CN104377828B - The complete adjustment method of breaker protection function - Google Patents
The complete adjustment method of breaker protection function Download PDFInfo
- Publication number
- CN104377828B CN104377828B CN201410675335.3A CN201410675335A CN104377828B CN 104377828 B CN104377828 B CN 104377828B CN 201410675335 A CN201410675335 A CN 201410675335A CN 104377828 B CN104377828 B CN 104377828B
- Authority
- CN
- China
- Prior art keywords
- information
- chopper
- protection
- reflected
- order
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000012544 monitoring process Methods 0.000 claims abstract description 15
- 230000005540 biological transmission Effects 0.000 claims abstract description 14
- 230000001052 transient effect Effects 0.000 claims abstract description 13
- 238000012360 testing method Methods 0.000 claims abstract description 5
- 238000012423 maintenance Methods 0.000 claims description 18
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 239000002131 composite material Substances 0.000 claims description 3
- 238000003786 synthesis reaction Methods 0.000 claims description 3
- 238000007689 inspection Methods 0.000 claims 1
- 230000002159 abnormal effect Effects 0.000 abstract description 4
- 101100000858 Caenorhabditis elegans act-3 gene Proteins 0.000 description 1
- HEFNNWSXXWATRW-UHFFFAOYSA-N Ibuprofen Chemical compound CC(C)CC1=CC=C(C(C)C(O)=O)C=C1 HEFNNWSXXWATRW-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The complete adjustment method of breaker protection function; the steps include: that running into transient fault tripping using chopper is started the whole process of coincidence function as reference by protection device again; formulate the observing and controlling information reflected and protection act information sequentially; this order is normal sequence: run into the environment of above-mentioned transient fault with electric current voltage test platform mimic-disconnecting switch; the information that chopper is reflected is sent by measure and control device and protection device; it is transferred to monitor computer by network in station, and by order before and after the monitoring information that reflected of computer recording;If before and after the information reflected by monitoring computer recording, order is consistent with normal sequence, it is believed that chopper possesses power transmission condition, can carry out power transmission;When difference, before and after the information that will reflect, order is compared with normal sequence, it is judged that in standing, which device is abnormal.The present invention monitors comprehensively, can position fault quickly and accurately, bring great convenience to dispatcher.
Description
Technical field
The present invention relates to a kind of complete adjustment method of breaker protection function.
Background technology
For in transformer station, chopper is primary equipment, and it is arranged between Generation Side and electricity consumption side, is for control line
The visual plant of road transmission or not, is generally located on open air;Secondary device refers to relevant parameter when being energized by monitoring breaker
(electric current and voltage), reaches to pass by online and flows or the equipment of automatic tripping chopper when short circuit, mainly include measure and control device
And protection device, the master control being generally located on transformer station is indoor.
The information (observing and controlling information and protection act information) reflected when chopper is because of fault trip is electric power system dispatching personnel
Carrying out the important evidence of accident analysis, observing and controlling information spinner to include switching separating brake information, switch combined floodgate information and control loop template
Information, protection act information spinner overcurrent tripping to be included information, short circuit tripping operation information and reclosing information;Inaccurate or incorrect
Circuit breaker failure information dispatcher can be caused to judge by accident, send false command, cause larger range of power outage.
In transformer station, protection act information is sent message, then the monitoring being transferred in transformer station by network by protection device
Computer;Switch point, closing a floodgate and the information such as control loop template sends message by measure and control device, the interior network that is transferred to stand is sent out again
Deliver to the monitoring computer in transformer station.
Conventional adjustment method: individually carry out the separating brake of chopper, combined floodgate, protection act, reclosing, control loop template
Debugging etc. function.
This kind of adjustment method can not judge the sequence of movement of various information during circuit breaker trip.Particularly in transformer station
Under GPS correction device abnormal conditions, during the Time Inconsistency of measure and control device in transformer station and protection device, chopper can be caused
The various information sequence error of course of action, causes dispatcher to judge by accident when accident analysis, and this situation is a plurality of in transformer station
The impact that dispatcher carries out when tripping in the line-breaker short time accident analysis simultaneously is the most serious.
Summary of the invention
The present invention is to solve the problems referred to above that prior art exists, it is provided that a kind of complete adjustment method of breaker protection function.
The technical solution of the present invention is:
The complete adjustment method of breaker protection function, it is characterized in that:
1, by protection act information and switch separating brake information through logical "and" door, composite signal is entitled, and " this chopper is responsible for line
Road has an accident ";
2, set the switch separating brake information of chopper, switch combined floodgate information and control loop template information to be sent by measure and control device;Set
Overcurrent tripping information, short circuit tripping operation information and reclosing action message are sent by protection device;
3, by chopper by open position to closing position or by the transient state in the middle of closing position to open position, the most neither dividing
Gate position is not defined as control loop template state in the state of closing position, when chopper is in this state, and measure and control device
Send " control loop template " information;
4, using chopper run into transient fault tripping again by protection device start coincidence function whole process as reference, sequentially
Formulating the observing and controlling information that reflected and protection act information, this order is normal sequence: this chopper be responsible for circuit have an accident,
Protection act, switch separating brake, control loop template, reclosing action, switch close a floodgate;
5, run into the environment of above-mentioned transient fault with electric current voltage analog testing stand mimic-disconnecting switch, measure and control device and protection device send
The information that chopper is reflected, is transferred to monitor computer, and the information reflected by monitoring computer recording by network in station
Before and after order;
If before and after 6 information reflected by monitoring computer recording, order is consistent with normal sequence, it is believed that chopper possesses power transmission bar
Part, can carry out power transmission;When difference, before and after the information that will reflect, order is compared with normal sequence;
If 7 lack " this chopper is responsible for circuit and is had an accident " information, then check the synthesis condition of supervisory control of substation computer;
If 8 lack " protection act " information, then checked that the corresponding function of protection device is the most just in transformer station by field maintenance person
Often;
If 9 lack " switch separating brake " information, then checked that the corresponding function of measure and control device is the most just in transformer station by field maintenance person
Often, check that whether chopper is in relevant position;
If 10 lack " control loop template " information, then checked that transformer station's inner breaker is the most normal and becomes by field maintenance person
In power station, the corresponding function of measure and control device is the most normal;
If 11 lack " reclosing action " information, then checked that the corresponding function of protection device is in transformer station by field maintenance person
No normally;
If 12 lacking " switch closes a floodgate " information, then checked in transformer station the corresponding function of measure and control device whether by field maintenance person
Normally, check that whether chopper is in relevant position;
If the information order reflected during 13 breaker actuation is inconsistent with normal sequence, then checked by field maintenance person
The time of measure and control device and protection device whether strict conformance in transformer station, when checking the school in transformer station, equipment is the most working properly;
If during 14 is whole, information is without lacking and identical with normal sequence, then explanation circuit-breaker status is normal, meets power transmission bar
Part.
The invention has the beneficial effects as follows: present invention basically comprises the full detail that chopper is likely to occur under accident, monitoring is complete
Face, can carry out rapidly fault location, and accurate positioning, available existing current/voltage simulator stand, it is not necessary to additionally set
Standby investment, brings great convenience to dispatcher, enables dispatcher accurately grasp circuit abnormal information in the state of accident,
And the most correctly process, reduce the loss of supply.
Accompanying drawing explanation
Fig. 1 is the system diagram of the present invention.
Detailed description of the invention
This complete adjustment method of breaker protection function, it has main steps that:
1, using chopper run into transient fault tripping again by protection device start coincidence function whole process as reference, sequentially
Formulating the observing and controlling information and protection act information reflected, this order is normal sequence (being shown in Table 1): this chopper is responsible for circuit
Have an accident, protection act, switch separating brake, control loop template, reclosing action, switch close a floodgate;
2, run into the environment of above-mentioned transient fault with electric current voltage test platform mimic-disconnecting switch, measure and control device and protection device send open circuit
The information that device is reflected, before being transferred to monitor computer, and the information reflected by monitoring computer recording by network in station
Rear order;
If before and after 3 information reflected by monitoring computer recording, order is consistent with normal sequence, it is believed that chopper possesses power transmission bar
Part, can carry out power transmission;When difference, before and after the information that will reflect, order is compared with normal sequence, it is judged that stand
Which device interior is abnormal.
Table 1
Sequentially | Title |
1 | This chopper is responsible for circuit and is had an accident |
2 | Protection act |
3 | Switch separating brake |
4 | Control loop template |
5 | Reclosing action |
6 | Switch closes a floodgate |
Specifically comprise the following steps that
1, by protection act information and switch separating brake information through logical "and" door, composite signal is entitled, and " this chopper is responsible for circuit
Have an accident ";
2, set the switch separating brake information of chopper, switch combined floodgate information and control loop template information to be sent by measure and control device;Set
Stream tripping operation information, short circuit tripping operation information and reclosing action message are sent by protection device;
3, by chopper by open position to closing position or by the transient state in the middle of closing position to open position, the most neither at separating brake
Position is not defined as control loop template state in the state of closing position, and when chopper is in this state, measure and control device is sent out
Go out " control loop template " information;
4, using chopper run into transient fault tripping again by protection device start coincidence function whole process as reference, sequentially
Formulating the observing and controlling information that reflected and protection act information, this order is normal sequence: this chopper be responsible for circuit have an accident,
Protection act, switch separating brake, control loop template, reclosing action, switch close a floodgate;
5, run into the environment of above-mentioned transient fault with electric current voltage analog testing stand mimic-disconnecting switch, measure and control device and protection device send
The information that chopper is reflected, is transferred to monitor computer, and the information reflected by monitoring computer recording by network in station
Before and after order;
If before and after 6 information reflected by monitoring computer recording, order is consistent with normal sequence, it is believed that chopper possesses power transmission bar
Part, can carry out power transmission;When difference, before and after the information that will reflect, order is compared with normal sequence;
If 7 lack " this chopper is responsible for circuit and is had an accident " information, then check the synthesis condition of supervisory control of substation computer;
If 8 lack " protection act " information, then checked that the corresponding function of protection device is the most just in transformer station by field maintenance person
Often;
If 9 lack " switch separating brake " information, then checked that the corresponding function of measure and control device is the most just in transformer station by field maintenance person
Often, check that whether chopper is in relevant position;
If 10 lack " control loop template " information, then checked that transformer station's inner breaker is the most normal and becomes by field maintenance person
In power station, the corresponding function of measure and control device is the most normal;
If 11 lack " reclosing action " information, then checked that the corresponding function of protection device is in transformer station by field maintenance person
No normally;
If 12 lacking " switch closes a floodgate " information, then checked in transformer station the corresponding function of measure and control device whether by field maintenance person
Normally, check that whether chopper is in relevant position;
If the information order reflected during 13 breaker actuation is inconsistent with normal sequence, then checked by field maintenance person
The time of measure and control device and protection device whether strict conformance in transformer station, when checking the school in transformer station, equipment is the most working properly;
If during 14 is whole, information is without lacking and identical with normal sequence, then explanation circuit-breaker status is normal, meets power transmission
Condition.
Claims (1)
1. the complete adjustment method of breaker protection function, is characterized in that:
1), by protection act information and switch separating brake information through logical "and" door, composite signal entitled " this chopper be responsible for
Circuit has an accident ";
2), set the switch separating brake information of chopper, switch combined floodgate information and control loop template information to be sent by measure and control device;If
Determine overcurrent tripping information, short circuit tripping operation information and reclosing action message to be sent by protection device;
3), by chopper by open position to closing position or by the transient state in the middle of closing position to open position, the most neither exist
Open position is not defined as control loop template state in the state of closing position, and when chopper is in this state, observing and controlling fills
Put and send " control loop template " information;
4), using chopper run into transient fault tripping and started the whole process of coincidence function as reference by protection device again, by successively the most suitable
Sequence formulates observing and controlling information and the protection act information that chopper is reflected, this order is normal sequence: this chopper is responsible for circuit
Have an accident, protection act, switch separating brake, control loop template, reclosing action, switch close a floodgate;
5), run into the environment of above-mentioned transient fault with electric current voltage analog testing stand mimic-disconnecting switch, measure and control device and protection device send out
Go out observing and controlling information and protection act information that chopper is reflected, be transferred to monitor computer by network in station, and counted by monitoring
Order before and after observing and controlling information that calculation machine record chopper is reflected and protection act information;
6) if by order and normal sequence before and after the monitoring observing and controlling information that reflected of computer recording chopper and protection act information
Unanimously, it is believed that chopper possesses power transmission condition, power transmission can be carried out;When the observing and controlling reflected by monitoring computer recording chopper
When before and after information and protection act information, order is inconsistent with normal sequence, the observing and controlling information that chopper is reflected and protection
Before and after action message, order is compared with normal sequence;
7) if lacking " this chopper is responsible for circuit and is had an accident " information, then the synthesis condition of supervisory control of substation computer is checked;
8) if lacking " protection act " information, then checked in transformer station the corresponding function of protection device whether by field maintenance person
Normally;
9) if lacking " switch separating brake " information, then checked in transformer station the corresponding function of measure and control device whether by field maintenance person
Normally, check that whether chopper is in relevant position;
10) if lacking " control loop template " information, then checked that transformer station's inner breaker is the most normal and becomes by field maintenance person
In power station, the corresponding function of measure and control device is the most normal;
11) if lacking " reclosing action " information, then checked that the corresponding function of protection device is in transformer station by field maintenance person
No normally;
12) if lacking " switch close a floodgate " information, then checked in transformer station the corresponding function of measure and control device whether by field maintenance person
Normally, check that whether chopper is in relevant position;
13) if the observing and controlling information that reflects of chopper and protection act information order are the most inconsistent with normal sequence, then by on-site maintenance
The time of measure and control device and protection device whether strict conformance in personnel inspection transformer station, when checking the school in transformer station, whether equipment
Working properly;
14) if during whole, information is without lacking and identical with normal sequence, then explanation circuit-breaker status is normal, meets power transmission bar
Part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410675335.3A CN104377828B (en) | 2014-11-24 | 2014-11-24 | The complete adjustment method of breaker protection function |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410675335.3A CN104377828B (en) | 2014-11-24 | 2014-11-24 | The complete adjustment method of breaker protection function |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104377828A CN104377828A (en) | 2015-02-25 |
CN104377828B true CN104377828B (en) | 2016-08-17 |
Family
ID=52556555
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410675335.3A Active CN104377828B (en) | 2014-11-24 | 2014-11-24 | The complete adjustment method of breaker protection function |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104377828B (en) |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19601884A1 (en) * | 1996-01-19 | 1997-07-24 | Siemens Ag | Connection device, in particular plug device for TT and TN networks |
JP5119503B2 (en) * | 2010-02-25 | 2013-01-16 | Necシステムテクノロジー株式会社 | Power supply system, power supply method, and program |
CN201893540U (en) * | 2010-11-26 | 2011-07-06 | 南宁华供电力科技有限公司 | Intelligent radio network dispatching digital-type boundary controller complete equipment |
CN102279325B (en) * | 2011-04-19 | 2014-03-12 | 中国电力科学研究院 | Ultra high voltage direct current (UHVDC) transmission engineering station system debugging method |
CN102412624B (en) * | 2011-11-08 | 2013-07-17 | 湖北省电力公司电力科学研究院 | Virtual monitoring method for transformer substation sequence control |
CN104037762A (en) * | 2014-06-28 | 2014-09-10 | 国家电网公司 | Distribution line section switch control method |
-
2014
- 2014-11-24 CN CN201410675335.3A patent/CN104377828B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104377828A (en) | 2015-02-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102218268B1 (en) | Substation Automation Operating Device Equipped with Automatic Generation of Failure Judgment and Failure Recovery Scenarios | |
CN102621417B (en) | Method for testing automatic throw-in equipment of emergency power supply | |
RU2622473C2 (en) | Method and device for electric plant maintenance | |
CN102306953B (en) | Test method for secondary injection of power distribution automatization system | |
CN107657375A (en) | A kind of method for electric network fault judgement, verification and fault incidence analysis | |
CN105069697A (en) | Intelligent transformer station maintenance strategy automatic identification system and method | |
CN103996099B (en) | Method for conducting intelligent evaluation on student operation in training system | |
CN106571688A (en) | Method for monitoring operation mode of direct current system and operation state of isolating switch | |
CN104753042B (en) | It is a kind of to realize the method for not having a power failure and examining route protection by outputing in short-term | |
CN106771730A (en) | The intelligent substation real-time calibration equipment of protection device analog quantity sampling circuit and method | |
CN103346497B (en) | Intelligent substation electrical virtual circuit isolation method and system | |
CN103558466A (en) | Method for on-line whole group logic calibration of 10kV protecting device | |
CN106487004B (en) | One electrical secondary system of intelligent substation runs hidden danger Intelligent drainage checking method | |
CN104330730B (en) | The connection of catalyst and disjunction test monitoring protection device and the method for operation thereof | |
CN110350660B (en) | Online monitoring method and system for relay protection function pressing plate | |
CN104377828B (en) | The complete adjustment method of breaker protection function | |
Konarski et al. | The use of power restoration systems for automation of medium voltage distribution grid | |
CN206038788U (en) | Analog switch for device overhaul is cut soon to power | |
CN111641214A (en) | Stable quota monitoring and checking system | |
CN112018887A (en) | Distribution network feeder automatic operation process supervision and analysis method | |
CN106340954A (en) | Method for identifying line breaking of power supply line and switching to standby power supply | |
CN104753734B (en) | A kind of method of automatic diagnosis power grid EMS system remote signalling data transmission fault | |
CN103854711B (en) | A kind of method of analytical reactions heap shutdown breaker opening times performance | |
CN103253572B (en) | Method and device for detecting elevator power failure emergency power source in automatic timing mode | |
CN107611944B (en) | A kind of intelligent substation secondary protection equipment safety quarantine measures automatic analysis method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |