CN104400320B - Pipe well door and technique for processing pipe well door - Google Patents

Pipe well door and technique for processing pipe well door Download PDF

Info

Publication number
CN104400320B
CN104400320B CN201410459358.0A CN201410459358A CN104400320B CN 104400320 B CN104400320 B CN 104400320B CN 201410459358 A CN201410459358 A CN 201410459358A CN 104400320 B CN104400320 B CN 104400320B
Authority
CN
China
Prior art keywords
door
plate
door plate
edges
bending
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410459358.0A
Other languages
Chinese (zh)
Other versions
CN104400320A (en
Inventor
张海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGCHUN MENGGU DOOR-INDUSTRY Co Ltd
Original Assignee
CHANGCHUN MENGGU DOOR-INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGCHUN MENGGU DOOR-INDUSTRY Co Ltd filed Critical CHANGCHUN MENGGU DOOR-INDUSTRY Co Ltd
Priority to CN201410459358.0A priority Critical patent/CN104400320B/en
Publication of CN104400320A publication Critical patent/CN104400320A/en
Application granted granted Critical
Publication of CN104400320B publication Critical patent/CN104400320B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/08Built-in cupboards; Masks of niches; Covers of holes enabling access to installations

Abstract

The invention discloses a technique for processing a pipe well door. The technique comprises the following steps: S1) the punching and the corner cutting are performed for a first door plate; S2) four edges of the first door plate are vertically bent; S3) the punching and the corner cutting are performed for a second door plate; S4) four edges of the second door plate are vertically bent; S5) any three bent edges of the first door plate and the second door plate are riveted; and S6) the locking hole pressing and the edge beating are performed for the fourth bent edges of the first door plate and the second door plate. The technique, provided by the invention, fixedly connects the formed door plates in a rivet riveting manner to prevent the environmental harm and pollution caused by waste gas generated in welding. The invention further discloses the pipe well door, wherein the pipe well door comprises the first door plate and the second door plate, and four vertical bent edges are arranged on the first door plate and the second door plate respectively, wherein any three vertical bent edges are fixedly connected by rivets, and the fourth vertical bent edges are provided with locking holes.

Description

A kind of process of conduit shaft door and process pipeline Jing Men
Technical field
The present invention relates to door and window technology field, more particularly to a kind of process of process pipeline Jing Men.This Outward, the invention further relates to a kind of conduit shaft door.
Background technology
With the development of Chinese mechanics of communication, the wire harness such as cable, optical fiber, optical cable extends in all direction in the pipeline in city.For Ensure the unimpeded of communication, prevent the pipeline wire harness stolen or destroyed, typically pipeline well head is provided with conduit shaft door, also referred to as shield Cover door.
At present, the manufacturing of conduit shaft door generally adopts Rhizoma Euonymus plate weld technology, i.e., with two pieces of pure color iron plates or steel plate Two-sided welding is carried out etc. the door-plate of material.After the completion of welding, then the spray painting of door-plate outer surface is painted.
In prior art when door-plate is welded, waste residue and waste gas can be produced, chemical substance therein can be to environment even people Body is pacified all with harm.In addition, conduit shaft door production technology of the prior art is more complicated, the paint of paint color is to environment Harm is big.
The content of the invention
It is an object of the invention to provide a kind of process of process pipeline Jing Men, can avoid in prior art because of welding And produce waste gas and cause the harm to environment.It is a further object of the present invention to provide a kind of conduit shaft door.
To solve above-mentioned technical problem, the present invention provides a kind of process of process pipeline Jing Men, including step:
S1) by the first door-plate punching and corner cut;
S2) by the vertical bending of the four edges of the first door-plate;
S3) by the second door-plate punching and corner cut;
S4) by the vertical bending of the four edges of the second door-plate;
S5) any three bending edges of the first door-plate and the second door-plate are riveted with rivet;
S6) the 4th bending edge of the first door-plate and the second door-plate is carried out with mould pressing lockhole and clapping side.
Preferably, in step S4) after also include step S401):Foaming is applied in the first door-plate and the second door-plate inner surface Glue.
Preferably, in step S401) after also include step S402):Fill between the first door-plate and the second door-plate and fill out Fill thing.
Preferably, in step S6) after also include step S7):Adhesive tape is stained with rivet head.
The present invention also provides a kind of conduit shaft door, including the first door-plate and the second door-plate, first door-plate and described the Four vertical bending edges, four vertical bending edges and second door-plate of first door-plate are respectively provided with two door-plates Four vertical bending edges correspond, and wherein any three pairs of corresponding described vertical bending edge rivets fix company Connect, lockhole is set on the 4th pair of vertical bending edge.
Preferably, the inner surface of first door-plate and second door-plate scribbles foamed glue.
Preferably, it is provided with implant between first door-plate and second door-plate.
Preferably, first door-plate and the second door-plate are autochromatic plate.
Preferably, the rivet head is provided with adhesive tape.
The process of process pipeline Jing Men provided by the present invention, is mainly the first door-plate and the second door-plate with material, first First by the first door-plate punching and corner cut, the position of punching and quantity are all default, and for the rivet in subsequent step installation is provided Space;Corner cut is to remove the uneven part of the corner of the first door-plate, is easy to subsequent installation.Then, will on bender Four sides of the first door-plate are bent, and bending angle must be 90 °.Next, with same method by the second door-plate also punching, Corner cut and by four side 90-degree bents.Then, the first door-plate and the second door-plate are stitched together, allow both four bending edges all Overlap, then the bending edge of the first door-plate and any three sides of the second door-plate is riveted together with rivet.Finally, The bending edge of the first door-plate and the 4th side of the second door-plate is carried out into pressure lockhole with particular manufacturing craft on bender to operate simultaneously Side is clapped, thus the first door-plate and the second door-plate is closely fitted to together, and lockhole remains to install lockset.
The process of process pipeline Jing Men provided by the present invention, with the mode of rivet staking the first door-plate is fixedly mounted With the second door-plate, it is to avoid the harm that the waste gas in welding procedure is caused to environment.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Inventive embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, can be with basis The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 is the method schematic diagram of process pipeline Jing Men in the first specific embodiment provided by the present invention;
Fig. 2 is a kind of structural representation of conduit shaft door in the first specific embodiment provided by the present invention;
Fig. 3 is the method schematic diagram of process pipeline Jing Men in second specific embodiment provided by the present invention.
Wherein, in Fig. 1-Fig. 3:
First door-plate -1, the second door-plate -2, foamed glue -3, implant -4, adhesive tape -5.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Fig. 1 is refer to, Fig. 1 is the structural representation of the first specific embodiment provided by the present invention.
In the first specific embodiment, the process of process pipeline Jing Men is firstly the need of carrying out step S1), by The punching of one door-plate 1 and corner cut, i.e., punched on the first door-plate 1 with puncher or boring machine, and its punch position is typically at first On the surrounding side of plate 1, installation site is provided for the rivet in subsequent step, the quantity of punching is indefinite, can increase and decrease as needed; Corner cut technique, refers to and is cut on four sides of the first door-plate 1, and uneven, agnail on four sides etc. is cut away, and makes first Four sides of door-plate 1 are smooth, the rectangular shaped on certain craft precision.
Followed by step S2), usually, the first door-plate 1 is fixed on bender, then by the first door-plate 1 A wherein Edge Bend, for the ease of installing and connecting, bending angle must be that the plane of 90 °, i.e. bending edge and the first door-plate 1 is hung down Directly.In the same manner, four sides of the first door-plate 1 are all bent, and it is all vertical with the plane of the first door-plate 1.First The overbending direction of the bending plate of plate 1 can at will be chosen, and bend inwards or outward bending can be adopted.
Followed by step S3), by the punching of the second door-plate 2 and corner cut, i.e., with puncher or drilling on the second door-plate 2 Machine punches, and its punch position typically on the surrounding side of the second door-plate 2, for the rivet in subsequent step installation site is provided, The quantity of punching is indefinite, can increase and decrease as needed;Corner cut technique, refers to and is cut on four sides of the second door-plate 2, by four sides On uneven, agnail etc. cut away, make four sides of the second door-plate 2 smooth, the rectangular shape on certain craft precision Shape.
Followed by step S4), usually, the second door-plate 2 is fixed on bender, then by the second door-plate 2 A wherein Edge Bend, for the ease of installing and connecting, bending angle must be that the plane of 90 °, i.e. bending edge and the second door-plate 2 is hung down Directly.In the same manner, four sides of the second door-plate 2 are all bent, and it is all vertical with the plane of the second door-plate 2.Second The overbending direction of the bending plate of plate 2 can at will be chosen, and bend inwards or outward bending can be adopted.
Followed by step S5), in this step, need to use rivet.First by the first door-plate 1 and the second door-plate 2 Four bending edges are superimposed together, and are combined into the shape of a cuboid box.Then the first door-plate 1 and the second door-plate 2 are chosen Any three bending edges, are riveted on the first door-plate 1 and the second door-plate 2 by the hole on aforementioned three bending edges with rivet.This step In rapid, the 4th bending edge is not dealt with.
Followed by step S6), in this step, need to use art technology particular manufacturing craft.By the die for special purpose Tool, aforementioned the 4th bending edge not dealt with is carried out on bender to press lockhole operation.Bat side is carried out again after pressure lockhole Technique.So, just the first door-plate 1 and the second door-plate 2 can tightly be installed fixation, and claps the lockhole after side, lock is installed Tool is efficient and convenient, both artistic and practical.
In view of the sealing of conduit shaft door, step S7 next can also be carried out), first is riveted in abovementioned steps Used in the process of the door-plate 2 of plate 1 and second to rivet head be stained with adhesive tape 5, so, both ensure that the sealing of conduit shaft door, In turn ensure that the attractive in appearance of conduit shaft door.
The process of process pipeline Jing Men that the present embodiment is adopted, by the way of rivet staking first is fixedly connected Door-plate 1 and second door-plate 2, it is to avoid caused environment is endangered because of the waste gas, the waste residue that are caused using welding method in prior art Evil problem.In addition, in the present embodiment, the first door-plate 1 and the second door-plate 2 are using the riveting of any three bending edge, another bending edge pressure The mode of lockhole, installs hinge conveniently, and surface structure is attractive in appearance, saves the set-up time.
The present embodiment also provides a kind of conduit shaft door, and main body includes two pieces of door-plates:First door-plate 1 and the second door-plate 2.Its In, it is both provided with four vertical bending edges on the first door-plate 1 and the second door-plate 2, i.e., in the first door-plate 1 and the second door-plate 2 There are four sides vertical with its surface, the overbending direction of the bending edge can arbitrarily choose on four sides, bend inwards or to Outer bending is all feasible.The mode of wherein any three bending edges rivet staking of four bending edges is fixed together, Remaining 4th bending edge is then provided with lockhole.
In order to fasten the connection of the first door-plate 1 and the second door-plate 2, it is preferable that in the first door-plate 1 and the second door-plate 2 Surface scribbles one layer of foamed glue 3, in order to coordinate it to use, between the first door-plate 1 and the second door-plate 2 implant 4 has been filled in.This Sample, the first door-plate 1 and the second door-plate 2 are firmly close together by the effect of foamed glue 3 with implant 4, and due to filling out The presence of thing 4 is filled, makes the first door-plate 1 and the rigidity and intensity of the second door-plate 2 obtain a certain degree of enhancing.
The aesthetic problem of conduit shaft door is considered simultaneously, and the first door-plate 1 and the second door-plate 2 can adopt the door of colored sheet material Plate.
In addition in view of the sealing problem of conduit shaft door, with the position of rivet on the first door-plate 1 and the second door-plate 2 Put, i.e. the head of rivet, be stained with adhesive tape 5, so both ensure that sealing, rivet has been covered again, it is ensured that attractive in appearance.
Fig. 2 is refer to, Fig. 2 is the structural representation of second specific embodiment provided by the present invention.
Second specific embodiment provided by the present invention, changes on the basis of the first specific embodiment Enter, specially in step S4) after also carry out step S401) and step S402).
Remaining step of the method for process pipeline Jing Men that the present embodiment is provided is identical with the first specific embodiment, Here is omitted.
In the present embodiment, in step S4) after also carry out step S401):In the first door-plate 1 and the inner surface of the second door-plate 2 Apply foamed glue 3.In order to coordinate it to use, in step S401) after also include step S402):In the first door-plate 1 and the second door-plate Implant 3 is filled between 2.So, the first door-plate 1 and the second door-plate 2 are firmly tight with implant 4 by the effect of foamed glue 3 Stick together, and due to the presence of implant 4, the first door-plate 1 and the rigidity and intensity of the second door-plate 2 is obtained to a certain extent Enhancing.
The present embodiment also provides a kind of conduit shaft door, the pipeline described in the conduit shaft door and the first specific embodiment Well door is identical, and here is omitted.

Claims (9)

1. a kind of process of process pipeline Jing Men, it is characterised in that including step:
S1) by (1) punching of the first door-plate and corner cut;
S2) by the vertical bending of four edges of first door-plate (1);
S3) by (2) punching of the second door-plate and corner cut;
S4) by the vertical bending of four edges of second door-plate (2);
S5) any three bending edges of first door-plate (1) and second door-plate (2) are riveted with rivet;
S6) the 4th bending edge of first door-plate (1) and second door-plate (2) is carried out with mould pressing lockhole and clapping Side.
2. process according to claim 1, it is characterised in that in step S4) after also include step S401):Foamed glue is applied in first door-plate (1) and second door-plate (2) inner surface.
3. process according to claim 2, it is characterised in that in step S401) after also include step S402):Implant (3) is filled between first door-plate (1) and second door-plate (2).
4. process according to claim 1, it is characterised in that in step S6) after also include step S7): Adhesive tape (4) is stained with rivet head.
5. a kind of conduit shaft door, is processed by the process as described in any one of claim 1-4, it is characterised in that Including the first door-plate (1) and the second door-plate (2), four are respectively provided with first door-plate (1) and second door-plate (2) and are hung down Straight bending edge, four vertical bending edges of first door-plate (1) are described vertical curved with four of second door-plate (2) Flanging is corresponded, and wherein any three pairs of corresponding described vertical bending edges are fixedly connected with rivet, and the 4th pair described vertical Lockhole is set on straight bending edge.
6. conduit shaft door according to claim 5, it is characterised in that first door-plate (1) and second door-plate (2) Inner surface scribble foamed glue.
7. conduit shaft door according to claim 6, it is characterised in that first door-plate (1) and second door-plate (2) Between be provided with implant (3).
8. conduit shaft door according to claim 5, it is characterised in that first door-plate (1) and the second door-plate (2) are coloured silk Colour table.
9. conduit shaft door according to claim 5, it is characterised in that the rivet head is provided with adhesive tape (4).
CN201410459358.0A 2014-09-10 2014-09-10 Pipe well door and technique for processing pipe well door Active CN104400320B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410459358.0A CN104400320B (en) 2014-09-10 2014-09-10 Pipe well door and technique for processing pipe well door

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410459358.0A CN104400320B (en) 2014-09-10 2014-09-10 Pipe well door and technique for processing pipe well door

Publications (2)

Publication Number Publication Date
CN104400320A CN104400320A (en) 2015-03-11
CN104400320B true CN104400320B (en) 2017-04-12

Family

ID=52638019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410459358.0A Active CN104400320B (en) 2014-09-10 2014-09-10 Pipe well door and technique for processing pipe well door

Country Status (1)

Country Link
CN (1) CN104400320B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7434365B2 (en) * 2003-09-03 2008-10-14 Gary Robert Geller Drawer or door front assembly
CN201420370Y (en) * 2009-06-01 2010-03-10 刘明远 Invisible conduit shaft door
CN102337831B (en) * 2011-09-30 2013-06-05 广州金迅建材有限责任公司 Production method of metal door
CN202673039U (en) * 2012-07-16 2013-01-16 上海森林特种钢门有限公司 Novel steel door leaf structure
CN203729552U (en) * 2013-11-27 2014-07-23 天津奥林门业有限公司 Reinforced piping shaft door

Also Published As

Publication number Publication date
CN104400320A (en) 2015-03-11

Similar Documents

Publication Publication Date Title
CN104032920B (en) A kind of paper honeycomb combined wall board and installation method thereof
CN105750829A (en) Sheet metal processing technology
CN107218448B (en) A kind of double thickness fashioned iron face rectangle composite air duct and its processing method
CN207974324U (en) Plane reserves process seam connection structure
CN104400320B (en) Pipe well door and technique for processing pipe well door
CN105946979B (en) A kind of car trunk locating mounting method and positioning tool
CN204060422U (en) Labeled door
CN206789874U (en) A kind of European-type box becomes pin-connected panel water-proof top cover
CN202850489U (en) Pre-buried line pipe locating connecting piece
CN103171957B (en) Shrouding and processing technology thereof under a kind of elevator cage door
CN205917923U (en) Latent combo boxes body, wall and door and window who puts of solder joint
CN207449118U (en) Multipurpose screen sticking film device
CN206487098U (en) Wood moulding corner wallboard
CN206571059U (en) A kind of color steel tile fixture
CN211397230U (en) Solderless door leaf structure
CN205172342U (en) Box -like metal door fan
CN104481372A (en) Fireproof door and processing method thereof
CN106004373B (en) A kind of car entirety punch forming safety door
CN202659076U (en) Rear cabin door for passenger vehicle
CN204266860U (en) The little fan of a kind of fire prevention composite door, labeled door
CN207959770U (en) Aluminium alloy integrated wall plate
CN205631901U (en) Decorative board of easily installing
CN106284774A (en) A kind of box body ultra-thin gold copper coin and processing method thereof
CN217871378U (en) Filled type color steel sandwich panel convenient to splice
CN201649972U (en) Silica gel corner former

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant