CN104421547B - By floating oil transportation that is thermally welded for sponge and being wound around tempering silk and dredge rubber pipe - Google Patents

By floating oil transportation that is thermally welded for sponge and being wound around tempering silk and dredge rubber pipe Download PDF

Info

Publication number
CN104421547B
CN104421547B CN201310653897.3A CN201310653897A CN104421547B CN 104421547 B CN104421547 B CN 104421547B CN 201310653897 A CN201310653897 A CN 201310653897A CN 104421547 B CN104421547 B CN 104421547B
Authority
CN
China
Prior art keywords
tempering
wound around
silk
mentioned
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310653897.3A
Other languages
Chinese (zh)
Other versions
CN104421547A (en
Inventor
金志贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CN104421547A publication Critical patent/CN104421547A/en
Application granted granted Critical
Publication of CN104421547B publication Critical patent/CN104421547B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L11/00Hoses, i.e. flexible pipes
    • F16L11/04Hoses, i.e. flexible pipes made of rubber or flexible plastics
    • F16L11/08Hoses, i.e. flexible pipes made of rubber or flexible plastics with reinforcements embedded in the wall
    • F16L11/081Hoses, i.e. flexible pipes made of rubber or flexible plastics with reinforcements embedded in the wall comprising one or more layers of a helically wound cord or wire
    • F16L11/082Hoses, i.e. flexible pipes made of rubber or flexible plastics with reinforcements embedded in the wall comprising one or more layers of a helically wound cord or wire two layers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C53/00Shaping by bending, folding, twisting, straightening or flattening; Apparatus therefor
    • B29C53/56Winding and joining, e.g. winding spirally
    • B29C53/58Winding and joining, e.g. winding spirally helically
    • B29C53/581Winding and joining, e.g. winding spirally helically using sheets or strips consisting principally of plastics material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C53/00Shaping by bending, folding, twisting, straightening or flattening; Apparatus therefor
    • B29C53/80Component parts, details or accessories; Auxiliary operations
    • B29C53/82Cores or mandrels
    • B29C53/821Mandrels especially adapted for winding and joining
    • B29C53/825Mandrels especially adapted for winding and joining for continuous winding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C63/00Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor
    • B29C63/0065Heat treatment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C63/00Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor
    • B29C63/02Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor using sheet or web-like material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C65/00Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor
    • B29C65/02Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor by heating, with or without pressure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C70/00Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
    • B29C70/04Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts comprising reinforcements only, e.g. self-reinforcing plastics
    • B29C70/28Shaping operations therefor
    • B29C70/30Shaping by lay-up, i.e. applying fibres, tape or broadsheet on a mould, former or core; Shaping by spray-up, i.e. spraying of fibres on a mould, former or core
    • B29C70/32Shaping by lay-up, i.e. applying fibres, tape or broadsheet on a mould, former or core; Shaping by spray-up, i.e. spraying of fibres on a mould, former or core on a rotating mould, former or core
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29DPRODUCING PARTICULAR ARTICLES FROM PLASTICS OR FROM SUBSTANCES IN A PLASTIC STATE
    • B29D23/00Producing tubular articles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L11/00Hoses, i.e. flexible pipes
    • F16L11/14Hoses, i.e. flexible pipes made of rigid material, e.g. metal or hard plastics
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L11/00Hoses, i.e. flexible pipes
    • F16L11/24Hoses, i.e. flexible pipes wound from strips or bands
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2023/00Tubular articles
    • B29L2023/005Hoses, i.e. flexible

Abstract

The present invention relates to will be thermally welded for sponge and be wound around the floating oil delivery hose of tempering silk and dredge rubber pipe.It is related in more detail sponge is carried out with method that is thermally welded and being wound around tempering silk and manufacture floating sebific duct, the method comprises the steps:First step, is wound around adhesive tape in spiral rubber hose and is vulcanized;Second step, unties adhesive tape, and sponge is adhered to the surface of spiral rubber hose, to form flooring material spongy layer;Third step, forms thermally welded spongy layer on flooring material spongy layer;Four steps, forms the second outer glue-line on thermally welded spongy layer.And, when the surface in first step is tempering silk, second step can be omitted and be directly entered third step.

Description

By floating oil transportation that is thermally welded for sponge and being wound around tempering silk and dredge rubber pipe
Technical field
The present invention relates to a kind of structure of floating sebific duct sponge being adhered to and being wound around tempering silk and make.
Background technology
The present invention relates to a kind of structure of the easy floating sebific duct preparing and have buffering effect.Floating sebific duct be oil transportation and One of dredging sebific duct, dredge rubber pipe is roughly divided into two methods, makes the method for pipe and sebific duct floating using floating drum and borrows The method (floating sebific duct, Floating Hose) of magnetic assist power floating, and belt (band type), flange are had according to its purposes Formula (flange type) etc., the size discrimination according to use condition and dredger be marine effective, drowning pipe is used, effective etc. in ship. This dredging sebific duct needs easily to be connected with iron pipe, and not only the abrasion performance of its hose lining will be got well simultaneously, and pressure, stretching will By force, and the bendability such as solubility to be had.Particularly, recently, be in dredging apart from progressively longer trend, with dredging away from Can dredge to remote sea from elongated, thus be accomplished by more preferable abrasion performance or pressure, draftability etc..
At present, the dredging sebific duct of widely used flange form is heavy caliber (diameter of about 760mm~1100mm) Sebific duct, generally by the reinforcement cloth between inner rubber, outer rubber layer, inner rubber and outer rubber layer and reinforcement material Formed, the end of above-mentioned dredging sebific duct has the flange of metal material, and above-mentioned flange is by sebific duct and the suction being connected to pump side Enter with or discharge steel pipe between be connected, or sebific duct and the end of sebific duct be connected and slenderly extend and discharge, Generally, the outer rim of flange is to outer exposed, thus other sebific ducts or pipe (Pipe) can be connected by fastening fastening bolt, And be made up of the rubber layer of inside and outside.Fig. 1 a and Fig. 1 b shows the section of conventional sebific duct.
In Korean Utility Model notification number the 1980-0001371st, the sebific duct that sebific duct only refers to by magnetic force floating is (floating Formula sebific duct), by the reinforcement layer of cloth of the sebific duct being made up of rubber layer, tempering layer and epidermal area with common nylon (Nylon) or wash Synthetic fibre cord fabric (Polyester Corde) preposition (Topping) rubber vertical and being entered with the phase dihedral moving closer in 54,45 Row engages, but because being difficult to make the vertical and angle and because may be inclined in the pressure of the junction generation not specified of meeting the requirements Difference, causes the internal pressure of sebific duct unbalance.In the sebific duct manufacture method of above-mentioned utility model, the manufacture method of tempering layer is profit The method of the manual work being adhered to cord fabric, is commonly used manual work mode at present.This method not only needs Want longer time, also have the overlap between a lot of cord fabrics so that the thickness of sebific duct is thickening, and thus make the pliability of sebific duct Become problem.
In " high pressure rubber sebific duct and its manufacture method " in Korean Patent Publication No. 2001-0052849, in hose lining Organic fiber cord is woven into the organic fiber tempering layer of the spiral type of two-layer or one layer of leaf morphology by the periphery configuration of layer, In the outer circumferential side configuration of organic fiber tempering layer, tempering silk is woven into the spiral tempering silk tempering layer of two-layer, and makes organic The angle of weave of fiber tempering layer is less than the angle of weave of tempering silk tempering layer, so that the knitting tension of organic fiber tempering layer is more than The knitting tension of tempering silk tempering layer, to strengthen pliability, to realize lightweight, and to improve durability.
But, this sebific duct structure more enhances tempering layer so that with respect to the fracture radially to sebific duct not to Inner side diffusion, thus it may be said that durability enhances compared with conventional sebific duct, but, the lateral part branch of sebific duct because of carrying or Using folding, and the purposes according to sebific duct, use length, cut-out and the sebific duct that uses or both sides connect uses metal shaft coupling Device uses in the way of fluid pressure type connection engages, and does not have any solution thus for the leak coupling position is bad.
In dredging sebific duct, the metal part at the flange position and tempering silk part of the rubber of sebific duct adhesion is attached most importance to most Will, but above-mentioned sebific duct structure does not specifically record the adhesion method of the connecting portion to sebific duct and flange.
Recently, in the apllied application of the applicant, it is inserted into becket in hose lining, makes damage on length direction not Spread again, thus the damage within sebific duct can be processed, but, above-mentioned application also have cannot to because of environment under high pressure or Internal objects and the damage of hose lining that occurs are processed, and the shortcoming not having bendability.
And, the floating sebific duct of the present invention not only includes dredge rubber pipe, floating petroleum pipeline sebific duct can also be included.Floating is defeated Oil pipe sebific duct is used in migration stream class in the way of being connected between ship and ship or being connected with ship and harbour.
When forming inner glue layer, inner glue layer is formed at the heart using extruder in the way of tubular type by floating petroleum pipeline sebific duct Axle, in case leak-stopping is oily, and inner glue layer uses oil resistivity rubber, and dredge rubber pipe uses abrasion performance rubber.
Content of the invention
The present invention is to overcome the shortcoming of manual work as above to propose, it is intended that providing a kind of Sebific duct, using sponge, is specifically pasted and is wound around using from the in the past different thermally welded methods of sponge that are wound around Tempering silk, thus being wound around tempering silk to fix flange and rubber hose part, and does not use tinsel (Wire), thus buoyancy is relatively Get well and do not allow easy damaged.
And, form a kind of sebific duct, automatization will be wound around, made with easy, and because of automatization with existing making Method is compared shortening Production Time, is reduced raw material, the durability of reinforcing hose, do not damage pliability, and will be and another pipe between Connection coupling one-piece type so that there is no connecting portion, and can simultaneously wound tempering silk and rubber slab, to be formed Sebific duct.
In order to reach above-mentioned purpose, provide a kind of will be thermally welded for sponge and be wound around the floating oil transportation of tempering silk and dredge rubber pipe Manufacture method, the method may include following steps:First step, is wound around adhesive tape in spiral rubber hose and is vulcanized;Second step Suddenly, untie adhesive tape, and sponge is adhered to the surface of spiral rubber hose, to form flooring material spongy layer;Third step, on floor Thermally welded spongy layer is formed on material spongy layer;Four steps, forms the second outer glue-line on thermally welded spongy layer.
In above-mentioned four steps, the second outer glue-line can be formed by simultaneously wound tempering silk and rubber slab.
Above-mentioned spiral rubber hose comprises the steps:A-1 step, wrapping machine automatic winding rubber slab, or by manual Operation is forming inner glue layer, and places flange in the upside of the inner glue layer of the sebific duct being formed with inner glue layer, to be supplied to wrapping machine, A-2 step, provides many tempering silks to above-mentioned wrapping machine, and the upside of above-mentioned inner glue layer be wound around tempering silk, make winding it Front above-mentioned tempering silk and the above-mentioned tempering silk being wound around are less than angle set in advance, to form tempering layer, and fixing flange, A-3 step, provides rubber on above-mentioned tempering layer, and forms outer glue-line and vulcanized;In above-mentioned inner glue layer and outer glue-line A certain kind can be formed through sulfidation by after simultaneously wound tempering silk and rubber slab.
Can also comprise the steps between above-mentioned A-2 step and above-mentioned A-3 step:The step forming mesoglea; The step forming another tempering layer between mesoglea and outer glue-line.
Above-mentioned mesoglea can be the form of simultaneously wound tempering silk and rubber slab.
Above-mentioned tempering silk can be that terylene, nylon, Kev draw (Kevlar), a certain kind in aramid fiber, and is applied by resin Form so that rubber and tempering silk are easily adhered.
When simultaneously wound rubber slab and tempering silk, rubber slab can with axially rotate in the side that contacts of roller Formula rotates, and above-mentioned tempering silk is axially supplied to right angle orientation, and axially moves left and right, and to adjust winding angle.
Above-mentioned tempering silk can through the step of sequence, the tension force of each tempering silk be only via before being wound after guiding piece On the spot controlled.
The method being wound around above-mentioned tempering silk can use more than a certain kind in incline direction and rectilinear direction.
And, the present invention provide a kind of will be thermally welded for sponge and be wound around the floating oil transportation of tempering silk and dredge rubber pipe, above-mentioned Floating sebific duct sequentially forms flooring material spongy layer and thermally welded spongy layer in the outer peripheral face of spiral rubber hose;Spiral rubber hose is formed with Sebific duct body and flange part, above-mentioned sebific duct body is made up of the inner glue layer of inner side and the outer glue-line in outside, and above-mentioned flange part is by gold Belong to and constituting, and be located at the both sides of above-mentioned sebific duct body, can be connected with another sleeve pipe or metal tube;Above-mentioned inner glue layer and outer glue It is formed with more than one tempering layer, above-mentioned tempering layer is by being wound around many tempering filamentouss and shape with predetermined angular between layer Become, between above-mentioned inner glue layer and outer glue-line, be formed with mesoglea;A certain kind in above-mentioned inner glue layer and outer glue-line is passed through to twine simultaneously Formed through sulfidation after tempering silk and rubber slab.
When simultaneously wound rubber slab and tempering silk, rubber slab can with axially rotate in the side that contacts of roller Formula rotates, and above-mentioned tempering silk is axially supplied to right angle orientation, and axially moves left and right, and to adjust winding angle.
According to the present invention, have the effect that:There is provided a kind of have higher buoyancy again easily resistance in internal pressure, And strengthen durability and pliability, there is the one-piece type sebific duct of flange of relatively thin diameter.
Brief description
Fig. 1 a and Fig. 1 b is the figure in the section illustrating conventional sebific duct.
Fig. 2 a, Fig. 2 b and Fig. 2 c are the figures of the structure of the sebific duct illustrating the present invention.
Fig. 3 is the figure of the embodiment illustrating the sebific duct according to made by the present invention.
Fig. 4 a, Fig. 4 b and Fig. 4 c are the figures of the device illustrating to be used during the sebific duct making the present invention.
Fig. 4 d represents the device maintaining indivedual tension force of tempering silk and supplying tempering silk.
Fig. 5 is the photo of the process illustrating using binding agent, sponge to be adhered in conventional manual work operation.
Fig. 6 is the figure illustrating according to the present invention, sponge to be carried out thermally welded machinery.
Fig. 7 and Fig. 8 is the figure of the manufacturing process illustrating the present invention.
The explanation of reference
11:Inner glue layer
12:Mesoglea
13:Outer glue-line
14:Tempering layer
15:Sebific duct shoulder
21:Tempering layer
22:Auxiliary layer
Specific embodiment
Below, referring to the drawings, the present invention will be described in detail.Fig. 2 a shows the sebific duct according to made by the present invention Section.The sebific duct of the present invention is configured to inner glue layer-tempering silk winding layer the-the first outer glue-line-thermally welded sea from downside to upside Continuous layer-tempering silk winding layer the-the second outer glue-line.Conventional mode is to make the sebific duct with inner glue layer-tempering layer-outer glue-line Afterwards, it is wound around adhesive tape and is vulcanized, then form thermally welded spongy layer to the outside of outer glue-line, and re-form the second outer glue Layer.When forming the second outer glue-line, can be wound around together with tempering silk, or can also form one in the downside of the second outer glue-line Tempering layer.
In order to manufacture the sebific duct of the present invention, sulfur is carried out being wound around adhesive tape by the spiral rubber hose made by conventional method It is installed on wrapping machine after change.Now, after spiral rubber hose being vulcanized, sponge is adhered to, this is to apply to press Power simultaneously carries out vulcanizing to release the air being present between hose lining, tempering layer, each layer of outer glue and the rubber of sebific duct, and help Adhesion between rubber.
The initial adhesion of the outside of the sebific duct so being vulcanized and spongy surface does not carry out thermally welded, thus plays thermally welded The sponge of bottom surface effect is adhered to using binding agent, and is adhered to the 1/2 about of sponge thickness with thermally welded.
