Prior art keywords
adpting flange
guide rod
sleeve pipe
rubber absorbers
bumper assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410637647.5A
Other languages
Chinese (zh)
Other versions
CN104372787A (en
Inventor
赵军
张久
蒋惠民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Foundation Engineering Co Ltd
Original Assignee
Sinohydro Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Foundation Engineering Co Ltd filed Critical Sinohydro Foundation Engineering Co Ltd
Priority to CN201410637647.5A priority Critical patent/CN104372787B/en
Publication of CN104372787A publication Critical patent/CN104372787A/en
Application granted granted Critical
Publication of CN104372787B publication Critical patent/CN104372787B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/046Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
    • E02D3/054Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil involving penetration of the soil, e.g. vibroflotation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of bumper assembly of vibro replacement stone column machine, for the transit joint of the guide rod and vibrating impacter that connect vibro replacement stone column machine, comprising: the rubber absorbers in tubular; Be embedded in the upper adpting flange for connecting described guide rod on rubber absorbers top; Be embedded in the lower adpting flange for connecting described transit joint of rubber absorbers bottom; Wherein, the bonding surface of described upper adpting flange and described guide rod is provided with hermetically-sealed construction; Wherein, the bonding surface of described lower adpting flange and described transit joint is provided with lower seal structure; Wherein, described guide rod is telescopic guide rod, has the multilayer sleeve be socketed successively from inside to outside.

Description

The bumper assembly of vibro replacement stone column machine
Technical field
The present invention relates to Foundation Design construction field, particularly a kind of bumper assembly of vibro replacement stone column machine.
Background technology
In Soft Soil Ground And Foundation consolidation process engineering, advantages such as vibro replacement stone column technique is remarkably productive with construction quality, construction technology is simple, construction cost is low, filling material wide material sources and obtain extensive use.Especially at earthquake Chang Faqu, Vibro-replacement Stone Column technique has outstanding anti-seismic performance with the composite foundation of anti-liquefaction and formation and becomes the technique of designer's first-selection.
Inherently see, vibroflotation method is the water using elevated pressures in sand, rubble, soil layer, sometimes also will add cobble or rubble is replaced, and therefore, is in a kind of slurry condition in hole always.Under shallow-layer shakes the condition of rushing within 20 meters, single guide rod (swing pipe) is used to reach engineering purpose; More deeply shake for punching for 30-40 meter level, use main equipment, single lengthening guide rod also can reach engineering purpose, and just engineering cost greatly increases; When hole depth more than 50 meters, if continue to use single guide rod, not only engineering cost is difficult to bear, and potential safety hazard sharply increases, and vibroflotation technique cannot continue.For this reason, applicant has developed a kind of telescopic guide rod, to carry out the operation of ultra-deep vibrating and impacting construction of ballast pile on the stratum dark more than 40 meters.
But, because telescopic guide rod is made up of more piece guide rod, and work in the state of rubble, sand, mud mixing, therefore, once mud and sandstone wherein enter among the gap of inside and outside guide rod, make telescopic guide rod card, then vibrating impacter will be imbedded in hole, make vibrating and impacting construction of ballast pile failure, and bring about great losses.
And the damper vitals that to be vibro-replacement stone column method construction equipment required; play the effect of abatement vibrating impacter shaking force, protection guide rod and superstructure; current use have metal-rubber shock absorber, gum damper etc.; its common feature is that damping effect is general, to bear axial tension little; and the vibroflotation construction be only applicable within traditional 40m degree of depth; if vibroflotation depth is more than 40; the shaking force be then transmitted on guide rod through damper during vibrating impacter work is very large; cause guide rod to twist, and wearing and tearing are caused to cable, water pipe and hoisting wirerope etc.
Summary of the invention
The present invention, in order to solve the problem, provides a kind of bumper assembly that can alleviate the vibro replacement stone column machine of vibration when ultra-deep is shaken and rushed, and its structure is simple, easy to use, and tension, antitorque, pressure-resistant seal performance is good, and damping effect is outstanding.
The bumper assembly of a kind of vibro replacement stone column machine of the present invention is for the transit joint of the guide rod and vibrating impacter that connect vibro replacement stone column machine, and it comprises:
Rubber absorbers in tubular;
Be embedded in the upper adpting flange for connecting described guide rod on rubber absorbers top;
Be embedded in the lower adpting flange for connecting described transit joint of rubber absorbers bottom;
Wherein, the bonding surface of described upper adpting flange and described guide rod is provided with hermetically-sealed construction;
Wherein, the bonding surface of described lower adpting flange and described transit joint is provided with lower seal structure;
Wherein, described guide rod is telescopic guide rod, has the multilayer sleeve be socketed successively from inside to outside.
Preferably, described upper hermetically-sealed construction and described lower seal comprise respectively: the cannelure being arranged on described upper adpting flange top or described lower adpting flange bottom; Be placed in the upper sealing ring in described cannelure.
Bumper assembly of the present invention also comprise be embedded in described rubber absorbers for improving cord in rubber absorbers tension and anti-twisting property, wherein, described interior cord is combined by nylon rope and steel wire and makes, and is embedded on the cross section of described rubber absorbers.
In addition, bumper assembly of the present invention also comprises the tensile structure being embedded in described upper adpting flange and/or described lower adpting flange and described rubber absorbers bonding surface place, and described tensile structure comprises: the screwed hole being preset in the horizontal integration face place of described upper adpting flange and/or described lower adpting flange and described rubber absorbers.
Preferably, described tensile structure also comprises: the interior swivel nut being embedded in longitudinal bonding surface place of described upper adpting flange and/or described lower adpting flange and described rubber absorbers.
Preferably, the inner embedding pre-embedded bolt had for its top and bottom are connected as one with described upper adpting flange and described lower adpting flange respectively of described rubber absorbers.
Preferably, the nut of described pre-embedded bolt and described upper adpting flange or described lower adpting flange junction are provided with preset flange.
Preferably, described multilayer sleeve comprises a top layer sleeve pipe, one or more intermediate casing are connected described upper adpting flange bottom sleeve pipe with one; Wherein: described top layer sleeve pipe and the intermediate casing be adjacent are provided with the first sliding pair for being slidably connected, and the first clamping being used for after stretching, extension, both being connected together secondary; Described bottom sleeve pipe and the intermediate casing be adjacent are provided with the second sliding pair for being slidably connected, and the second clamping being used for both being connected together after stretching, extension is secondary.
Preferably, described first sliding pair comprises: at least one first keyway being arranged on described top layer internal surface of sleeve pipe; Be arranged at least one first flat key of described intermediate casing outer wall; Wherein, described first flat key coordinates with described first keyway; Wherein, described first keyway and described first flat key extend along the axis of described top layer sleeve pipe and intermediate casing respectively.
