CN104390733B - 一种地应力大小和方向的确定方法 - Google Patents
一种地应力大小和方向的确定方法 Download PDFInfo
- Publication number
- CN104390733B CN104390733B CN201410751555.XA CN201410751555A CN104390733B CN 104390733 B CN104390733 B CN 104390733B CN 201410751555 A CN201410751555 A CN 201410751555A CN 104390733 B CN104390733 B CN 104390733B
- Authority
- CN
- China
- Prior art keywords
- stress
- sigma
- strain
- rock
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
本发明公开了一种地应力大小和方向的确定方法,在测量应力的环氧树脂空心包体上沿圆周方向设置三个应变花,相邻应变花的夹角为120°,每个应变花上有四个应变片,每个应变花上的应变片依次旋转45°设置;造孔;洗孔;应力计的安装:空心包体定向送入测量孔内,让粘结剂充满应力计与岩石钻孔的空隙;应力解除:待粘结剂固化后,用金刚石钻头套钻解除,测试过程按解除深度采用应变仪记录解除过程的数据;本发明利用圆周方向上12个不同方向应变值,能够准确有效的计算出地应力和应力方向,为指导矿井施工提供了非常有效的帮助,进一步提高了矿井安全性。
Description
技术领域
本发明涉及一种地应力测量计算方法,尤其涉及的是一种地应力大小和方向的确定方法。
背景技术
近二十年来,世界上许多国家地下工程均开展了地应力的测量及应用研究工作,它无论在构造地质、地震预报和地球动力学研究上,还是在矿山开采、地下工程和能源开发等生产实践中均起到了越来越重要的作用,日益受到国内外学术界和工程界的重视。
对矿山开采而言,地应力是引起采矿工程围岩变形、支护结构损伤破坏、发生矿井动力现象的根本作用力,在诸多影响采矿工程稳定性的因素中,地应力是最主要和最根本的因素之一,准确的地应力资料是确定工程岩体力学属性,进行围岩稳定性分析和计算、矿井动力现象区域预测,实现采矿决策和设计科学化的必要前提条件。以前的采矿工程设计和施工中较少考虑地应力的影响,但随着采矿规模的不断扩大和不断向深部发展,地应力的影响会越加严重,不考虑地应力对井下工程设计和施工的影响,往往造成地下巷道围岩大变形和采场的坍塌破坏、冲击地压等矿井动力现象的发生,严重影响了矿井安全生产。
为了对矿井进行合理的开采设计和施工,首先应对影响矿井开采稳定性的各种因素进行充分的调查和分析,只有详细了解了这些工程影响因素,并通过数值计算和分析,才能作出技术合理、施工安全和经济效益好的工程设计和施工。如对矿山设计而言,只有掌握了工程区域的地应力条件,才能合理确定矿山总体布置,选取适当的采矿方法,确定巷道和采场的最佳断面形状、巷道位置、支护形式、支护结构参数和支护时间等,确保煤矿的安全生产。
因此,在采深较大的矿井开发时,要根据工程所处的不同构造部位和工程地质条件,掌握矿井所处的地应力状态,才能采取合理有效的预防矿井动力现象的技术措施,合理地确定采场布局和回采顺序,这对于保证巷道的相对稳定和生产的安全都具有重要意义。
从国内对地应力研究的深度和广度来看,在地震预报预测,石油勘查开发、水利水电建设行业中,地应力研究不论在理论和应用研究已走在其他行业的前列,而在矿井开采中进行地应力研究起步较晚,是摆在国内采矿界面前的一个重大的理论课题和实际问题,是矿井开采研究中的一个新理论、新思维、新趋势,特别是随着工程力学和工程稳定性研究由定性分析逐步转入定量计算,地应力测量数据成为岩体力学计算必不可少的基础数据,是矿井采场布局设计和地下工程设计的依据。
发明内容
本发明的目的在于克服现有技术的不足,提供了一种地应力大小和方向的确定方法,简便有效的计算出地应力的方向和大小。
本发明是通过以下技术方案实现的,本发明包括应力采集和应力计算,所述应力采集包括以下步骤:
(a)在测量应力的环氧树脂空心包体上沿圆周方向设置三个应变花,相邻应变花的夹角为120°,每个应变花上有四个应变片,每个应变花上的应变片依次旋转45°设置;
(b)造孔:先用金刚石钻头开孔,钻进到预测孔深,再用钻头同心钻进测量孔,
(c)洗孔:测量孔钻进完毕,观察岩芯的完整情况,若岩芯较为完整,且无大的节理裂隙面,则用清水冲洗,清除测量孔中的岩粉;如果岩芯不符合测试要求,则用130mm套芯,重复上一步的工作;
(d)应力计的安装:空心包体定向送入测量孔内,让粘结剂充满应力计与岩石钻孔的空隙;
(e)应力解除:待粘结剂固化后,用金刚石钻头套钻解除,测试过程按解除深度采用应变仪记录解除过程的数据;
所述应力大小的计算方法如下:
式中:εij——第i个应变花第j个应变片测得的解除应变值,i=1~3,j=1~4,
θi——第i个应变花对应的极角,
——第i个应变花第j个应变片对应的角度,
Ki——应变片的修正系数;
其中:
D=(1+x2n)[x1+n+(1-n)(3m2-6m4+4m6)]
+(x1-x2n)m2[(1-n)m6+x1+n]
x1=3-4v1
x2=3-4v2
R1为空心包体内半径;R2为测量孔的半径;G1、G2分别为包体材料环氧树脂和岩石的剪切模量;v1、v2分别为空心包体材料和岩石的泊松比;ρ为应变片在空心包体中的径向距离。
所述应力值方程为12个观测值方程,解六个应力分量的未知量,利用最小二乘法原理,得到求解应力分量最佳值的正规方程组:
由此解得由钻孔坐标系表达的岩体六个应力分量后,把它们转换到大地坐标系中去,再根据下式求解它的三个主应力:
式中:
式中J1、J2和J3为应力张量的第一、第二和第三不变量;
主应力方向由下式:
(σx-σi)li+τxymi+τzxni=0
τxyli+(σy-σi)mi+τvzni=0
τzxli+τyzmi+(σz-σi)ni=0
其中任二式和方向余弦关系式:
联立解得,
主应力的倾角αi和方位角βi为:
αi=sin-1ni
式中:β0为大地坐标系X轴的方位角,如X轴为正北方向,则β0=0。
本发明相比现有技术具有以下优点:本发明利用圆周方向上12个不同方向应变值,能够准确有效的计算出地应力和应力方向,为指导矿井施工提供了非常有效的帮助,进一步提高了矿井安全性。
附图说明
图1是本发明应力计的结构示意图;
图2是环氧树脂筒上应变从的示意图;
图3是图2的截面图;
图4是单个应变花上应变片的分布示意图。
具体实施方式
下面对本发明的实施例作详细说明,本实施例在以本发明技术方案为前提下进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。
如图1所示,本实施例包括设置于岩石钻孔12外的安装杆1、定向器3和定向销5,设置于岩石钻孔12内的环氧树脂筒7、固定销9、活塞杆11、出胶孔13和导向头15;所述定向器3设置在安装杆1上用以旋转安装杆1定向,定向器3上连接定向器导线2,安装杆1的顶部和环氧树脂筒7连接,安装杆1的顶部开设连接孔,定向销5通过连接孔连接安装杆和环氧树脂筒7,环氧树脂筒7的外壁上设有应变从16,应变从16连接读数电缆4,环氧树脂筒7的内部设有空腔8,空腔8内装填粘胶剂,活塞杆11的首端套设在环氧树脂筒7的空腔8内,活塞杆11为空心结构,所述空心结构连通空腔8,环氧树脂筒7上开设通孔,所述固定销9穿过所述通孔定位所述活塞杆11,出胶孔13设置在活塞杆11的末端且与出胶孔13连通,导向头15固定在活塞杆11上。
环氧树脂筒7的端部设有第一密封圈6,导向头15上设有第二密封圈14,第一密封圈6和第二密封圈14将岩石钻孔12与环氧树脂筒7、活塞杆11之间的空隙10形成封闭空间。
如图2、图3和图4所示,应变从16上包覆环氧树脂外层,应变从16包裹在环氧树脂筒7外部。应变从16包括三个应变花,所述应变花沿环氧树脂筒7圆周方向分布,相邻应变花的夹角为120°。每个应变花上有四个应变片,每个应变花上的应变片依次旋转45°设置。
该应力计的使用方法如下:
(a)造孔:先用130mm金刚石钻头开孔,钻进到预测孔深,再用36mm钻头同心钻进测量孔,长度约33cm。
(b)洗孔:测量孔钻进完毕,观察岩芯的完整情况。若岩芯较为完整,且无大的节理裂隙面,则用清水冲洗,清除测量孔中的岩粉;如果岩芯不符合测试要求,则用130mm套芯,重复上一步的工作。
(c)应力计的安装:把应力计的环氧树脂筒7内腔装满粘结剂,并用固定销9固定活塞杆11,再用安装杆1定向送入测孔内,推动安装杆1,切断固定销9,粘结剂从出胶孔13排出,充满应力计与岩石钻孔12的空隙。
(d)应力解除:待粘结剂固化后,用130mm金刚石钻头套钻解除,测试过程按解除深度采用便携式防爆电阻应变仪进行解除过程的数据记录。
应力大小的计算方法如下:
式中:εij——第i个应变花第j个应变片测得的解除应变值,i=1~3,j=1~4,
θi——第i个应变花对应的极角,
——第i个应变花第j个应变片对应的角度,
Ki——应变片的修正系数;
其中:
D=(1+x2n)[x1+n+(1-n)(3m2-6m4+4m6)]
+(x1-x2n)m2[(1-n)m6+x1+n]
x1=3-4vi
