CN104400427B CN201410720661.1A CN201410720661A CN104400427B CN 104400427 B CN104400427 B CN 104400427B CN 201410720661 A CN201410720661 A CN 201410720661A CN 104400427 B CN104400427 B CN 104400427B
Authority
CN
China
Prior art keywords
regulator valve
pressure regulator
oil pump
pressure
catch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410720661.1A
Other languages
Chinese (zh)
Other versions
CN104400427A (en
Inventor
谭小群
马二萍
殷成欣
李树军
秦现生
白晶
冯华山
于薇薇
白亚光
王战玺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwestern Polytechnical University
Original Assignee
Northwestern Polytechnical University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwestern Polytechnical University filed Critical Northwestern Polytechnical University
Priority to CN201410720661.1A priority Critical patent/CN104400427B/en
Publication of CN104400427A publication Critical patent/CN104400427A/en
Application granted granted Critical
Publication of CN104400427B publication Critical patent/CN104400427B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P21/00Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control
    • B23P21/004Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units passing two or more work-stations whilst being composed

Abstract

The invention discloses a kind of assembly bench based on group technology, for solving the technical problem of existing assembly bench assembly precision difference.Technical scheme is made up of feeding system, pressure regulator valve ramming system, pressure regulator valve catch ramming system and aid system.Pressure regulator valve ramming system and pressure regulator valve catch ramming system have assembling, split the feature quick, precision is high, wherein pressure regulator valve ramming system completes to be pressed into gas-liquid solenoid valve and choke valve the function of oil pump carrier, quick change mode is used to design, ensure to change frock speed, there are detent mechanism and clamp system, detent mechanism ensures the positioning precision of part, it is ensured that being placed and taken out all without damage of part.Pressure regulator valve catch ramming system completes to be pressed into catch the function of oil pump carrier; this device uses cylinder to promote; pressure head uses over-pressure safety device; can be prevented effectively from a part put in place and another one not yet complete install; now equipment continues to down pressure and can cause the damage of the part that put in place, it is ensured that installation accuracy.

Description

Assembly bench based on group technology
Technical field
The present invention relates to a kind of work platforms, particularly relate to a kind of assembly bench based on group technology.
Background technology
In gasoline injection system, the task of electric fuel punp is, provides enough for electromotor under all working state Fuel oil, play disorder of internal organs at electromotor, electric fuel punp operates incessantly, and thus from fuel tank through drainage screen to starting Machine provides continuous print fuel oil, and the pressure regulator valve being made up of gas-liquid solenoid valve and choke valve ensures that the pressure in spraying system keeps Constant, unnecessary fuel oil flows back to fuel tank.Oil pump carrier provides good machinery peace in being arranged on fuel tank for electric fuel punp Dress support, needs pressure regulator valve mounted thereto, but when pressure regulator valve is installed, required precision is high and is vulnerable to damage, in order to Ensure installation accuracy and installation quality, accordingly, it would be desirable to design a kind of special workbench to complete installation task.
The document Chinese invention patent of CN102434341B " Authorization Notice No. be " disclose a kind of fuel pump bracket structure and Its assembly method.Electric fuel punp is arranged on the inside of bracket, electric fuel punp and bracket and is fixed by locker;Bracket On have " V " shape cable clamping interface, the wire harness of liquid level sensor is installed at " V " shape cable clamping interface;Whole fuel pump bracket structure passes through "T"-shaped snap-on on bracket matches with oil storage barrel, is fixed in oil storage barrel;The inlet port of electric fuel punp and bracket phase Coordinate mutually.On the one hand this structure have cured oil pump structure, solves oil pump carrier and oil pump assembly problem, lacks peace Dress accuracy detecting device, damages the risk of oil pump during improve assembling;On the other hand, design lacks motility, When changing oil pump structure, this equipment cannot use, and causes production cost to increase.Thus while this equipment is for small-sized The oil pump carrier of fixed structure is equipped with certain advantage, but for flexible structure, oil pump carrier that assembly precision is high For, have certain restricted.
Summary of the invention
In order to overcome the deficiency of existing assembly bench assembly precision difference, the present invention provides a kind of assembly bench based on group technology. This assembly bench is made up of feeding system, pressure regulator valve ramming system, pressure regulator valve catch ramming system and aid system.Pressure regulation Valve ramming system and pressure regulator valve catch ramming system have assembling, split the feature quick, precision is high, at oil pump carrier During model change, it is convenient to carry out the processing of new product, time-consuming and cost.Wherein pressure regulator valve ramming system master Complete to be pressed into gas-liquid solenoid valve and choke valve the function of oil pump carrier, use quick change mode to design, it is ensured that to change work Dress speed, has detent mechanism and clamp system, and detent mechanism ensures the positioning precision of part, it is ensured that putting of part Enter and take out all without injuring part.Pressure regulator valve catch ramming system mainly completes to be pressed into catch the merit of oil pump carrier Can, this device uses cylinder to promote, and the pressure head on equipment uses over-pressure safety device, can be prevented effectively from a part Put in place and another one not yet complete install, now equipment continues to down pressure and can cause the damage of the part that put in place, Guarantee installation accuracy.
The technical solution adopted for the present invention to solve the technical problems is: a kind of assembly bench based on group technology, its Feature is made up of feeding system, pressure regulator valve ramming system 4 and pressure regulator valve catch ramming system 5.Described feeding system Including pressure regulator valve magazine 10 and steel ball magazine 6.It is left that pressure regulator valve magazine 10 and steel ball magazine 6 are arranged in assembly bench successively Top.Described pressure regulator valve ramming system includes the first conduction band 13, forcing press 14, First Transition plate 15, rand pressing Bar axle 16, depression bar 17, briquetting 18, clip pressure head the 19, first support plate the 20, first holding screw 21, pressing plate latch 22 and pressure head spacing 23.First conduction band 13, First Transition plate the 15, first support plate 20 and the first holding screw 21 groups Oil pump carrier positioner, First Transition plate 15 is become to be used as bearing-surface when press-fiting, rand pressing bar axle 16, depression bar 17, briquetting 18 and pressing plate latch 22 form oil pump carrier clamp system.Forcing press 14 drives clip pressure head 19 downward Motion, is pressed into oil pump carrier by pressure regulator valve.Gas-liquid solenoid valve and choke valve are pressed into oil pump carrier by clip pressure head 19 simultaneously. Pressure head spacing 23 is final position backstop, it is ensured that will not damage oil pump carrier during press-in.Described pressure regulator valve catch pressure Enter system include column 24, steel ball pressure head 25, union joint 26, contact 27, cylinder the 28, second rebound 29, Two conduction band the 30, second support plate the 31, second holding screws 32, displacement transducer 33, press base 34, sensor Support 35 and cylinder fixed mount 36.Second rebound the 29, second conduction band the 30, second support plate 31 and the second clamp screw Nail 32 composition oil pump carrier positioner, the second rebound 29 is used as bearing-surface when press-fiting, column 24 and forcing press Base 34 forms the support of system.Cylinder fixed mount 36 is fixed by screws on column 24, provides for cylinder 28 Supporting construction.Cylinder 28 is connected with steel ball pressure head 25 by union joint 26, under the drive of cylinder 28, and steel ball pressure Catch is pressed into pressure regulator valve by 25.Sensor stand 35 is arranged on column 24, and displacement transducer inserts sensor and props up Frame 35.
