CN104360244A - Solid-state transformer partial discharge on-line monitoring method - Google Patents

Solid-state transformer partial discharge on-line monitoring method Download PDF

Info

Publication number
CN104360244A
CN104360244A CN201410643704.0A CN201410643704A CN104360244A CN 104360244 A CN104360244 A CN 104360244A CN 201410643704 A CN201410643704 A CN 201410643704A CN 104360244 A CN104360244 A CN 104360244A
Authority
CN
China
Prior art keywords
solid
discharge
state transformer
signal
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410643704.0A
Other languages
Chinese (zh)
Inventor
鲁旭
黄旭炜
孙善华
王健
韩帅
李庆民
王高勇
刘伟杰
李明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
North China Electric Power University
China EPRI Electric Power Engineering Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
North China Electric Power University
China EPRI Electric Power Engineering Co Ltd
Smart Grid Research Institute of SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd, North China Electric Power University, China EPRI Electric Power Engineering Co Ltd, Smart Grid Research Institute of SGCC filed Critical State Grid Corp of China SGCC
Priority to CN201410643704.0A priority Critical patent/CN104360244A/en
Publication of CN104360244A publication Critical patent/CN104360244A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a solid-state transformer partial discharge on-line monitoring method, and belongs to the technical field of solid-state transformer detection. The solid-state transformer partial discharge on-line monitoring method comprises the steps of hardware configuration and monitoring. In the hardware configuration step, a current sensor is connected with a broadband digital oscilloscope, and the broadband digital oscilloscope, a processing computer, a data storage server and an analysis system are connected in sequence. Changes in leakage current on a ground wire of a solid-state transformer to be detected are monitored and used as characteristic signals for judging insulation aging of the solid-state transformer, graphs obtained through a data processing step are used for showing the characteristic differences of all parameters in phase distribution and amplitude quantitative distribution, the insulating state of the solid-state transformer is effectively evaluated, potential insulation defects of the solid-state transformer can be found as early as possible, the requirement for intelligent device repairing regulation signals is met, and an intelligent grid control and maintenance device can work efficiently and operate safely and reliably. The solid-state transformer partial discharge on-line monitoring method enables power grid equipment to be maintained in time, reduce losses and reduce the production cost.