x2=3-4v2
R1为空心包体内半径;R2为测量孔的半径;G1、G2分别为包体材料环氧树脂和岩石的剪切模量;v1、v2分别为空心包体材料和岩石的泊松比;ρ为应变片在空心包体中的径向距离。
所述应力值方程为12个观测值方程,解六个应力分量的未知量,利用最小二乘法原理,得到求解应力分量最佳值的正规方程组:
由此解得由钻孔坐标系表达的岩体六个应力分量后,把它们转换到大地坐标系中去,再根据下式求解它的三个主应力:
式中:
式中J1、J2和J3为应力张量的第一、第二和第三不变量;
主应力方向由下式:
(σx-σi)li+τxymi+τzxni=0
τxyli+(σy-σi)mi+τyzni=0
τzxli+τyzmi+(σz-σi)ni=0
其中任二式和方向余弦关系式:
联立解得,
主应力的倾角αi和方位角βi为:
αi=sin-1ni
式中:β0为大地坐标系X轴的方位角,如X轴为正北方向,则β0=0。
Claims (1)
1.一种地应力大小和方向的确定方法,其特征在于,包括应力采集和应力计算,所述应力采集包括以下步骤:
(a)应变从包裹在环氧树脂筒外部,在测量应力的环氧树脂空心包体上沿圆周方向设置三个应变花,相邻应变花的夹角为120°,每个应变花上有四个应变片,每个应变花上的应变片依次旋转45°设置;
(b)造孔:先用金刚石钻头开孔,钻进到预测孔深,再用钻头同心钻进测量孔,
(c)洗孔:测量孔钻进完毕,观察岩芯的完整情况,若岩芯较为完整,且无大的节理裂隙面,则用清水冲洗,清除测量孔中的岩粉;如果岩芯不符合测试要求,则用130mm套芯,重复上一步的工作;
(d)应力计的安装:空心包体定向送入测量孔内,让粘结剂充满应力计与岩石钻孔的空隙;
(e)应力解除:待粘结剂固化后,用金刚石钻头套钻解除,测试过程按解除深度采用应变仪记录解除过程的数据;
所述应力大小的计算方法如下:
式中:εij——第i个应变花第j个应变片测得的解除应变值,i=1~3,j=1~4,
θi——第i个应变花对应的极角,
——第i个应变花第j个应变片对应的角度,
Ki——应变片的修正系数;
其中:
D=(1+x2n)[x1+n+(1-n)(3m2-6m4+4m6)]
+(x1-x2n)m2[(1-n)m6+x1+n]
x1=3-4v1
x2=3-4v2
R1为空心包体内半径;R2为测量孔的半径;G1、G2分别为包体材料环氧树脂和岩石的剪切模量;v1、v2分别为空心包体材料和岩石的泊松比;ρ为应变片在空心包体中的径向距离;
所述应力值方程为12个观测值方程,解六个应力分量的未知量,利用最小二乘法原理,得到求解应力分量最佳值的正规方程组:
由此解得由钻孔坐标系表达的岩体六个应力分量后,把它们转换到大地坐标系中去,再根据下式求解它的三个主应力:
式中:
式中J1、J2和J3为应力张量的第一、第二和第三不变量;
主应力方向由下式:
(σx-σi)li+τxymi+τzxni=0
τxyli+(σy-σi)mi+τyzni=0
τzxli+τyzmi+(σz-σi)ni=0
其中任二式和方向余弦关系式:
联立解得,
主应力的倾角αi和方位角βi为:
αi=sin-1ni
式中:β0为大地坐标系X轴的方位角,如X轴为正北方向,则β0=0。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410751555.XA CN104390733B (zh) | 2014-12-02 | 2014-12-02 | 一种地应力大小和方向的确定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410751555.XA CN104390733B (zh) | 2014-12-02 | 2014-12-02 | 一种地应力大小和方向的确定方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104390733A CN104390733A (zh) | 2015-03-04 |
CN104390733B true CN104390733B (zh) | 2017-01-11 |
Family
ID=52608666
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410751555.XA Active CN104390733B (zh) | 2014-12-02 | 2014-12-02 | 一种地应力大小和方向的确定方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104390733B (zh) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104748664B (zh) * | 2015-03-13 | 2017-10-24 | 南华大学 | 一种岩土体内部位移量测量系统 |
CN106289586A (zh) * | 2015-05-19 | 2017-01-04 | 魏宇坤 | 一种石油钻采工程用现场地应力的测试装置 |
CN105043610B (zh) * | 2015-06-04 | 2024-01-26 | 中国科学院武汉岩土力学研究所 | 一种测量地应力的高灵敏度钻孔变形计及其检测方法 |
CN105547539B (zh) * | 2016-03-01 | 2018-01-30 | 中国地震局地壳应力研究所 | 基于经纬应变线的地应力方向测量系统及方法 |
CN105888658A (zh) * | 2016-04-22 | 2016-08-24 | 西安科技大学 | 一种原始地应力试验孔的布置施工方法 |
CN105841855A (zh) * | 2016-05-06 | 2016-08-10 | 中国矿业大学(北京) | 一种新型地应力测试装置 |
CN106814407B (zh) * | 2017-01-05 | 2018-08-24 | 中国科学院武汉岩土力学研究所 | 基于单一钻孔变形测量确定岩体三维地应力的方法 |
CN107607232B (zh) * | 2017-09-07 | 2018-09-14 | 张重远 | 一种地壳岩体平面应力的连续测量方法及系统 |
CN108593174B (zh) * | 2018-05-08 | 2024-01-02 | 安徽理工大学 | 一种煤岩体采动应力监测包体 |
CN109253833B (zh) * | 2018-10-10 | 2019-11-01 | 中国科学院武汉岩土力学研究所 | 一种开采扰动下三维扰动应力动态演化测量装置及方法 |
CN109341922B (zh) * | 2018-11-07 | 2024-04-09 | 湖南科技大学 | 地应力测试用空芯包体小孔安装对中调整装置和使用方法 |
CN110108736B (zh) * | 2019-05-14 | 2021-12-14 | 中国石油化工股份有限公司 | 利用泥页岩方解石脉体研究古地应力状态的方法 |
CN111948029B (zh) * | 2020-09-18 | 2021-08-03 | 中南大学 | 岩体地应力测量方法及抗拉强度均匀性测定方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101922985A (zh) * | 2010-08-04 | 2010-12-22 | 中国水电顾问集团华东勘测设计研究院 | 一种tbm掘进时围岩应力变化测量方法 |
CN103195442A (zh) * | 2013-04-01 | 2013-07-10 | 平顶山天安煤业股份有限公司 | 一种煤矿巷道均布注浆结构及其施工工艺 |
CN103293560A (zh) * | 2013-05-17 | 2013-09-11 | 上海大屯能源股份有限公司 | 一种采动三向应力场的测试方法 |
CN203376087U (zh) * | 2013-07-12 | 2014-01-01 | 解波 | 空心包体应力计 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007064864A (ja) * | 2005-09-01 | 2007-03-15 | Toyo Seiki Seisakusho:Kk | 歪み計測方法、歪み計測装置 |
-
2014
- 2014-12-02 CN CN201410751555.XA patent/CN104390733B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101922985A (zh) * | 2010-08-04 | 2010-12-22 | 中国水电顾问集团华东勘测设计研究院 | 一种tbm掘进时围岩应力变化测量方法 |
CN103195442A (zh) * | 2013-04-01 | 2013-07-10 | 平顶山天安煤业股份有限公司 | 一种煤矿巷道均布注浆结构及其施工工艺 |
CN103293560A (zh) * | 2013-05-17 | 2013-09-11 | 上海大屯能源股份有限公司 | 一种采动三向应力场的测试方法 |
CN203376087U (zh) * | 2013-07-12 | 2014-01-01 | 解波 | 空心包体应力计 |
Also Published As
Publication number | Publication date |
---|---|
CN104390733A (zh) | 2015-03-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104390733B (zh) | 一种地应力大小和方向的确定方法 | |
US11326449B2 (en) | Method for determining three-dimensional in-situ stress based on displacement measurement of borehole wall | |
CN101892830B (zh) | 一种深部地应力随钻测试系统 | |
Emsley et al. | ZEDEX-A study of damage and disturbance from tunnel excavation by blasting and tunnel boring | |
CN103293560B (zh) | 一种采动三向应力场的测试方法 | |
CN101922985B (zh) | 一种tbm掘进时围岩应力变化测量方法 | |
Zhang et al. | Borehole stress monitoring analysis on advanced abutment pressure induced by longwall mining | |
CN108918012B (zh) | 一种用于地铁盾构隧道围岩扰动应力监测方法 | |
CN103513016B (zh) | 采用传感柱的软岩多测点地应力测试方法 | |
CN104181611A (zh) | 一种矿井工作面顶底板采动破坏裂隙发育动态监测方法 | |
CN102221332A (zh) | 松散地层的光纤光栅多点传感装置及监测系统与监测方法 | |
Kang et al. | Safe mining technology of undersea metal mine | |
CN103591922B (zh) | 近距离煤层开采上位煤层底板破坏深度氡气探测方法 | |
CN103063335A (zh) | 基于载荷监测数据的深部地应力三维地质勘察测试方法 | |
CN110374636A (zh) | 一种隧道岩爆安全防护的施工方法 | |
CN106996841A (zh) | 具有自洽功能的钻孔式光纤三维地应力观测装置 | |
Obara et al. | Updating the use of the CCBO cell in Japan: overcoring case studies | |
CN101482621A (zh) | 一种滑坡体滑动姿态加速度监测方法 | |
CN103616111A (zh) | 小孔厚壁套芯应力解除法 | |
CN210321706U (zh) | 一种顶管隧道施工模型试验监测采集系统 | |
CN105952445A (zh) | 一种基于数理模型的高地应力条件下的钻孔试验方法 | |
AU2021101678A4 (en) | Method for testing soft rock ground stress in exploration engineering | |
CN104897321B (zh) | 一种预制开口混凝土管桩桩身内壁剪应力测试方法 | |
CN109946008A (zh) | 一种球形包体真三维原岩应力解除法测量装置及测量方法 | |
CN203037286U (zh) | 高地应力区地下厂房围岩变形破裂演化测试结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Jie Bo Inventor after: Zhang Hongzhong Inventor after: Qian Xuesen Inventor after: Wang Jian Inventor after: Zong Zhaobing Inventor after: Xu Wuyi Inventor after: Li Jun Inventor before: Jie Bo Inventor before: Zhang Hongzhong |
|
COR | Change of bibliographic data | ||
GR01 | Patent grant | ||
GR01 | Patent grant |