected with gauge tap 9, and described gauge tap 9 is arranged on described outer tube.In a preferred embodiment, gauge tap 9, near adjusting gear 3, facilitates punching personnel one hand to complete punch operation.
In concrete implementation process, the length of outer tube is 100 ~ 150cm; The length of interior pipe is 80 ~ 120cm; The length of Linear rack is 70 ~ 110cm.In a kind of specific embodiment, the length of outer tube is 120cm; The length of interior pipe is 100cm; The length of Linear rack is 90cm.Outer tube and inner tube length add and close to two meters, can meet common story height needs.
Further, the personnel that conveniently punch carry out roof punching with the drilling point that ground configuration is good, and the present invention also provides following embodiment, and punch device comprises: outer tube 1, and described outer tube is rail cavity; Outer tube offers installing hole 32; Interior pipe 2, described outer wall of inner tube has Linear rack 22; Interior pipe is arranged in the rail cavity of outer tube; Adjusting gear 3, described adjusting gear 3 is arranged on described outer tube 1 by rotating shaft, and rotating shaft is through described installing hole 32, and adjusting gear 3 engages with described Linear rack 22, and during rotation adjusting gear, adjusting gear 3 drives interior pipe 2 to move along rail cavity; Electric hammer installing rack 4, described electric hammer installing rack 4 removably connects with the upper end of interior pipe; Electric hammer 5, described electric hammer 5 is fixed on electric hammer installing rack 4, and drill bit straight up.In the present embodiment, the axis extended line of outer tube and the dead in line of drill bit.
The punch device of the present embodiment is utilized to carry out drill process as follows: to discharge drilling point in the ground configuration in the house that needing to punch, when punching, outer tube lower center point has been aimed at drilling point and punch.Avoid and arrange that drilling point is inconvenient on roof, and punching personnel are difficult to the problem of drill bit being aimed at drilling point in drill process, punch more accurate.
Above embodiment is only exemplary embodiment of the present invention, and be not used in restriction the present invention, protection scope of the present invention is defined by the claims.Those skilled in the art can in essence of the present invention and protection domain, and make various amendment or equivalent replacement to the present invention, this amendment or equivalent replacement also should be considered as dropping in protection scope of the present invention.
Claims (9)
1. a portable perforating equipment, is characterized in that, comprising:
Outer tube, described outer tube is rail cavity; Outer tube offers installing hole;
Interior pipe, described outer wall of inner tube has Linear rack; Interior pipe is arranged in the rail cavity of outer tube;
Adjusting gear, described adjusting gear is arranged on described outer tube by rotating shaft, and rotating shaft is through described installing hole, and adjusting gear engages with described Linear rack, and during rotation adjusting gear, adjusting gear drives interior pipe to move along rail cavity;
Electric hammer installing rack, the upper end of described electric hammer installing rack and interior pipe removably connects;
Electric hammer, described electric hammer is fixed on electric hammer installing rack, and drill bit straight up.
2. portable perforating equipment according to claim 1, is characterized in that, also comprise extension tube, and the lower end of extension tube and the upper end of interior pipe removably connect, and upper end and described electric hammer installing rack removably connect.
3. portable perforating equipment according to claim 2, is characterized in that, described extension tube is aluminium alloy or glass steel material.
4. portable perforating equipment according to claim 1, is characterized in that, also comprise air level, and it is fixed on the outer wall of described outer tube by link, makes it keep vertical direction for calibrating outer tube.
5. portable perforating equipment according to claim 1, is characterized in that, also comprises outer pipe holder, and outer pipe holder is fixed on outer tube bottom, keeps vertical state for supporting outer tube.
6. portable perforating equipment according to claim 5, is characterized in that, described outer pipe holder comprises:
First installing ring, is fixed on the bottom of outer tube;
Second installing ring, is set in the bottom of outer tube, and is positioned at below the first installing ring;
Leg, its quantity is three, and one end of leg is hinged on the first installing ring respectively;
Support arm, its quantity is three, and one end of support arm is hinged on the second installing ring respectively, and the leg of the other end respectively with corresponding is hinged.
7. portable perforating equipment according to claim 1, is characterized in that, the power line of electric hammer is connected with gauge tap, and gauge tap is arranged on described outer tube.
8. portable perforating equipment according to claim 1, is characterized in that, the length of outer tube is 100 ~ 150cm; The length of interior pipe is 80 ~ 120cm; The length of Linear rack is 70 ~ 110cm.
9. portable perforating equipment according to claim 1, is characterized in that, the axis extended line of outer tube and the dead in line of drill bit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410670006.XA CN104439403A (en) | 2014-11-20 | 2014-11-20 | Portable drilling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410670006.XA CN104439403A (en) | 2014-11-20 | 2014-11-20 | Portable drilling equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104439403A true CN104439403A (en) | 2015-03-25 |
Family
ID=52886589
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410670006.XA Pending CN104439403A (en) | 2014-11-20 | 2014-11-20 | Portable drilling equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104439403A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106378476A (en) * | 2016-12-01 | 2017-02-08 | 唐浩 | Long rod perforating machine and multi-functional long rod |
CN108637981A (en) * | 2018-07-25 | 2018-10-12 | 泸州天灵开关有限公司 | A kind of high-order flexible electric hammer frame |
CN109676806A (en) * | 2018-12-28 | 2019-04-26 | 谢旻静 | A kind of construction and decoration roof auxiliary perforating device |
CN115502442A (en) * | 2022-11-23 | 2022-12-23 | 山东鲁润塑业股份有限公司 | Well lid drilling equipment |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06226518A (en) * | 1992-02-05 | 1994-08-16 | Sumio Akagi | Machine for pushing-up vibrating drill and drill or the like for drilling anchor hole in building concrete slab and hole in ceiling surface and its manufacture |
JPH07186136A (en) * | 1993-12-24 | 1995-07-25 | Sumio Akagi | Anker drilling on concrete slabe for construction, vibration drills for ceiling surface, and machine for pushing up drills and its manufacture |
US20040240952A1 (en) * | 2003-03-18 | 2004-12-02 | Perry Eugene D. | Device for drilling holes in a ceiling |
US20110255929A1 (en) * | 2010-04-15 | 2011-10-20 | Buchner David J | Universal Drill Stand |
CN103291058A (en) * | 2012-03-03 | 2013-09-11 | 谷涛涛 | Multifunctional touch-stop type high-altitude drilling machine |
CN203635997U (en) * | 2013-12-31 | 2014-06-11 | 中建海峡建设发展有限公司 | Lifting drilling equipment |
CN203725833U (en) * | 2014-03-24 | 2014-07-23 | 山西八建集团有限公司 | Electric drill horizontal supporting device |
CN204262411U (en) * | 2014-11-20 | 2015-04-15 | 国家电网公司 | A kind of portable perforating equipment |
-
2014
- 2014-11-20 CN CN201410670006.XA patent/CN104439403A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06226518A (en) * | 1992-02-05 | 1994-08-16 | Sumio Akagi | Machine for pushing-up vibrating drill and drill or the like for drilling anchor hole in building concrete slab and hole in ceiling surface and its manufacture |
JPH07186136A (en) * | 1993-12-24 | 1995-07-25 | Sumio Akagi | Anker drilling on concrete slabe for construction, vibration drills for ceiling surface, and machine for pushing up drills and its manufacture |
US20040240952A1 (en) * | 2003-03-18 | 2004-12-02 | Perry Eugene D. | Device for drilling holes in a ceiling |
US20110255929A1 (en) * | 2010-04-15 | 2011-10-20 | Buchner David J | Universal Drill Stand |
CN103291058A (en) * | 2012-03-03 | 2013-09-11 | 谷涛涛 | Multifunctional touch-stop type high-altitude drilling machine |
CN203635997U (en) * | 2013-12-31 | 2014-06-11 | 中建海峡建设发展有限公司 | Lifting drilling equipment |
CN203725833U (en) * | 2014-03-24 | 2014-07-23 | 山西八建集团有限公司 | Electric drill horizontal supporting device |
CN204262411U (en) * | 2014-11-20 | 2015-04-15 | 国家电网公司 | A kind of portable perforating equipment |
Non-Patent Citations (1)
Title |
---|
梁炳文等: "《机械加工工艺与窍门精选 第3集》", 31 January 2004 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106378476A (en) * | 2016-12-01 | 2017-02-08 | 唐浩 | Long rod perforating machine and multi-functional long rod |
CN106378476B (en) * | 2016-12-01 | 2018-04-27 | 唐浩 | A kind of stock puncher and Multifunction long rod |
CN108637981A (en) * | 2018-07-25 | 2018-10-12 | 泸州天灵开关有限公司 | A kind of high-order flexible electric hammer frame |
CN109676806A (en) * | 2018-12-28 | 2019-04-26 | 谢旻静 | A kind of construction and decoration roof auxiliary perforating device |
CN109676806B (en) * | 2018-12-28 | 2021-06-25 | 苏中市政工程有限公司 | Auxiliary punching device for building decoration roof |
CN115502442A (en) * | 2022-11-23 | 2022-12-23 | 山东鲁润塑业股份有限公司 | Well lid drilling equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104439403A (en) | Portable drilling equipment | |
CN202416664U (en) | Tool for installing suspender in construction of suspended ceiling | |
CN204262411U (en) | A kind of portable perforating equipment | |
CN205673646U (en) | Bore position floor boring bar tool accurately | |
CN104131641B (en) | A kind of hanger rod mounting device | |
CN201762973U (en) | Lifting scaffold | |
CN203738069U (en) | High roof drilling instrument | |
CN204164505U (en) | Universal Joining clasp lifting device | |
CN209743984U (en) | rotating bracket | |
CN204023864U (en) | A kind of hanger rod mounting device | |
CN204827250U (en) | Whitewashing drilling tool | |
CN204975422U (en) | A lift drilling equipment for install expansion bolts on roof boarding | |
CN207063503U (en) | A kind of scaffold | |
CN203964214U (en) | A kind of air conditioner mounting bracket | |
CN211078316U (en) | Adjustable pipeline installation crane | |
CN209886738U (en) | Portable portable roof ware of making a hole | |
CN207592111U (en) | A kind of outrigger spray equipment of construction | |
CN203067936U (en) | High-altitude pipeline installation safe lifting bracket | |
CN204782060U (en) | Strutting arrangement for building site | |
CN201695683U (en) | Steel beam concrete slab rapid-assembling and disassembling tool type truss | |
CN220028759U (en) | Vertical lifting device for punching roof of building engineering | |
CN209850837U (en) | Foldable scalable electric hammer support frame | |
CN205369645U (en) | Jib subassembly | |
CN204135402U (en) | Ceiling drilling device | |
CN211229642U (en) | Narrow place room construction arrangement structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||