CN104400352A - Method for processing semi-hard copper pipes - Google Patents
Method for processing semi-hard copper pipes Download PDFInfo
- Publication number
- CN104400352A CN104400352A CN201410660398.1A CN201410660398A CN104400352A CN 104400352 A CN104400352 A CN 104400352A CN 201410660398 A CN201410660398 A CN 201410660398A CN 104400352 A CN104400352 A CN 104400352A
- Authority
- CN
- China
- Prior art keywords
- copper pipe
- semi
- finished product
- copper pipes
- copper
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 title claims abstract description 90
- 229910052802 copper Inorganic materials 0.000 title claims abstract description 90
- 239000010949 copper Substances 0.000 title claims abstract description 90
- 238000000034 method Methods 0.000 title claims abstract description 26
- 238000012545 processing Methods 0.000 title abstract description 6
- 238000000137 annealing Methods 0.000 claims abstract description 24
- 239000011265 semifinished product Substances 0.000 claims abstract description 22
- 238000004806 packaging method and process Methods 0.000 claims abstract description 5
- 239000000047 product Substances 0.000 claims abstract description 5
- 238000001514 detection method Methods 0.000 claims abstract description 4
- 238000003801 milling Methods 0.000 claims abstract description 4
- 238000003672 processing method Methods 0.000 claims description 16
- 210000001161 mammalian embryo Anatomy 0.000 claims description 9
- 238000003754 machining Methods 0.000 claims description 7
- 239000007795 chemical reaction product Substances 0.000 claims description 3
- 238000012856 packing Methods 0.000 claims description 3
- 238000003860 storage Methods 0.000 claims description 3
- 238000005266 casting Methods 0.000 abstract 1
- 238000005096 rolling process Methods 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 4
- 238000004886 process control Methods 0.000 description 2
- 238000005482 strain hardening Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 238000005555 metalworking Methods 0.000 description 1
- 230000010349 pulsation Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C37/00—Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
- B21C37/06—Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Metal Extraction Processes (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410660398.1A CN104400352B (en) | 2014-11-18 | 2014-11-18 | Method for processing semi-hard copper pipes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410660398.1A CN104400352B (en) | 2014-11-18 | 2014-11-18 | Method for processing semi-hard copper pipes |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104400352A true CN104400352A (en) | 2015-03-11 |
CN104400352B CN104400352B (en) | 2017-01-11 |
Family
ID=52638051
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410660398.1A Active CN104400352B (en) | 2014-11-18 | 2014-11-18 | Method for processing semi-hard copper pipes |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104400352B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110499413A (en) * | 2019-07-09 | 2019-11-26 | 浙江海亮股份有限公司 | A kind of method of pipe fitting annealing regulation performance |
CN114141439A (en) * | 2021-11-30 | 2022-03-04 | 天津经纬辉开光电股份有限公司 | Processing and manufacturing method of diamond-lattice double-side dispensing heat-resistant paper aluminum-clad flat wire for wind power transformer |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109986306A (en) * | 2019-04-10 | 2019-07-09 | 广东海亮铜业有限公司 | It is a kind of to dissipate rosette copper pipe and its production technology greatly |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1995028239A1 (en) * | 1994-04-14 | 1995-10-26 | Sumitomo Metal Industries, Ltd. | Bright-annealed highly smooth inner surface stainless steel pipe and method of manufacturing the same |
CN1785586A (en) * | 2005-12-12 | 2006-06-14 | 浦益龙 | Production method of B7 heat transfer copper alloy seamless pipe |
CN101078452A (en) * | 2007-06-19 | 2007-11-28 | 高新张铜股份有限公司 | Technique for processing semihard phosphorus deoxidized copper pipes |
CN101209524A (en) * | 2007-12-21 | 2008-07-02 | 金龙精密铜管集团股份有限公司 | Method of preparing copper or copper alloy tube |
CN102240697A (en) * | 2011-05-21 | 2011-11-16 | 广东龙丰精密铜管有限公司 | Production method and production line of copper coil pipe |
CN104043943A (en) * | 2013-03-11 | 2014-09-17 | 高玉树 | Manufacturing process of cupronickel pipe |
-
2014
- 2014-11-18 CN CN201410660398.1A patent/CN104400352B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1995028239A1 (en) * | 1994-04-14 | 1995-10-26 | Sumitomo Metal Industries, Ltd. | Bright-annealed highly smooth inner surface stainless steel pipe and method of manufacturing the same |
CN1785586A (en) * | 2005-12-12 | 2006-06-14 | 浦益龙 | Production method of B7 heat transfer copper alloy seamless pipe |
CN101078452A (en) * | 2007-06-19 | 2007-11-28 | 高新张铜股份有限公司 | Technique for processing semihard phosphorus deoxidized copper pipes |
CN101209524A (en) * | 2007-12-21 | 2008-07-02 | 金龙精密铜管集团股份有限公司 | Method of preparing copper or copper alloy tube |
CN102240697A (en) * | 2011-05-21 | 2011-11-16 | 广东龙丰精密铜管有限公司 | Production method and production line of copper coil pipe |
CN104043943A (en) * | 2013-03-11 | 2014-09-17 | 高玉树 | Manufacturing process of cupronickel pipe |
Non-Patent Citations (1)
Title |
---|
荣文清: "试论BFe30-1-1白铜冷凝管的铸锭裂纹形成机理", 《东方电气评论》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110499413A (en) * | 2019-07-09 | 2019-11-26 | 浙江海亮股份有限公司 | A kind of method of pipe fitting annealing regulation performance |
CN114141439A (en) * | 2021-11-30 | 2022-03-04 | 天津经纬辉开光电股份有限公司 | Processing and manufacturing method of diamond-lattice double-side dispensing heat-resistant paper aluminum-clad flat wire for wind power transformer |
Also Published As
Publication number | Publication date |
---|---|
CN104400352B (en) | 2017-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5907997B2 (en) | Manufacturing method of end group parts made of pure niobium with superconducting acceleration cavity | |
CN106448924B (en) | A kind of magnesium oxide mineral insulation cable production method | |
CN104226868B (en) | Valve body composite rolling ring forming method for ball valve | |
JP2011528995A5 (en) | ||
CN105331912A (en) | GH4169 high-temperature alloy bar and manufacturing method thereof | |
CN103556094B (en) | Utilize the method for precise forging machine forging TC4 titanium alloy rod bar | |
CN106425314A (en) | Combined manufacturing method of titanium alloy curvature component with ribs | |
CN110026748A (en) | Ultra-thin non-magnetic alloy steel inside and outside circle precise machining process | |
CN105665608A (en) | Forging technique for nuclear-grade F91 valve body | |
CN104400352A (en) | Method for processing semi-hard copper pipes | |
CN105463171A (en) | Manufacturing method for austenitic stainless steel bar used for nuclear power reactor | |
CN104233136A (en) | Production process for obtaining copper alloy strip with uniform and small grains | |
CN109328120A (en) | Method for the ducted body of ferrite FeCrAl alloy to be shaped to pipe | |
CN103160668A (en) | Device for online thermal deformation treatment of steel wire | |
CN105880442B (en) | One kind set forging receives forming method with empty | |
CN103071690B (en) | Cold and hot extrusion molding method of rotary thick-walled shell part for vehicle | |
CN206763612U (en) | It is a kind of can online annealing continuous cold-drawn machine group | |
CN113695574B (en) | Motor coil and preparation method thereof | |
CN104155480B (en) | Processing device for semi-finished product of nanoprobe and manufacturing method of nanoprobe | |
CN110314941A (en) | A kind of production method of aluminum alloy hot rolling gradient tension force | |
US11065673B2 (en) | Hot steel forging in horizontal press | |
CN103433322A (en) | Preparation method of elbow by hot pushing under intermediate frequency | |
CN111958193A (en) | Preparation method of alloy wire difficult to deform | |
CN105478521A (en) | Hafnium wire drawing technological method | |
CN110814069A (en) | Production method of semi-hard copper straight pipe and drawing die thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Method for processing semi-hard copper pipes Effective date of registration: 20171215 Granted publication date: 20170111 Pledgee: Zhengzhou Branch of China Minsheng Bank Co.,Ltd. Pledgor: WUXI GOLDEN DRAGON KAWAMURA PRECISION TUBE Co.,Ltd.|CHONGQING LONGYU PRECISE COPPER TUBE Co.,Ltd.|HENAN LONGHUI COPPER INDUSTRY Co.,Ltd.|Xinxiang Jinxiang Precision Pipe Fittings Co.,Ltd.|XINXIANG LONGTENG REFRIGERATION HIGH-TECH CO.,LTD.|JIANGSU CANGHUAN COPPER PRODUCTS CO.,LTD.|GOLDEN DRAGON PRECISE COPPER TUBE Group Inc.|GUANGDONG LONGFENG PRECISION COPPER PIPE CO.,LTD. Registration number: 2017990001045 |
|
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: 519090 No. 236 Shangdu Street, Hongqi Town, Jinwan District, Zhuhai City, Guangdong Province Patentee after: GUANGDONG LONGFENG PRECISION COPPER PIPE CO.,LTD. Address before: 519000 East Shuanglin Road, Zhuhai Avenue, Jinwan District, Zhuhai City, Guangdong Province Patentee before: GUANGDONG LONGFENG PRECISION COPPER PIPE CO.,LTD. |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20190814 Granted publication date: 20170111 Pledgee: Zhengzhou Branch of China Minsheng Bank Co.,Ltd. Pledgor: GUANGDONG LONGFENG PRECISION COPPER PIPE CO.,LTD. Registration number: 2017990001045 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Method for processing semi-hard copper pipes Effective date of registration: 20190904 Granted publication date: 20170111 Pledgee: Zhengzhou Branch of China Minsheng Bank Co.,Ltd. Pledgor: GUANGDONG LONGFENG PRECISION COPPER PIPE CO.,LTD. Registration number: Y2019990000126 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220801 Granted publication date: 20170111 Pledgee: Zhengzhou Branch of China Minsheng Bank Co.,Ltd. Pledgor: GUANGDONG LONGFENG PRECISION COPPER PIPE CO.,LTD. Registration number: Y2019990000126 |