And, can calculate, by calculating the specification of sebific duct and weight, the weight via thing, the buoyancy that sebific duct needs have And set the thickness of the thermally welded use sponge being used.
Width usually as sponge uses width in 200 to 450mm, but can be according to thickness also to be wrapped in roller Form is formed, or also can be formed with the form not being wound.
In order to be wound around sponge, in the deflector roll being attached with required width up and down of guide eye portion, the side being wound To make radiator towards the temperature of the fusing point distributing sponge in the way of sponge, Wrapping formed machine rotates and makes sponge for downside Deposition.Fig. 6 shows concept map related to this.
In order that sponge deposition, before being wound around sponge, sponge comes off from guide eye, and through guide rolls support radiator, Easily to carry out deposition.
And, when being wound around sponge, the quantity of spongy layer is preferably even number, and is wound in become with respect to the rotary shaft of sebific duct 45 ° about.If being wound around the spongy layer corresponding with required thickness, after the both-side ends part of smooth sebific duct, it is wound around Tempering silk (now, outer glue-line can be wound around, and simultaneously wound tempering silk and rubber slab and form the second outer glue-line).
If being formed to the second outer glue-line, and it is wound around binder, then after being vulcanized, untie binder, then complete floating sebific duct. The floating sebific duct made by this method has higher durability, and not only larger to the resistance of external force, and has Higher buoyancy, and it is readily adaptable for use in conventional sebific duct.
But, generally, when making sebific duct, if the thickness of sebific duct is too thick or width is too big, it is difficult to process, thus sebific duct Width and thickness according to the specification of sebific duct depending on.But, floating sebific duct needs there is a certain degree of buoyancy, thus, make In the case that buoyancy becomes big, the intensity of sebific duct can decline, but in the case of laying stress on the intensity of sebific duct, buoyancy can under Fall.
The sebific duct of the present invention can be using method as above by sponge (ethene-vinyl acetate EVA, ethylene- Vinyl acetate) carry out thermally welded, to reduce the thickness of sebific duct.Durability in order to prevent sebific duct to have reduces, and is Formation sebific duct, can form tempering layer.In the sebific duct of the present invention, independently can only form tempering layer it is also possible to utilize simultaneously The method being wound around rubber slab and tempering silk, to form the first outer glue-line and the second outer glue-line.
Formation to tempering layer in the sebific duct of the present invention is described in detail.The tempering layer of the present invention is in conventional sebific duct Form form thermally welded spongy layer it is also possible to be formed as, outside it, there is outer glue-line while form tempering layer it is also possible to Initially just formed using following method.
Fig. 2 b and Fig. 2 c shows the example forming tempering layer, can use as tempering layer drawn by terylene, nylon, Kev, The tempering silk that a certain kind in aramid fiber is made is it is also possible to applying tempering silk and using.It is wound around above-mentioned on inner glue layer by continuation Tempering silk, to form tempering layer, can form multiple tempering layers being wound around tempering silk.Fig. 2 b shows the sebific duct of the present invention Shape and its section.
The line being used during formation tempering layer is terylene, nylon, Kev draw, aramid fiber, can be as tempering silk, using about More than 1000 daniers.Preferably, using more than 1000 daniers and below 2000 daniers.And, can also apply Tempering silk and use.When coating, have the disadvantage that:Carbamide resin is coated on the outside of tempering silk, due to 1000 denier Buddhist nuns Tempering silk below you is too thin, causes by outside pressure and easily disconnects, when actual fabrication product, 2000 daniers with On tempering silk too thick, cause and be difficult to winding, and thickness becomes too thick after wrapping.The resin being used during coating is not It is confined to polyureas, resin makes rubber and the adhesion of tempering silk become easy.
And, the tempering silk being wound being used during operation is twined in the way of so that unsegregated many tempering silks is not turned off Around the angle that the tempering silk being wound is formed continues to be wound around with 45 ° to 53 ° of angle.If being twined with the angle more than 45 ° to 53 ° Around, then become Tai Mi between tempering silk and tempering silk so that the thickness after being wound around becomes to be too far away between too thick or tempering silk, Thus reducing the effect of tempering layer.Because above-mentioned angle is less than the angle of maximum license expansion 5%, thus with expansion Effect is also less.The winding angle being wound around tempering silk can be different according to the quantity of the tempering silk being once wound, but can be Above-mentioned 45 ° to 53 ° of angle, the quantity of the tempering silk being once wound reduces, and the bigger winding angle of diameter of sebific duct is more Greatly.
Use the cloth being woven or weaving as the enhancement layer in conventional sebific duct, if using the cloth being woven or weaving, Then the thickness of layer is no longer thickening, even if being weaved, also can be easily separated lower floor and upper strata, and is easily divided by sharp object From the woven tram of institute and an organizine, but, as the present invention, if using tempering silk come the outside of spiral rubber hose, and with cloth The same during formation, distinguish between the cloth on upper strata and the cloth of downside, the cloth of the upper and lower can be no any overlapping in combination, But, as the present invention, in the case of being wound around with predetermined angular, be wound around itself be a kind of combine, thus with use institute Different during the cloth of weaving or braiding, stronger adhesion can be produced.And, by tempering silk application of resin, easily to glue Attached tempering silk and rubber, thus different from the conventional product of difference rubber layer and tempering layer.
Therefore, even if entering sharp foreign body inside sebific duct, also will not be easily via tempering layer.And, to from inside and outside The resistance of the pressure that portion applies becomes big, and it is overall that the pressure applying from inside and outside is uniformly distributed to sebific duct.And, in order to resistance in height Pressure, till just starting to be wound into end winding, needs to prevent tempering silk from disconnecting.