Description

A kind of solid-state transformer partial discharge monitoring method
Technical field
The invention belongs to solid-state transformer detection technique scope, particularly a kind of solid-state transformer partial discharge monitoring method.
Background technology
Solid-state transformer (Solid State Transformer) is a kind of novel intelligent power transmission and transformation equipments also known as electric power electric transformer, and it can realize the flexible transmission of electric energy, improves system stability and power supply reliability.The quality of solid-state transformer insulation is the safe and reliable stable operation of the whole intelligent grid of impact, finds in the research experiment of solid-state transformer, and the fault of most of solid-state transformer causes because deterioration occurs in its insulation.In the past, China is for the widely used preventive trial of power transformer in the past, and traditional method is the means taking regularly to have a power failure, and belongs to offline inspection.But because solid-state transformer is the equipment operated in intelligent distribution network, have new requirement to system stability, off-line testing method originally can not adapt to actual needs.Therefore study solid-state transformer on-line monitoring technique, reasonable analysis can be carried out to solid-state transformer in time, then under the cooperation of intelligent maintenance, repair apparatus means, to ensureing that the reliable and stable intelligent operation of power distribution network is significant.
In the research of nearest solid-state transformer, be converted to meet its safe and stable operation state aspect from realizing flexible transformation transfer function.In order to study the stable of solid-state transformer and security performance, on solid-state transformer on-line monitoring technique, had certain exploration in the industry, main method has: DC component method, DC superposition method, shelf depreciation method and low frequency method of superposition etc.Through extensively research, shelf depreciation method has relative advantage on on-line monitoring.Because solid-state transformer belongs to the category of high frequency power transformer, the pwm pulse waveform of its excitation has the advantages that the rise time is of short duration, amplitude is large, frequency is high, and its structure is compacter compared with Industrial Frequency Transformer, turn ratio is larger, because turn-to-turn voltage is higher, the constant impingement of Geng Duo volume partial discharge pulse and the distortion of space electric field can be caused, easily cause insulation to be lost efficacy rapidly under high-frequency impulse.Due to the difference of its supply voltage and traditional power frequency, cause the difficulty to its on-line monitoring technique.Many scholars, expert and the research unit detection technique to solid-state transformer constantly advance innovation both at home and abroad, but the actual on-line monitoring method put into operation is also little.Therefore, be necessary to study and develop a kind of solid-state transformer partial discharge monitoring method, to meet the requirement of solid-state transformer effect flexibly in intelligent distribution network, give the early warning information of solid-state transformer insulation degradation in advance, to prevent trouble before it happens, in advance Intelligent treatment is carried out to defect solid-state transformer, avoid causing trouble to occur.
Summary of the invention
The object of the invention is to propose a kind of solid-state transformer partial discharge monitoring method, it is characterized in that, comprise the following steps:
1) data acquisition, Leakage Current and power supply trigger pip in real time on the ground wire being obtained corresponding solid-state transformer by wideband current sensor;
2) data summarization, is aggregated into broadband digital oscillograph by above-mentioned real-time current signal by 50 Ω concentric cable;
3) data transmission, the real-time current signal discrete of acquisition is changed into digital signal by broadband digital oscillograph, transfers to process computer by usb protocol;
4) data processing, the real-time current signal data obtained from oscillograph is carried out online filtering process by process computer, obtains local discharge signal;
5) data store, and are preserved in a database by the real-time local discharge signal through process computer process, form shelf depreciation historical current data;
6) data analysis, by local discharge signal analytic system to above-mentioned shelf depreciation historical current data analysis, extracts characteristic parameter, forms the characteristic spectrum for insulation judgement and monitoring analysis.
Described step 4) data processing step as follows:
401. process computers carry out EMD filtering process to the described real-time current signal transferred;
The filtered signal obtained in step 401 is carried out the process that takes absolute value by 402. process computers;
The absolute value data obtained in step 402 is dispelled white noise by the setting of upper threshold by 403. process computers;
The concussion data that obtain in step 403 by conventional windowing method process, are obtained effective impulse local discharge signal by 404. process computers.
Described characteristic parameter comprises arrowband Partial discharge signal, maximum pd quantity, mean discharge magnitude and discharge time, wherein:
Described arrowband Partial discharge signal is the peak value of effective Partial discharge signal under certain narrow band frequency;
Described maximum pd quantity is the maximal value that in single sine power supply signal activation period, pulse amplitude is put in office;
Described mean discharge magnitude is the mean value that in single sine power supply signal activation period, pulse amplitude is put in office;
Described discharge time is discharge time in single sine power supply signal activation period.
Described characteristic spectrum comprises:
Maximum pd quantity phase resolved plot, represents the maximum pd quantity being distributed in each several part in whole phase region;
Mean discharge magnitude phase resolved plot, represents the mean discharge magnitude being distributed in each several part in whole phase region;
Electric discharge amplitude distribution collection of illustrative plates, represents the statistics of the discharge time to different amplitude;
Discharge time phase resolved plot, represents the discharge time being distributed in each several part in whole phase region;
φ-Q-N collection of illustrative plates, represents discharge capacity, relation between discharge time and discharge phase.
The invention has the beneficial effects as follows and overcome prior art deficiency, solve the acquisition difficult point of the shelf depreciation of on-line monitoring under the service condition that solid-state transformer is special, by monitoring the characteristic signal of the leakage current change on solid-state transformer ground wire to be measured as the insulation ag(e)ing of differentiation solid-state transformer, utilize the collection of illustrative plates obtained through data processing step in each parameter PHASE DISTRIBUTION, the feature difference of amplitude distributed number, realize the Efficient Evaluation to solid-state transformer state of insulation, ensure that intelligent power distribution network control system can find the potential insulation defect of solid-state transformer as early as possible, meet the needs of intelligent prosthetic device adjustment signal, effectively can detect the state of insulation of solid-state transformer, for the safe and stable operation of solid-state transformer in intelligent distribution network provides the practical method of on-line checkingi and supervision, thus intelligent grid control service equipment is effectively worked, security of operation, reliably.Grid equipment is safeguarded timely, reduces the loss, reduce production cost.
Accompanying drawing explanation
Fig. 1 is the process flow diagram of solid-state transformer Partial discharge on-line monitoring.
Fig. 2 is the process flow diagram of data processing step.
Fig. 3 is maximum pd quantity phase resolved plot.
Fig. 4 is mean discharge magnitude phase resolved plot.
Fig. 5 is electric discharge amplitude distribution collection of illustrative plates.
Fig. 6 is discharge time phase resolved plot.
Fig. 7 is φ-Q-N collection of illustrative plates.
Fig. 8 is actual pick-up unit schematic diagram.
Embodiment
The present invention proposes a kind of solid-state transformer partial discharge monitoring method.Below in conjunction with accompanying drawing and particularly embodiment be described in detail:
Embodiment,
As shown in Figure 1, solid-state transformer partial discharge monitoring process flow diagram, comprise the following steps: the hardware device of actual pick-up unit of the present invention comprises solid-state transformer to be measured, current sensor, broadband digital oscillograph, process computer, data storage server, analytic system, current sensor and solid-state transformer ground wire are combined by code and configures, be connected with broadband digital oscillograph by current sensor, broadband digital oscillograph, process computer, data storage server, analytic system are connected (as shown in Figure 8) successively.
Process computer and analytic system install the process and routine analyzer and analysis of developing based on LabView image conversion programming software respectively
1) data acquisition, Leakage Current and power supply trigger pip in real time on the ground wire being obtained corresponding solid-state transformer by wideband current sensor;
2) data summarization, is aggregated into broadband digital oscillograph by above-mentioned real-time current signal by 50 Ω concentric cable;
3) data transmission, the real-time current signal discrete of acquisition is changed into digital signal by broadband digital oscillograph, transfers to process computer by usb protocol;
4) data processing, the real-time current signal data obtained from oscillograph is carried out online filtering process by process computer, obtains local discharge signal;
5) data store, and are preserved in a database by the real-time local discharge signal through process computer process, form shelf depreciation historical current data;
6) data analysis, by local discharge signal analytic system to above-mentioned shelf depreciation historical current data analysis, extracts characteristic parameter, forms the characteristic spectrum for insulation judgement and monitoring analysis.
Described step 4) data processing step as follows:
401. process computers carry out empirical mode decomposition (EMD) filtering process to the described real-time current signal transferred;
The filtered signal obtained in step 401 is carried out the process that takes absolute value by 402. process computers;
The absolute value data obtained in step 402 is dispelled white noise by the setting of upper threshold by 403. process computers;
The concussion data obtained in step 403 are obtained effective impulse local discharge signal by conventional windowing method process by 404. process computers.
Described characteristic parameter comprises arrowband Partial discharge signal, maximum pd quantity, mean discharge magnitude and discharge time, wherein:
Described arrowband Partial discharge signal is the peak value of effective Partial discharge signal under certain narrow band frequency;
Described maximum pd quantity is the maximal value that in single sine power supply signal activation period, pulse amplitude is put in office;
Described mean discharge magnitude is the mean value that in single sine power supply signal activation period, pulse amplitude is put in office;
Described discharge time is discharge time in single sine power supply signal activation period.
Described characteristic spectrum comprises:
Maximum pd quantity phase resolved plot, represents the maximum pd quantity (as shown in Figure 3) being distributed in each several part in whole phase region;
Mean discharge magnitude phase resolved plot, represents the mean discharge magnitude (as shown in Figure 4) being distributed in each several part in whole phase region;
Electric discharge amplitude distribution collection of illustrative plates, represents the statistics (as shown in Figure 5) of the discharge time to different amplitude; ;
Discharge time phase resolved plot, represents the discharge time (as shown in Figure 6) being distributed in each several part in whole phase region;
φ-Q-N collection of illustrative plates, represents discharge capacity, relation (as shown in Figure 7) between discharge time and discharge phase.
In above-mentioned data analysis step, analyzing software system, by carrying out Treatment Analysis to the data collected, can realize following characteristics:
1. analytic system by obtain from solid-state transformer and treated local discharge signal, according to the difference of characteristic parameter and TuPu method, the ageing state of solid-state transformer is finally divided into early stage, mid-term, the middle and later periods and critical days four-stage, and the logging data in early stage of experimentally gained, provide the degree of confidence of judgement;
2. system supports self study and fuzzy reasoning, and stacking-type will image data and logging data as study foundation, make reasoning and judging more tally with the actual situation in earlier stage;
3. system support remote monitoring, with solid-state transformer with the use of can only prosthetic appliance can not full action time, realize remote handle judge and operation.
In sum, solid-state transformer partial discharge monitoring method of the present invention, by monitoring the characteristic signal of the curent change on solid-state transformer ground wire to be measured as the insulation ag(e)ing of differentiation solid-state transformer, utilize characteristic spectrum at the feature difference of different time, effectively can detect the state of insulation of solid-state transformer, for the on-line checkingi of solid-state transformer and supervision provide practicable method, realize self-contr ol and the reparation of intelligent distribution network, meet safe and stable operation requirement.

Claims (4)

1. a solid-state transformer partial discharge monitoring method, is characterized in that, comprises the following steps:
1) data acquisition, Leakage Current and power supply trigger pip in real time on the ground wire being obtained corresponding solid-state transformer by wideband current sensor;
2) data summarization, is aggregated into broadband digital oscillograph by above-mentioned real-time current signal by 50 Ω concentric cable;
3) data transmission, the real-time current signal discrete of acquisition is changed into digital signal by broadband digital oscillograph, transfers to process computer by usb protocol;
4) data processing, the real-time current signal data obtained from oscillograph is carried out online filtering process by process computer, obtains local discharge signal;
5) data store, and are preserved in a database by the real-time local discharge signal through process computer process, form shelf depreciation historical current data;
6) data analysis, by local discharge signal analytic system to above-mentioned shelf depreciation historical current data analysis, extracts characteristic parameter, forms the characteristic spectrum for insulation judgement and monitoring analysis.
2. a kind of solid-state transformer partial discharge monitoring method according to claim 1, is characterized in that, described step 4) data processing step as follows:
401. process computers carry out EMD filtering process to the described real-time current signal transferred;
The filtered signal obtained in step 401 is carried out the process that takes absolute value by 402. process computers;
The absolute value data obtained in step 402 is dispelled white noise by the setting of upper threshold by 403. process computers;
The concussion data obtained in step 403 are obtained effective impulse local discharge signal by conventional windowing method process by 404. process computers.
3. a kind of solid-state transformer partial discharge monitoring method according to claim 1, it is characterized in that, described characteristic parameter comprises arrowband Partial discharge signal, maximum pd quantity, mean discharge magnitude and discharge time, wherein:
Described arrowband Partial discharge signal is the peak value of effective Partial discharge signal under certain narrow band frequency;
Described maximum pd quantity is the maximal value that in single sine power supply signal activation period, pulse amplitude is put in office;
Described mean discharge magnitude is the mean value that in single sine power supply signal activation period, pulse amplitude is put in office;
Described discharge time is discharge time in single sine power supply signal activation period.
4. a kind of solid-state transformer partial discharge monitoring method according to claim 1, it is characterized in that, described characteristic spectrum comprises:
Maximum pd quantity phase resolved plot, represents the maximum pd quantity being distributed in each several part in whole phase region;
Mean discharge magnitude phase resolved plot, represents the mean discharge magnitude being distributed in each several part in whole phase region;
Electric discharge amplitude distribution collection of illustrative plates, represents the statistics of the discharge time to different amplitude;
Discharge time phase resolved plot, represents the discharge time being distributed in each several part in whole phase region;
Φ-Q-N collection of illustrative plates, represents discharge capacity, relation between discharge time and discharge phase.
CN201410643704.0A 2014-11-07 2014-11-07 Solid-state transformer partial discharge on-line monitoring method Pending CN104360244A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410643704.0A CN104360244A (en) 2014-11-07 2014-11-07 Solid-state transformer partial discharge on-line monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410643704.0A CN104360244A (en) 2014-11-07 2014-11-07 Solid-state transformer partial discharge on-line monitoring method

Publications (1)

Publication Number Publication Date
CN104360244A true CN104360244A (en) 2015-02-18

Family

ID=52527525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410643704.0A Pending CN104360244A (en) 2014-11-07 2014-11-07 Solid-state transformer partial discharge on-line monitoring method

Country Status (1)

Country Link
CN (1) CN104360244A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105044577A (en) * 2015-08-25 2015-11-11 国网天津市电力公司 Partial-discharge charged detection method of transformer
CN107194476A (en) * 2017-05-26 2017-09-22 中国南方电网有限责任公司超高压输电公司天生桥局 The pre- anti-aging maintenance policy formulating method of transformer based on semi-Markov chain
CN112243499A (en) * 2018-06-08 2021-01-19 西门子股份公司 Method for measuring partial discharges in an electric drive system
CN112860927A (en) * 2021-01-31 2021-05-28 广东省博瑞海曼科技有限公司 Partial discharge detection data storage method, system and device
CN116125214A (en) * 2022-09-30 2023-05-16 国网浙江省电力有限公司电力科学研究院 Partial discharge and electric branch variable frequency measurement method and system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1553207A (en) * 2003-12-18 2004-12-08 西安交通大学 High-frequency wide-band local discharging on-line monitoring method in gas insulative converting station
US20060235574A1 (en) * 2005-04-19 2006-10-19 Genscape, Inc. Method and system for AC power grid monitoring
CN103901330A (en) * 2014-04-15 2014-07-02 上海君世电气科技有限公司 Partial discharge on-line monitoring method for XLPE cable
CN103913681A (en) * 2014-03-24 2014-07-09 华北电力大学 System and method for detecting partial discharge under high-frequency voltage
CN103983903A (en) * 2014-05-15 2014-08-13 国家电网公司 Whole substation partial discharge locating method for utilizing oscilloscope to detect radio-frequency signals

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1553207A (en) * 2003-12-18 2004-12-08 西安交通大学 High-frequency wide-band local discharging on-line monitoring method in gas insulative converting station
US20060235574A1 (en) * 2005-04-19 2006-10-19 Genscape, Inc. Method and system for AC power grid monitoring
CN103913681A (en) * 2014-03-24 2014-07-09 华北电力大学 System and method for detecting partial discharge under high-frequency voltage
CN103901330A (en) * 2014-04-15 2014-07-02 上海君世电气科技有限公司 Partial discharge on-line monitoring method for XLPE cable
CN103983903A (en) * 2014-05-15 2014-08-13 国家电网公司 Whole substation partial discharge locating method for utilizing oscilloscope to detect radio-frequency signals

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
庞月龙: "高频与脉冲电应力下局部放电检测方法的研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105044577A (en) * 2015-08-25 2015-11-11 国网天津市电力公司 Partial-discharge charged detection method of transformer
CN107194476A (en) * 2017-05-26 2017-09-22 中国南方电网有限责任公司超高压输电公司天生桥局 The pre- anti-aging maintenance policy formulating method of transformer based on semi-Markov chain
CN107194476B (en) * 2017-05-26 2019-12-10 中国南方电网有限责任公司超高压输电公司天生桥局 aging prevention maintenance strategy making method of transformer based on half Markov chain
CN112243499A (en) * 2018-06-08 2021-01-19 西门子股份公司 Method for measuring partial discharges in an electric drive system
CN112243499B (en) * 2018-06-08 2023-10-20 西门子股份公司 Method for measuring partial discharge in an electric drive system
CN112860927A (en) * 2021-01-31 2021-05-28 广东省博瑞海曼科技有限公司 Partial discharge detection data storage method, system and device
CN116125214A (en) * 2022-09-30 2023-05-16 国网浙江省电力有限公司电力科学研究院 Partial discharge and electric branch variable frequency measurement method and system
CN116125214B (en) * 2022-09-30 2023-09-29 国网浙江省电力有限公司电力科学研究院 Partial discharge and electric branch variable frequency measurement method and system

Similar Documents

Publication Publication Date Title
CN104360244A (en) Solid-state transformer partial discharge on-line monitoring method
CN104730458B (en) Generator excited system state monitoring method
CN103901330A (en) Partial discharge on-line monitoring method for XLPE cable
CN202956441U (en) High voltage capacitor on-line monitoring device
CN106443433B (en) Breaker state monitoring system and method based on opening and closing coil current
CN101762758A (en) System for monitoring and orientating electric power quality pollution source in electric network
CN108759926A (en) Mobile robot formula high-tension switch cabinet colony intelligence on-line monitoring system and method
CN202217029U (en) Novel partial discharge comprehensive monitoring and analyzing system
CN204761154U (en) New forms of energy power station failure recognition and state monitoring system
CN104880222B (en) Secondary device condition monitoring system based on 3G radio communications
CN104266679A (en) Method and device for monitoring and diagnosing power transformer
CN204065286U (en) A kind of electric energy quality monitoring system based on Internet of Things and 4G communication
CN104122473A (en) Online monitoring method for states of secondary device of distribution network
CN207408542U (en) A kind of partial discharge of transformer on-line monitoring system based on optical fiber
CN104731037A (en) Energy-saving monitoring and controlling system
CN103744006B (en) High voltage electric equipment inside loosens the shelf depreciation positioning diagnosticing method produced
CN113205127A (en) Transformer self-diagnosis evaluation device and method based on edge calculation
CN103049661B (en) GIS remaining life appraisal procedure and system
CN104682566A (en) Fault recognition and condition monitoring system for new energy source power station
CN203870440U (en) Network centralized control platform of transformer station main transformation oil chromatogram on-line monitoring devices
CN212060504U (en) On-line monitoring, early warning and analyzing system for high-voltage motor faults
CN113381693A (en) Alternating current fault identification method for inverter and photovoltaic system
CN203848796U (en) On-line monitoring device of power distribution network transformer low-voltage winding deformation
CN104280632A (en) Automatic detecting and early warning method for relay protection device and fault recorder
CN110672966A (en) Online monitoring method for parallel capacitor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20170622

Address after: 102206 Beijing city Changping District Zhu Daxinzhuang North Agricultural Road No. 2

Applicant after: North China Electric Power University

Applicant after: State Grid Corporation of China

Applicant after: China-EPRI Electric Power Engineering Co., Ltd.

Applicant after: Electric Power Research Institute of State Grid Shandong Electric Power Company

Address before: 102206 Beijing city Changping District Zhu Daxinzhuang North Agricultural Road No. 2

Applicant before: North China Electric Power University

Applicant before: State Grid Corporation of China

Applicant before: State Grid Smart Grid Institute

Applicant before: China-EPRI Electric Power Engineering Co., Ltd.

Applicant before: Electric Power Research Institute of State Grid Shandong Electric Power Company

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20150218

RJ01 Rejection of invention patent application after publication