Preferably, described first clamping pair comprises: ring be located at described top layer internal surface of sleeve pipe bottom and radially towards center position protrude the first support ear; Ring is located at described intermediate casing outer wall top and the first clamping platform radially protruded outwardly; Wherein, described first clamping platform is overlapped on described first support ear.
Compared with prior art, the invention has the beneficial effects as follows, ultra-deep shake rush time damping effect outstanding, tension, antitorque, pressure-resistant seal performance is good; And structure is simple, easy to use, long service life, reduces maintenance, change man-hour, do not affect the duration of vibro-replacement stone operation, can enhance productivity.
Below in conjunction with accompanying drawing, the present invention is described in detail.
Accompanying drawing explanation
Fig. 1 is the structural representation of the vibro replacement stone column machine with the synchronous auto feed system of multireel dish of the present invention;
Fig. 2 is the left side view shown in Fig. 1;
Fig. 3 is the structural representation of the synchronous auto feed system of figure multireel of the present invention dish;
Fig. 4 is the structural representation of the drill pipe system of vibro replacement stone column machine;
Fig. 5 is that the N-N shown in Fig. 4 is to sectional view;
Fig. 6 is the structural representation of vibro replacement stone column machine guide rod pallet component;
Fig. 7 is the right side view shown in Fig. 6;
Fig. 8 is the structural representation of telescopic guide rod;
Fig. 9 is the cross section cut-away view that top layer sleeve pipe and intermediate casing are slidably connected;
Figure 10 is the cross section cut-away view that bottom sleeve pipe and intermediate casing are slidably connected;
Figure 11 is the structural representation of the second sleeve pipe in intermediate casing;
Figure 12 is the enlarged drawing of part A shown in Fig. 8;
Figure 13 is the structural representation of the pallet of guide rod pallet component first embodiment;
Figure 14 is the structural representation of the pallet of guide rod pallet component second embodiment;
Figure 15 is the structural representation of vibrating impacter of the present invention;
Figure 16 is the structural representation of bumper assembly of the present invention;
Figure 17 is the schematic diagram of vibro replacement stone column machine construction method of the present invention.
Detailed description of the invention
As shown in Figure 1 and Figure 2, for the structural representation of vibro replacement stone column machine provided by the invention, as seen from the figure, vibro replacement stone column machine comprises: crane system 400, auto feed system 300, drill pipe system 100 and vibrating impacter system 200, the cable winding plant 302 of auto feed system, water pipe winding plant 304, tracheae winding plant 301 and wire rope winding plant 303 are synchro-feed, wherein, in drill pipe system, the axial length of guide rod 101 is adjustable, to change the lowered position on the relative ground of vibrating impacter system; Wherein, auto feed system is installed on the rear portion of crane in crane system 400, as the counterweight of crane.
Concrete, as shown in Figure 1-Figure 3, the cable winding plant 302 in auto feed system, water pipe winding plant 301 and tracheae winding plant 304 have respectively makes vibrating impacter realize cable 321, first water pipe 311 and first tracheae 341 of vibrating and impacting construction of ballast pile function for being connected with vibrating impacter system.In addition, water pipe winding plant also has the second water pipe 312 for making vibrating impacter realize hydraulic pressure dynamic equilibrium in vibrating and impacting construction of ballast pile operation; Tracheae winding plant also has the second tracheae 342 for making vibrating impacter realize dynamically balanced air pressure in vibrating and impacting construction of ballast pile operation.
And drill pipe system 100 has the telescopic guide rod 101 along its axial elongation or shortening, this telescopic guide rod has the multilayer sleeve be socketed successively from inside to outside; Wherein, wire rope connects the bottom sleeve pipe 5 in multilayer sleeve, to transfer or to lift bottom sleeve pipe, makes length elongation or the shortening of multilayer sleeve; Wherein, the second water pipe 312 and the second tracheae 342 are connected the top (as shown in Figure 4, Figure 5) of the bottom sleeve pipe 5 in multilayer sleeve respectively; And the first water pipe 311, first tracheae 341, cable 321 are from top to bottom through each layer sleeve pipe in telescopic guide rod, and be connected with vibrating impacter.
In auto feed system of the present invention, its water pipe winding plant 301 and tracheae winding plant 304 are except having the first water pipe 311 for making vibrating impacter realize vibrating and impacting construction of ballast pile function and the first tracheae 341, also have for making the vibrating impacter of vibro replacement stone column machine realize the second water pipe 312 of hydraulic pressure dynamic equilibrium and realize the second tracheae 342 of dynamically balanced air pressure respectively, further, the wire rope of its wire rope winding plant 303, the second water pipe, the second tracheae are separately fixed at the top of bottom sleeve pipe 5.When the wire rope in auto feed system plays lift to bottom sleeve pipe or transfers effect, the second water pipe, the second tracheae can along with synchronously lifting or transferring, thus make telescopic guide rod change length.
When multilayer sleeve due to telescopic guide rod all stretches out, the total length of telescopic guide rod can reach 90 meters, and therefore vibro replacement stone column machine of the present invention can carry out vibrating and impacting construction of ballast pile operation to the stratum that the degree of depth is greater than 40 meters.And carry out in the process of vibrating and impacting construction of ballast pile operation at vibrating impacter, because telescopic guide rod works under the state of rubble, sand, mud three mixing, therefore, the mixture of rubble, sand, mud is easy to the gap entered between the multilayer sleeve of telescopic guide rod, the multilayer of telescopic guide rod or which floor sleeve pipe are stuck, thus make the vibrating impacter of vibrating impacter system 200 imbed in hole, make vibrating and impacting construction of ballast pile failure, and bring about great losses.
In order to avoid the multilayer sleeve of telescopic guide rod is stuck, in auto feed system of the present invention, second water pipe and the second tracheae are connected to the bottom of the bottom sleeve pipe of telescopic guide rod, upwards send water from bottom sleeve pipe and supply gas, make the water via the second water pipe and the conveying of the second tracheae gentle, upwards flow from bottom sleeve pipe, until arrive the top layer sleeve upper end of telescopic guide rod, and then discharge via the catch basin 150 (as shown in Figure 1) be positioned on top layer sleeve pipe.Catch basin is provided with the outlet for outwards flowing out for unnecessary water in telescopic guide rod.In vibro-replacement stone operation, due to the second water pipe intermediate casing upward, top layer sleeve pipe conveying water from bottom sleeve pipe endlessly, and catch basin is positioned on ground, make the head water level in telescopic guide rod all the time higher than the water level of stake holes head being arranged in underground, water in it can be forced via shell clearance hydraulic pressure outwardly for telescopic guide rod provides, thus define press water in telescopic guide rod.
Hydraulic pressure due to telescopic guide rod inside is greater than the hydraulic pressure of its outside all the time, when the mixture that the water carried of rubble, sand, mud and the first water pipe in vibro-replacement stone operation the is formed near gaps to upper reaches and between the multilayer sleeve flowing into telescopic guide rod from the bottom to top, under the effect of the press water provided at the second water pipe, the mixture that can withstand outside pipe flow into the inside of telescopic guide rod, thus avoid telescopic guide rod to be stuck, guarantee that telescopic guide rod can free-extension, make the construction of large degree of depth vibro replacement stone column become possibility.On the other hand, if there is spiece to enter in pipe, the gas with certain pressure of the second tracheae conveying can make mixture at boiling in ducts, and discharges from catch basin 150, is deposited in pipe to avoid mixture.
And further, because auto feed system of the present invention also comprises the second tracheae be connected with bottom cannula tip, it is when vibrating impacter carries out vibrating and impacting construction of ballast pile operation, can to telescopic guide rod delivered inside gases at high pressure (air pressure balance of the gas formative dynamics carried with the first tracheae), itself and the second water pipe coordinate jointly, guarantee described rubble, sand, the mixture of mud can not enter into telescopic guide rod inside, and, both made have mixture to enter into telescopic guide rod once in a while inner, under the water carried at the second water pipe and the second tracheae and the mating reaction of gas, the described passage of mixture above bottom sleeve pipe can be made upwards to flow, and flow out (not shown) from the effluent trough be positioned at above drill pipe system, thus mixture can not be made to gamble the gap location of plug at multilayer sleeve, ensure that multilayer sleeve can be in the state of free-extension.
Figure 17 shows the construction method of a kind of vibro replacement stone column machine of the present invention, and wherein vibro replacement stone column machine comprises crane system, auto feed system, drill pipe system and vibrating impacter system, and the method comprises:
Be synchro-feed by the cable winding plant of auto feed system, water pipe winding plant, tracheae winding plant and wire rope winding plant;
When vibro replacement stone column machine carries out the construction of vibrating impacter ultra-deep, wire rope winding plant by stretching downwards or upwards shrinking the sleeve pipe being arranged in stake holes in telescopic guide rod, the vibrating impacter be connected to below telescopic guide rod is declined gradually transfer or on carry;
While the sleeve pipe that wire rope winding plant is successively transferred in telescopic guide rod, cable winding plant, water pipe winding plant and tracheae winding plant are synchronously positioned over down cable, water pipe and tracheae in telescopic guide rod;
Vibrating impacter utilizes cable, the electric power of water pipe and tracheae supply, clear water and the gas synchronously declined with it constantly to shake downwards and rushes pore-creating or upwards encrypt stake processed, formation ultra-deep vibro replacement stone column.
In addition, said method also comprises: when vibro replacement stone column machine carries out the construction of vibrating impacter ultra-deep, increase along with vibroflotation depth or reduce, stretch in stake holes gradually or shrink telescopic guide rod, rush pore-creating to make the vibrating impacter be positioned at below telescopic guide rod constantly shake downwards or upwards encrypt stake processed; During telescopic guide rod stretches gradually or shrinks, by continuing water filling in telescopic guide rod, in telescopic guide rod, be full of press water; By making hydraulic pressure in telescopic guide rod be greater than the hydraulic pressure of stake holes all the time, forcing the press water in telescopic guide rod to flow to mud stake holes from the shell clearance of telescopic guide rod, realizing hydraulic pressure dynamic equilibrium, enter to prevent the sandstone in mud and be stuck in shell clearance.
Wherein, auto feed system is installed on the rear portion of crane system, to be used as the counterweight of crane system; Telescopic guide rod comprises: the multilayer sleeve be socketed successively from inside to outside, comprises a top layer sleeve pipe, one or more intermediate casing and a bottom sleeve pipe.
Wherein, continue water filling in telescopic guide rod to comprise: the lower end outlet of the water injection pipe being exclusively used in water filling in pipe being installed to the bottom sleeve pipe of telescopic guide rod, be used for stoping the outer mixing water containing mud rubble of pipe via the clear water in shell clearance inflow pipe to introduce; The clear water of outside is continued via water injection pipe the lower end being pumped into bottom sleeve pipe, so that clear water flows from the lower end of bottom sleeve pipe to top layer sleeve pipe.
Wherein, the hydraulic pressure making hydraulic pressure in telescopic guide rod be greater than stake holes all the time comprises: install above top layer sleeve pipe and be communicated with top layer collar cavities and the catch basin with delivery port; By controlling the clear water flow pumping into layer sleeve pipe on earth, making clear water in pipe while flowing to outside pipe from shell clearance, rise to catch basin, and discharging from catch basin delivery port; By catch basin is positioned on ground in work progress, form the water-head of mixing water in press water and stake holes in telescopic guide rod, thus force the hydraulic pressure in telescopic guide rod to be greater than the hydraulic pressure of stake holes all the time.
Wherein, said method of the present invention also comprises: at telescopic guide rod gradually between extensin period, by continuing gas injection in telescopic guide rod, being blown from bottom to top by the sand entered in telescopic guide rod, making sand at boiling in ducts.
On the other hand, a kind of vibro replacement stone column machine of the present invention comprises crane system, auto feed system, drill pipe system and vibrating impacter system, wherein, auto feed system comprises the cable winding plant of synchro-feed, water pipe winding plant, tracheae winding plant and wire rope winding plant; Auto feed system is installed on the rear portion of crane system, as the counterweight of crane system; Telescopic guide rod comprises: the multilayer sleeve be socketed successively from inside to outside, comprises a top layer sleeve pipe, one or more intermediate casing and a bottom sleeve pipe; When vibro replacement stone column machine carries out the construction of vibrating impacter ultra-deep, wire rope winding plant by stretching downwards or upwards shrinking the sleeve pipe being arranged in stake holes in telescopic guide rod, the vibrating impacter be connected to below telescopic guide rod is declined gradually or on carry; While wire rope winding plant stretches downwards or upwards shrinks the sleeve pipe in telescopic guide rod, cable winding plant, water pipe winding plant and tracheae winding plant synchronously transfer or on carry the cable, water pipe and the tracheae that are placed in telescopic guide rod; Vibrating impacter utilize synchronously to decline with it or on cable, the electric power of water pipe and tracheae supply, clear water and the gas carried constantly shake downwards and rush pore-creating or upwards encrypt stake processed, formation ultra-deep vibro replacement stone column.
Water pipe winding plant has the water injection pipe (the second namely above-mentioned water pipe) for realizing hydraulic pressure dynamic equilibrium; Tracheae winding plant has the air injection pipe (the second namely above-mentioned tracheae) for preventing from managing interior desilting; The wire rope of wire rope winding plant connects the bottom sleeve pipe of guide rod, to transfer or to lift bottom sleeve pipe, makes length elongation or the shortening of guide rod; Water injection pipe and air injection pipe are connected the lower end of bottom sleeve pipe respectively.
Cable winding plant of the present invention, water pipe winding plant, tracheae winding plant, wire rope winding plant is respectively by four motors or fluid motor-driven, and with wire rope winding plant for main drive, namely, when needs bottom sleeve pipe lifted or lowering operation time, the motor of wire rope winding plant or hydraulic motor work, then cable winding plant, water pipe winding plant, the motor of tracheae winding plant or hydraulic motor are with identical torque synchronous working, thus make and vibrating impacter, the water of each pipeline that telescopic guide rod is connected respectively, electricity, the supply of gas is synchronously carried out, guarantee the normal operation of each system of vibro replacement stone column machine.
Concrete, when carrying out vibrating and impacting construction of ballast pile operation, need vibrating impacter to transfer or on mention desired depth, therefore need to make the telescopic guide rod be connected with vibrating impacter extend or shrink.Now, the motor of wire rope winding plant or hydraulic motor work, wire rope is made to extend under the effect of hoist engine or upwards shorten downwards, because the bottom sleeve pipe of telescopic guide rod is connected with wire rope, and be connected with the top of the second tracheae with bottom sleeve pipe for the formation of second water pipe of dynamic water-pressure balance with dynamic air pressure balance, therefore, when wire rope winding plant works, for carrying water pipe winding plant and the tracheae winding plant also synchronous working of the second water pipe and the second tracheae, so that the second water pipe, second tracheae and wire rope synchronously transferred with same speed or on carry.Accordingly, cable, the first water pipe and the second tracheae be also lowered with same speed with wire rope or on carry, that is, cable winding plant, water pipe winding plant, tracheae winding plant are all synchronoused working with wire rope winding plant.
In addition, the cable winding plant of auto feed system of the present invention, water pipe winding plant, tracheae winding plant, wire rope winding plant are arranged on the rear portion of crane in the crane system 400 of vibro replacement stone column machine respectively, form the counterweight of about 16 tons at crane rear portion, also ensure that the stable operation of vibro replacement stone column machine and the safety of construction.
In the present invention, drill pipe system has guide rod pallet component, and its structural representation as shown in Figure 6, Figure 7.Wherein, the telescopic guide rod in guide rod pallet component for regulate the vibrating impacter of vibro replacement stone column machine transfer or on carry position, and pallet is used for and telescopic guide rod coordinates, and support telescopic guide rod and realized retraction and transfer.
Wherein, telescopic guide rod is connected with pallet 8, and pallet 8 is connected with the vibrating impacter of vibro replacement stone column machine by First Transition joint 9, thus transferred by the vibrating impacter of the length realization adjustment vibro replacement stone column machine of the telescopic guide rod of adjustment or on put forward the object of position.
Concrete, as shown in Fig. 6-Fig. 9, telescopic guide rod of the present invention comprises: the multilayer sleeve be socketed successively from inside to outside; Wherein, the top layer sleeve pipe in multilayer sleeve and intermediate casing are slidably connected by the first sliding pair, and are connected together by the first clamping vice card; Wherein, the intermediate casing in multilayer sleeve and bottom sleeve pipe are slidably connected by the second sliding pair, and are connected together by the second clamping vice card.
In telescopic guide rod of the present invention, because the every two-layer adjacent casing in multilayer sleeve is slidably connected by sliding pair, therefore the length of every two-layer adjacent casing can elongate or shorten, thus the length of multilayer sleeve can be elongated or shortened, and then by regulate the length of multilayer sleeve to reach to regulate the vibrating impacter be connected with multilayer sleeve transfer or on carry position, make the vibrating impacter carrying out vibrating and impacting construction of ballast pile operation can arrive the required degree of depth (vibrating impacter of the application can carry out vibro-replacement stone operation to the stratum that the degree of depth reaches 90 meters).
Due to when applying, telescopic guide rod of the present invention is in vertical state, therefore, to be slidably connected every two-layer adjacent casing, adjacent inside and outside two-layer sleeve pipe can be made to move up and down, and can not mutually reverse by sliding pair.In addition, be connected together by clamping vice card between every two-layer adjacent casing, every two-layer adjacent casing can not be departed from mutually, thus ensure vibrating impacter safety in the course of the work and stability.
Concrete, as shown in Figure 6, telescopic guide rod of the present invention comprises top layer sleeve pipe 1, bottom sleeve pipe 5 and the intermediate casing between top layer sleeve pipe and bottom sleeve pipe.Wherein, in the application, the intermediate casing of multilayer sleeve can adopt multilayer, and the length of the multilayer sleeve of telescopic guide rod can need according to use and determine.Preferably, multilayer sleeve of the present invention its be 5 layers of sleeve pipe, that is, intermediate casing comprises the three layers of sleeve pipe 2,3,4 be set with successively from inside to outside.Wherein, the length of every layer of sleeve pipe of the telescopic guide rod of the present invention is 18-20 rice, thus making the length of telescopic guide rod can reach 90-100 rice, the guide rod length solving prior art vibro replacement stone column machine is short, make vibro replacement stone column machine cannot be greater than 20 meters, the engineering that is especially greater than more than the 50 meters problem of constructing to the degree of depth.
Wherein, the first sleeve pipe 2 in top layer sleeve pipe 1 of the present invention and intermediate casing adopts the first sliding pair to be slidably connected, and this first sliding pair comprises: uniform three the first keyways being arranged on top layer internal surface of sleeve pipe; Uniform three the first flat keys being arranged on intermediate casing first sleeve pipe 2 outer wall; Wherein, each first flat key coordinates with the first corresponding keyway; Wherein, the first keyway and the first flat key extend along the axis of top layer sleeve pipe and intermediate casing first sleeve pipe 2 respectively.By the first sliding pair, the first sleeve pipe of intermediate casing can be slided up and down in top layer sleeve pipe 1, thus change length.Preferably, in order to make adjacent two layers sleeve pipe slide axially smoothly, be separately positioned on the first keyway on adjacent two layers sleeve pipe and the first flat key adopts matched in clearance.
And during in order to prevent the first sleeve pipe from sliding in top layer sleeve pipe, depart from top layer sleeve pipe, the first sleeve pipe and top layer sleeve pipe arrange the first clamping respectively that be used for both to be connected together secondary.First clamping pair comprises: ring be located at top layer sleeve pipe 1 inwall bottom and radially towards center position protrude the first support ear; Ring is located at the first sleeve outer wall top and the first clamping platform radially protruded outwardly; Wherein, the virtual diameter of a circle of the first clamping platform outer rim is greater than the first virtual diameter of a circle in support ear inner edge, is less than the internal diameter of top layer sleeve pipe 1, thus the first clamping platform can be overlapped on the first support ear, thus the first sleeve pipe and top layer casing clamp is connected together.
Wherein, the 3rd sleeve pipe 4 in bottom sleeve pipe 5 of the present invention and intermediate casing adopts the second sliding pair to be slidably connected, and as shown in Figure 10, this second sliding pair comprises: uniform three the second keyways 7 being arranged on the 3rd sleeve pipe 4 inwall; Uniform three the second flat keys 6 being arranged on bottom sleeve pipe 5 outer wall; Wherein, the second flat key coordinates with the second keyway; Wherein, the second keyway and the second flat key extend along the axis of the 3rd sleeve pipe and bottom sleeve pipe respectively.
In like manner, by the second sliding pair, bottom sleeve pipe 5 can be slided up and down in the 3rd sleeve pipe 4 of intermediate casing, thus change length.Preferably, in order to make adjacent two layers sleeve pipe slide axially smoothly, be separately positioned on the first keyway on adjacent two layers sleeve pipe and the first flat key adopts matched in clearance.
And during in order to prevent bottom sleeve pipe from sliding in the 3rd sleeve pipe, depart from the 3rd sleeve pipe, the 3rd sleeve pipe and bottom sleeve pipe arrange the second clamping respectively that be used for both to be connected together secondary.As shown in figure 12, the second clamping pair comprises: ring be located at the 3rd internal surface of sleeve pipe bottom and radially towards center position protrude the second support ear; Ring is located at bottom sleeve outer wall top and the second clamping platform radially protruded outwardly; Wherein, the second clamping platform is overlapped on the second support ear.
Visible, first sliding pair is identical with the principle of confounding of the second sliding pair, first clamping is secondary also identical with the clamping principle of the second clamping pair, namely the mode by arranging flat key and/or keyway on adjacent two layers sleeve pipe respectively makes adjacent two layers cannula slide connect, and by the mode arranging support ear and clamping platform on the top of adjacent two layers sleeve pipe and/or bottom respectively, adjacent two layers casing clamp is connected together.
Wherein, the structure of each sleeve pipe of intermediate casing is identical, as shown in figure 11, introduces the structure of each sleeve pipe in intermediate casing here for the second sleeve pipe 3 of intermediate casing.As seen from the figure, each sleeve pipe of intermediate casing includes: the uniform multiple flat keys 6 being arranged on sleeve outer wall; Ring is located at sleeve outer wall top and the clamping platform 15 radially protruded outwardly; The uniform multiple keyways 7 being arranged on internal surface of sleeve pipe; And ring be located at internal surface of sleeve pipe bottom and radially towards center position protrude support ear 16.
Second sleeve pipe of intermediate casing and the first sleeve pipe, the 3rd sleeve pipe are slidably connected respectively by the matched in clearance between flat key, keyway, and made by the snap-fit engagement of support ear and clamping platform the second sleeve pipe and the first sleeve pipe, the 3rd sleeve pipe respectively clamping be integrated, thus change the axial length of intermediate casing.
It should be noted that, the first support ear, the structure of the second support ear are identical from the structure of the support ear 16 of intermediate casing, size is different; First clamping platform, the structure of the second clamping platform are identical from the structure of the clamping platform shown in Figure 11, size is different; And the structure of the first flat key, the second flat key is identical from the structure of the flat key shown in Figure 11, size is different; The structure of the first keyway, the second keyway is identical from the structure of keyway shown in Figure 11, size is different.The size of each support ear, clamping platform, flat key, keyway is determined according to adjacent casing size.
Wherein, bottom sleeve pipe 5 top of telescopic guide rod is provided with cover plate 17, and on cover plate 17, fixes the wire rope that can make bottom sleeve pipe and other sleeve pipe retraction.Preferably, cover plate 17 is provided with the hanger 18 for fixing wire rope.
Wherein, form the second water pipe of hydraulic pressure dynamic equilibrium when being on the cover board connected to for making vibrating impacter carry out vibrating and impacting construction of ballast pile operation and form the second tracheae of dynamically balanced air pressure, and, on the cover board be installed with multiple through hole (not shown), carry out the first water pipe of vibrating and impacting construction of ballast pile operation, the first tracheae and cable for making vibrating impacter and be connected with vibrating impacter through after through hole corresponding on cover plate and bottom sleeve pipe.
In addition, in bottom sleeve pipe, be provided with the filler for the first water pipe, the first tracheae and the cable shake preventing described vibrating impacter when carrying out vibrating and impacting construction of ballast pile operation, through in bottom sleeve pipe.Bottom inside pipe casing is filled closely knit by filler, thus effectively prevents cable, the first water pipe, the shake of the first tracheae when vibrating impacter works, and then prevents cable, the first water pipe, the first tracheae because shaking the wearing and tearing caused.Preferably, in bottom sleeve pipe, be furnished with the plastic pipe for making cable pass.
Wherein, bottom sleeve pipe 5 bottom of the telescopic guide rod of the present invention is connected with pallet 8, pallet is provided with corresponding to each layer sleeve pipe of telescopic guide rod the bearing device respectively to the corresponding sleeve pipe of each layer of upper support.
Concrete, as shown in Figure 6, pallet comprises: for connecting the cylinder of the bottom sleeve pipe in telescopic guide rod; Be arranged on cylinder outer wall and the bearing device radially stretched out outwardly; Wherein, bearing device is provided with multiple ladder platforms of radially arranging successively, its each ladder platform is used for a corresponding sleeve pipe in the telescopic guide rod of support.
Because pallet has bearing device, and bearing device is arranged multiple ladder platform, when the telescopic guide rod be connected with pallet is bounced back, each ladder platform support can play sleeve pipe corresponding in telescopic guide rod, each layer sleeve pipe can be bounced back smoothly, and again can not extend because of Action of Gravity Field after retraction.
Wherein, when cylinder is connected with bottom sleeve pipe, the mode of welding can be adopted both to be connected as one, also can adopt and both are connected as one by the mode of cylinder set in or beyond bottom sleeve pipe, certainly, also can adopt other connected mode.
And as shown in figure 13, bearing device can be located at the Support tray of cylinder outer wall for ring, Support tray is arranged and distinguishes corresponding ladder platform with the multilayer sleeve of telescopic guide rod.Or in order to reduce pallet quality, adopt the multiple support arms shown in Figure 14 to replace the Support tray shown in Figure 13, as shown in figure 14, multiple support arm (showing three support arms in figure) uniform ring is located at cylinder outer wall.
Wherein, as shown in Figure 13 or Figure 14, be no matter adopt Support tray or support arm, in multiple ladder platforms of radially arranging successively of setting it on, each ladder platform to be respectively used in the telescopic guide rod of support a corresponding sleeve pipe.
Because telescopic guide rod is five layers, therefore, the quantity of the ladder platform in pallet is also five, and each ladder platform corresponding support one deck sleeve pipe, i.e. the first ladder platform 10 corresponding support bottom sleeve pipe 5, second-order halfpace 11 is for the 3rd sleeve pipe the 4, three ladder platform 12 corresponding support second sleeve pipe 3 of corresponding support intermediate casing, quadravalence halfpace 13 corresponding support first sleeve pipe the 2, five ladder platform 14 corresponding support top layer sleeve pipe 1.