It is also possible to consider to be wound around the thin slice being made up of polyethylene or tyre cord in addition to this tempering silk, but, In the case of using thin slice, need to be wound around a sheet part overlapping so that the thickness of final products is thickening, in order to resistance in High pressure, needs to be wound in very dense, thus its efficiency declines compared with using tempering silk, causes and has to using more thin Piece.Therefore, in the case of being wound around using tempering silk, the quantitative change of the line being used few it is possible to make the lower thickness of sebific duct.
In the embodiment of Fig. 1 b, for flange connector, the inner glue layer of end being equivalent to sebific duct places flange, and It is wound around along radial direction with tempering silk, so that sebific duct is combined with flange, and merely tyre cord is wrapped in outside rubber Interior, but, in the case of will be according to the application, as shown in Figure 2 c, though do not use above-mentioned tempering silk it is also possible to by flange with Sebific duct is connected.That is, if from flange one end starting point using circular (Hoop) mode in the state of placing flange on the upside of inner glue layer Start, and be set to 45~53 ° afterwards in sebific duct part using spiral type (helical) mode, flange portion is using circle over there Shape mode continues to be wound around tempering silk, even if then not having the connection units such as tempering silk that flange can also be made to combine, in this case, with Past sebific duct is wound around by tempering silk, solves the problems, such as to be relaxed because of the sticking problem of rubber and tempering silk, and can be thin Sebific duct shape in the form of conventional sebific duct embodies flange and the one-piece type sleeve pipe sebific duct of rubber tempering silk.
But it is possible to provide and a kind of bearing higher pressure and there is no a shoulder and thinner sebific duct, rather than to conventional Sebific duct the same and thick and that there is from shoulder to flange inner.
And if, to form inner glue layer by this method, rubber is mutually mixed with tempering silk, resistance in because in sebific duct The foreign body in portion and the damage that occurs.
In figure 3, although the sebific duct being formed somewhat has shoulder, it is in somewhat thin shape compared with conventional sebific duct State.
When forming inner glue layer, common dredge rubber pipe can be formed by manual work, but petroleum pipeline sebific duct utilizes extruder In the way of tubular type, inner glue layer is formed at heart axle.And, common dredge rubber pipe uses abrasion performance rubber, and petroleum pipeline sebific duct makes Use oil resistivity rubber.
Fig. 3 shows an embodiment of the sebific duct to make by this method.The embodiment of Fig. 3 is not form outer glue Layer, and formed to the state of tempering layer, blend rubber layer covers above it.In figure, may can be appreciated that tempering silk is formed across Similar to covering institute's woven reinforcement cloth, but, for the tempering silk of the present invention, persistently rotate sebific duct while being wound around dimension Hold the tempering silk of required angle, when being wound around reinforcement cloth, the amount of the active force of the regulation applying along radial direction is restricted, thus Active force can not be continuously applied as being wound around tempering silk, so that fixing flange or tightly pulling enhancement layer, durable to improve Property.
And, when forming outer glue-line, after forming enhancement layer, as in the past it is also possible to through sulfidation shape Become outer glue-line, but, when being wound around many tempering silks, can be with the width of the degree having similar to above-mentioned many tempering silks Raw rubber plate is wound around together and is formed.Fig. 4 a, Fig. 4 b and Fig. 4 c show this device.At this time it is also possible to omit tempering layer, but Outer glue-line plays the effect of tempering layer.
The device of Fig. 4 a, Fig. 4 b and Fig. 4 c can also be used in winding tempering filamentous, shows when forming outer glue-line, The state that the method being wound around using being formed together with rubber slab is formed.If rubber slab has once winding tempering filamentous when institute The width about width accounting for, then will not especially be confined to this width.After terminating to be wound around operation, will through sulfidation Rubber slab forms as one, thus this width is inessential.
In the past, after having tinsel being inserted between rubber slab, it is wound around this tinsel and forms the situation of rubber layer, But in the present invention, it is wound around tempering filamentous and forms rubber slab, conventional is inserted with rubber slab wiry with suitable The mode of width closing rubber slab is wound around so that tinsel is not overlapping, thus with the present invention difference.And, in the present invention In, through sulfidation, rubber layer is made one layer, thus with conventional technology difference, even final result thing, In the form to be filled up by rubber between the tempering silk of the angle wound of regulation, thus with the rubber slab being inserted with tempering silk Difference.
Fig. 3 is the form that no rubber slab ground is only wound around tempering silk, but can be considered tempering silk and tempering silk under above-mentioned form Between the part of sky filled up by rubber slab.And, it is not only outer glue-line, mesoglea is also by method as above at the same time Make through sulfidation after being wound around rubber slab and tempering silk, so made mesoglea or outer glue-line not only can be held By the stronger pressure from inside and outside, and guarantee pliability it is also possible to bear from sebific duct because of the distinctive elasticity of rubber Internal impact.
As shown in figure 3, when being wound around tempering silk, can be at two ends to be wound around in the way of axial, but in inboard portion (not being end) is wound around in the way of the organizine forming regulation.
In sulfidation, in addition to rubber is wound around with rubber slab form, also persistently by rubber and 140 DEG C to 150 DEG C Steam supply together, to improve the rubber density of sebific duct.For this reason, single mould can also be used.Be respectively formed inner glue layer, After the rubber layers such as mesoglea, outer glue-line, implement sulfuration.
And, can also be wound around outside outer glue-line again with tempering silk, additionally to manufacture tempering after being vulcanized Silk layer.
Fig. 4 a is the figure shown on tempering silk wrapping machine side, and Fig. 4 b is the figure shown in from upside.If removing whereabouts tempering silk The rubber slab of the downside supply of supply machine, then can be used in formation tempering layer as above.Above-mentioned wrapping machine is by the one of core Mobile station is fixed at end, so that from the rotary shaft inserting the core of sebific duct and the central part extension of core in order to maintain the form of sebific duct Rotate and move.And, form filament supply unit in the front of core, if being supplied to tempering from the reel being wound around by tempering silk Silk, and tightly maintain tension force, then can quilt core be wound around.
In fig .4, for the machinery inclusion of winding etc.:Main shaft, is used for making product rotary motion, wire barrow, is wound with fibre Dimension, and be wound around for moving left and right, countershaft, hold product while the length according to product moves, so that this product Product rotatable movement;Countershaft can have antero posterior axis or rotary shaft, to calibrate the angle being wound around fiber, and moves forward and backward (with product Axially vertical direction).
That is, on the top of main shaft and countershaft, wire barrow is installed, in wire barrow side, antero posterior axis and rotary shaft is installed, so that sharp So that product is increased with the bearing block in axle center and the bearing block of countershaft, and utilize scroll chuck (3-jaw chuck) in main shaft side Fixing product axle.
In fig. 4b, when supplying tempering silk, rubber slab can be supplied to a direction, thus being wound around together.Even and if, to The upper end of tempering silk is supplied simultaneously to rubber slab it is also possible to make the two-way supply of rubber slab.
When being wound around, the roller shown in Fig. 4 b makes rubber slab smooth, and guide eye (eye) makes to be produced after by pilot pin Fiber before product are wound around sorts, and when being rotated according to winding angle, fiber alignment is at guide eye center, so that playing dimension Hold the effect being wound around while winding angle.
Fig. 4 c shows the integrality of the device for being wound around tempering silk.Filament supply unit sustainable supply is wrapped in outside Tempering silk, moved left and right with speed set in advance while core persistently rotates, and be wound around tempering silk.From left side to right side or After person is wound around one layer of tempering silk while movement along its opposite direction, changes moving direction, and move to opposite direction and be wound around Tempering silk.But, a tempering silk is persistently wound around in the state of not turning off, and moves left and right and be wound around.Common Tempering layer forms in this way, and is wound around about 10 to 15 layers about, in the case of being formed continuously multiple tempering layers, It is wound around one layer between this main tempering layer to be used for distinguishing the auxiliary tempering layer between tempering layer.
As illustrated in fig. 4 c, when being wound around fiber and during rubber, combination incline direction (spiral type) and rectilinear direction (circular) this Two kinds are wound, the pattern shown in Fig. 4 c show product two side portions to rectilinear direction be wound around, product mid portion to The state that incline direction is wound around.
Formed by method as above inner glue layer, mesoglea, more than a certain kind in outer glue-line in the case of, It is compared with conventional sebific duct, the overall lower thickness of sebific duct, simultaneously because being wrapped in the tempering silk of tempering layer and rubber layer Make pliability increase, and bear the active force of the pressure from sebific duct inside and outside also to become strong.Particularly, even if existing outside sebific duct The damage in portion or the damage of inner face, also will not damage to length direction or radial diffusion, thus the durability of sebific duct sharply increases.
Fig. 4 d shows fiber tension device, when being wound around product, needs often to maintain the tension force of fiber, and the number of fiber Measure as 24~72, need each fiber independently controlled tension force, when be wound around when, by the tension force of fiber be 1.5kgf~ 1.8kgf about and use..
Tensioner makes the fiber being wrapped in rove (Roving) enter product via the deflector roll being provided with load sensor, Each unit (unit) is separately installed 24.
Tension regulator panel for controlling tension force is made up of 24ch, and independently adjustable tension value and other settings Value.And, for tensioner, mechanism part is by will be via the rove outer housing of rove, the dc motor of Rotating outer, mensure The load sensor of tension force and fiber are constituted, electrically by 24ch panel and the unidirectional current of adjustable tension value and other setting values The servo board of motivation and supply unit are constituted.If selecting to control this tensioner to install rove from panel Ch after, fiber is fixed on product, then from PC, the signal preparing to be wound around fiber is sent to panel, then dc motor with Set tension value accordingly real-time control in panel, if breaking off relations fiber, detection refusal signal and be delivered to PC so that The form work to suspend for the machinery.
And, when being wound around tempering silk, it is wound around together with flange, thus with respect to needing by single tempering silk in the past Deng and attachment flanges, the present invention can be wound around flange by tempering silk, carry out easy to manufacture in the way of no individually operation.
Fig. 7 and Fig. 8 shows the manufacturing process of the sebific duct of the present invention.
The floating sebific duct of the present invention, after making spiral rubber hose, will be present in the air within spiral rubber hose through over cure Release, and in the above adhesion flooring material sponge after, deposition is carried out to thermally welded sponge.
After terminating sponge and be thermally welded, form the second outer glue-line, then vulcanized.
And, from the past different, or can be wound around together with rubber slab in the way of having and being angularly wound around tempering silk Mode form spiral rubber hose, to improve durability and pliability.The manufacture method of this sebific duct comprises the steps:Wrapping machine Automatic winding rubber slab, or flange is placed on the upside of the inner glue layer of sebific duct being formed with inner glue layer by manual work, thus The step being supplied to wrapping machine;There is provided many tempering silks to wrapping machine, and be wound around tempering silk in the upside of above-mentioned inner glue layer, make to twine Above-mentioned tempering silk around above-mentioned tempering silk before and winding is less than angle set in advance, to form tempering layer, and fixing The step of flange;There is provided rubber on tempering layer, and the step forming outer glue-line and being vulcanized;Can be by only by conventional The vulcanization process of rubber make inner glue layer and outer glue-line respectively it is also possible to simultaneously wound rubber slab and tempering silk and formed.As this Sample, different from other products, the application provides tempering silk, to improve durability and pliability.
Fig. 7 illustrate in detail the forming process of rubber part, in fig. 8, in order that floating part molding, sponge is entered Row is thermally welded, is wound around tempering silk, and after being wound around nylon tape, is vulcanized and removed nylon tape, thus completing floating sebific duct.

Claims (11)

1. a kind of by manufacture method that is thermally welded for sponge and being wound around the floating oil transportation of tempering silk and dredge rubber pipe it is characterised in that Comprise the steps:
First step, is wound around adhesive tape in spiral rubber hose and is vulcanized;
Second step, unties adhesive tape, and sponge is adhered to the surface of spiral rubber hose, to form flooring material spongy layer;
Third step, forms thermally welded spongy layer on flooring material spongy layer;
Four steps, forms the second outer glue-line on thermally welded spongy layer.
2. according to claim 1 will be thermally welded for sponge and be wound around the floating oil transportation of tempering silk and the manufacturer of dredge rubber pipe Method is it is characterised in that in above-mentioned four steps, form the second outer glue-line by simultaneously wound tempering silk and rubber slab.
3. according to claim 1 will be thermally welded for sponge and be wound around the floating oil transportation of tempering silk and the manufacturer of dredge rubber pipe Method it is characterised in that
The manufacture method of spiral rubber hose comprises the steps:
A-1 step, wrapping machine automatic winding rubber slab, or extrude and form hose lining by manual work or extruder Layer, and place flange in the upside of the inner glue layer of the sebific duct being formed with inner glue layer, to be supplied to wrapping machine,
A-2 step, provides many tempering silks to above-mentioned wrapping machine, and is wound around tempering silk in the upside of above-mentioned inner glue layer, makes to twine Above-mentioned tempering silk around above-mentioned tempering silk before and winding is less than angle set in advance, to form tempering layer, and fixing Flange,
A-3 step, provides rubber on above-mentioned tempering layer, and forms outer glue-line and vulcanized;
A certain kind in above-mentioned inner glue layer and outer glue-line by after simultaneously wound tempering silk and rubber slab through sulfidation Formed.
4. according to claim 3 will be thermally welded for sponge and be wound around the floating oil transportation of tempering silk and the manufacturer of dredge rubber pipe Method is it is characterised in that also comprise the steps between above-mentioned A-2 step and above-mentioned A-3 step:
The step forming mesoglea;
The step forming another tempering layer between mesoglea and outer glue-line.
5. according to claim 4 will be thermally welded for sponge and be wound around the floating oil transportation of tempering silk and the manufacturer of dredge rubber pipe Method is it is characterised in that above-mentioned mesoglea is in the form of simultaneously wound tempering silk and rubber slab.
6. according to claim 5 will be thermally welded for sponge and be wound around the floating oil transportation of tempering silk and the manufacturer of dredge rubber pipe Method is it is characterised in that above-mentioned tempering silk is terylene, nylon, Kev draws, a certain kind in aramid fiber, and is formed by resin coating, makes Obtain rubber and tempering silk is easily adhered.
7. according to claim 6 will be thermally welded for sponge and be wound around the floating oil transportation of tempering silk and the manufacturer of dredge rubber pipe Method it is characterised in that when simultaneously wound rubber slab and tempering silk, tempering silk together with above-mentioned rubber slab axially and right angle Direction is supplied to, and axially moves left and right, and to adjust winding angle.
8. according to claim 7 will be thermally welded for sponge and be wound around the floating oil transportation of tempering silk and the manufacturer of dredge rubber pipe Method it is characterised in that above-mentioned tempering silk via before being wound after guiding piece through sequence step, the tension force of each tempering silk Independently controlled.
9. according to claim 8 will be thermally welded for sponge and be wound around the floating oil transportation of tempering silk and the manufacturer of dredge rubber pipe Method is it is characterised in that the method being wound around above-mentioned tempering silk uses at least one in incline direction and rectilinear direction.
10. a kind of by thermally welded for sponge and be wound around the floating oil transportation of tempering silk and dredge rubber pipe it is characterised in that
Floating sebific duct sequentially forms flooring material spongy layer and thermally welded spongy layer in the outer peripheral face of spiral rubber hose;
Spiral rubber hose is formed with sebific duct body and flange part, the outer glue-line structure in the inner glue layer by inner side for the above-mentioned sebific duct body and outside Become, above-mentioned flange part is made up of metal, and be located at the both sides of above-mentioned sebific duct body, can be connected with another sleeve pipe or metal tube Connect;
It is formed with more than one tempering layer, above-mentioned tempering layer is wound around many with predetermined angular between above-mentioned inner glue layer and outer glue-line Tempering filamentous and formed, be formed with mesoglea between above-mentioned inner glue layer and outer glue-line;
A certain kind in above-mentioned inner glue layer and outer glue-line by after simultaneously wound tempering silk and rubber slab through sulfidation Formed.
11. according to claim 10 will be thermally welded for sponge and be wound around the floating oil transportation of tempering silk and dredge rubber pipe, it is special Levy and be, when simultaneously wound rubber slab and tempering silk, above-mentioned tempering silk together with above-mentioned rubber slab axially and right angle side To being supplied to, and axially move left and right, to adjust winding angle.
CN201310653897.3A 2013-08-19 2013-12-05 By floating oil transportation that is thermally welded for sponge and being wound around tempering silk and dredge rubber pipe Expired - Fee Related CN104421547B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2013-0098190 2013-08-19
KR1020130098190A KR101428031B1 (en) 2013-08-19 2013-08-19 Hose

Publications (2)

Publication Number Publication Date
CN104421547A CN104421547A (en) 2015-03-18
CN104421547B true CN104421547B (en) 2017-03-01

Family

ID=51749925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310653897.3A Expired - Fee Related CN104421547B (en) 2013-08-19 2013-12-05 By floating oil transportation that is thermally welded for sponge and being wound around tempering silk and dredge rubber pipe

Country Status (2)

Country Link
KR (1) KR101428031B1 (en)
CN (1) CN104421547B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102301247B1 (en) * 2016-12-30 2021-09-13 (주)동양기업 Method for producing concrete hose

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2202237Y (en) * 1994-10-12 1995-06-28 周应才 Reinforced heat-shrinkable tube
JP3643197B2 (en) * 1996-12-26 2005-04-27 株式会社ブリヂストン Floating hose and method for manufacturing the same
JP4132985B2 (en) * 2002-05-30 2008-08-13 株式会社ニチリン Manufacturing method of rubber hose
CN2622523Y (en) * 2003-05-15 2004-06-30 尹能吉 Continuous oil transportation flexible pipe used in sea
CN100419321C (en) * 2006-08-25 2008-09-17 王长军 High temp oil gas conveying pipeline and its preparation method
JP2008095947A (en) 2006-09-12 2008-04-24 Bridgestone Corp Method for manufacturing buoyant hose, and buoyant hose manufactured by using same
KR101246463B1 (en) * 2012-02-13 2013-03-22 김지현 Method for producing hose

Also Published As

Publication number Publication date
KR101428031B1 (en) 2014-08-11
CN104421547A (en) 2015-03-18

Similar Documents

Publication Publication Date Title
CN104781068B (en) For reinforcing the lining and its manufacture method of pipeline
US20030113489A1 (en) Fiber reinforced cured in place liner for lining an existing conduit and method of manufacture
AU2013355697B2 (en) Lining Material for Conduit and Lining Method for Conduit
CN105836072B (en) A kind of ship launching fiber reinforced rubber air bag and moulding process
CN104040215B (en) Friction belt for power transmission and manufacture method thereof and belt driver
CN102762361B (en) Process and plant for building green tyres for vehicle wheels
US10279553B2 (en) Fibre reinforced polymer matrix composite pipes
CN104235530A (en) Hose capable of being flattened and manufacturing method thereof
CN105387291A (en) High-pressure hose and production method thereof
CN104169058B (en) For compaction pressure being put on the method and apparatus of fabric prefabricated component in winding process
CN104421547B (en) By floating oil transportation that is thermally welded for sponge and being wound around tempering silk and dredge rubber pipe
JPH10151910A (en) Radial tire
AU2004200327A1 (en) Abrasion-resistant hose
JP7074950B2 (en) Asymmetric fabric composition for wrapping in pipe relining
JP6713254B2 (en) Conveyor belt manufacturing method
CN100395101C (en) Method and apparatus for manufacturing pneumatic tires
JP6657685B2 (en) Manufacturing method for pneumatic tires
KR101246463B1 (en) Method for producing hose
US20030181111A1 (en) Hose and pipe reinforcement
RU2012145553A (en) METHOD FOR MANUFACTURING A LEVER FROM A COMPOSITE MATERIAL CONTAINING A CROSS SUPPORT BEARING INTENDED FOR INSTALLING A FIXED OR ROTATING AXLE IN IT
JPH0890692A (en) Tubular structure as well as its production method and device
US20080105517A1 (en) Spliceless, corded baler belt
JP6696538B2 (en) Tire manufacturing method, molding system, and tire
CN209501998U (en) A kind of polyethylene fabric composite concrete injection pipe
JP6666801B2 (en) Existing pipe rehabilitation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170301

Termination date: 20181205

CF01 Termination of patent right due to non-payment of annual fee