CN104384821B - Mounting and elevating method for deep-well pump of liquefied natural gas storage tank - Google Patents

Mounting and elevating method for deep-well pump of liquefied natural gas storage tank Download PDF

Info

Publication number
CN104384821B
CN104384821B CN201410584598.3A CN201410584598A CN104384821B CN 104384821 B CN104384821 B CN 104384821B CN 201410584598 A CN201410584598 A CN 201410584598A CN 104384821 B CN104384821 B CN 104384821B
Authority
CN
China
Prior art keywords
steel wire
wire rope
well pump
deep well
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410584598.3A
Other languages
Chinese (zh)
Other versions
CN104384821A (en
Inventor
张国中
闫景鹏
叶忠志
韩冬
苏健
孙瑜
张宝和
韩小康
薛峰
齐海宁
曾文阳
蔡文刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201410584598.3A priority Critical patent/CN104384821B/en
Publication of CN104384821A publication Critical patent/CN104384821A/en
Application granted granted Critical
Publication of CN104384821B publication Critical patent/CN104384821B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/04Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for assembling or disassembling parts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a mounting and elevating method for a deep-well pump of a liquefied natural gas storage tank. The mounting and elevating method comprises the following specific steps of firstly, in the mounting process of the deep-well pump, firstly, taking one section of steel wire rope with connectors at two ends, connecting one end of the steel wire rope with a low-pressure pump, and connecting the other end of the steel wire rope with a lifting hook of lifting equipment; secondly, downward placing the lifting hook of the lifting equipment to the upper edge of the pump well, then using a brace rod to insert into a supporting hole which is connected with the steel wire rope and is used for lifting a supporting plate, so that the whole deep-well pump is supported; at the same time, detaching the lifting hook, lengthening a steel wire rope with one connector; performing mounting and downward placing work of next section of deep-well pump by using the lengthened steel wire rope, and finishing the mounting work of the whole deep-well pump according to the cycle, wherein the elevating process of the deep-well pump is opposite to the mounting process of the deep-well pump. According to the mounting and elevating method disclosed by the invention, the process can be finished only by using one steel wire rope, so that detaching, mounting and winding work of the steel wire rope in the mounting and elevating process of the deep-well pump for multiple times can be avoided; in addition, the detaching, mounting and winding time of the steel wire rope is greatly shortened.