Preferably, the multiple ladder platforms extended towards telescopic guide rod direction rise from the bottom to top successively, namely, in multiple ladder platforms that telescopic guide rod direction extends, its virtual diameter of a circle in each ladder platform place reduces gradually, and the diameter of one deck sleeve bottom end face corresponding with it in the diameter of each ladder platform and telescopic guide rod is suitable, so that each ladder platform can corresponding support one deck sleeve pipe, sleeve pipe is bounced back.
Pallet 8 bottom is connected with vibrating impacter by First Transition joint 9.When cable is passed down through in the plastic pipe be arranged in bottom sleeve pipe, be connected with vibrating impacter by transit joint.Transit joint can ensure insulation, waterproof, resistance to wear; In transit joint, realize docking and the location of water pipe, tracheae and cable, the water of the first water pipe is connected to vibrating impacter by transit joint and sprays bottom from vibrating impacter, and the first tracheae is connected with the venthole on transit joint.
Wherein, form hydraulic pressure, the second water pipe of dynamically balanced air pressure, the second tracheae for making vibrating impacter and vibrating impacter forms the first water pipe of vibrating and impacting construction of ballast pile operation, the first tracheae is designed with one way valve respectively for making, thus anti-sealing, gas flow back in corresponding water pipe, tracheae.
Wherein, each layer sleeve pipe of the telescopic guide rod of the present invention realizes transferring under gravity, thus makes extended length; And telescopic guide rod bounces back under the effect of wire rope, e.g., when moving on wire rope is under the effect of wire rope winding plant, wire rope pulls the bottom sleeve pipe of telescopic guide rod, and bottom sleeve pipe is upwards bounced back; When in the 3rd sleeve pipe that bottom sleeve pipe upwards retracts to intermediate casing, ladder platform support corresponding with the 3rd sleeve pipe on pallet the bottom of the 3rd sleeve pipe, and drives the 3rd sleeve pipe upwards to bounce back along with bottom sleeve pipe; By that analogy, until the first sleeve pipe of intermediate casing retracts in top layer sleeve pipe.
It should be noted that, in the present invention, each sliding pair, except the form of structure adopting above-mentioned keyway, flat key and connect, can also adopt in prior art the adjacent casing that can make to connect together to realize the structure be slidably connected arbitrarily in axial sliding; Equally, the clamping for being fitted together by adjacent two layers casing pipe sleeve is secondary except the interface arrangment of above-mentioned support ear, clamping platform, also can adopt interface arrangment of the prior art.And the mode that is slidably connected of the prior art, snap fit have multiple, do not enumerate at this.
As shown in figure 15, for the structural representation of vibrating impacter system provided by the invention, as seen from the figure, vibrating impacter system comprises: the bumper assembly 220 that its top is connected with telescopic guide rod, the second transit joint 230 be connected with bumper assembly bottom, the motor 240 be connected with transit joint, by motor-driven vibrating body 250, wherein, motor is variable-frequency motor.
Because motor of the present invention is variable-frequency motor, when vibro replacement stone column machine works, by being arranged on the frequency converter of vibrating impacter outside, motor can be made to realize stepless speed regulation, thus can to meet vibro replacement stone column machine be vibrosinking pile construction requirement under the complex stratum condition of 40-90 rice in the degree of depth: when accidental power failure or when occurring that other fault makes vibrating body mend to block, by frequency converter, electric current that cable is carried is started from scratch to increase gradually, thus can successfully Vibration on Start-up body, make vibrating body carry out vibrating and impacting construction of ballast pile operation; And according to the different conditions on stratum, by regulating the frequency of variable-frequency motor, vibrating body frequency can be made identical with the foundation soil frequency on stratum, thus vibrating body and foundation soil are resonated, the ability making vibrating body penetrate foundation soil strengthens greatly, improve the efficiency of construction of vibrating body, that is, improve the efficiency of construction of vibrating impacter.
And as shown in figure 16, bumper assembly 220 of the present invention comprises: the rubber absorbers 201 in tubular; Be embedded in the upper adpting flange 202 for connecting guide rod on rubber absorbers 201 top; Be embedded in the lower adpting flange 203 for connecting transit joint of rubber absorbers 201 bottom; Wherein, the bonding surface of upper adpting flange 202 and guide rod is provided with hermetically-sealed construction; Wherein, the bonding surface of lower adpting flange 203 and transit joint is provided with lower seal structure.
Concrete, as shown in figure 16, in bumper assembly of the present invention, the bonding surface of upper adpting flange 202 and guide rod is provided with hermetically-sealed construction, and on this, hermetically-sealed construction comprises: the cannelure 204 being arranged on adpting flange 202 top; Be placed in the upper sealing ring (not shown) in cannelure 204, wherein, upper sealing ring is O-ring seals.Sealed by the bonding surface of O-ring seals by upper adpting flange and guide rod, improve the sealing at bonding surface place.
In addition, the bonding surface of lower adpting flange 203 and transit joint is provided with lower seal structure (not shown), and this lower seal structure is identical with upper hermetically-sealed construction, no longer repeats at this.
In addition, bumper assembly of the present invention also comprise be embedded in rubber absorbers 201 for improving cord 208 in rubber absorbers tension and anti-twisting property, it is combined by nylon rope and steel wire and makes, be embedded on arbitrary cross section of rubber absorbers, preferably, interior cord is embedded in rubber absorbers and is positioned on middle cross section.By interior cord is embedded in rubber absorbers inside, substantially increases tension and the anti-twisting property of damper, avoid the damage to connected guide rod, and cable, water pipe and the wire rope that is connected with guide rod are played a protective role.
Further, as shown in figure 16, bumper assembly of the present invention also comprises the tensile structure being embedded in adpting flange 202 and/or lower adpting flange 203 and rubber absorbers 201 bonding surface place, and this tensile structure comprises: the screwed hole 209 being preset in the horizontal integration face place of adpting flange 202 and/or lower adpting flange 203 and rubber absorbers 201; And be embedded in the interior swivel nut 210 at adpting flange 202 and/or lower adpting flange 203 and longitudinal bonding surface place of rubber absorbers 201.
By presetting screwed hole at the bonding surface place transversely of rubber absorbers and upper and lower adpting flange, when upper and lower adpting flange can be made to be connected with guide rod and transit joint respectively, directly upper adpting flange, guide rod and rubber absorbers can be connected as one by screw, and by screw, rubber absorbers and lower adpting flange, transit joint are connected as one, thus installation or removal are convenient, be convenient to maintenance, and, screwed hole is preset in rubber absorbers, improves the bonding strength connecting upper and lower adpting flange and guide rod and transit joint.
In addition, at rubber absorbers and upper and lower adpting flange bonding surface place is longitudinally also embedding interior swivel nut, thus add the bond area of rubber absorbers and upper and lower adpting flange, improve the pressure-resistant seal between rubber absorbers and two adpting flanges and tension sealing performance.Upper and lower adpting flange of the present invention is connected with guide rod or transit joint by screw, can increase the damping cross section on damper cross section, improves damping effect.
Wherein, as shown in figure 16, the present invention is at the inner also embedding pre-embedded bolt 211 had for being connected as one with upper adpting flange 202 and lower adpting flange 203 respectively in its top and bottom of rubber absorbers 201.Preferably, the nut of pre-embedded bolt 211 and upper adpting flange 202 or lower adpting flange 203 junction are provided with preset flange 212.By pre-embedded bolt 211, add the bonding strength between rubber absorbers and upper and lower adpting flange, and improve the damping effect of rubber absorbers.
It should be noted that, bolt 211 in the present invention, preset flange 212, interior swivel nut 210 are embedded in rubber absorbers respectively, namely, in manufacturing process, above-mentioned parts are the same with upper and lower adpting flange, all be well placed in mould, then by castable rubber in mould, make above-mentioned each parts shape all-in-one-piece rubber absorbers together with rubber.By changing structure and the manufacture craft of traditional shock absorber, substantially increasing the damping effect of bumper assembly of the present invention, the exciting force of vibrating impacter when shaking punching operation being decayed rapidly, relieving the destruction that vibrating impacter vibration force causes guide rod and lifting appliance.
Bumper assembly of the present invention, has following difference: in shape compared with the bumper assembly in prior art vibrating impacter, no longer adopts the structure of circular platform type, but adopts cylindrical structure, when making, no longer adopt traditional damper be made up of the mode of steel sheet inside casting rubber, but employing directly makes damper by the elastomeric material of high strength, simplify production process, and, in manufacturing process, by upper, the parts such as lower adpting flange are placed in mould by predeterminated position, castable rubber is adopted to form rubber absorbers again in mould, thus obtain the parts such as upper and lower adpting flange and be embedded in structure in rubber absorbers and integrally formed with it, greatly increase the bonding strength of the parts such as upper and lower adpting flange and rubber absorbers, improve the application life of bumper assembly, in addition, the bonding surface of upper and lower adpting flange and guide rod and transit joint is respectively arranged with upper and lower hermetically-sealed construction, thus improves the reliability of bonding surface place sealing, improve the damping effect of damper.
Vibrating impacter system of the present invention, solve traditional vibrating impacter system frequency fix, can not according to Different Strata regulating frequency, make to shake rush that pore-creating and pile driving construction efficiency processed decline, the degree of depth problem that cannot construct in the stratum of (especially the degree of depth is 90 meters) at all more than 40 meters.Vibrating impacter of the present invention is the electronic vibrating impacter of high-power frequency conversion formula, therefore vibroflotation construction work efficiency can be increased substantially: current domestic vibrating impacter rotating speed is all at 1460-1480r/min, rotating speed 0-1800r/min can be realized by frequency conversion, according to the different situations of foundation soil (as layer of sand, sand-pebble layer, silt, the natural frequency of mucky soil own is different), vibrating impacter frequency is regulated to make vibrating impacter frequency identical with foundation soil frequency and resonate, thus vibrating impacter penetration capacity is strengthened greatly, greatly improve efficiency of construction.
In sum, the bumper assembly of vibro replacement stone column machine of the present invention connects the guide rod of vibro replacement stone column machine and the transit joint of vibrating impacter, and it comprises:
Rubber absorbers in tubular;
Be embedded in the upper adpting flange for connecting described guide rod on rubber absorbers top;
Be embedded in the lower adpting flange for connecting described transit joint of rubber absorbers bottom;
Wherein, the bonding surface of described upper adpting flange and described guide rod is provided with hermetically-sealed construction;
Wherein, the bonding surface of described lower adpting flange and described transit joint is provided with lower seal structure;
Wherein, described guide rod is telescopic guide rod, has the multilayer sleeve be socketed successively from inside to outside.
Preferably, described upper hermetically-sealed construction and described lower seal comprise respectively: the cannelure being arranged on described upper adpting flange top or described lower adpting flange bottom; Be placed in the upper sealing ring in described cannelure.
In addition, bumper assembly of the present invention also comprise be embedded in described rubber absorbers for improving cord in rubber absorbers tension and anti-twisting property, wherein, described interior cord is combined by nylon rope and steel wire and makes, and is embedded on the cross section of described rubber absorbers.
In addition, bumper assembly of the present invention also comprises the tensile structure being embedded in described upper adpting flange and/or described lower adpting flange and described rubber absorbers bonding surface place, and described tensile structure comprises: the screwed hole being preset in the horizontal integration face place of described upper adpting flange and/or described lower adpting flange and described rubber absorbers.
Wherein, described tensile structure also comprises: the interior swivel nut being embedded in longitudinal bonding surface place of described upper adpting flange and/or described lower adpting flange and described rubber absorbers.
Wherein, the inner embedding pre-embedded bolt had for its top and bottom are connected as one with described upper adpting flange and described lower adpting flange respectively of described rubber absorbers.
Wherein, the nut of described pre-embedded bolt and described upper adpting flange or described lower adpting flange junction are provided with preset flange.
Wherein, described multilayer sleeve comprises a top layer sleeve pipe, one or more intermediate casing are connected described upper adpting flange bottom sleeve pipe with one; Wherein: described top layer sleeve pipe and the intermediate casing be adjacent are provided with the first sliding pair for being slidably connected, and the first clamping being used for after stretching, extension, both being connected together secondary; Described bottom sleeve pipe and the intermediate casing be adjacent are provided with the second sliding pair for being slidably connected, and the second clamping being used for both being connected together after stretching, extension is secondary.
Wherein, described first sliding pair comprises: at least one first keyway being arranged on described top layer internal surface of sleeve pipe; Be arranged at least one first flat key of described intermediate casing outer wall; Wherein, described first flat key coordinates with described first keyway; Wherein, described first keyway and described first flat key extend along the axis of described top layer sleeve pipe and intermediate casing respectively.
Wherein, described first clamping pair comprises: ring be located at described top layer internal surface of sleeve pipe bottom and radially towards center position protrude the first support ear; Ring is located at described intermediate casing outer wall top and the first clamping platform radially protruded outwardly; Wherein, described first clamping platform is overlapped on described first support ear.
Although be explained in detail the present invention above; but the present invention is not limited thereto; those skilled in the art can principle according to the present invention modify, and therefore, all various amendments carried out according to principle of the present invention all should be understood to fall into protection scope of the present invention.

