CN104408650A - Settlement method of separate deviation electricity weighting for inter-provincial electric energy transaction - Google Patents

Settlement method of separate deviation electricity weighting for inter-provincial electric energy transaction Download PDF

Info

Publication number
CN104408650A
CN104408650A CN201410653199.8A CN201410653199A CN104408650A CN 104408650 A CN104408650 A CN 104408650A CN 201410653199 A CN201410653199 A CN 201410653199A CN 104408650 A CN104408650 A CN 104408650A
Authority
CN
China
Prior art keywords
electricity
deviation
power
plan
price
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410653199.8A
Other languages
Chinese (zh)
Inventor
蒙文川
陈政
冷媛
欧鹏
张翔
宋艺航
杨惠萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSG Electric Power Research Institute
Research Institute of Southern Power Grid Co Ltd
Original Assignee
Research Institute of Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Research Institute of Southern Power Grid Co Ltd filed Critical Research Institute of Southern Power Grid Co Ltd
Priority to CN201410653199.8A priority Critical patent/CN104408650A/en
Publication of CN104408650A publication Critical patent/CN104408650A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a settlement method of deviation electricity separate weighting for inter-provincial electric energy transaction. The settlement method includes: 1) calculating the planned electricity of the supplier and the buyer; 2) calculating the planned electricity fee based on the approved electricity price, the actual electricity price, the planned electricity and the actual electricity; 3) calculating the deviation electricity and its price, wherein, the deviation electricity of each transaction main body is the deviation of the actual electricity and the planned electricity, the deviation price is the weighted average of each transaction based on the planned electricity; 4) calculating the deviation electricity fee of the parties to the transaction, wherein the deviation electricity fee is the product of the deviation electricity and the deviation price; 5) calculating the total electricity fee of the parties to the transaction, wherein the total electricity fee is the sum of the planned electricity fee and the deviation electricity fee; 6) calculating the total transmission fee, wherein the total transmission fee is the difference of the total electricity fee between the supplier and the buyer. The present disclosure can effectively solve the problem of unfair allocation and complex process in the current settlement method.

Description

The power trade settlement method of district transprovincially of the independent weighting price of a kind of deviation electricity
Technical field
The invention belongs to Power System Analysis field, particularly a kind of defining method for determining the electricity charge that transprovincially district's power trade clearing large deviations electricity price and each transaction agent are collected or paid, belongs to the innovative technology of district's power trade settlement method transprovincially.
Background technology
Transprovincially district's power trade alleviates energy source distribution and the unbalanced problem of electricity consumption effectively, creates good social benefit.Transprovincially power trade settlement method in district's relates to the key benefits of each transaction agent, needs the actual conditions design settlement method for different market.According to being difference to deviation electricity processing mode, settlement method two class that transprovincially district's power trade settlement method can be divided into deviation electricity to share the settlement method of clearing and deviation electricity settling accounts separately.Along with transaction size constantly increases, kind and the quantity of transaction agent progressively increase, trade mode is tending towards complicated, deviation electricity is there is and shares the problem such as injustice, line loss exception in the settlement method that more original deviation electricity share clearing in practical operation, the settlement method that deviation electricity is settled accounts separately then avoids the problem that complicated deviation electricity is shared, key problem how to formulate the price of deviation electricity, not only to use for reference advanced electric energy clearing experience both at home and abroad, the present situation that Power Market Construction is at the early-stage will be considered simultaneously.
Summary of the invention
The object of the invention is to consider the problems referred to above and a kind of deviation electricity power trade settlement method of district transprovincially that independent weighting is fixed a price is provided.The present invention effectively can solve current balance method large deviations electricity and share unfairness and the numerous and diverse situation of settlement process, for the complex transaction trend that may occur future provides can the settlement method of reference.
Technical scheme of the present invention is: the power trade settlement method of district transprovincially of the independent weighting price of deviation electricity of the present invention, includes following steps:
1) the plan electricity of each power transmission side and each power purchase side is calculated respectively;
2) appraising and deciding rate for incorporation into the power network and landing electricity price and plan electricity volume and the electricity Settlement Plan electricity charge of landing according to each transaction;
3) calculation deviation electricity and electricity price, the deviation electricity of each transaction agent equals actual online (landing) electricity and the deviation of planning electricity, and deviation electricity price is obtained according to plan electricity weighted mean by the electricity price of each transaction;
4) the deviation electricity charge of settlement bargain both sides, the deviation electricity charge are that deviation electricity and deviation electricity price are long-pending;
5) total electricity charge of settlement bargain both sides, total electricity charge are the plan electricity charge and deviation electricity charge sum;
6) settle accounts total transmit power to take, total transmission charges is the total expenses that the total expenses of power purchase side deducts power transmission side.
Above-mentioned steps 1) in, calculate plan electricity, suppose there is a m power transmission side, a n power purchase side, the plan electricity volume of power transmission side i is:
P i ' = Σ j = 1 n P ij , ( i = 1,2 , . . . m ) - - - ( 1 )
Wherein, P ijfor power transmission side i send the plan electricity volume of power purchase side j, when without plan, P ij=0.
The plan of power purchase side j is landed electricity and is:
Q j ' = Σ i = 1 m Q ij + Σ k = 1 n Q kj B - Σ k = 1 n P jk B , ( j = 1,2 , . . . , n ) - - - ( 2 )
Wherein, Q ijfor power transmission side i send the plan of power purchase side j to land electricity, meet
Q ij=P ij× (1-K ij), K ijfor power transmission side i send, power purchase side j's appraise and decide line loss per unit. with for the program trading between power purchase side, can be the transaction of actual generation physics trend, also can be the transfer of banking contract, for power purchase side k send the plan of power purchase side j to land electricity, for power purchase side j send the plan electricity volume of power purchase side k, when power purchase side k and j does not conclude the business, with be zero.
Above-mentioned steps 2) in, appraising and deciding rate for incorporation into the power network and landing electricity price and plan electricity volume and the method for the electricity Settlement Plan electricity charge of landing and be according to each transaction:
The plan electricity charge that power transmission side i collects are:
G i ' = Σ j = 1 n S ij × P ij , ( i = 1,2 , . . . , m ) - - - ( 3 )
Wherein, S ijfor power transmission side i send the plan rate for incorporation into the power network of power purchase side j.
The plan electricity charge that power purchase side j pays are:
F j ' = Σ i = 1 m L ij × Q ij + Σ k = 1 n L kj B × Q kj B - Σ k = 1 n S jk B × P jk B , ( j = 1,2 , . . . , n ) - - - ( 4 )
Wherein, L ijfor power transmission side i send the plan of power purchase side j to land electricity price, for power purchase side k send the plan of power purchase side j to land electricity price, for power purchase side j send the plan rate for incorporation into the power network of power purchase side k.
Above-mentioned steps 3) in, calculation deviation electricity and electricity price, the deviation electricity of each transaction agent equals actual online (landing) electricity and the deviation of planning electricity, and deviation electricity price is obtained according to plan electricity weighted mean by the electricity price of each transaction, and concrete grammar is as follows:
The online deviation electricity of power transmission side i is:
△P i=P i-P′ 1,(i=1,2,...,m) (5)
Wherein, P ifor the actual electricity volume of power transmission side i, measured by online end energy metering table.
The deviation electricity price of power transmission side i is:
S Δi = Σ j = 1 n S ij × P ij Σ j = 1 n P ij = G i ' P i ' , ( i = 1,2 , . . . , m ) - - - ( 6 )
The deviation electricity that lands of power purchase side j is:
△Q j=Q j-Q′ j,(j=1,2,...,n) (7)
Wherein, Q jfor the actual electricity that lands of power purchase side j, energy metering table is held to measure by landing.
The deviation electricity price of power purchase side j is:
L Δj = Σ i = 1 m L ij × Q ij + Σ k = 1 n L kj B × Q kj B + Σ k = 1 n S jk B × P jk B Σ i = 1 m Q ij + Σ k = 1 n Q kj B + Σ k = 1 n P jk B , ( j = 1,2 , . . . , n ) - - - ( 8 )
Above-mentioned steps 4) in, the deviation electricity charge of settlement bargain both sides, the deviation electricity charge are that deviation electricity and deviation electricity price are long-pending, and concrete grammar is as follows:
The deviation electricity charge of power transmission side i are:
λ i=△P i×S △i,(i=1,2,...,m) (9)
The deviation electricity charge of power purchase side j are:
μ j=△Q j×L △j,(j=1,2,...,n) (10)
Above-mentioned steps 5) in, total electricity charge of settlement bargain both sides, total electricity charge are the plan electricity charge and deviation electricity charge sum, and concrete grammar is as follows:
Total electricity charge that power transmission side i collects are:
W i=λ i+G′ i,(i=1,2,...,m) (11)
Total electricity charge that power purchase side j pays are:
V j=μ j+F′ j,(j=1,2,...,n) (12)
Above-mentioned steps 6) in, clearing total transmit power takes, and total transmission charges is that the total expenses that power purchase side pays deducts the total expenses collected power transmission side.Method is as follows:
Total transmit power expense is:
S = Σ j = 1 n v j - Σ i = 1 m W i - - - ( 13 ) .
The power trade settlement method of district transprovincially of the independent weighting price of deviation electricity of the present invention effectively can solve deviation electricity and share unfairness, the problem that settlement process is numerous and diverse, for various types of districts transprovincially power trade provides clearing foundation.The present invention is a kind of convenient and practical power trade settlement method of district transprovincially.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the power trade settlement method of district transprovincially of the independent weighting price of deviation electricity of the present invention.
Embodiment
Embodiment:
As shown in Figure 1, the defining method of the district transprovincially of the present invention power trade clearing electricity charge, includes following steps to the schematic diagram of the power trade settlement method of district transprovincially of the independent weighting price of deviation electricity of the present invention:
1) calculate plan electricity, suppose there is a m power transmission side, a n power purchase side, the plan electricity volume of power transmission side i is:
P i ' = Σ j = 1 n P ij , ( i = 1,2 , . . . , m ) - - - ( 1 )
Wherein, P ijfor power transmission side i send the plan electricity volume of power purchase side j, when without plan, P ij=0.
The plan of power purchase side j is landed electricity and is:
Q j ' = Σ i = 1 m Q ij + Σ k = 1 n Q kj B - Σ k = 1 n P jk B , ( j = 1,2 , . . . , n ) - - - ( 2 )
Wherein, Q ijfor power transmission side i send the plan of power purchase side j to land electricity, meet Q ij=P ij× (1-K ij), K ijfor power transmission side i send, power purchase side j's appraise and decide line loss per unit. with for the program trading between power purchase side, can be the transaction of actual generation physics trend, also can be the transfer of banking contract, for power purchase side k send the plan of power purchase side j to land electricity, for power purchase side j send the plan electricity volume of power purchase side k, when power purchase side k and j does not conclude the business, with be zero.
2) the Settlement Plan electricity charge, appraising and deciding rate for incorporation into the power network and landing electricity price and plan electricity volume and the electricity Settlement Plan electricity charge of landing according to each transaction.
The plan electricity charge that power transmission side i collects are:
G i ' = Σ j = 1 n S ij × P ij , ( i = 1,2 , . . . , m ) - - - ( 3 )
Wherein, S ijfor power transmission side i send the plan rate for incorporation into the power network of power purchase side j.
The plan electricity charge that power purchase side j pays are:
F j ' = Σ i = 1 m L ij × Q ij + Σ k = 1 n L kj B × Q kj B - Σ k = 1 n S jk B × P jk B , ( j = 1,2 , . . . , n ) - - - ( 4 )
Wherein, L ijfor power transmission side i send the plan of power purchase side j to land electricity price, for power purchase side k send the plan of power purchase side j to land electricity price, for power purchase side j send the plan rate for incorporation into the power network of power purchase side k.
3) calculation deviation electricity and electricity price, the deviation electricity of each transaction agent equals actual online (landing) electricity and the deviation of planning electricity, and deviation electricity price is obtained according to plan electricity weighted mean by the electricity price of each transaction.
The online deviation electricity of power transmission side i is:
△P i=P i-P′ i,(i=1,2,...,m) (5)
Wherein, P ifor the actual electricity volume of power transmission side i, measured by online end energy metering table.
The deviation electricity price of power transmission side i is:
S Δi = Σ j = 1 n S ij × P ij Σ j = 1 n P ij = G i ' P i ' , ( i = 1,2 , . . . , m ) - - - ( 6 )
The deviation electricity that lands of power purchase side j is:
△Q j=Q j-Q′ j,(j=1,2,...,n) (7)
Wherein, Q jfor the actual electricity that lands of power purchase side j, energy metering table is held to measure by landing.
The deviation electricity price of power purchase side j is:
L Δj = Σ i = 1 m L ij × Q ij + Σ k = 1 n L kj B × Q kj B + Σ k = 1 n S jk B × P jk B Σ i = 1 m Q ij + Σ k = 1 n Q kj B + Σ k = 1 n P jk B , ( j = 1,2 , . . . , n ) - - - ( 8 )
Above-mentioned steps 4) in, the deviation electricity charge of settlement bargain both sides, the deviation electricity charge are that deviation electricity and deviation electricity price are long-pending.Method is as follows:
The deviation electricity charge of power transmission side i are:
λ i=△P i×S △i,(i=1,2,...,m) (9)
The deviation electricity charge of power purchase side j are:
μ j=△Q j×L △j,(j=1,2,...,n) (10)
Above-mentioned steps 5) in, total electricity charge of settlement bargain both sides, total electricity charge are the plan electricity charge and deviation electricity charge sum.Method is as follows:
Total electricity charge that power transmission side i collects are:
W i=λ i+G′ i,(i=1,2,...,m) (11)
Total electricity charge that power purchase side j pays are:
V j=μ j+F′ j,(j=1,2,...,n) (12)
Above-mentioned steps 6) in, clearing total transmit power takes, and total transmission charges is that the total expenses that power purchase side pays deducts the total expenses collected power transmission side.Method is as follows:
Total transmit power expense is:
S = Σ j = 1 n V j - Σ i = 1 m W i - - - ( 13 ) .

Claims (7)

1. the power trade settlement method of district transprovincially of the independent weighting price of deviation electricity, is characterized in that comprising the steps:
1) the plan electricity of each power transmission side and each power purchase side is calculated respectively;
2) appraising and deciding rate for incorporation into the power network and landing electricity price and plan electricity volume and the electricity Settlement Plan electricity charge of landing according to each transaction;
3) calculation deviation electricity and electricity price, the deviation electricity of each transaction agent equals actual online (landing) electricity and the deviation of planning electricity, and deviation electricity price is obtained according to plan electricity weighted mean by the electricity price of each transaction;
4) the deviation electricity charge of settlement bargain both sides, the deviation electricity charge are that deviation electricity and deviation electricity price are long-pending;
5) total electricity charge of settlement bargain both sides, total electricity charge are the plan electricity charge and deviation electricity charge sum;
6) settle accounts total transmit power to take, total transmission charges is the total expenses that the total expenses of power purchase side deducts power transmission side.
2. the power trade settlement method of district transprovincially of the independent weighting price of deviation electricity according to claim 1, is characterized in that above-mentioned steps 1) in, calculate plan electricity, suppose there is a m power transmission side, a n power purchase side, the plan electricity volume of power transmission side i is:
P i ′ = Σ j = 1 n P ij , ( i = 1,2 , . . . , m ) - - - ( 1 )
Wherein, P ijfor power transmission side i send the plan electricity volume of power purchase side j, when without plan, P ij=0,
The plan of power purchase side j is landed electricity and is:
Q j ′ = Σ i = 1 m Q ij + Σ k = 1 n Q kj B - Σ k = 1 n P jk B , ( j = 1,2 , . . . , n ) - - - ( 2 )
Wherein, Q ijfor power transmission side i send the plan of power purchase side j to land electricity, meet Q ij=P ij× (1-K ij), K ijfor power transmission side i send, power purchase side j's appraise and decide line loss per unit, with for the program trading between power purchase side, can be the transaction of actual generation physics trend, also can be the transfer of banking contract, for power purchase side k send the plan of power purchase side j to land electricity, for power purchase side j send the plan electricity volume of power purchase side k, when power purchase side k and j does not conclude the business, with be zero.
3. the power trade settlement method of district transprovincially of the independent weighting price of deviation electricity according to claim 1, it is characterized in that above-mentioned steps 2) in, appraising and deciding rate for incorporation into the power network and landing electricity price and plan electricity volume and the method for the electricity Settlement Plan electricity charge of landing and be according to each transaction:
The plan electricity charge that power transmission side i collects are:
G i ′ = Σ j = 1 n S ij × P ij , ( i = 1,2 , . . . , m ) - - - ( 3 )
Wherein, S ijfor power transmission side i send the plan rate for incorporation into the power network of power purchase side j,
The plan electricity charge that power purchase side j pays are:
F j ′ = Σ i = 1 m L ij × Q ij + Σ k = 1 n L kj B × Q kj B - Σ k = 1 n S jk B × P jk B , ( j = 1,2 , . . . , n ) - - - ( 4 )
Wherein, L ijfor power transmission side i send the plan of power purchase side j to land electricity price, for power purchase side k send the plan of power purchase side j to land electricity price, for power purchase side j send the plan rate for incorporation into the power network of power purchase side k.
4. the power trade settlement method of district transprovincially of the independent weighting price of deviation electricity according to claim 1, it is characterized in that above-mentioned steps 3) in, calculation deviation electricity and electricity price, the deviation electricity of each transaction agent equals actual online (landing) electricity and the deviation of planning electricity, deviation electricity price is obtained according to plan electricity weighted mean by the electricity price of each transaction, and concrete grammar is as follows:
The online deviation electricity of power transmission side i is:
△P i=P i-P′ i,(i=1,2,...,m) (5)
Wherein, P ifor the actual electricity volume of power transmission side i, measured by online end energy metering table,
The deviation electricity price of power transmission side i is:
S Δi = Σ j = 1 n S ij × P ij Σ j = 1 n P ij = G i ′ P i ′ , ( i = 1,2 , . . . , m ) - - - ( 6 )
The deviation electricity that lands of power purchase side j is:
△Q j=Q j-Q' j,(j=1,2,...,n) (7)
Wherein, Q jfor the actual electricity that lands of power purchase side j, energy metering table is held to measure by landing,
The deviation electricity price of power purchase side j is:
L Δj = Σ i = 1 m L ij × Q ij + Σ k = 1 n L kj B × Q kj B + Σ k = 1 n S jk B × P jk B Σ i = 1 m Q ij + Σ k = 1 n Q kj B + Σ k = 1 n P jk B , ( j = 1,2 , . . . , n ) - - - ( 8 ) .
5. the power trade settlement method of district transprovincially of the independent weighting price of deviation electricity according to claim 1, it is characterized in that above-mentioned steps 4) in, the deviation electricity charge of settlement bargain both sides, the deviation electricity charge are that deviation electricity and deviation electricity price are long-pending, and concrete grammar is as follows:
The deviation electricity charge of power transmission side i are:
λ i=△P i×S △i,(i=1,2,...,m) (9)
The deviation electricity charge of power purchase side j are:
μ j=△Q j×L △j,(j=1,2,...,n) (10)。
6. the power trade settlement method of district transprovincially of the independent weighting price of deviation electricity according to claim 1, is characterized in that above-mentioned steps 5) in, total electricity charge of settlement bargain both sides, total electricity charge are the plan electricity charge and deviation electricity charge sum, and concrete grammar is as follows:
Total electricity charge that power transmission side i collects are:
W i=λ i+G′ i,(i=1,2,...,m) (11)
Total electricity charge that power purchase side j pays are:
V j=μ j+F′ j,(j=1,2,...,n) (12)。
7. the power trade settlement method of district transprovincially of the independent weighting price of deviation electricity according to claim 1, it is characterized in that above-mentioned steps 6) in, clearing total transmit power takes, and total transmission charges is that the total expenses that power purchase side pays deducts the total expenses collected power transmission side, and concrete grammar is as follows:
Total transmit power expense is:
S = Σ j = 1 n V j - Σ i = 1 m W i - - - ( 13 ) .
CN201410653199.8A 2014-11-17 2014-11-17 Settlement method of separate deviation electricity weighting for inter-provincial electric energy transaction Pending CN104408650A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410653199.8A CN104408650A (en) 2014-11-17 2014-11-17 Settlement method of separate deviation electricity weighting for inter-provincial electric energy transaction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410653199.8A CN104408650A (en) 2014-11-17 2014-11-17 Settlement method of separate deviation electricity weighting for inter-provincial electric energy transaction

Publications (1)

Publication Number Publication Date
CN104408650A true CN104408650A (en) 2015-03-11

Family

ID=52646279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410653199.8A Pending CN104408650A (en) 2014-11-17 2014-11-17 Settlement method of separate deviation electricity weighting for inter-provincial electric energy transaction

Country Status (1)

Country Link
CN (1) CN104408650A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105303318A (en) * 2015-10-30 2016-02-03 国家电网公司 Trans-regional power grid transaction settlement processing method based on deviation electric quantity responsibility judgment
CN106296455A (en) * 2016-08-10 2017-01-04 中国南方电网有限责任公司电网技术研究中心 Power network resources configuration and for power network resources configure count based on go out method and system
CN107239944A (en) * 2017-06-16 2017-10-10 昆明电力交易中心有限责任公司 A kind of Regional Electric Market sale of electricity main body settlement system and settlement method
CN107301537A (en) * 2017-06-16 2017-10-27 昆明电力交易中心有限责任公司 A kind of Regional Electric Market power purchase main body settles accounts system and method
CN110428330A (en) * 2019-07-09 2019-11-08 广东电力交易中心有限责任公司 A kind of three settlement methods processed of spot market environment lower complete period

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101794424A (en) * 2010-01-29 2010-08-04 华东电网有限公司 Self-adaptive unified power market transaction method
CN103217958A (en) * 2013-03-29 2013-07-24 山东电力集团公司 Electric quantity purchase, supply and selling integrated system and method based on gas insulated switchgear (GIS) platform
CN103455941A (en) * 2013-08-09 2013-12-18 南方电网科学研究院有限责任公司 Intra-provincial electricity generation right transfer transaction method using two price setting mechanisms

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101794424A (en) * 2010-01-29 2010-08-04 华东电网有限公司 Self-adaptive unified power market transaction method
CN103217958A (en) * 2013-03-29 2013-07-24 山东电力集团公司 Electric quantity purchase, supply and selling integrated system and method based on gas insulated switchgear (GIS) platform
CN103455941A (en) * 2013-08-09 2013-12-18 南方电网科学研究院有限责任公司 Intra-provincial electricity generation right transfer transaction method using two price setting mechanisms

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
江健健 等: ""区域电力市场考核结算新方法"", 《电力系统自动化》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105303318A (en) * 2015-10-30 2016-02-03 国家电网公司 Trans-regional power grid transaction settlement processing method based on deviation electric quantity responsibility judgment
CN106296455A (en) * 2016-08-10 2017-01-04 中国南方电网有限责任公司电网技术研究中心 Power network resources configuration and for power network resources configure count based on go out method and system
CN107239944A (en) * 2017-06-16 2017-10-10 昆明电力交易中心有限责任公司 A kind of Regional Electric Market sale of electricity main body settlement system and settlement method
CN107301537A (en) * 2017-06-16 2017-10-27 昆明电力交易中心有限责任公司 A kind of Regional Electric Market power purchase main body settles accounts system and method
CN107239944B (en) * 2017-06-16 2018-02-13 昆明电力交易中心有限责任公司 A kind of Regional Electric Market sale of electricity main body settlement system and settlement method
CN107301537B (en) * 2017-06-16 2018-03-02 昆明电力交易中心有限责任公司 A kind of Regional Electric Market power purchase main body settles accounts system and method
CN110428330A (en) * 2019-07-09 2019-11-08 广东电力交易中心有限责任公司 A kind of three settlement methods processed of spot market environment lower complete period

Similar Documents

Publication Publication Date Title
CN104408650A (en) Settlement method of separate deviation electricity weighting for inter-provincial electric energy transaction
CN107239944B (en) A kind of Regional Electric Market sale of electricity main body settlement system and settlement method
KR101976401B1 (en) Block-Chain based Electricity power trading system, Method thereof, and Computer readable Storage medium having the method
CN103455941A (en) Intra-provincial electricity generation right transfer transaction method using two price setting mechanisms
WO2013044093A3 (en) Offer management and settlement in a payment network
CN103106743A (en) Real-time concentrated long-distance charge-control power system
CN104899978B (en) Based on the resident's day electricity charge charging method and system for taking control technology
CN108280693A (en) A kind of power generation side marketization electricity settlement method
CN106557857A (en) Project of transmitting and converting electricity amount bill compilation and pricing method
CN108681891A (en) A kind of Multiple Currencies tranaction costs collection methods based on block chain
CN105303318A (en) Trans-regional power grid transaction settlement processing method based on deviation electric quantity responsibility judgment
Anaya et al. The role of distribution network operators in promoting cost-effective distributed generation: Lessons from the United States of America for Europe
Ximei et al. Small hydropower financing in China: External environment analyses, financing modes and problems with solutions
Rego Reserve price: Lessons learned from Brazilian electricity procurement auctions
CN104318672B (en) IC-card table gas price conversion method and device
CN104217371A (en) Power grid construction project increased power supply quantity benefit calculation method based on power supply safety standard
CN106600109A (en) Method for calculating power generation cost by using quotation information of power generation enterprise based on matchmaking trading
CN107798553A (en) Application process of the credit score in shared power service
CN111861543A (en) Method and device for calculating and allocating double-track unbalance expense of plan and market
CN108985826A (en) It is a kind of to consider that electricity market entirety electricity deviation and power consumer enter the market the deviation electricity settlement method and system of time
CN104408666A (en) Trans-provincial electric power trade clearing method based on corrected line loss rate
CN107563589A (en) A kind of electricity market main body credit management system and management method
Zou et al. Distributed efficient charging coordinations for electric vehicles under progressive second price auction mechanism
CN107220904A (en) A kind of electric power based on Network Security Constraints concentrates trade matching emulation mode
CN103632206A (en) Two-part-tariff electricity-transmitting pricing method of interprovincial electric network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150311