Description

Method for improving installed by liquefied natural gas storage tank deep well pump
Technical field
The present invention relates to the method that lifting installed by liquefied natural gas storage tank, more particularly, to a kind of liquefied natural gas storage tank deep-well Method for improving installed by pump.Belong to oil, chemical field.
Background technology
In petroleum chemical industry, many is stored in the liquid petroleum chemicals in large-scale storage tank, needs by deep well pump, by liquid State petroleum chemicals pump out from storage tank.Because deep well pump is often arranged on from the pump sump that tank top leads to liquid internal, because This, during deep well pump is installed and used, usually can be related to installation decentralization and the lifting work of deep well pump.
As shown in figure 4, at present, when installing decentralization or lifting deep well pump 1, because pump sump 2 is relatively deep, the lifting of hanging device is high Degree is limited, it is impossible to once transferring deep well pump 1, hanging out pump sump 2 in installation, lifting process, in practical operation, all uses Two steel wire ropes, wherein, one is used for transferring and rising lifting first steel wire rope 6 of castering action, one be used for supporting cable with Temporary support deep well pump the second steel wire rope 7.In concrete operations, need for one end of the first steel wire rope to connect water pump, the other end It is wound on lifting appliance steel wire rope roller, this is accomplished by advance by carrying on lifting appliance roller after steel wire rope unloads, then Carry out installation, the lifting of deep well pump.After the first steel wire rope reaches the position requiring, using strut temporary support second steel wire rope 7, the first steel wire rope 6 is discharged from lifting appliance roller, then the steel wire rope that lifting appliance is carried is installed on roller, now, Because of remaining lifting work, in the range of the lifting of the lifting appliance of equipment, then steel wire rope is carried using lifting appliance complete to hang Fill work, and complete the winding of the first steel wire rope 6 and lay work.In operating process, due to be repeatedly related to steel wire rope dismounting and Winding work is installed, leads to operating process more complicated.
Content of the invention
Present invention is primarily targeted at overcoming the disadvantages mentioned above that prior art exists, and provide a kind of liquefied natural gas storage Method for improving installed by tank deep well pump, and it, only just can be completed using steel cable in deep well pump in installation, lifting process, Deep well pump can not only be avoided installing, in lifting process, the multiple dismounting of steel wire rope and install winding work, and, significantly Save steel wire rope dismounting and winding time, material-saving expense are installed.
The purpose of the present invention is realized by technical scheme below:
A kind of liquefied natural gas storage tank deep well pump method for improving is installed it is characterised in that: installed using segmentation, the behaviour of lifting Make method, specifically comprise the following steps that
The first step: in the installation process of deep well pump, first take one section of two that the steel wire rope of one jointing is installed, and will One end of this steel wire rope is connected with low-lift pump, and the other end is connected with the suspension hook of lifting appliance;
Second step: the suspension hook of lifting appliance is transferred near pump sump top edge, then, using strut insertion and steel wire rope Two supported holes of connected lifting support plate, in order to support whole deep well pump, now, pull down suspension hook, then spreading one is provided with The steel wire rope of one jointing, using the installation decentralization work of the deep well pump of next section of carrying out of the steel wire rope of spreading, so follows Ring, just completes the installment work of whole deep well pump;The lifting operation process of deep well pump and deep well pump installment work, process is contrary.
A kind of steel wire rope for realizing said method it is characterised in that: steel wire rope is to be connect with a connection by several sections of two The head steel wire rope that linked together by jointing is in series.
Described jointing is connected with steel wire rope for one end, the fork configuration that the other end is connected with support plate.
Described support plate is oblong, support plate is relatively set with two holes for hoist and is located at one strut in middle part Hole.
Beneficial effects of the present invention:, due to adopting technique scheme, it is in deep well pump in installation, lifting process for the present invention In, only just can be completed using steel cable, deep well pump can not only be avoided installing, in lifting process, steel wire rope many Secondary dismounting and installation winding work, and, greatly save steel wire rope dismounting and winding time, material-saving expense are installed.
Brief description
Fig. 1 is present configuration schematic diagram.
Fig. 2 connects schematic front view for steel wire rope of the present invention.
Fig. 2 a connects schematic side view for steel wire rope of the present invention.
Fig. 3 is support plate schematic diagram of the present invention.
Fig. 4 is prior art installation method operating diagram.
In figure Major Symbol illustrates:
1. deep well pump, 2. pump sump, 3. steel wire rope, 4. cable guide pad, 5. cable, 6. the first steel wire rope, 7. the second steel wire Rope.
Specific embodiment
As shown in Fig. 1 Fig. 3, the present invention is provided with: one installs, Wire Rope Used in Lifting 3, and this steel wire rope 3 is by several sections of two The steel wire rope being linked together with a jointing and by jointing is in series.
Above-mentioned jointing is connected, with steel wire rope 3, the fork configuration that the other end is connected with support plate for one end.
Above-mentioned support plate is oblong, support plate is relatively set with two holes for hoist and is located at one strut in middle part Hole.
As shown in figure 1, the present invention adopts the method that segmentation is installed, lifted, concrete operation step is as follows:
The first step: in installation process, taking install deep well pump as a example: first take one section of two to be provided with the steel wire of jointing Rope, and one end of this steel wire rope is connected with low-lift pump, and the other end is connected with the suspension hook of lifting appliance, now, cable 5 and deep-well Pump 1 connects;In steel wire rope 3 decentralization process, by cable guide pad 4, complete the cable organizing work of cable 5 and steel wire rope 3.
Second step: the suspension hook of lifting appliance is transferred near pump sump top edge, then, is supported using strut insertion lifting The supported hole of disk, in order to support whole deep well pump 1, now, pulls down suspension hook, then spreading one is provided with the steel wire rope 3 of jointing, Using the installation decentralization work of the deep well pump 1 of next section of carrying out of the steel wire rope 3 of spreading, so circulate, just complete whole deep-well The installment work of pump 1.
The lifting operation process of deep well pump 1 and deep well pump installment work, process is contrary, and operational approach is identical.Therefore it is no longer superfluous State.
The above, be only presently preferred embodiments of the present invention, and not the present invention is made with any pro forma restriction, all It is any simple modification, equivalent variations and modification above example made according to the technical spirit of the present invention, all still fall within In the range of technical solution of the present invention.

Claims (4)

1. a kind of liquefied natural gas storage tank deep well pump method for improving is installed it is characterised in that: installed using segmentation, the operation of lifting Method, specifically comprises the following steps that
The first step: in the installation process of deep well pump, first take one section of two that the steel wire rope of one jointing is installed, and by this steel One end of cord is connected with low-lift pump, and the other end is connected with the suspension hook of lifting appliance;
Second step: the suspension hook of lifting appliance is transferred near pump sump top edge, then, is connected with steel wire rope using strut insertion Lifting support plate two supported holes, in order to support whole deep well pump, now, pull down suspension hook, then spreading one be provided with one even The steel wire rope of joint, using the installation decentralization work of the deep well pump of next section of carrying out of the steel wire rope of spreading, so circulates, just Complete the installment work of whole deep well pump;The lifting operation process of deep well pump and deep well pump installment work, process is contrary.
2. liquefied natural gas storage tank deep well pump according to claim 1 method for improving is installed it is characterised in that: described steel wire Rope is that the steel wire rope being carried a jointing and linked together by jointing by several sections of two is in series.
3. liquefied natural gas storage tank deep well pump according to claim 2 method for improving is installed it is characterised in that: described connection Joint is connected with steel wire rope for one end, the fork configuration that the other end is connected with support plate.
4. liquefied natural gas storage tank deep well pump according to claim 3 method for improving is installed it is characterised in that: described support Disk is oblong, support plate is relatively set with two holes for hoist and is located at the one strut hole in middle part.
CN201410584598.3A 2014-10-27 2014-10-27 Mounting and elevating method for deep-well pump of liquefied natural gas storage tank Active CN104384821B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410584598.3A CN104384821B (en) 2014-10-27 2014-10-27 Mounting and elevating method for deep-well pump of liquefied natural gas storage tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410584598.3A CN104384821B (en) 2014-10-27 2014-10-27 Mounting and elevating method for deep-well pump of liquefied natural gas storage tank

Publications (2)

Publication Number Publication Date
CN104384821A CN104384821A (en) 2015-03-04
CN104384821B true CN104384821B (en) 2017-02-01

Family

ID=52602828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410584598.3A Active CN104384821B (en) 2014-10-27 2014-10-27 Mounting and elevating method for deep-well pump of liquefied natural gas storage tank

Country Status (1)

Country Link
CN (1) CN104384821B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104986285B (en) * 2015-07-13 2017-03-29 中船黄埔文冲船舶有限公司 A kind of installation method of the outer defeated deep well pump of the built-in oil receiving equipment oil spilling of ship
IT201600082789A1 (en) * 2016-08-05 2018-02-05 Tesmec Spa AUTOMATIC RAILWAY POSITIONING SYSTEM
CN109052251B (en) * 2018-07-24 2020-06-26 武汉船用机械有限责任公司 Lifting device for movable low-temperature immersed pump

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3738433A (en) * 1971-04-05 1973-06-12 Leary P O Hydraulically-motivated, rope-operated feed device for rock drills and the like
JP3453209B2 (en) * 1995-01-10 2003-10-06 三菱重工業株式会社 Middle boring excavator
CN102602798A (en) * 2012-03-16 2012-07-25 王鹏 Split combined rope sling
CN202967861U (en) * 2012-10-19 2013-06-05 张继网 Quickly assembled steel wire rope rigging
CN103407871B (en) * 2013-08-05 2015-11-11 中国长江三峡集团公司 Combination articulating formula drop shot rope

Also Published As

Publication number Publication date
CN104384821A (en) 2015-03-04

Similar Documents

Publication Publication Date Title
CN104384821B (en) Mounting and elevating method for deep-well pump of liquefied natural gas storage tank
CN103979403B (en) Cable terminations head is used to promote the method for jig lifting cable
US10113380B2 (en) Pumping system deployment using cable
CN203806962U (en) Cable terminal head lifting fixture
CN203392738U (en) Wire coil hoisting equipment
CN203895865U (en) Cable laying device
CN107381397B (en) Quick safe hoist device of cable in wind generating set tower section of thick bamboo
CN202326196U (en) Oil pumping barrel with ultra-long stroke
JP6554610B2 (en) Assembly method for a DC converter valve
CN204416900U (en) A kind of transformer bushing lifting device
CN104261283B (en) A kind of construction method of antenna hanging apparatus of wireless base station
CN206016750U (en) Packing box pulling apparatus and wellhead assembly
CN104594319A (en) Integral lifting and installing method for deeper water ocean platform pump protection pipe
CN203201483U (en) Drill floor mechanism in petroleum drilling and repairing equipment
CN203998623U (en) With the tubing suspender of self-locking structure
CN204827316U (en) A device for salvaging oil well junk
CN206298265U (en) A kind of automatic decoupling device for being applied to well casing
CN205714030U (en) A kind of increase sleeve for polished rod eye
CN203361662U (en) Large net rack short-distance lifting device
CN203568680U (en) Lifting device for electrolytic copper plates
CN111305791B (en) Pressure balance guide and method for lowering heating steel cable by using same
CN206490358U (en) Production tree upper flange cable penetration special hanger
CN202531115U (en) Waterpower pump for oil well
CN205275008U (en) Bell and spigot autospasy hook block utensil
CN205638324U (en) Annotate general wellhead assembly of vapour oil recovery

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: Offshore Oil Engineering Co., Ltd.

Patentee after: China Offshore Oil Group Co., Ltd.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: Offshore Oil Engineering Co., Ltd.

Patentee before: China National Offshore Oil Corporation