Also include aid system, specifically include illuminating lamp 1, Working gantry 2, information board 3, electrical control cubicles 9, display panel 11 and elesocket 12.Illuminating lamp 1 provides light source for whole operating process.Working gantry 2 uses aluminium section bar, connection Part and roller are formed by connecting, and are connected with ground by foundation bolt 8, include in electrical control cubicles 9 driver, sensor, PLC, failure warning system.Driver is used for driving cylinder, makes cylinder export desirable pressure, and sensor leads to Cross data wire to be connected with PLC, the data collected are passed in PLC by data wire.Fault Warning system is connected with PLC by data wire with button, display lamp, wherein failure warning system and display lamp It it is output device.Display panel 11 can show that current duty is for normal or fault in real time.Elesocket 12 is The connector of protective cover is installed.
The invention has the beneficial effects as follows: this assembly bench is by feeding system, pressure regulator valve ramming system, the press-in of pressure regulator valve catch System and aid system composition.Pressure regulator valve ramming system and pressure regulator valve catch ramming system have assembling, split quick, The feature that precision is high, when oil pump carrier model change, it is convenient to carry out the processing of new product, time-consuming with become This.Wherein pressure regulator valve ramming system mainly completes to be pressed into gas-liquid solenoid valve and choke valve the function of oil pump carrier, uses Quick change mode designs, it is ensured that change frock speed, has detent mechanism and clamp system, and detent mechanism ensures determining of part Position precision, it is ensured that being placed and taken out all without injuring part of part.Pressure regulator valve catch ramming system is the completeest Becoming the function that catch is pressed into oil pump carrier, this device uses cylinder to promote, and the pressure head on equipment uses overvoltage protection dress Put, can be prevented effectively from a part put in place and another one not yet complete install, now equipment continues to down Pressure can cause the damage of the part that put in place, it is ensured that installation accuracy.
With detailed description of the invention, the present invention is elaborated below in conjunction with the accompanying drawings.
Accompanying drawing explanation
Fig. 1 is integral structure layout's figure of present invention assembly bench based on group technology based on group technology.
Fig. 2 is pressure regulator valve ramming system schematic diagram in Fig. 1.
Fig. 3 is pressure regulator valve catch ramming system schematic diagram in Fig. 1.
In figure, 1-illuminating lamp, 2-Working gantry, 3-information board, 4-pressure regulator valve ramming system, 5-pressure regulator valve catch is pressed into System, 6-steel ball magazine, 7-flange chute, 8-foundation bolt, 9-electricity cabinet, 10-pressure regulator valve magazine, 11-digital display meter 12-elesocket, 13-first conduction band, 14-forcing press, 15-First Transition plate, 16-rand pressing bar axle, 17-depression bar, 18-briquetting, 19-clip pressure head, 20-the first support plate, 21-the first holding screw, 22-pressing plate latch, 23-pressure head is spacing, 24-column, 25-steel ball pressure head, 26-union joint, 27-contact, 28-cylinder, 29-the second rebound, 30-the second conduction band, 31-the second support plate, 32-the second holding screw, 33-displacement transducer, 34-press base, 35-sensor stand, 36-cylinder fixed mount.
Detailed description of the invention
Following example are with reference to Fig. 1-3.
Present invention assembly bench based on group technology is by feeding system, pressure regulator valve ramming system 4, the press-in of pressure regulator valve catch System 5 and aid system composition.
Feeding system includes oil pump carrier hopper, pressure regulator valve magazine 10, O magazine, steel ball magazine 6, spring material Box and catch magazine.Feeding system is arranged in assembly bench upper left side successively, is operated by the principle of first in first out, The nearest can take part with the shortest time, during assembling close to assembly bench (device) and operative employee Manually from magazine, take out corresponding part.
Pressure regulator valve ramming system include the first conduction band 13, forcing press 14, First Transition plate 15, rand pressing bar axle 16, Depression bar 17, briquetting 18, clip pressure head the 19, first support plate the 20, first holding screw 21, pressing plate latch 22 and pressure Spacing 23.Gas-liquid solenoid valve and choke valve are pressed into oil pump carrier by this device simultaneously, only have final position sensor and final position Gear, to guarantee that part installation puts in place, but not injuring part.First conduction band 13, First Transition plate the 15, first support plate 20 and first holding screw 21 form oil pump carrier positioner, it is ensured that oil pump carrier is placed and taken out all without damage Part, simultaneously during installing choke valve and gas-liquid solenoid valve, this device is used for ensureing the positioning accurate of oil pump carrier Really, the First Transition plate 15 bearing-surface in time press-fiting, this device is to ensure that the speed changing frock takes quick change mode Design.Rand pressing bar axle 16, depression bar 17, briquetting 18 and pressing plate latch 22 form oil pump carrier clamp system, really Protect pump during operation bracket will not shift.Forcing press 14 drives clip pressure head 19 to move downward, by pressure regulator valve pressure Enter oil pump carrier.Gas-liquid solenoid valve and choke valve are pressed into oil pump carrier by clip pressure head 19 simultaneously, are designed with on pressure head Over-pressure safety device, prevents when press-fiting part because part puts in place that another not yet completes installation equipment still Press under continuing and cause the damage of the part that puts in place.Pressure head spacing 23 is final position backstop, it is ensured that during press-in Oil pump carrier will not be damaged.There is gas-liquid solenoid valve to be manually loaded pressure head in the frock of oil pump carrier and choke valve is manually loaded Pressure head, gas-liquid solenoid valve pressure head detects device with O, is made up of cylinder, sensor etc..The horizontal peace of cylinder Dress, determines that cylinder rod can be judged by the position arrived after stretching out.If O exists, stopped then vapour by O Cylinder can not arrive final position;If without O, then cylinder will arrive final position.
Pressure regulator valve catch ramming system include column 24, steel ball pressure head 25, union joint 26, contact 27, cylinder 28, Second rebound the 29, second conduction band the 30, second support plate the 31, second holding screw 32, displacement transducer 33, pressure Machine base 34, sensor stand 35 and cylinder fixed mount 36.Second rebound the 29, second conduction band 30, second Plate 31 and the second holding screw 32 form oil pump carrier positioner, it is ensured that oil pump carrier is placed and taken out all without damage Hindering part, simultaneously during press-in catch, this device is used for ensureing the registration of oil pump carrier, the second transition The plate 29 bearing-surface in time press-fiting, this device is to ensure that the speed changing frock takes quick change mode to design.Column 24 and press base 34 form the support of this system, other parts are installed on this support.Cylinder fixed mount 36 It is fixed by screws on column 24, provides the structural support for cylinder 28.Cylinder 28 is by union joint 26 and steel ball Pressure head 25 connects, and under the drive of cylinder 28, catch is pressed into pressure regulator valve by steel ball pressure head 25.Sensor stand 35 Being arranged on column 24, displacement transducer inserts sensor stand 35.When cylinder moves downward, contact 27 encounters position Displacement sensor 35, it is ensured that catch is pressed onto position without damage catch and oil pump carrier.Negative pressure is had in the frock of oil pump carrier Device and hot pressing pressure head.By hand catch is put into, utilize negative pressure device to be held by catch fixing.Hot pressing pressure head is with temperature Degree controls function, and temperature controlling range is 150~400 DEG C, and temperature controlled precision is ± 1 DEG C, and thermal head has special painting Layer, will not occur wire drawing phenomenon.
Aid system include illuminating lamp 1, Working gantry 2, information board 3, electrical control cubicles 9, display panel 11, elesocket 12, Protection grating and collecting receptacle.Illuminating lamp 1 provides light source for whole operating process, it is ensured that operating environment can be carried out.Work Making stand 2 uses the prefabricated components such as aluminium section bar, connector, roller to be formed by connecting, and is connected with ground by foundation bolt 8 Connect, it is ensured that workbench is stable, be fitted with the worktable panel made with steel plate.Protection grating, uses secondary light coral Preventer.Be fully completed if all of technical process and meet technological requirement, then the green display lamp of equipment is bright, Protective door automatically opens up, and part is taken out by workman.There is indication sensor that workpiece enters in collecting receptacle and can only put into not The mechanism that can take out, it is ensured that when assembling substandard product occurs, do not have maloperation.Include in electrical control cubicles 9 driving Device, sensor, PLC, failure warning system.Driver is used for driving cylinder, makes the required pressure of cylinder output Power, sensor is connected with PLC by data wire, by data wire, the data collected is passed to PLC and controls On device processed.Failure warning system is connected with PLC by data wire with button, display lamp etc., wherein fault report Alarm system and display lamp are output devices, and button is entering apparatus, also run equipment while controlling omnidistance action During abnormal conditions differentiate, and make failure identification, the respective handling such as warning, failure logging of stopping.Aobvious Show that plate 11 can show that current duty is for normal or fault in real time.Elesocket 12 is the company installing protective cover Fitting.
The work process of the present embodiment is:
Step one, pretreatment.Manually oil pump carrier is put in the base of pressure regulator valve ramming system, according to the first conduction band 13 determine and put into position, adjust the first holding screw 21 on the first support plate 20 so that after oil pump carrier accurate positioning, Rotating depression bar 17 makes briquetting 18 compress oil pump carrier, is jointly compressed by oil pump carrier with rand pressing bar axle 16.
Step 2, automatically it is pressed into pressure regulator valve.Manually take gas-liquid solenoid valve and O from feeding system, on O Painting oils, and defensive position is dynamic to be contained in O on gas-liquid solenoid valve, and the gas-liquid solenoid valve that then will be equipped with O loads oil pump Corresponding pressure head on bracket tool, whether sensor detection gas-liquid solenoid valve is entirely enclosed in pressure head.From pressure regulator valve magazine Taking out choke valve in 10, choke valve manually loads its pressure head, pressure head uses negative-pressure adsorption choke valve.Press the button, First equipment detect O whether on gas-liquid solenoid valve, if detecting, O exists, then forcing press 14 drives card Clamp 19 decline, gas-liquid solenoid valve and choke valve are pressed into oil pump carrier simultaneously, have final position sensor and final position backstop Guarantee that part is installed to put in place, but not injuring part, there is sensor to detect whether to put in place in bottom, otherwise equipment alarm.
Step 4, automatically it is pressed into catch.In pressure regulating valve hole, it is sequentially loaded into steel ball and spring, exists manual catch is adsorbed On pressure head corresponding in oil pump carrier frock, there is negative pressure generator inside pressure head, negative pressure catch is held.Press by Button, protective door falls, and cylinder 28 band dynamic head 25 declines, and catch is pressed into pressure regulator valve hot-pressing plastic.Pressure head 25 is With temperature controlled hot pressing pressure head, it is ensured that catch will cause damage, thermal head have specific coatings, will not wire drawing. The displacement transducer 33 being arranged on sensor stand 35 detects whether catch puts in place automatically, it is ensured that catch is pressed onto position not Catch and oil pump carrier must be damaged.
Step 5, taking-up part are also checked.It is fully completed if all of technical process and meets technological requirement, then setting Standby green display lamp is bright, and protective door automatically opens up, and part is taken out by workman, puts into subsequent processing after doing overall visual inspection Oil pump carrier base in.If technical process is not fully completed or technological requirement not met, equipment then hard stop, Red light lights, and display defect content on information board 3 immediately, and workman presses device reset button, takes out faulty part Put it into collecting receptacle.
Step 5, return step one continue.

Claims (2)

1. an assembly bench based on group technology, it is characterised in that: by feeding system, pressure regulator valve ramming system (4) Form with pressure regulator valve catch ramming system (5);Described feeding system includes pressure regulator valve magazine (10) and steel ball magazine (6); Pressure regulator valve magazine (10) and steel ball magazine (6) are arranged in assembly bench upper left side successively;Described pressure regulator valve ramming system (4) Including the first conduction band (13), forcing press (14), First Transition plate (15), rand pressing bar axle (16), depression bar (17), Briquetting (18), clip pressure head (19), the first support plate (20), the first holding screw (21), pressing plate latch (22) Spacing with pressure head (23);First conduction band (13), First Transition plate (15), the first support plate (20) and the first clamp screw Nail (21) composition oil pump carrier positioner, First Transition plate (15) is used as bearing-surface when press-fiting, rand pressing Bar axle (16), depression bar (17), briquetting (18) and pressing plate latch (22) composition oil pump carrier clamp system;Pressure Machine (14) drives clip pressure head (19) to move downward, and pressure regulator valve is pressed into oil pump carrier;Clip pressure head (19) is same Time gas-liquid solenoid valve and choke valve are pressed into oil pump carrier;Pressure head spacing (23) is final position backstop, it is ensured that in press-in During will not damage oil pump carrier;Described pressure regulator valve catch ramming system (5) includes column (24), steel ball pressure head (25), union joint (26), contact (27), cylinder (28), the second rebound (29), the second conduction band (30), Second support plate (31), the second holding screw (32), displacement transducer (33), press base (34), sensor Support (35) and cylinder fixed mount (36);Second rebound (29), the second conduction band (30), the second support plate (31) Forming oil pump carrier positioner with the second holding screw (32), the second rebound (29) is used as supporting when press-fiting Face, column (24) and the support of press base (34) composition system;Cylinder fixed mount (36) is solid by screw It is scheduled on column (24), provides the structural support for cylinder (28);Cylinder (28) passes through union joint (26) and steel Pearl pressure head (25) connects, and under the drive of cylinder (28), catch is pressed into pressure regulator valve by steel ball pressure head (25);Pass Sensor bracket (35) is arranged on column (24), and displacement transducer inserts sensor stand (35).
Assembly bench based on group technology the most according to claim 1, it is characterised in that: also include aid system, Specifically include illuminating lamp (1), Working gantry (2), information board (3), electrical control cubicles (9), display panel (11) and elesocket (12);Illuminating lamp (1) provides light source for whole operating process;Working gantry (2) use aluminium section bar, connector and Roller is formed by connecting, and is fixedly connected with the ground by foundation bolt (8), and electrical control cubicles includes driver, biography in (9) Sensor, PLC, failure warning system;Driver is used for driving cylinder, makes cylinder export desirable pressure, passes Sensor is connected with PLC by data wire, the data collected is passed in PLC by data wire; Failure warning system is connected with PLC by data wire with button, display lamp, wherein failure warning system and referring to Show that lamp is output device;Display panel (11) can show that current duty is for normal or fault in real time;elesocket (12) for installing the connector of protective cover.
CN201410720661.1A 2014-12-01 2014-12-01 Assembly bench based on group technology Expired - Fee Related CN104400427B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410720661.1A CN104400427B (en) 2014-12-01 2014-12-01 Assembly bench based on group technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410720661.1A CN104400427B (en) 2014-12-01 2014-12-01 Assembly bench based on group technology

Publications (2)

Publication Number Publication Date
CN104400427A CN104400427A (en) 2015-03-11
CN104400427B true CN104400427B (en) 2016-08-24

Family

ID=52638126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410720661.1A Expired - Fee Related CN104400427B (en) 2014-12-01 2014-12-01 Assembly bench based on group technology

Country Status (1)

Country Link
CN (1) CN104400427B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105855875B (en) * 2016-05-17 2018-02-06 东莞凯科电子科技有限公司 A kind of golden shell automatic assembling method and apparatus of data wire five
CN106312517A (en) * 2016-09-29 2017-01-11 菲斯达排放控制装置(苏州)有限公司 Mounting tool for crank and metal pin of actuator

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3358681B2 (en) * 1994-06-22 2002-12-24 ジヤトコ株式会社 Tube connector assembly equipment
JP4032645B2 (en) * 2000-07-12 2008-01-16 日産自動車株式会社 Valve cotter assembly inspection equipment
JP2007229842A (en) * 2006-02-28 2007-09-13 Fuji Techno:Kk Press-fitting device for valve guide and valve seat of cylinder head
CN201693350U (en) * 2010-05-20 2011-01-05 杭州欣诚祥机电技术有限公司 Automatic straight pipe flange assembling machine
CN201783807U (en) * 2010-09-06 2011-04-06 阜新液压油泵厂 Automatic hydraulic press-mounting machine
CN102303235B (en) * 2011-06-14 2013-03-20 南通星维油泵油嘴有限公司 Press fit testing device for buffer valve

Also Published As

Publication number Publication date
CN104400427A (en) 2015-03-11

Similar Documents

Publication Publication Date Title
CN202025095U (en) Leakage-proof automatic detecting machine for mounting screws
CN103418698B (en) Full-automation accessory assembly machine
CN202292053U (en) Valve oil seal press mounting machine
CN108458839B (en) Engine front cover assembly leakage detection device and method
CN102922282A (en) Intelligent assembly testing production line of hydraulic plunger pump
CN205616207U (en) Lead boots material loading pile up neatly device and skip location locking device
CN106382306B (en) A kind of ball assembly equipment and method for rotatable parts retainer
CN104400427B (en) Assembly bench based on group technology
CN204893365U (en) Automatic change press
CN216939336U (en) Synchronous screwing system for main bearing cap bolts of diesel engine
CN109000564A (en) A kind of keycap assembling method for testing performance and automatic detection device
CN201807877U (en) Assembly detector for first pistons of automobile braking main cylinders
CN106945296A (en) Inlet manifold assembling test production system
CN205483062U (en) Automobile storage battery fuse box detection device
CN111044929A (en) Battery module electrical property detects machine
CN205879142U (en) Special fan assembly, check out test set
CN203245587U (en) Automatic detection mechanism for motor assembly connector
CN210108610U (en) Bypass valve gas tightness detection device
CN206953615U (en) Inlet manifold assembling test production system
CN110501534A (en) A kind of PCBA test macro and its control method
CN208450991U (en) A kind of oil seal pressing device
CN106041529A (en) Full-automatic biserial conical bearing assembly line
CN205996517U (en) Full-automatic biserial conical bearing assembly line
CN109702444A (en) A kind of ball valve automatic assembling device
CN207155198U (en) A kind of press fit device of cover handle hinge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20211201

CF01 Termination of patent right due to non-payment of annual fee