CN104361825A - Distribution network map display method convenient for quick emergency maintenance and command for power failure - Google Patents
Distribution network map display method convenient for quick emergency maintenance and command for power failure Download PDFInfo
- Publication number
- CN104361825A CN104361825A CN201410620115.0A CN201410620115A CN104361825A CN 104361825 A CN104361825 A CN 104361825A CN 201410620115 A CN201410620115 A CN 201410620115A CN 104361825 A CN104361825 A CN 104361825A
- Authority
- CN
- China
- Prior art keywords
- emergency maintenance
- distribution map
- repairing
- breakdown service
- map
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000012423 maintenance Methods 0.000 title abstract 15
- 238000013439 planning Methods 0.000 claims abstract description 4
- 230000015556 catabolic process Effects 0.000 claims description 39
- 238000010586 diagram Methods 0.000 claims description 9
- 238000004458 analytical method Methods 0.000 claims description 4
- 238000011065 in-situ storage Methods 0.000 claims description 4
- 238000004364 calculation method Methods 0.000 claims description 3
- 230000007257 malfunction Effects 0.000 claims description 3
- 238000012544 monitoring process Methods 0.000 claims description 3
- 239000002699 waste material Substances 0.000 abstract description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B29/00—Maps; Plans; Charts; Diagrams, e.g. route diagram
- G09B29/10—Map spot or coordinate position indicators; Map reading aids
- G09B29/102—Map spot or coordinate position indicators; Map reading aids using electrical means
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Human Resources & Organizations (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Public Health (AREA)
- Mathematical Physics (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Locating Faults (AREA)
Abstract
The invention discloses a distribution network map display method convenient for quick emergency maintenance and command for power failure. The method includes: marking the location of a fault point in red on a map; displaying positions of emergency maintenance stations with emergency maintenance conditions in green on the map; selecting the nearest emergency maintenance station easiest to reach the fault point; planning a best route between the emergency maintenance station and the fault point, and marking in blue on the map; sending call signals to the emergency maintenance station, and sending information of the route for emergency maintenance through the network; after the emergency maintenance station receives the call signals, timely organizing personnel to rush to the fault point according to instructions of the route map, and carrying out emergency maintenance. Positions of the fault point and the emergency maintenance stations are highlighted, the nearest emergency maintenance station can be selected automatically, and the planned emergency maintenance route map is displayed in blue, so that more intelligence and automation are achieved, complexity and troubles of manually calling the emergency maintenance stations are avoided, and resource waste caused by the fact that several emergency maintenance stations rush to the same fault point is avoided as well.
Description
Technical field
The present invention relates to power failure repairing field, particularly relate to a kind of distribution map-indication method facilitating power failure rapid rush-repair to command.
Background technology
Electric system is the economic development of society, the stability basis of order and public welfare, once break down, bring immeasurable impact will to the economy of society and the life of people, so requirement must recover the supply of electric power within the shortest time usually.After the power failure that how can cause in disaster or other reasons occurs, the very first time restores electricity, and transfers available resources fast and rushes to repair the electric power facility damaged, be power industry must faced by problem.
Current main electric power repairing scheduling mode is after the information passed back by fault in-situ or personnel rush for scene, by each repairing center of manual calling periphery, then select troop's (comprising equipment to perfect, without other repairing tasks) scene of rushing towards possessing repairing condition and carry out repairing work.Which is by manually having called out step by step, and inefficiency, does not meet the demand of current rapid rush-repair, seriously constrains the speed of power recovery.On the other hand, after the multiple breakdown service of periphery together searches position of failure point information, select mechanism owing to communicating with each other and lack, there will be the situation that same trouble spot hurried to by many places breakdown service, cause the serious waste of resource.Therefore, we need to look for a kind of electric power first-aid comand way of more efficient and science.
Summary of the invention
The problem that the present invention mainly solves is to provide a kind of distribution map-indication method facilitating power failure rapid rush-repair to command, can on map red highlighted display position of failure point coordinate, the repairing website that periphery possesses repairing condition is green bright light display then; The nearest breakdown service of automatic selection, and blue show the repairing route map cooked up, more intelligent and robotization, map denotation is remarkably productive, avoids the loaded down with trivial details of manual calling breakdown service and the wasting of resources caused same trouble spot rushed towards by multiple breakdown service.
For solving the problem, the present invention adopts following technical scheme:
Facilitate the distribution map-indication method that power failure rapid rush-repair is commanded, comprise the following steps rapid:
A, reception position of failure point information, on distribution map, redness indicates this guilty culprit ground;
The electromagnetic wave signal that b, reception periphery breakdown service are launched, will possess breakdown service position green display on distribution map of repairing condition;
C, by planning, analysis and calculation, from the breakdown service of above-mentioned green display, chosen distance is nearest, the most easily arrives the breakdown service of trouble spot;
D, cook up optimum line between above-mentioned breakdown service and trouble spot, and go out this wiring diagram with blue markings on distribution map;
E, send call signal to the above-mentioned nearest breakdown service possessing repairing condition, and transmit repairing wiring diagram information by network;
F, the nearest breakdown service possessing repairing condition receive call signal, and timely establishment officer indicates according to wiring diagram, hurries to fault in-situ to carry out repairing, and green bright spot map representing this breakdown service position is extinguished thereupon;
G, fault clearance, repair personnel gets back to breakdown service, and the green marking light of this breakdown service in distribution map lights again, and meanwhile, the bright red spot of representing fault point position extinguishes.
Preferably, in described step a, the prerequisite successfully indicating abort situation point is that malfunction monitoring end is provided with locating device, accurately can locate the very first time, and positional information is passed to the receiving end of distribution map fast.
Preferably, in described step b, the electromagnetic wave signal that electric power first-aid station is launched will meet repairing protocol specification, successfully captures for distribution map receiving end; The repairing conditional information comprised in described electromagnetic wave signal, refers to whether rush repair equipment and personnel are in complete and armed state.
Adopt technique scheme, beneficial effect of the present invention is:
1, abandon the poor efficiency way that artificial calling step by step realizes dispatching, improve the rapid rush-repair level of power failure further;
2, in distribution map trouble spot with repairing center common display, very clear, be more conducive to repairing commander;
3, the breakdown service nearest from trouble spot can be gone out by automatic analysis, cook up optimum repairing route, it also avoid multiple breakdown service simultaneously and rush towards the wasting of resources caused same trouble spot, substantially increase the intelligent level in the middle of electric power first-aid scheduling.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, content of the present invention is described further:
Fig. 1 is the schematic flow sheet of this invention institute supplying method.
Embodiment
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with the drawings and the specific embodiments, a kind of distribution map-indication method facilitating power failure rapid rush-repair to command of the present invention is described in further detail.Should be appreciated that embodiment described herein only in order to explain the present invention, can not limit the scope of the invention with this.
Fig. 1 illustrates the schematic flow sheet of this invention institute supplying method, a kind of distribution map-indication method facilitating power failure rapid rush-repair to command, comprises the following steps rapid:
Step 1, receive position of failure point information, on distribution map, redness indicates this position, trouble spot;
Step 2, receives the electromagnetic wave signal that periphery breakdown service is launched, and will possess breakdown service position green display on distribution map of repairing condition;
Step 3, by planning, analysis and calculation, from the breakdown service of above-mentioned green display, chosen distance is nearest, the most easily arrives the breakdown service of trouble spot;
Step 4, cooks up the optimum line between above-mentioned breakdown service and trouble spot, and goes out this wiring diagram with blue markings on distribution map;
Step 5, sends call signal to the above-mentioned nearest breakdown service possessing repairing condition, and by network by transmission repairing wiring diagram information;
Step 6, the nearest breakdown service possessing repairing condition receives call signal, and timely establishment officer indicates according to wiring diagram, hurries to fault in-situ to carry out repairing, and green bright spot map representing this breakdown service position is extinguished thereupon;
Step 7, fault clearance, repair personnel gets back to breakdown service, and the green marking light of this breakdown service in distribution map lights again, and meanwhile, the bright red spot of representing fault point position extinguishes.
Wherein, in step 1, the prerequisite successfully indicating abort situation point in the middle of distribution map is that malfunction monitoring end is provided with locating device, can accurately locate the very first time, and positional information is passed to the receiving end of distribution map fast.
In step 2, the electromagnetic wave signal that electric power first-aid station is launched will meet repairing protocol specification, successfully captures for distribution map receiving end; The repairing conditional information comprised in described electromagnetic wave signal, refers to whether rush repair equipment and personnel are in complete and armed state.If the rush repair equipment of certain breakdown service and personnel are in complete and armed state, then can green indicate in distribution map; If rush repair equipment and personnel are not in complete and armed state, such as equipment Under Repair or personnel processing other repairing tasks, then this breakdown service does not have any color marking in distribution map.
The foregoing is only better embodiment of the present invention, not in order to limit the present invention, one of ordinary skill in the art will be recognized, use the solution of the present invention can also realize many optional embodiments.All any amendments done within the spirit and principles in the present invention, equivalent replacement and improvement etc., all should be included within protection scope of the present invention.
Claims (3)
1. facilitate the distribution map-indication method that power failure rapid rush-repair is commanded, it is characterized in that, comprise the following steps rapid:
A, reception position of failure point information, on distribution map, redness indicates this guilty culprit ground;
The electromagnetic wave signal that b, reception periphery breakdown service are launched, will possess breakdown service position green display on distribution map of repairing condition;
C, by planning, analysis and calculation, from the breakdown service of above-mentioned green display, chosen distance is nearest, the most easily arrives the breakdown service of trouble spot;
D, cook up optimum line between above-mentioned breakdown service and trouble spot, and go out this wiring diagram with blue markings on distribution map;
E, send call signal to the above-mentioned nearest breakdown service possessing repairing condition, and transmit repairing wiring diagram information by network;
F, the nearest breakdown service possessing repairing condition receive call signal, and timely establishment officer indicates according to wiring diagram, hurries to fault in-situ to carry out repairing, and green bright spot map representing this breakdown service position is extinguished thereupon;
G, fault clearance, repair personnel gets back to breakdown service, and the green marking light of this breakdown service in distribution map lights again, and meanwhile, the bright red spot of representing fault point position extinguishes.
2. a kind of distribution map-indication method facilitating power failure rapid rush-repair to command according to claim 1, it is characterized in that, in described step a, the prerequisite successfully indicating abort situation point is, malfunction monitoring end is provided with locating device, accurately can locate the very first time, and positional information is passed to the receiving end of distribution map fast.
3. a kind of distribution map-indication method facilitating power failure rapid rush-repair to command according to claim 1, it is characterized in that, in described step b, the electromagnetic wave signal that electric power first-aid station is launched will meet repairing protocol specification, successfully captures for distribution map receiving end; The repairing conditional information comprised in described electromagnetic wave signal, refers to whether rush repair equipment and personnel are in complete and armed state.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410620115.0A CN104361825A (en) | 2014-11-07 | 2014-11-07 | Distribution network map display method convenient for quick emergency maintenance and command for power failure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410620115.0A CN104361825A (en) | 2014-11-07 | 2014-11-07 | Distribution network map display method convenient for quick emergency maintenance and command for power failure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104361825A true CN104361825A (en) | 2015-02-18 |
Family
ID=52529082
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410620115.0A Pending CN104361825A (en) | 2014-11-07 | 2014-11-07 | Distribution network map display method convenient for quick emergency maintenance and command for power failure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104361825A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106251420A (en) * | 2016-07-29 | 2016-12-21 | 国网山西省电力公司大同供电公司 | Electric power equipment inspection system |
CN106486002A (en) * | 2016-09-30 | 2017-03-08 | 深圳市华傲数据技术有限公司 | Data processing and methods of exhibiting, the system of degree is involved in dangerous materials storing place |
CN107276041A (en) * | 2017-05-16 | 2017-10-20 | 国网山东省电力公司临清市供电公司 | Power distribution network rushes to repair maneuvering platform |
CN111026008A (en) * | 2019-12-16 | 2020-04-17 | 上海宏力达信息技术股份有限公司 | Intelligent switch first-aid repair method and system based on ant colony algorithm |
CN112884185A (en) * | 2021-03-25 | 2021-06-01 | 广东科学技术职业学院 | Distribution network resource first-aid repair optimal scheduling method based on tabu search algorithm |
CN115752493A (en) * | 2022-11-07 | 2023-03-07 | 国网天津市电力公司 | Path planning method for electric power fault first-aid repair |
CN117474191A (en) * | 2023-12-28 | 2024-01-30 | 成都秦川物联网科技股份有限公司 | GIS (geographic information system) inspection management method based on intelligent water meter, internet of things system and device |
-
2014
- 2014-11-07 CN CN201410620115.0A patent/CN104361825A/en active Pending
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106251420A (en) * | 2016-07-29 | 2016-12-21 | 国网山西省电力公司大同供电公司 | Electric power equipment inspection system |
CN106251420B (en) * | 2016-07-29 | 2018-07-20 | 国网山西省电力公司大同供电公司 | Electric power equipment inspection system |
CN106486002A (en) * | 2016-09-30 | 2017-03-08 | 深圳市华傲数据技术有限公司 | Data processing and methods of exhibiting, the system of degree is involved in dangerous materials storing place |
CN106486002B (en) * | 2016-09-30 | 2019-09-20 | 深圳市华傲数据技术有限公司 | Involve data processing and the methods of exhibiting, system of degree in dangerous material storing place |
CN107276041A (en) * | 2017-05-16 | 2017-10-20 | 国网山东省电力公司临清市供电公司 | Power distribution network rushes to repair maneuvering platform |
CN111026008A (en) * | 2019-12-16 | 2020-04-17 | 上海宏力达信息技术股份有限公司 | Intelligent switch first-aid repair method and system based on ant colony algorithm |
CN111026008B (en) * | 2019-12-16 | 2021-12-24 | 上海宏力达信息技术股份有限公司 | Intelligent switch first-aid repair method and system based on ant colony algorithm |
CN112884185A (en) * | 2021-03-25 | 2021-06-01 | 广东科学技术职业学院 | Distribution network resource first-aid repair optimal scheduling method based on tabu search algorithm |
CN115752493A (en) * | 2022-11-07 | 2023-03-07 | 国网天津市电力公司 | Path planning method for electric power fault first-aid repair |
CN117474191A (en) * | 2023-12-28 | 2024-01-30 | 成都秦川物联网科技股份有限公司 | GIS (geographic information system) inspection management method based on intelligent water meter, internet of things system and device |
CN117474191B (en) * | 2023-12-28 | 2024-04-05 | 成都秦川物联网科技股份有限公司 | GIS (geographic information system) inspection management method based on intelligent water meter, internet of things system and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104361825A (en) | Distribution network map display method convenient for quick emergency maintenance and command for power failure | |
WO2019095910A1 (en) | Daily patrol working method and system in substation | |
CN202474601U (en) | Power grid fault rush repair system based on GIS | |
CN103714437A (en) | Power line repair commanding method based on CIS and movable operation | |
CN104751295A (en) | Power distribution network repair mass texting work order processing platform and method | |
CN206077800U (en) | Wireless control system and illuminator | |
CN202472695U (en) | Transformer station optical/electric cable identification management system based on RFID tag | |
CN103166795A (en) | Automatic dependent surveillance-broadcast (ADS-B) testing beacon equipment and channel intelligent switching control management method | |
CN104330700A (en) | Scheduling method for rapid repair of power failures | |
CN106254479A (en) | The intelligent networking gateway of wisdom electric power Internet of things system | |
CN102616254B (en) | Control method, equipment and system for railway passenger special line station interlocking machine | |
CN204330950U (en) | A kind of power failure point is monitored and calling device automatically | |
CN110264695A (en) | Navigational lighting aid monitoring system and method based on power-line carrier communication | |
CN102546262B (en) | A kind of regulator control system | |
CN202600072U (en) | High frequency channel exchange test system for high frequency protection apparatus | |
CN203104857U (en) | Aviation obstruction beacon monitoring system | |
CN104540268A (en) | System and method for automatically canceling fault warning on basis of intelligent streetlamp | |
CN204330949U (en) | A kind of distribution map facilitating power failure rapid rush-repair to command | |
CN203930936U (en) | Grid switching operation supervisory system | |
CN207233014U (en) | It is a kind of to be used for the intelligent repair system on electric fault | |
CN109818294A (en) | Intelligent substation unmanned plane inspection tour system | |
CN105873197A (en) | Method and device for intelligently managing information transmission | |
CN203522786U (en) | Switch convenient for maintenance | |
CN104699052A (en) | Remote training, fault diagnosis system of production system and implementation method thereof | |
CN204795615U (en) | Emergent multi -functional transmission device of intelligence water conservancy trade |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150218 |
|
RJ01 | Rejection of invention patent application after publication |