CN104363059A - Testing method and testing system of integrated test instrument - Google Patents

Testing method and testing system of integrated test instrument Download PDF

Info

Publication number
CN104363059A
CN104363059A CN201410720591.XA CN201410720591A CN104363059A CN 104363059 A CN104363059 A CN 104363059A CN 201410720591 A CN201410720591 A CN 201410720591A CN 104363059 A CN104363059 A CN 104363059A
Authority
CN
China
Prior art keywords
test
module
testing
instrumentation
started
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410720591.XA
Other languages
Chinese (zh)
Other versions
CN104363059B (en
Inventor
裴瑞凌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Benxi Steel Group Information Automation Co ltd
Original Assignee
Shanghai Feixun Data Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Feixun Data Communication Technology Co Ltd filed Critical Shanghai Feixun Data Communication Technology Co Ltd
Priority to CN201410720591.XA priority Critical patent/CN104363059B/en
Publication of CN104363059A publication Critical patent/CN104363059A/en
Application granted granted Critical
Publication of CN104363059B publication Critical patent/CN104363059B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides a testing method and a testing system of an integrated test instrument. According to the testing method, when the testing system is used for testing a tested device, starting corresponding testing modules by invoking pre-configured interfaces and interfaces in various testing modules in the test instrument; after the completion of the running of the started test modules is determined, obtaining test logs which are recorded by the testing modules and comprise the test processes and/or the test results; and continuously testing the tested device based on the obtained test logs. According to the testing method and the testing system of the integrated test instrument, the interfaces corresponding to the testing modules in the test instrument are configured to combine two test devices which are completely different in execution environment, and therefore, the discordance of the two test devices is effectively avoided and the efficiency of testing the tested device is effectively improved; meanwhile, the testing system automatically extracts desired test records and continuously performs testing by use of the test logs in the test instrument, so that the completely automatic testing between two completely different test environments is realized.

Description

The method of testing of integration testing instrument and system
Technical field
The present invention relates to a kind of field tests of communication equipment, particularly relate to a kind of method of testing and system of integration testing instrument.
Background technology
Have multiple to the test of communication class electronic equipment, as the test, functional test, performance statistics test etc. of protocol conformance.In order to full test equipment under test, tester needs to utilize multiple test platform to test equipment under test.
At present, tester needs to do test as much as possible to equipment under test on a test platform in test process, and then another test platform of fighting in different parts.Because the hardware of each test platform, software environment are inconsistent.Therefore, design test module and maintenance test environment all need tester to dispose separately.In addition, in a lot of situation, need to rely on the test result of another test platform or the data of test process at the test process of a certain test platform.At this moment, the energy spent by tester and the composition of manual intervention will be more.This is concerning tester, not only troublesome operation but also cannot avoid, and maintenance cost is just higher.
Therefore, need to carry out effectively integrated to existing many test macros.
Summary of the invention
The shortcoming of prior art in view of the above, the object of the present invention is to provide a kind of method of testing and system of integration testing instrument, too low for solving existing many test platforms degree of coupling in prior art, cannot realize the problem of test automatically.
For achieving the above object and other relevant objects, the invention provides a kind of method of testing of integration testing instrument, comprising: in the process of test equipment under test, pre-configured start corresponding test module to the interface of test module each in test instrumentation by calling; When determining that started test module has run, obtain the test log comprising test process and/or test result that described test module records; Continue to perform the test to described equipment under test based on obtained test log.
Preferably, described default comprising with the interface of each test module in test instrumentation: the keyword configuring the start-up code corresponding to each described test module.
Preferably, default comprising with the mode of the interface of each test module in test instrumentation is called described in: adopt SSH technology that the start-up code of called test module is passed to described test instrumentation, so that described test instrumentation starts corresponding test module.
Preferably, determine that the mode that started test module has run comprises: monitor the process of test module in described test instrumentation started, when described process disappears, then determine that started test module has run.
Preferably, described test instrumentation comprises: based on the automatic test instrument of CDRouter, IXIA or SmartBits.
Based on above-mentioned purpose, the present invention also provides a kind of test macro of integration testing instrument, comprising: the first module, for pre-configured starting corresponding test module to the interface of test module each in test instrumentation by calling in the process of test equipment under test; Second module, for when determining that started test module has run, obtains the test log comprising test process and/or test result that described test module records; 3rd module, for continuing to perform the test to described equipment under test based on obtained test log.
Preferably, that presets in described first module comprises with the interface of each test module in test instrumentation: the keyword configuring the start-up code corresponding to each described test module.
Preferably, the start-up code of called test module is passed to described test instrumentation for adopting SSH technology by described first module, so that described test instrumentation starts corresponding test module.
Preferably, tell the second module also for monitoring the process of started test module in described test instrumentation, when described process disappears, then determine that started test module has run.
Preferably, described test instrumentation comprises: based on the automatic test instrument of CDRouter, IXIA or SmartBits.
As mentioned above, the method of testing of integration testing instrument of the present invention and system, there is following beneficial effect: two diverse testing equipments of execution environment combined with the interface of test module each in test instrumentation by configuration, effectively prevent the inharmonious of two testing equipments, effectively improve the testing efficiency to equipment under test; Meanwhile, described test macro utilizes the test log in described test instrumentation, and the test record needed for automatically extracting also proceeds test, achieves full automatic test between two diverse test environments; In addition, determine that started test module completes test by the process in monitoring and test instrument, obtain test log again, test log can not only be obtained in time to carry out follow-up test, effectively can also prevent from blindly obtaining because test instrumentation cannot be learnt whether to complete test the not congruent defect of data that test log brings; Further, adopt SSH technology, can safety carry out Long-distance Control test instrumentation, decrease the troubles such as the place that test macro and test instrumentation bring by signal wiring.
Accompanying drawing explanation
Fig. 1 is shown as the flow chart of the method for testing of integration testing instrument of the present invention.
Fig. 2 is shown as the structural representation of the test macro of integration testing instrument of the present invention.
Element numbers explanation
1 test macro
11 first modules
12 second modules
13 the 3rd modules
2 test instrumentations
S1 ~ S3 step
Embodiment
Below by way of specific instantiation, embodiments of the present invention are described, those skilled in the art the content disclosed by this specification can understand other advantages of the present invention and effect easily.The present invention can also be implemented or be applied by embodiments different in addition, and the every details in this specification also can based on different viewpoints and application, carries out various modification or change not deviating under spirit of the present invention.It should be noted that, when not conflicting, the feature in following examples and embodiment can combine mutually.
Refer to Fig. 1, the invention provides a kind of method of testing of integration testing instrument.Described method of testing performs primarily of the test macro be arranged in test platform.Wherein, described test platform can be the test frame etc. based on the test platform of RobotFramework (auto-testing-framework), QTP (Quick Test Professional tests professional version fast) or the stratification of independent research.Described test instrumentation includes but not limited to: based on the automatic test instrument of CDRouter, IXIA or SmartBits
Wherein, described test instrumentation is mainly used to carry out described test macro to equipment under test and cannot carries out or utilize described test macro to be not easy to the test carried out.Such as, described test macro is used for testing the function of equipment under test, and integrated test instrumentation is the protocol conformance for testing equipment under test, when described test macro needs the packet capturing data in the test result of described test instrumentation or test process in test process, which employs following method will give integrated with the diverse test instrumentation of selftest environment, to realize automatic test.Wherein, described equipment under test can be the electronic equipment of any communication class, and it includes but not limited to: router, switch etc.
In step sl, described test macro pre-configured starts corresponding test module to the interface of test module each in test instrumentation by calling in the process of test equipment under test.
Wherein, described interface can be the hardware interface between described test macro and test instrumentation.Here preferred, described interface is that tester is pre-configured in described test macro according to the corresponding relation in each test module in test instrumentation and each test module in described test macro in advance.Such as, described tester utilizes configuration file the start-up code of the call instruction of each test module in described test macro with the corresponding test module in described test instrumentation to be matched.More preferably, described interface is the keyword that configuration corresponds to the start-up code of each described test module.Such as, tester is configured with the keyword of the start-up code corresponding to each described test module in described test macro, then described test macro starts the operation of corresponding test module in described test instrumentation in running by calling corresponding keyword.
At this, the instruction between described test macro and test instrumentation can be passed through hardware interface (as serial bus interfaces such as USB) and transmit.Preferably, described test macro adopts SSH (safety shell protocol) technology the start-up code of called test module to be passed to described test instrumentation, so that described test instrumentation starts corresponding test module.Such as, described test macro is connected with test instrumentation network, then described test macro adopts SSH framework, and the start-up code of encryption is passed to described test instrumentation.
Therefore, described test macro is when performing test script, be arranged through according to script and call configured keyword, adopt SSH technology that the start-up code corresponding to described keyword is passed to test instrumentation, then described test instrumentation starts and runs corresponding test module, meanwhile, described test macro suspends current test, and waits for that the test of corresponding test module completes.
In step s 2, described test macro, when determining that started test module has run, obtains the test log comprising test process and/or test result that described test module records.
Particularly, when the test module in described test instrumentation is activated operation, test process and test result are kept in default file with the form of daily record by described test instrumentation, when described test instrumentation executes corresponding test module, initiatively described test log can be supplied to described test macro, so that described test macro again recovers and continues to perform follow-up test.Its presentation mode also can adopt SSH technology, to guarantee safety.
In fact, most of test instrumentation does not have the function initiatively exporting test log.Described test macro, while time-out test, is monitored the process of started test module in described test instrumentation by the mode such as telnet or interface accessing, when described process disappears, is then determined that started test module has run.
In the present embodiment, described test macro utilizes the technology such as telnet to enter in the operating system of described test instrumentation, and the process title of monitoring in described test instrumentation, when the process title of started test module disappears, determine that it has run, now, from the file preset, corresponding test log is extracted.
Such as, described test macro is long-range after startup test module A enters described test instrumentation, and the executive process of buddy is monitored in the instruction of circulation execution ps-auwx|grep buddy, and read the result of PS instruction, coupling tclsh process is gone by return value regular expression, corresponding test module A is described also in operation if the match is successful, otherwise then from the file preset, provides the test log corresponding to described test module A, and perform step S3.
In step s3, described test macro continues to perform the test to described equipment under test based on obtained test log.
Particularly, described test macro is after obtaining test log, by the analysis to test log, therefrom extract the detecting information such as test result or described packet capturing data, and extracted detecting information is substituted in the test script suspended as parameter, to continue to perform described test script.
Such as, described test macro extracts data retransmission that address ip 1 sends by equipment under test to all forwarding datas in address ip 2 process in obtained test log, and extracted forwarding data is sent in the test script suspended, and continue to perform this test script, whether consistent with the expectation preset to detect the forwarding data extracted, and obtain corresponding test result.
Refer to Fig. 2, the invention provides a kind of test macro of integration testing instrument.Described test macro 1 comprises by the software and hardware be arranged in test platform.Wherein, described test platform can be the test frame etc. based on the test platform of RobotFramework (auto-testing-framework), QTP (Quick Test Professional tests professional version fast) or the stratification of independent research.Described test instrumentation 2 includes but not limited to: based on the automatic test instrument 2 of CDRouter, IXIA or SmartBits
Wherein, described test instrumentation 2 is mainly used to carry out described test macro 1 to equipment under test 3 and cannot carries out or utilize described test macro 1 to be not easy to the test carried out.Such as, described test macro 1 is used for testing the function of equipment under test 3, and integrated test instrumentation 2 is the protocol conformance for testing equipment under test 3, when described test macro 1 needs the packet capturing data in the test result of described test instrumentation 2 or test process in test process, it have invoked as lower module will give integrated with the diverse test instrumentation of selftest environment 2, to realize automatic test.Wherein, described equipment under test 3 can be the electronic equipment of any communication class, and it includes but not limited to: router, switch etc.
Described test macro 1 comprises: the first module 11, second module 12 and the 3rd module 13.
Described first module 11 for pre-configured starting corresponding test module to the interface of each test module in test instrumentation 2 by calling in the process of test equipment under test 3.
Wherein, described interface can be the hardware interface between described test macro 1 and test instrumentation 2.Here preferred, described interface is that tester is pre-configured in described first module 11 according to the corresponding relation in each test module in each test module in test instrumentation 2 and described first module 11 in advance.Such as, described tester utilizes configuration file to be matched with the start-up code of the corresponding test module in described test instrumentation 2 by the call instruction of each test module in described first module 11.More preferably, described interface is the keyword that configuration corresponds to the start-up code of each described test module.Such as, tester is configured with the keyword of the start-up code corresponding to each described test module in described first module 11, then described first module 11 starts the operation of corresponding test module in described test instrumentation 2 in running by calling corresponding keyword.
At this, the instruction between described first module 11 and test instrumentation 2 can be passed through hardware interface (as serial bus interfaces such as USB) and transmit.Preferably, described first module 11 adopts SSH (safety shell protocol) technology that the start-up code of called test module is passed to described test instrumentation 2, so that described test instrumentation 2 starts corresponding test module.Such as, described first module 11 is connected with test instrumentation 2 network, then described first module 11 adopts SSH framework, and the start-up code of encryption is passed to described test instrumentation 2.
Therefore, described first module 11 is when performing test script, be arranged through according to script and call configured keyword, adopt SSH technology that the start-up code corresponding to described keyword is passed to test instrumentation 2, then described test instrumentation 2 starts and runs corresponding test module, meanwhile, described first module 11 suspends current test, and waits for that the test of corresponding test module completes.
Described second module 12, for when determining that started test module has run, obtains the test log comprising test process and/or test result that described test module records.
Particularly, when the test module in described test instrumentation 2 is activated operation, test process and test result are kept in default file with the form of daily record by described test instrumentation 2, when described test instrumentation 2 executes corresponding test module, initiatively described test log can be supplied to described second module 12, so that described second module 12 is again recovered and continued to perform follow-up test.Its presentation mode also can adopt SSH technology, to guarantee safety.
In fact, most of test instrumentation 2 does not have the function initiatively exporting test log.Described second module 12, while time-out test, is monitored the process of started test module in described test instrumentation 2 by the mode such as telnet or interface accessing, when described process disappears, is then determined that started test module has run.
In the present embodiment, described second module 12 utilizes the technology such as telnet to enter in the operating system of described test instrumentation 2, and the process title of monitoring in described test instrumentation 2, when the process title of started test module disappears, determine that it has run, now, from the file preset, corresponding test log is extracted.
Such as, described second module 12 is long-range after startup test module A enters described test instrumentation 2, and the executive process of buddy is monitored in the instruction of circulation execution ps-auwx|grep buddy, and read the result of PS instruction, coupling tclsh process is gone by return value regular expression, corresponding test module A is described also in operation if the match is successful, otherwise then from the file preset, provides the test log corresponding to described test module A, and start described 3rd module 13.
Described 3rd module 13 is for continuing to perform the test to described equipment under test 3 based on obtained test log.
Particularly, described 3rd module 13 is after obtaining test log, by the analysis to test log, therefrom extract the detecting information such as test result or described packet capturing data, and extracted detecting information is substituted in the test script suspended as parameter, to continue to perform described test script.
Such as, described 3rd module 13 extracts data retransmission that address ip 1 sends by equipment under test 3 to all forwarding datas in address ip 2 process in obtained test log, and extracted forwarding data is sent in the test script suspended, and continue to perform this test script, whether consistent with the expectation preset to detect the forwarding data extracted, and obtain corresponding test result.
In sum, the method of testing of integration testing instrument of the present invention and system, two diverse testing equipments of execution environment are combined with the interface of test module each in test instrumentation by configuration, effectively prevent the inharmonious of two testing equipments, effectively improve the testing efficiency to equipment under test; Meanwhile, described test macro utilizes the test log in described test instrumentation, and the test record needed for automatically extracting also proceeds test, achieves full automatic test between two diverse test environments; In addition, determine that started test module completes test by the process in monitoring and test instrument, obtain test log again, test log can not only be obtained in time to carry out follow-up test, effectively can also prevent from blindly obtaining because test instrumentation cannot be learnt whether to complete test the not congruent defect of data that test log brings; Further, adopt SSH technology, can safety carry out Long-distance Control test instrumentation, decrease the troubles such as the place that test macro and test instrumentation bring by signal wiring.So the present invention effectively overcomes various shortcoming of the prior art and tool high industrial utilization.
Above-described embodiment is illustrative principle of the present invention and effect thereof only, but not for limiting the present invention.Any person skilled in the art scholar all without prejudice under spirit of the present invention and category, can modify above-described embodiment or changes.Therefore, such as have in art usually know the knowledgeable do not depart from complete under disclosed spirit and technological thought all equivalence modify or change, must be contained by claim of the present invention.

Claims (10)

1. a method of testing for integration testing instrument, is characterized in that, comprising:
Pre-configured corresponding test module is started to the interface of test module each in test instrumentation by calling in the process of test equipment under test;
When determining that started test module has run, obtain the test log comprising test process and/or test result that described test module records;
Continue to perform the test to described equipment under test based on obtained test log.
2. the method for testing of integration testing instrument according to claim 1, is characterized in that: described default comprising with the interface of each test module in test instrumentation: the keyword configuring the start-up code corresponding to each described test module.
3. the method for testing of integration testing instrument according to claim 2, it is characterized in that: described in call default comprising with the mode of the interface of each test module in test instrumentation: adopt SSH technology that the start-up code of called test module is passed to described test instrumentation, so that described test instrumentation starts corresponding test module.
4. the method for testing of integration testing instrument according to claim 1, it is characterized in that: determine that the mode that started test module has run comprises: monitor the process of test module in described test instrumentation started, when described process disappears, then determine that started test module has run.
5. the method for testing of integration testing instrument according to claim 1, is characterized in that: described test instrumentation comprises: based on the automatic test instrument of CDRouter, IXIA or SmartBits.
6. a test macro for integration testing instrument, is characterized in that, comprising:
First module, for pre-configured starting corresponding test module to the interface of test module each in test instrumentation by calling in the process of test equipment under test;
Second module, for when determining that started test module has run, obtains the test log comprising test process and/or test result that described test module records;
3rd module, for continuing to perform the test to described equipment under test based on obtained test log.
7. the test macro of integration testing instrument according to claim 6, is characterized in that: that presets in described first module comprises with the interface of each test module in test instrumentation: the keyword configuring the start-up code corresponding to each described test module.
8. the test macro of integration testing instrument according to claim 7, it is characterized in that: the start-up code of called test module is passed to described test instrumentation for adopting SSH technology by described first module, so that described test instrumentation starts corresponding test module.
9. the test macro of integration testing instrument according to claim 6, it is characterized in that: tell the second module also for monitoring the process of started test module in described test instrumentation, when described process disappears, then determine that started test module has run.
10. the test macro of integration testing instrument according to claim 6, is characterized in that: described test instrumentation comprises: based on the automatic test instrument of CDRouter, IXIA or SmartBits.
CN201410720591.XA 2014-12-02 2014-12-02 The method of testing and system of integration testing instrument Active CN104363059B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410720591.XA CN104363059B (en) 2014-12-02 2014-12-02 The method of testing and system of integration testing instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410720591.XA CN104363059B (en) 2014-12-02 2014-12-02 The method of testing and system of integration testing instrument

Publications (2)

Publication Number Publication Date
CN104363059A true CN104363059A (en) 2015-02-18
CN104363059B CN104363059B (en) 2017-11-28

Family

ID=52530290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410720591.XA Active CN104363059B (en) 2014-12-02 2014-12-02 The method of testing and system of integration testing instrument

Country Status (1)

Country Link
CN (1) CN104363059B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108256363A (en) * 2016-12-29 2018-07-06 大唐移动通信设备有限公司 A kind of radio frequency test method and device
CN110347589A (en) * 2019-06-11 2019-10-18 烽火通信科技股份有限公司 A kind of software unit testing automated detection method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7222255B1 (en) * 2001-02-28 2007-05-22 3Com Corporation System and method for network performance testing
CN101106787A (en) * 2006-07-12 2008-01-16 大唐移动通信设备有限公司 Base station RF index testing system and method, and RF box for TD-SCDMA system
CN102855155A (en) * 2012-06-21 2013-01-02 伟创力电子技术(苏州)有限公司 Automatic programming and functional test all-in-one machine for light-radio frequency transceiving module
CN102904777A (en) * 2012-10-15 2013-01-30 上海斐讯数据通信技术有限公司 Port-based multi-equipment testing implementing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7222255B1 (en) * 2001-02-28 2007-05-22 3Com Corporation System and method for network performance testing
CN101106787A (en) * 2006-07-12 2008-01-16 大唐移动通信设备有限公司 Base station RF index testing system and method, and RF box for TD-SCDMA system
CN102855155A (en) * 2012-06-21 2013-01-02 伟创力电子技术(苏州)有限公司 Automatic programming and functional test all-in-one machine for light-radio frequency transceiving module
CN102904777A (en) * 2012-10-15 2013-01-30 上海斐讯数据通信技术有限公司 Port-based multi-equipment testing implementing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108256363A (en) * 2016-12-29 2018-07-06 大唐移动通信设备有限公司 A kind of radio frequency test method and device
CN110347589A (en) * 2019-06-11 2019-10-18 烽火通信科技股份有限公司 A kind of software unit testing automated detection method and system

Also Published As

Publication number Publication date
CN104363059B (en) 2017-11-28

Similar Documents

Publication Publication Date Title
CN107995068B (en) Network port testing method, equipment and computer readable storage medium
CN108763086B (en) Script recording method, terminal and computer readable storage medium based on remote true machine
CN109408338B (en) Method, device, equipment and system for grabbing trace of NVME (network video management entity) hard disk
CN106776294B (en) Automatic android mobile phone testing method and system
WO2017161964A1 (en) Communication network inspection method and device, and inspection client terminal
CN105243016B (en) The methods, devices and systems being monitored to the terminal device on test platform
CN104375914A (en) Automatic testing method for internal pressure changes of server
US20140189103A1 (en) System for monitoring servers and method thereof
CN103731663B (en) The testing method of a kind of intelligent television and device
US20130322266A1 (en) Network traffic monitoring
WO2016082543A1 (en) Device testing method and testing device
CN108984363B (en) Parallel test method and system
CN112529223A (en) Equipment fault repair method and device, server and storage medium
CN111651232A (en) One-machine multi-control method, device and system and electronic equipment
CN109471763B (en) Method, device, equipment and system for grabbing trace of NVME (network video management entity) hard disk
CN104363059A (en) Testing method and testing system of integrated test instrument
US9329960B2 (en) Methods, systems, and computer readable media for utilizing abstracted user-defined data to conduct network protocol testing
CN106598793B (en) Test system and test method based on BIOS serial port log data
JP2008176353A (en) Information processor and log acquisition method, and program
CN103399803A (en) Method and device for collecting browser breakdown information and terminal equipment
CN111585830A (en) User behavior analysis method, device, equipment and storage medium
CN111124828A (en) Data processing method, device, equipment and storage medium
TW201743069A (en) Logic analyzer, method of retrieving data of the same, and method of performance testing
CN116137603A (en) Link fault detection method and device, storage medium and electronic device
CN114338347A (en) Ampere platform-based fault information out-of-band acquisition method and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201030

Address after: 318015 no.2-3167, zone a, Nonggang City, no.2388, Donghuan Avenue, Hongjia street, Jiaojiang District, Taizhou City, Zhejiang Province

Patentee after: Taizhou Jiji Intellectual Property Operation Co.,Ltd.

Address before: 201616 Shanghai city Songjiang District Sixian Road No. 3666

Patentee before: Phicomm (Shanghai) Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231019

Address after: 117000 No. 130, Guangyu Road, Pingshan District, Benxi City, Liaoning Province

Patentee after: BENXI STEEL (GROUP) INFORMATION AUTOMATION CO.,LTD.

Address before: 318015 no.2-3167, area a, nonggangcheng, 2388 Donghuan Avenue, Hongjia street, Jiaojiang District, Taizhou City, Zhejiang Province

Patentee before: Taizhou Jiji Intellectual Property Operation Co.,Ltd.