CN104408666A - Trans-provincial electric power trade clearing method based on corrected line loss rate - Google Patents

Trans-provincial electric power trade clearing method based on corrected line loss rate Download PDF

Info

Publication number
CN104408666A
CN104408666A CN201410652909.5A CN201410652909A CN104408666A CN 104408666 A CN104408666 A CN 104408666A CN 201410652909 A CN201410652909 A CN 201410652909A CN 104408666 A CN104408666 A CN 104408666A
Authority
CN
China
Prior art keywords
electricity
power
clearing
power purchase
line loss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410652909.5A
Other languages
Chinese (zh)
Inventor
蒙文川
陈政
冷媛
欧鹏
张翔
宋艺航
杨惠萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSG Electric Power Research Institute
Research Institute of Southern Power Grid Co Ltd
Original Assignee
Research Institute of Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Research Institute of Southern Power Grid Co Ltd filed Critical Research Institute of Southern Power Grid Co Ltd
Priority to CN201410652909.5A priority Critical patent/CN104408666A/en
Publication of CN104408666A publication Critical patent/CN104408666A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions

Landscapes

  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Engineering & Computer Science (AREA)
  • Marketing (AREA)
  • Health & Medical Sciences (AREA)
  • Finance (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Accounting & Taxation (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Primary Health Care (AREA)
  • Tourism & Hospitality (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a trans-provincial electric power trade clearing method based on corrected line loss rate. The trans-provincial electric power trade clearing method based on the corrected line loss rate includes steps that 1) clearing the trade with clearing priority; 2) for the other power transmission parties, calculating the cleared on-grid energy of each power transmission type; 3) calculating a line loss rate correction value according to the cleared on-grid energy of each power transmission party, the checked line loss rate and the actual power purchasing quantity of each power purchasing party; 4) calculating the cleared power purchasing quantity of each trade type; 5) calculating the exchange electric quantity between two power purchasing parties; 6) judging the exchange situation of the current month between the power purchasing parties; 7) calculating the cleared power purchasing quantity of the power purchasing party 1; 8) obtaining the cleared power purchasing quantity of each party sent to the power purchasing party 1. The trans-provincial electric power trade clearing method based on the corrected line loss rate is capable of effectively solving the line loss clearing abnormality and providing clearing basis for different types of trans-provincial electric power trade. The trans-provincial electric power trade clearing method based on the corrected line loss rate is convenient to perform and practical.

Description

A kind of power trade settlement method of district transprovincially based on modified line loss rate
Technical field
The invention belongs to Power System Analysis field, particularly one is used for determining that various types of districts transprovincially power trade settles accounts electric method for determination of amount, belongs to the innovative technology of district's power trade settlement method transprovincially.
Background technology
Transprovincially district's power trade has played vital role for promoting different regions coordination, sustainable development and optimizing allocation of resources, and also brings significant economic benefit and social benefit for networking economizes (district).Along with transaction size constantly increases, kind and the quantity of transaction agent progressively increase, trade mode is tending towards complicated, there is the problems such as existing line loss is abnormal in the more original transaction of district transprovincially electricity clearing partitioning algorithm in practical operation, the needs of power trade development under the new situation can not be adapted to, easily there is dispute or problem when electricity price inspection, power monitoring, therefore need badly and study and define a set of fair and reasonable, settlement method of meeting following district's power trade development need transprovincially.
Summary of the invention
The object of the invention is to consider the problems referred to above and a kind of power trade settlement method of district transprovincially based on modified line loss rate is provided.The present invention effectively can solve in current balance method the situation that negative wire is damaged that may occur, for the complex transaction trend that may occur future provides can the settlement method of reference.
Technical scheme of the present invention is: the power trade settlement method of district transprovincially that the present invention is based on modified line loss rate, comprises the steps:
1) transaction of the preferential clearing of first clearing, power transmission side 1 needs preferentially to settle accounts to k, and its online side clearing electricity equals plan power transmission electricity, and calculates it and land side according to appraising and deciding line loss per unit and settle accounts electricity;
2) to other power transmission side, power purchase side 1, the online side Transaction algorithm of power purchase side 2 and actual online voltameter is sent to calculate the clearing electricity volume of each power transmission type according to it;
3) clearing of preferential settlement bargain landed electricity from after actual critical point, power purchase side electricity deduction, calculate electricity volume according to each power transmission reef knot, appraise and decide the actual electricity that lands of line loss per unit and power purchase side and calculate line loss per unit modified value;
4) calculate electricity volume according to each power transmission reef knot, appraise and decide line loss per unit and line loss per unit modified value, electricity is landed in the clearing calculating each type of transaction;
5) land electricity according to the actual clearing of landing electricity and each type of transaction of power purchase side 1, power purchase side 2 and calculate the mutual power transmission amount of two power purchase sides;
6) judge the condition of giving a present mutually between of that month power purchase side, if send power purchase side 2 for power purchase side 1, line loss per unit is zero, load actual conditions, otherwise need to power purchase side 1 land clearing electricity carry out secondary adjustment;
7) determine that power purchase side 2 send power purchase side 1 end clearing electricity of surfing the Net to be step 5) in the mutual power transmission amount of two power purchase sides calculated, then by the actual line loss rate on of that month two power purchase side's interconnections, calculate the clearing of side, power purchase side 1 and land electricity;
8) that power purchase side 2 is sent power purchase side 1 lands that clearing electricity is actual from power purchase side 1 to land electricity after deduction, proportionally carried out sharing of deviation electricity to the power transmission side that remaining non-preferential is settled accounts, finally obtains each side and send the clearing of power purchase side 1 to land electricity.
Above-mentioned steps 1) in, the transaction of the preferential clearing of first clearing, power transmission side 1 needs preferentially to settle accounts to k, and its online side clearing electricity equals plan power transmission electricity, and calculates it and land side according to appraising and deciding line loss per unit and settle accounts electricity:
P lm ‾ = P lm , ( l = 1,2 . . . , k ; m = 1,2 ) - - - ( 1 )
Q lm ‾ = P lm ‾ × ( 1 - K lm ) , ( l = 1,2 . . . , k ; m = 1,2 ) - - - ( 2 )
Wherein, P lmthe plan electricity volume that the preferential power transmission side l settled accounts send power purchase side m, the clearing electricity volume that power transmission side l send power purchase side m, that power transmission side l send the clearing of power purchase side m to land electricity, K lmthat power transmission side l send that power purchase side m's appraise and decide line loss per unit.
Above-mentioned steps 2) in, the online side clearing electricity computing method of other power transmission sides are:
A q power transmission side send the clearing electricity volume of power purchase side 1 to be:
P q 1 ‾ = P q × P q 1 j P q 1 j + P q 2 j , ( q = k + 1 , k + 2 . . . , n ) - - - ( 3 )
The clearing electricity volume of power purchase side 2 is sent to be:
P q 2 ‾ = P q × P q 2 j P q 1 j + P q 2 j , ( q = k + 1 , k + 2 . . . , n ) - - - ( 4 )
Wherein, k+1 to n is the power transmission side participating in district's power trade transprovincially except preferential clearing, P qbe the actual electricity volume of a q power transmission side, P q1jbe the plan electricity volume that q power transmission side sent power purchase side 1 this month, when its do not exist send power purchase side 1 to conclude the business time, P q1j=0, P q2jbe the plan electricity volume that q power transmission side sent power purchase side 2 this month, when its do not exist send power purchase side 2 to conclude the business time, P q2j=0.
Above-mentioned steps 3) in, the clearing of preferential settlement bargain are landed electricity from after actual critical point, power purchase side electricity deduction, calculate electricity volume according to each power transmission reef knot, appraise and decide line loss per unit and power purchase side actually land the method that electricity calculates line loss per unit modified value K and be:
Build electric quantity balancing equation---
Σ q = k + 1 n P q 1 ‾ × ( 1 - K × K q 1 ) + Σ q = k + 1 n P q 2 ‾ × ( 1 - K × K q 2 ) = Q d + Q x - Σ l = 1 k Q l 1 ‾ - Σ l = 1 k Q l 2 ‾ - - - ( 5 )
Wherein, K q1be the line loss per unit of appraising and deciding that a q power transmission side send power purchase side 1, K q2be the line loss per unit of appraising and deciding that a q power transmission side send power purchase side 2, Q 1for the total electricity in critical point lands in power purchase side 1, Q 2for the total electricity in critical point lands in power purchase side 2, can calculate line loss per unit modified value K by electric quantity balancing equation is:
K = Σ q = k + 1 n P q 1 ‾ + Σ q = k + 1 n P q 2 ‾ - ( Q d + Q x - Σ l = 1 k Q l 1 ‾ - Σ 1 = 1 k Q l 2 ‾ ) Σ q = k + 1 n P q 1 ‾ × K q 1 + Σ q = k + 1 n P q 1 ‾ × K q 1 - - - ( 6 ) .
Above-mentioned steps 4) in, the computing method that each power transmission side send power purchase side 1, electricity is landed in the clearing of power purchase side 2 are:
A q power transmission side send the clearing of power purchase side 1 to land electricity:
Q q 1 ‾ = P q 1 ‾ × ( 1 - K q 1 × K ) , ( q = k + 1 , k + 2 . . . , n ) - - - ( 7 )
A q power transmission side send the clearing of power purchase side 2 to land electricity:
Q q 2 ‾ = P q 2 ‾ × ( 1 - K q 2 × K ) , ( q = k + 1 , k + 2 . . . , n ) - - - ( 8 ) .
Above-mentioned steps 5) in, between two power purchase sides, the computing method of mutual power transmission amount are:
Power purchase side 1 side electricity is Q 1 ‾ = Q 1 - Σ i = 1 n Q i 1 ‾ - - - ( 9 )
Power purchase side 2 side electricity is Q 2 ‾ = Q 2 - Σ i = 1 n Q i 2 ‾ - - - ( 10 )
According to above computation process, meet
Above-mentioned steps 6) in, judgement two power purchase sides are also needed to deliver easy actual conditions mutually, if power purchase side 1 to power purchase side 2 power transmissions, line loss is zero, checkout result tallies with the actual situation, if power purchase side 2 does not have trading program between power purchase side 1 power transmission or two power purchase sides, then need that electricity lands to the clearing of side, power purchase side 1 and carry out secondary adjustment.
Above-mentioned steps 7) in, by step 5) checkout result and of that month two power purchase side's interconnections on actual line loss rate calculate the clearing electricity of two sides' transaction:
Power purchase side 2 send power purchase side 1 to surf the Net and holds clearing electricity
Power purchase side 2 send power purchase side 1 to land and holds clearing electricity
Wherein, K is the actual line loss rate on the interconnection of of that month Guangdong and Guangxi Provinces.
Above-mentioned steps 8) in, adopt the method for pro rata distribution deviation electricity, the power transmission side being adjusted rear each non-preferential clearing send the clearing of power purchase side 1 to land electricity:
Q q 1 ′ = Q q 1 ‾ + ( Q 1 - Q 1 ′ - Q ‾ ) × T q , ( q = k + 1 , k + 2 , . . . , n ) - - - ( 11 )
Wherein, each side's (comprise preferential clearing power transmission side) for first time clearing send the clearing of power purchase side 1 to land electricity sum, T qthe power transmission side settled accounts for each non-preferential send power purchase side 1 to land electricity and accounts for and always land the ratio of electricity,
The power trade settlement method of district transprovincially that the present invention is based on modified line loss rate can solve the problem of clearing line loss exception, effectively for various types of districts transprovincially power trade provides clearing foundation.The present invention is a kind of convenient and practical power trade settlement method of district transprovincially.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the power trade settlement method of district transprovincially that the present invention is based on modified line loss rate.
Fig. 2 is the application model of the power trade settlement method of district transprovincially that the present invention is based on modified line loss rate.
Embodiment
Embodiment:
The present invention is based on the schematic diagram of the power trade settlement method of district transprovincially of modified line loss rate as shown in Figure 1, as shown in Figure 2, district transprovincially of the present invention power trade settles accounts electric method for determination of amount to application model, includes following steps:
1) transaction of the preferential clearing of first clearing, power transmission side 1 needs preferentially to settle accounts to k, and its online side clearing electricity equals plan power transmission electricity, and calculates it and land side according to appraising and deciding line loss per unit and settle accounts electricity:
P lm ‾ = P lm , ( l = 1,2 . . . , k ; m = 1,2 ) - - - ( 1 )
Q lm ‾ = P lm ‾ × ( 1 - K lm ) , ( l = 1,2 . . . , k ; m = 1,2 ) - - - ( 2 )
Wherein, P lmthe plan electricity volume that the preferential power transmission side l settled accounts send power purchase side m, the clearing electricity volume that power transmission side l send power purchase side m, that power transmission side l send the clearing of power purchase side m to land electricity, K lmthat power transmission side l send that power purchase side m's appraise and decide line loss per unit.
2) the online side clearing electricity of other power transmission sides is calculated
A q power transmission side send the clearing electricity volume of power purchase side 1 to be:
P q 1 ‾ = P q × P q 1 j P q 1 j + P q 2 j , ( q = k + 1 , k + 2 . . . , n ) - - - ( 3 )
The clearing electricity volume of power purchase side 2 is sent to be:
P q 2 ‾ = P q × P q 2 j P q 1 j + P q 2 j , ( q = k + 1 , k + 2 . . . , n ) - - - ( 4 )
Wherein, k+1 to n is the power transmission side participating in district's power trade transprovincially except preferential clearing, P qbe the actual electricity volume of a q power transmission side, P q1jbe the plan electricity volume that q power transmission side sent power purchase side 1 this month, when its do not exist send power purchase side 1 to conclude the business time, P q1j=0, P q2jbe the plan electricity volume that q power transmission side sent power purchase side 2 this month, when its do not exist send power purchase side 2 to conclude the business time, P q2j=0.
3) calculate electricity volume according to each power transmission reef knot, appraise and decide the actual electricity calculating line loss per unit modified value K that lands of line loss per unit and power purchase side.
Build electric quantity balancing equation---
Σ q = k + 1 n P q 1 ‾ × ( 1 - K × K q 1 ) + Σ q = k + 1 n P q 2 ‾ × ( 1 - K × K q 2 ) = Q d + Q x - Σ l = 1 k Q l 1 ‾ - Σ l = 1 k Q l 2 ‾ - - - ( 5 )
Wherein, K q1be the line loss per unit of appraising and deciding that a q power transmission side send power purchase side 1, K q2be the line loss per unit of appraising and deciding that a q power transmission side send power purchase side 2, Q 1for the total electricity in critical point lands in power purchase side 1, Q 2for the total electricity in critical point lands in power purchase side 2, can calculate line loss per unit modified value K by electric quantity balancing equation is:
K = Σ q = k + 1 n P q 1 ‾ + Σ q = k + 1 n P q 2 ‾ - ( Q d + Q x - Σ l = 1 k Q l 1 ‾ - Σ 1 = 1 k Q l 2 ‾ ) Σ q = k + 1 n P q 1 ‾ × K q 1 + Σ q = k + 1 n P q 1 ‾ × K q 1 - - - ( 6 )
4) computing method that each power transmission side (non-preferential clearing) send power purchase side 1, electricity is landed in the clearing of power purchase side 2.
A q power transmission side send the clearing of power purchase side 1 to land electricity:
Q q 1 ‾ = P q 1 ‾ × ( 1 - K q 1 × K ) , ( q = k + 1 , k + 2 . . . , n ) - - - ( 7 )
A q power transmission side send the clearing of power purchase side 2 to land electricity:
Q q 2 ‾ = P q 2 ‾ × ( 1 - K q 2 × K ) , ( q = k + 1 , k + 2 . . . , n ) - - - ( 8 )
5) two mutual power transmission amounts in power purchase side are calculated
Power purchase side 1 side electricity is Q 1 ‾ = Q 1 - Σ i = 1 n Q i 1 ‾ - - - ( 9 )
Power purchase side 2 side electricity is Q 2 ‾ = Q 2 - Σ i = 1 n Q i 2 ‾ - - - ( 10 )
According to above computation process, meet
6) judge that two power purchase sides deliver easy actual conditions mutually, if power purchase side 1 to power purchase side 2 power transmissions, line loss is zero, checkout result tallies with the actual situation, if power purchase side 2 does not have trading program between power purchase side 1 power transmission or two power purchase sides, then need that electricity lands to the clearing of side, power purchase side 1 and carry out secondary adjustment.
7) by step 5) checkout result and of that month two power purchase side's interconnections on actual line loss rate calculate the clearing electricity of two sides' transaction:
Power purchase side 2 send power purchase side 1 to surf the Net and holds clearing electricity
Power purchase side 2 send power purchase side 1 to land and holds clearing electricity
Wherein, K is the actual line loss rate on the interconnection of of that month Guangdong and Guangxi Provinces.
8) power purchase side 1 land clearing electricity secondary adjustment
Adopt the method for pro rata distribution deviation electricity, the power transmission side being adjusted rear each non-preferential clearing send the clearing of power purchase side 1 to land electricity:
Q q 1 ′ = Q q 1 ‾ + ( Q 1 - Q 1 ′ - Q ‾ ) × T q , ( q = k + 1 , k + 2 , . . . , n ) - - - ( 11 )
Wherein, each side's (comprise preferential clearing power transmission side) for first time clearing send the clearing of power purchase side 1 to land electricity sum, T qthe power transmission side settled accounts for each non-preferential send power purchase side 1 to land electricity and accounts for and always land the ratio of electricity,

Claims (9)

1., based on the power trade settlement method of district transprovincially of modified line loss rate, it is characterized in that including following steps:
1) transaction of the preferential clearing of first clearing, power transmission side 1 needs preferentially to settle accounts to k, and its online side clearing electricity equals plan power transmission electricity, and calculates it and land side according to appraising and deciding line loss per unit and settle accounts electricity;
2) to other power transmission side, power purchase side 1, the online side Transaction algorithm of power purchase side 2 and actual online voltameter is sent to calculate the clearing electricity volume of each power transmission type according to it;
3) clearing of preferential settlement bargain landed electricity from after actual critical point, power purchase side electricity deduction, calculate electricity volume according to each power transmission reef knot, appraise and decide the actual electricity that lands of line loss per unit and power purchase side and calculate line loss per unit modified value;
4) calculate electricity volume according to each power transmission reef knot, appraise and decide line loss per unit and line loss per unit modified value, electricity is landed in the clearing calculating each type of transaction;
5) land electricity according to the actual clearing of landing electricity and each type of transaction of power purchase side 1, power purchase side 2 and calculate the mutual power transmission amount of two power purchase sides;
6) judge the condition of giving a present mutually between of that month power purchase side, if send power purchase side 2 for power purchase side 1, line loss per unit is zero, load actual conditions, otherwise need to power purchase side 1 land clearing electricity carry out secondary adjustment;
7) determine that power purchase side 2 send power purchase side 1 end clearing electricity of surfing the Net to be step 5) in the mutual power transmission amount of two power purchase sides calculated, then by the actual line loss rate on of that month two power purchase side's interconnections, calculate the clearing of side, power purchase side 1 and land electricity;
8) that power purchase side 2 is sent power purchase side 1 lands that clearing electricity is actual from power purchase side 1 to land electricity after deduction, proportionally carried out sharing of deviation electricity to the power transmission side that remaining non-preferential is settled accounts, finally obtains each side and send the clearing of power purchase side 1 to land electricity.
2. the power trade settlement method of district transprovincially based on modified line loss rate according to claim 1, it is characterized in that above-mentioned steps 1) in, the transaction of the preferential clearing of first clearing, power transmission side 1 needs preferentially to settle accounts to k, its online side clearing electricity equals plan power transmission electricity, and calculates it land side clearing electricity according to appraising and deciding line loss per unit:
P lm ‾ = P lm , ( l = 1 , 2 . . . , k ; m = 1,2 ) - - - ( 1 )
Q lm ‾ = P lm ‾ × ( 1 - K lm ) , ( l = 1,2 . . . , k ; m = 1,2 ) - - - ( 2 )
Wherein, P lmthe plan electricity volume that the preferential power transmission side l settled accounts send power purchase side m, the clearing electricity volume that power transmission side l send power purchase side m, that power transmission side l send the clearing of power purchase side m to land electricity, K lmthat power transmission side l send that power purchase side m's appraise and decide line loss per unit.
3. the power trade settlement method of district transprovincially based on modified line loss rate according to claim 1, is characterized in that above-mentioned steps 2) in, the online side clearing electricity computing method of other power transmission sides are:
A q power transmission side send the clearing electricity volume of power purchase side 1 to be:
P q 1 ‾ = P q × P q 1 j P q 1 j + P q 2 j , ( q = k + 1 , k + 2 . . . , n ) - - - ( 3 )
The clearing electricity volume of power purchase side 2 is sent to be:
P q 2 ‾ = P q × P q 2 j P q 1 j + P q 2 j , ( q = k + 1 , k + 2 . . . , n ) - - - ( 4 )
Wherein, k+1 to n is the power transmission side participating in district's power trade transprovincially except preferential clearing, P qbe the actual electricity volume of a q power transmission side, P q1jbe the plan electricity volume that q power transmission side sent power purchase side 1 this month, when its do not exist send power purchase side 1 to conclude the business time, P q1j=0, P q2jbe the plan electricity volume that q power transmission side sent power purchase side 2 this month, when its do not exist send power purchase side 2 to conclude the business time, P q2j=0.
4. the power trade settlement method of district transprovincially based on modified line loss rate according to claim 1, it is characterized in that above-mentioned steps 3) in, the clearing of preferential settlement bargain are landed electricity from after actual critical point, power purchase side electricity deduction, calculate electricity volume according to each power transmission reef knot, appraise and decide line loss per unit and power purchase side actually land the method that electricity calculates line loss per unit modified value K and be:
Build electric quantity balancing equation---
Σ q = k + 1 n P q 1 ‾ × ( 1 - K × K q 1 ) + Σ q = k + 1 n P q 2 ‾ × ( 1 - K × K q 2 ) = Q d + Q x - Σ l = 1 k Q l 1 ‾ - Σ l = 1 k Q l 2 ‾ - - - ( 5 )
Wherein, K q1be the line loss per unit of appraising and deciding that a q power transmission side send power purchase side 1, K q2be the line loss per unit of appraising and deciding that a q power transmission side send power purchase side 2, Q 1for the total electricity in critical point lands in power purchase side 1, Q 2for the total electricity in critical point lands in power purchase side 2, can calculate line loss per unit modified value K by electric quantity balancing equation is:
K = Σ q = k + 1 n P q 1 ‾ + Σ q = k + 1 n P q 2 ‾ - ( Q d + Q x - Σ l = 1 k Q l 1 ‾ - Σ l = 1 k Q l 2 ‾ ) Σ q = k + 1 n P q 1 ‾ × K q 1 + Σ q = k + 1 n P q 1 ‾ × K q 1 - - - ( 6 ) .
5. the power trade settlement method of district transprovincially based on modified line loss rate according to claim 1, is characterized in that above-mentioned steps 4) in, the computing method that each power transmission side send power purchase side 1, electricity is landed in the clearing of power purchase side 2 are:
A q power transmission side send the clearing of power purchase side 1 to land electricity:
Q q 1 ‾ = P q 1 ‾ × ( 1 - K q 1 × K ) , ( q = k + 1 , k + 2 . . . , n ) - - - ( 7 )
A q power transmission side send the clearing of power purchase side 2 to land electricity:
Q q 2 ‾ = P q 2 ‾ × ( 1 - K q 2 × K ) , ( q = k + 1 , k + 2 . . . , n ) - - - ( 8 ) .
6. the power trade settlement method of district transprovincially based on modified line loss rate according to claim 1, is characterized in that above-mentioned steps 5) in, between two power purchase sides, the computing method of mutual power transmission amount are:
Power purchase side 1 side electricity is Q 1 ‾ = Q 1 - Σ i = 1 n Q i 1 ‾ - - - ( 9 )
Power purchase side 2 side electricity is Q 2 ‾ = Q 2 - Σ i = 1 n Q i 2 ‾ - - - ( 10 )
According to above computation process, meet
7. the power trade settlement method of district transprovincially based on modified line loss rate according to claim 1, it is characterized in that above-mentioned steps 6) in, judgement two power purchase sides are also needed to deliver easy actual conditions mutually, if power purchase side 1 to power purchase side 2 power transmissions, line loss is zero, checkout result tallies with the actual situation, if power purchase side 2 does not have trading program between power purchase side 1 power transmission or two power purchase sides, then needs to land electricity to the clearing of side, power purchase side 1 and carries out secondary adjustment.
8. the power trade settlement method of district transprovincially based on modified line loss rate according to claim 1, it is characterized in that above-mentioned steps 7) in, by step 5) checkout result and of that month two power purchase side's interconnections on actual line loss rate calculate the clearing electricity of two sides' transaction:
Power purchase side 2 send power purchase side 1 to surf the Net and holds clearing electricity
Power purchase side 2 send power purchase side 1 to land and holds clearing electricity
Wherein, K is the actual line loss rate on the interconnection of of that month Guangdong and Guangxi Provinces.
9. the power trade settlement method of district transprovincially based on modified line loss rate according to claim 1, it is characterized in that above-mentioned steps 8) in, adopt the method for pro rata distribution deviation electricity, the power transmission side being adjusted rear each non-preferential clearing send the clearing of power purchase side 1 to land electricity:
Q q 1 ′ = Q q 1 ‾ + ( Q 1 - Q 1 ′ - Q ‾ ) × T q , ( q = k + 1 , k + 2 , . . . , n ) - - - ( 11 )
Wherein, for each side of first time clearing send the clearing of power purchase side 1 to land electricity sum, T qthe power transmission side settled accounts for each non-preferential send power purchase side 1 to land electricity and accounts for and always land the ratio of electricity, T q = Q q 1 ‾ Σ q = k + 1 n Q q 1 ‾ , ( q = k + 1 , k + 2 , . . . , n ) .
CN201410652909.5A 2014-11-17 2014-11-17 Trans-provincial electric power trade clearing method based on corrected line loss rate Pending CN104408666A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410652909.5A CN104408666A (en) 2014-11-17 2014-11-17 Trans-provincial electric power trade clearing method based on corrected line loss rate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410652909.5A CN104408666A (en) 2014-11-17 2014-11-17 Trans-provincial electric power trade clearing method based on corrected line loss rate

Publications (1)

Publication Number Publication Date
CN104408666A true CN104408666A (en) 2015-03-11

Family

ID=52646295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410652909.5A Pending CN104408666A (en) 2014-11-17 2014-11-17 Trans-provincial electric power trade clearing method based on corrected line loss rate

Country Status (1)

Country Link
CN (1) CN104408666A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110852581A (en) * 2019-10-28 2020-02-28 南方电网能源发展研究院有限责任公司 Power transmission and distribution price verification method and device for distinguishing power grid structural characteristics
CN111724031A (en) * 2020-05-08 2020-09-29 广州电力交易中心有限责任公司 Cross-region and cross-provincial transaction electric quantity segmentation method and device suitable for spot goods condition

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004340767A (en) * 2003-05-16 2004-12-02 Hitachi Ltd Electric power transaction method and electric power transaction system prevented in stealing electricity
CN101794994A (en) * 2010-01-27 2010-08-04 清华大学 Power generation plan method considering network loss sharing under power market environment containing bilateral transaction
WO2010123567A1 (en) * 2009-04-22 2010-10-28 Parkpod Llc System for managing electric energy grid-vehicle exchange devices
CN102567645A (en) * 2012-01-10 2012-07-11 河北省电力公司 Method for counting equipment of power grid and computing transmission losses on basis of on-line theoretical transmission loss computation
CN103455940A (en) * 2013-08-09 2013-12-18 南方电网科学研究院有限责任公司 West-east power transmission trans-province contract transferring and replacing transaction method
CN103455941A (en) * 2013-08-09 2013-12-18 南方电网科学研究院有限责任公司 Intra-provincial electricity generation right transfer transaction method using two price setting mechanisms
CN103646356A (en) * 2013-12-18 2014-03-19 国家电网公司 Method for determining loss rate of integrated network in extra-high-voltage alternating-current trans-regional power transaction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004340767A (en) * 2003-05-16 2004-12-02 Hitachi Ltd Electric power transaction method and electric power transaction system prevented in stealing electricity
WO2010123567A1 (en) * 2009-04-22 2010-10-28 Parkpod Llc System for managing electric energy grid-vehicle exchange devices
CN101794994A (en) * 2010-01-27 2010-08-04 清华大学 Power generation plan method considering network loss sharing under power market environment containing bilateral transaction
CN102567645A (en) * 2012-01-10 2012-07-11 河北省电力公司 Method for counting equipment of power grid and computing transmission losses on basis of on-line theoretical transmission loss computation
CN103455940A (en) * 2013-08-09 2013-12-18 南方电网科学研究院有限责任公司 West-east power transmission trans-province contract transferring and replacing transaction method
CN103455941A (en) * 2013-08-09 2013-12-18 南方电网科学研究院有限责任公司 Intra-provincial electricity generation right transfer transaction method using two price setting mechanisms
CN103646356A (en) * 2013-12-18 2014-03-19 国家电网公司 Method for determining loss rate of integrated network in extra-high-voltage alternating-current trans-regional power transaction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
RUBIN L M: "《Application of Path Integrals in Modeling Transmission Line Loss》", 《IEEE TRANSACTIONS ON COMPONENTS,PACKAGING AND MANUFACTURING TECHNOLOGY》 *
孟文川: "《南方电网西电东送通道线损计算分析及降损措施》", 《南方电网技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110852581A (en) * 2019-10-28 2020-02-28 南方电网能源发展研究院有限责任公司 Power transmission and distribution price verification method and device for distinguishing power grid structural characteristics
CN110852581B (en) * 2019-10-28 2020-10-23 南方电网能源发展研究院有限责任公司 Power transmission and distribution price verification method and device for distinguishing power grid structural characteristics
CN111724031A (en) * 2020-05-08 2020-09-29 广州电力交易中心有限责任公司 Cross-region and cross-provincial transaction electric quantity segmentation method and device suitable for spot goods condition

Similar Documents

Publication Publication Date Title
CN107240002B (en) Electric power transaction method and device and micro-grid system
CN103426120A (en) Medium and low voltage power distribution network comprehensive evaluation method based on reliability
CN103455941A (en) Intra-provincial electricity generation right transfer transaction method using two price setting mechanisms
WO2011087920A3 (en) System and method for resolving transactions with selective use of user submission parameters
CN104408650A (en) Settlement method of separate deviation electricity weighting for inter-provincial electric energy transaction
CN108681891A (en) A kind of Multiple Currencies tranaction costs collection methods based on block chain
CN104408666A (en) Trans-provincial electric power trade clearing method based on corrected line loss rate
CN103501004A (en) Operation control method and device for distribution network
CN105977958B (en) Bilateral transaction loss allocation methods based on network catalogue system
CN105162143B (en) A kind of determination method of optimal trade capacity between large regional grid
CN104158177B (en) Day operation average eguivalent for calculating 10kV Calculating Network Theoretical Line Loss loads methodology
CN106296393A (en) A kind of interest settlement method and system
CN107122881B (en) Comprehensive energy efficiency evaluation system based on power distribution station area
CN104660422A (en) Balance-free communication billing method capable of realizing automatic grade promotion, conversion and carry-over
CN107707483A (en) A kind of load-balancing method, system, equipment and computer-readable storage medium
CN105931119A (en) Bond quotation processing method and device
CN107480312A (en) A kind of computational methods and device of wall scroll Natural gas pipeline system reliability
CN103632199B (en) Method for determining public power transmission network used share
CN103632206A (en) Two-part-tariff electricity-transmitting pricing method of interprovincial electric network
CN115496538A (en) Electricity price determination method, device and storage medium
CN107220904A (en) A kind of electric power based on Network Security Constraints concentrates trade matching emulation mode
CN104021272A (en) Method for extracting project budgetary estimate influence factors based on principal component analysis
CN107563589A (en) A kind of electricity market main body credit management system and management method
CN107769196B (en) Distributed power supply aggregated transaction electric quantity distribution method
CN111415047A (en) Optimization method and device based on available power transmission capacity in trans-provincial and trans-regional trading environment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150311