Claims (9)

1. a bumper assembly for vibro replacement stone column machine, for the transit joint of the guide rod and vibrating impacter that connect vibro replacement stone column machine, is characterized in that, comprising:
Rubber absorbers in tubular;
Be embedded in the upper adpting flange for connecting described guide rod on rubber absorbers top;
Be embedded in the lower adpting flange for connecting described transit joint of rubber absorbers bottom;
Be embedded in the tensile structure at described upper adpting flange and/or described lower adpting flange and described rubber absorbers bonding surface place, described tensile structure comprises: the screwed hole being preset in the horizontal integration face place of described upper adpting flange and/or described lower adpting flange and described rubber absorbers;
Be arranged on the upper hermetically-sealed construction on the bonding surface of described upper adpting flange and described guide rod;
Be arranged on the lower seal structure on the bonding surface of described lower adpting flange and described transit joint;
Wherein, described guide rod is telescopic guide rod, has the multilayer sleeve be socketed successively from inside to outside, and described multilayer sleeve comprises a top layer sleeve pipe, one or more intermediate casing are connected described upper adpting flange bottom sleeve pipe with one.
2. bumper assembly according to claim 1, is characterized in that, described upper hermetically-sealed construction comprises: the upper cannelure being arranged on described upper adpting flange top; Be placed in the upper sealing ring in described upper cannelure; Described lower seal structure comprises: the lower cannelure being arranged on described lower adpting flange bottom; Be placed in the lower seal in described lower cannelure.
3. bumper assembly according to claim 1, it is characterized in that, also comprise be embedded in described rubber absorbers for improving cord in rubber absorbers tension and anti-twisting property, wherein, described interior cord is combined by nylon rope and steel wire and makes, and is embedded on the cross section of described rubber absorbers.
4. bumper assembly according to claim 1, is characterized in that, described tensile structure also comprises:
Be embedded in the interior swivel nut at longitudinal bonding surface place of described upper adpting flange and/or described lower adpting flange and described rubber absorbers.
5. bumper assembly according to claim 1, is characterized in that, the inner embedding pre-embedded bolt had for being connected as one with described upper adpting flange and described lower adpting flange respectively in its top and bottom of described rubber absorbers.
6. bumper assembly according to claim 5, is characterized in that, in connection, the nut place of the described pre-embedded bolt of adpting flange or lower adpting flange is provided with preset flange.
7. bumper assembly according to claim 2, is characterized in that:
Described top layer sleeve pipe and the intermediate casing be adjacent are provided with the first sliding pair for being slidably connected, and the first clamping being used for both being connected together after stretching, extension is secondary; And
Described bottom sleeve pipe and the intermediate casing be adjacent are provided with the second sliding pair for being slidably connected, and the second clamping being used for both being connected together after stretching, extension is secondary.
8. bumper assembly according to claim 7, is characterized in that, described first sliding pair comprises:
Be arranged at least one first keyway of described top layer internal surface of sleeve pipe;
Be arranged at least one first flat key of described intermediate casing outer wall;
Wherein, described first flat key coordinates with described first keyway;
Wherein, described first keyway and described first flat key extend along the axis of described top layer sleeve pipe and intermediate casing respectively.
9. bumper assembly according to claim 7, is characterized in that, described first clamping pair comprises:
Ring be located at described top layer internal surface of sleeve pipe bottom and radially towards center position protrude the first support ear;
Ring is located at described intermediate casing outer wall top and the first clamping platform radially protruded outwardly;
Wherein, described first clamping platform is overlapped on described first support ear.
CN201410637647.5A 2014-11-13 2014-11-13 The bumper assembly of vibro replacement stone column machine Active CN104372787B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410637647.5A CN104372787B (en) 2014-11-13 2014-11-13 The bumper assembly of vibro replacement stone column machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410637647.5A CN104372787B (en) 2014-11-13 2014-11-13 The bumper assembly of vibro replacement stone column machine

Publications (2)

Publication Number Publication Date
CN104372787A CN104372787A (en) 2015-02-25
CN104372787B true CN104372787B (en) 2016-04-13

Family

ID=52551957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410637647.5A Active CN104372787B (en) 2014-11-13 2014-11-13 The bumper assembly of vibro replacement stone column machine

Country Status (1)

Country Link
CN (1) CN104372787B (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85106779B (en) * 1985-08-31 1987-11-04 沈阳胶管厂 Rubber shake-reductor of vibration and impulsion
JP2005133947A (en) * 2004-11-08 2005-05-26 Showa Electric Wire & Cable Co Ltd Manufacturing method of laminated rubber supporting body
CN202450507U (en) * 2011-12-08 2012-09-26 北京振冲工程股份有限公司 Vibro-impact equipment with bottom part discharging device
CN103938610B (en) * 2014-04-21 2016-06-29 云南省交通规划设计研究院 The construction pile pipe of the variable cross-section Reinforced Gravel Pile of a kind of strengthening soft foundation and technique

Also Published As

Publication number Publication date
CN104372787A (en) 2015-02-25

Similar Documents

Publication Publication Date Title
CN202482093U (en) Tower well seawater lifting system
CN103603339A (en) Method for long spiral drilling machine grouting retaining wall hole forming and system thereof
CN102182180B (en) Rotary extrusion sleeve anchor rod and construction method thereof
CN1460751A (en) Composite pile, combination construction method of composite pile and pile foundation and its application
CN104372788B (en) Vibro replacement stone column machine and construction method
CN100585090C (en) A kind of injection grouting method and injection slip casting drilling tool
CN104358248B (en) The telescopic guide rod of vibro replacement stone column machine
CN101914916B (en) Multi-disk pouring pile one-step molding device and construction method thereof
CN104343112B (en) The synchronous auto feed system of multireel dish of vibro replacement stone column machine
CN204225081U (en) Vibro replacement stone column machine
CN104372787B (en) The bumper assembly of vibro replacement stone column machine
CN212154858U (en) A cup joint formula underground conveyor for tailing lotion fills
CN102926654B (en) Stake holes ring cutting system and stake holes ring cutting method
CN113090192A (en) Complex stratum rotary drilling steel sleeve matched hole forming method
CN201891113U (en) Device for sinking hollow shell pile through high-pressure water jetting
CN104372786B (en) For hydraulic pressure dynamic balance method and the system of vibro-replacement stone
CN204282340U (en) The anti-desilting device of Water-gas linkage of vibro replacement stone column machine
CN104358249B (en) Water-gas linkage desilting for vibro-replacement stone stops method and system
CN104358246A (en) Vibroflotation gravel pile machine and quantitative water supply construction method thereof
CN104358247B (en) For electronic punching method and the device of shaking of vibro replacement stone column machine
CN116927236A (en) Integrated sleeve cage structure of single pile foundation of fan
CN102628270B (en) Great-diameter variable section irregularly-shaped resistance-increased steel pipe pile system and construction method thereof
CN204282339U (en) The synchronous auto feed system of multireel dish of vibro replacement stone column machine
CN204252111U (en) Vibro replacement stone column machine stretches the pallet of guide rod
CN106836215A (en) Inside and outside hydraulic pressure autobalance steel pile casting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant