CN104358199A - Road-bridge transition section structure of high-grade highway suitable for short construction period condition in cold region - Google Patents

Road-bridge transition section structure of high-grade highway suitable for short construction period condition in cold region Download PDF

Info

Publication number
CN104358199A
CN104358199A CN201410664878.5A CN201410664878A CN104358199A CN 104358199 A CN104358199 A CN 104358199A CN 201410664878 A CN201410664878 A CN 201410664878A CN 104358199 A CN104358199 A CN 104358199A
Authority
CN
China
Prior art keywords
roadbed
abutment
geo
grid
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410664878.5A
Other languages
Chinese (zh)
Other versions
CN104358199B (en
Inventor
马艳丽
娄彦江
韦钰
顾高峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute of Technology
Original Assignee
Harbin Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology filed Critical Harbin Institute of Technology
Priority to CN201410664878.5A priority Critical patent/CN104358199B/en
Publication of CN104358199A publication Critical patent/CN104358199A/en
Application granted granted Critical
Publication of CN104358199B publication Critical patent/CN104358199B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to a road-bridge transition section structure of a high-grade highway suitable for a short construction period condition in a cold region, and belongs to the field of highway construction. The road-bridge transition section structure comprises a bridge abutment and a roadbed, wherein a bridge is arranged on one side of the bridge abutment; the other side is connected with a highway through the roadbed, namely the roadbed is arranged on the highway side of the bridge abutment; and the roadbed comprises a foundation, a soil matrix, a pavement structure layer and a butt strap. The road-bridge transition section structure is characterized in that the foundation is lower than the base of the bridge abutment; the top surface of the foundation is flush with the bottom surface of the base of the bridge abutment; the soil matrix is arranged on the roadbed; the pavement structure layer is arranged on the soil matrix; the butt strap is embedded into the pavement structure layer; and the upper plane of the butt strap is flush with the pavement of the pavement structure layer. According to the road-bridge transition section structure, the jumping phenomenon which is easily generated when a car passes through the highway bridgehead in the cold region is solved; the driving safety of the car is improved; the operational performance of the high-grade highway is improved; and the service life of the high-grade highway is prolonged.

Description

Be applicable to the high-grade highway transition segment structure under cold district casual labourer phase condition
Technical field
The present invention relates to a kind of highway structure, particularly relate to a kind of high-grade highway transition segment structure be applicable under cold district casual labourer phase condition, belong to highway construction field.
Background technology
Since reform and opening-up, the highway construction of China achieves develop rapidly, by the end of the year 2013, the whole nation total mileage of highway oneself reach 435.62 ten thousand kilometers, wherein, speedway mileage reaches 10.44 ten thousand kilometers, secondary and above highway mileage 52.44 ten thousand kilometers, highway bridge reaches 71.3 ten thousand, 3663 myriametres, 70% of area is Seasonal freezing areas, by the impact of seasonal variations, freeze thawing phenomenon is obvious, frost boiling and the modal disease of frost heave Shi Gai district road structure, concrete through freeze-thaw test often shows as frost heave cracking and deicer-scaling two aspects simultaneously, this can make panel occur crack, disconnected plate, surface decortication, the phenomenon such as undisguised, and then cause purt mud, the diseases such as plat-bottom escape, add infiltration and the corrosion of load action and ambient conditions and corrosive solution, finally cause pavement durability not enough, there is the premature loss of structural performance and functional performance.
From the high-grade highway particularly speedway that oneself pays, there is the most general problem is that the joining place that bankets after abutment structure and platform exists sedimentation, and especially in cold zone Ji Han district, this phenomenon is more obvious.Because the distortion of Highway Structural Material deformation ratio fills embankment own is little, therefore natural ground sedimentation is the principal element causing abutment sedimentation, found by long term monitoring, banket under unit weight same case, embankment filled soil is higher, foundation settlement deformation amount is larger, and natural ground sedimentation accounts for more than 70% of roadbed total settlement, therefore natural ground sedimentation is the main cause causing differential settlement, the sedimentation of foundation of road bed causes vehicle by the most important factor of end of the bridge chattering in addition, and foundation settlement is almost inevitable, and foundation settlement issue handling difficulty is larger, especially when subgrade construction is on the viscosity soil body that compressibilty is larger, embankment basis the most easily has problems, in addition the sedimentation that embankment filled soil self compression and impeded drainage and slippage etc. of banketing cause is also had.
Er Han district, the construction period is short, under casual labourer's phase condition road-bridge transition section valve pit subsidence mechanism can be summarized as following some:
(1) under casual labourer's time limit system, road-bridge transition section roadbed consolidation is not enough, and soft base varied in thickness is larger; And part pile foundation cannot penetrate mud and in hanging shape, easily puncture bad and differential settlement under upper load effect.When ground base stress bearing load value exceedes its ultimate bearing capacity, namely cause crevice of roadbed even integral slipping, thus cause the general shear failure of roadbed.
(2) to the road-bridge transition section not arranging transition slab at bridge head, the bridge abutment structure thing of relative stiffness and the embankment of relative flexibility, under the acting in conjunction of cold low temp area and vehicular load, produce the relative settlement of self consolidation settlement distortion of natural soil matrix and the compressive strain of artificial earth fill.Faulting of slab ends will be produced when the uniform settlement of roadbed or uneven maximum value are near abutment; Road surface depression will be formed when differential settlement produces in changeover portion.
(3) transition slab at bridge head is a kind of measure comparatively generally adopted in the prophylactico-therapeutic measures of end of the bridge vehicle bound at present.Because road-bridge transition section embankment filled soil roller compaction construction has difficulties, grinding compacting degree is difficult to reach, and attachment strap is even supporting under it when just building up, but because roadbed sink deformation gradually after being open to traffic, transition slab at bridge head and roadbed is caused to be separated, the form of bearing surface decline is simultaneously come to nothing, in addition cold low temp area environment makes attachment strap generation low temperature brittleness, when heavy-duty vehicle produces dynamic loads effect to it, namely attachment strap and road slab become Non even supporting, and stress accumulates in position at the bottom of the plate at maximum settlement place of district of coming to nothing, when stress gather exceed flexural tensile stress permissible value time, namely attachment strap starts to rupture.
And these sedimentations make road surface form step or produce remarkable change of longitudinal grade, the vehicle of running at high speed by time produce that jolting jumps jumps car phenomenon, and this jump not only can affect the comfort of driver and passenger, vehicle unstability can be caused time serious, even cause traffic accident, but also the application life of bridge passage can be shortened, increase maintenance and the maintenance costs of bridge.
How to alleviate and even avoid highway end of the bridge automobile chattering, especially how under cold district construction period shorter reality, improve Expressway Construction speed, and the functional performance of high-grade highway and application life have technical problem to be solved.
Summary of the invention
For solving the problem, the invention provides a kind of high-grade highway transition segment structure be applicable under cold district casual labourer phase condition, it can reduce automobile by jumping degree during highway end of the bridge, can improve vehicle safety, and improves functional performance and the application life of high-grade highway.
The technical solution used in the present invention is: provide a kind of high-grade highway transition segment structure be applicable under cold district casual labourer phase condition, it comprises abutment and roadbed, abutment side is bridge, opposite side connects highway by roadbed, namely roadbed is arranged at the roadside of abutment, this roadbed comprises ground, soil matrix, road surface structare layer and attachment strap, it is characterized in that: ground is lower than abutment base, ground end face is concordant with the bottom surface of abutment base, soil matrix is provided with on ground, soil matrix is provided with road surface structare layer, attachment strap is embedded in road surface structare layer, and plane is mutually concordant with the road surface of plane on abutment and road surface structare layer on attachment strap.Reduce automobile by jumping degree during highway end of the bridge by the concordant setting on concordant attachment strap, abutment and road surface and ground and arranging of soil matrix, and improve functional performance and the application life of highway.
Further, ground adopts natural soft-clay to fill, soil matrix comprises Reinforced Sand soil layer and Roadbed Soil, wherein Reinforced Sand soil layer bottom surface contacts with ground end face and the length that extends to roadside of the bottom surface of Reinforced Sand soil layer is identical with the length that ground extends to roadside, Reinforced Sand soil layer is identical with roadbed filling height, and Reinforced Sand soil layer side is connected opposite side with abutment is connected with Roadbed Soil.
Further, Reinforced Sand soil layer and the closely knit connection of Roadbed Soil, Roadbed Soil forms to roadside the gradient that is less than or equal to 45 degree.
Further, Reinforced Sand soil layer adopts geosynthetics to fill, geosynthetics is formed by sandy soil and geo-grid compacting, and geosynthetics extends to the slope of Roadbed Soil from abutment, thus structure short under making Reinforced Sand soil layer form length.
Further, geo-grid one end is mounted on abutment, and building-in depth is no less than 20 centimetres;
Further, the build-in boudary portion of geo-grid and abutment is provided with the flexible cushion block being no less than 5 centimetres wide.
Selectively, geo-grid adopts and is anchored on the platform back wall face of abutment through the swell fixture of anti-corrosion process and steel press strip;
Further, steel press strip comprises the pressing plate being clamped in geo-grid top and the supporting steel plate being clamped in geo-grid bottom.
Further, geo-grid extends at highway width and length direction, and multilayer geo-grid is spaced from the top down and be arranged in Reinforced Sand soil layer in parallel to each other, the stretch modulus of this interval and geo-grid, design tensile strength and geo-grid are relevant apart from the degree of depth of road bed.
Beneficial effect of the present invention is: this high-grade highway transition segment structure can reduce vehicle bump at bridge ends, especially the structure of the highway in cold region end of the bridge changeover portion under casual labourer's phase execution conditions is suitable as, in addition, this structure can also improve functional performance and the application life of highway, has good economic benefit.
Accompanying drawing explanation
Fig. 1 is natural soft-clay and reinforcement sandy soil railway embankment using schematic diagram;
Fig. 2 is geo-grid and Abutment Back build-in schematic diagram;
Fig. 3 is that geo-grid and Abutment Back are anchored schematic diagram.
Detailed description of the invention
The specific embodiment of the present invention is specifically described below in conjunction with accompanying drawing 1-3.
The present invention includes abutment and roadbed, abutment side is bridge, opposite side connects highway by roadbed, namely roadbed is arranged at the roadside of abutment, roadbed comprises ground, soil matrix, road surface structare layer and attachment strap, ground is lower than abutment base, the i.e. downward road breaking groove in base side, and natural soft-clay is filled in the groove of road, ground end face is concordant with the bottom surface of abutment base (not shown), soil matrix is provided with on ground, soil matrix comprises Reinforced Sand soil layer and Roadbed Soil, soil matrix is provided with road surface structare layer, attachment strap is embedded in road surface structare layer, and plane is mutually concordant with the road surface of plane on abutment and road surface structare layer on attachment strap, Reinforced Sand soil layer bottom surface contacts with ground end face and the length that extends to roadside of the bottom surface of Reinforced Sand soil layer is identical with the length that ground extends to roadside, Reinforced Sand soil layer is identical with roadbed filling height, and Reinforced Sand soil layer side is connected with abutment, opposite side and the closely knit connection of Roadbed Soil, Roadbed Soil forms to roadside the gradient that is less than or equal to 45 degree.Reinforced Sand soil layer adopts geosynthetics to fill, geosynthetics is formed by sandy soil and geo-grid compacting, geo-grid one end is mounted on abutment, building-in depth is no less than 20 centimetres, the other end extends to the slope of Roadbed Soil from abutment, structure short under making Reinforced Sand soil layer form length, and geo-grid extends at highway width and length direction, form layer structure, and multilayer geo-grid is spaced from the top down and be arranged in Reinforced Sand soil layer in parallel to each other, the stretch modulus of this interval and geo-grid, design tensile strength and geo-grid are correlated with apart from the degree of depth of road bed.The build-in boudary portion of geo-grid and abutment is provided with the flexible cushion block being no less than 5 centimetres wide.Geo-grid also can adopt and be anchored on the platform back wall face of abutment through the swell fixture of anti-corrosion process and steel press strip, and steel press strip comprises the pressing plate being clamped in geo-grid top and the supporting steel plate being clamped in geo-grid bottom.
When road-bridge transition section arranges attachment strap, the buried depth of attachment strap, the gradient, thickness and length, the connected mode of attachment strap and abutment, the arrangement of reinforcement of attachment strap etc. conscientiously all should design according to engineering concrete condition.Also can arrange enhancement Layer under attachment strap, the thickness of enhancement Layer is generally not less than 2 meters, and length generally exceedes attachment strap 1 meter.
This project, under the cold district's weather of consideration and the impact of address factor and the restrictive condition of casual labourer's phase, arranges transition slab at bridge head, and adopts natural soft-clay and natural sandy soil to fill, improve road-bridge transition section sedimentation phenomenon simultaneously in conjunction with geo-grid.
Be provided with geo-grid in geosynthetics, thus increase pressure diffusion angle, to make the stress spread of roadbed even, thus reduce differential settlement.When arranging geo-grid in roadbed, effectively can alleviate the faulting of slab ends height even eliminating platform back of the body joining place, avoiding the impact of road-bridge transition section sedimentation.Geotechnological graticule mesh one end is fixed on Abutment Back, and the other end expands to Roadbed Soil level, is connected as a single entity by the subgrade compaction soil of geotechnological graticule mesh and the platform back of the body to make abutment.
In Practical Project, geo-grid can be laid along principal strain directions by engineering staff, and adopt the shortcoming of laying in this way and can make up the soil body self tensile strength deficiency, the compound soil body in this way in conjunction with formation is similar to steel concrete.Interaction energy between geo-grid and the soil body increases the tensile strength of the compound soil body, wherein interact and mainly comprise the rubbing action of grid upper and lower surface and grogs, the rib of geo-grid to the hindrance function of the soil body, the effect that the mesh of grid is inlayed the soil body and is engaged.
Wherein geo-grid Lay interval is calculated as follows:
ΔH = 100 T GC 2 E 0 E t γ m H m [ 3.5 γ m H m P 0 ( 1 - Z 2 H m 2 ) + ( 1 - Z H m ) ]
In formula: Δ H---apart from the Lay interval at road bed degree of depth z place, m;
T gC---the design tensile strength of geo-grid, by 60% tensile strength value, N/m;
H m---the discrepancy in elevation between roadbed end face and abutment base top surface, m;
Z---the vertical distance of last layer geo-grid paving location distance road bed, m;
E 0---the modulus of deformation after Roadbed Soil fills, Pa;
E t---the stretch modulus of geo-grid, Pa;
P 0---roadbed end face bear from road surface deadweight and the pressure at right angle of traffic loading, Pa;
γ m---the unit weight after Embankment Compaction, N/m 3.
The longitudinal direction of geo-grid is short under laying and should going up length, and the gradient delaying in or equal 1: 1 can be adopted successively to increase longitudinal laying length from bottom to top, and the laying length of basecoat should be not less than minimum longitudinal laying length L min, L minbe calculated as follows:
In formula: L min---the minimum laying length of geo-grid, m;
C gS---the interfacial adhesion on geo-grid and soil body interface, Pa;
---the interface friction angle on geo-grid and soil body interface, (°).
Platform back of the body reinforcement is adopted to reach dual purpose: to utilize the stretch-draw effect being fixed on reinforcement material one end of abutment on the one hand, at platform back of the body subrange, the sedimentation that layering stops filler to be carried on the back along platform, on the other hand, because reinforcement material is laid by certain interlamellar spacing level, the transmission of the pulling force of reinforcement material is from the soil particle be in contact with it to the soil particle not having to contact, soil particle is suffered restraints, the interlocking that rubs between soil particle and reinforcement material contact surface and the particle of the soil body own strengthens, thus make the part stress in the soil body be spread and shift, improve inside soil body in local loads lower stress state, expand the range of scatter along soil body depth direction load, and then reach reduction external loads to the effect of the Compression Settlement effect of the soil body, namely the non-deformability being equal to the soil body improves, play the effect of transition structure layer between rigidity abutment and flexible embankment.Wherein Roadbed Soil fill after modulus of deformation and unit weight after Embankment Compaction recorded by the normal experiment in Road Detection, roadbed end face bear from road surface deadweight and the pressure at right angle of traffic loading, estimate by pavement design load and road surface deadweight.Interfacial adhesion on geo-grid and soil body interface, can adopt direct shear friction test to record.
The foregoing is only the preferred embodiment of the present invention; not thereby the scope of the claims of the present invention is limited; every equivalent structure transformation utilizing manual of the present invention and accompanying drawing content to do, or be directly or indirectly used in other relevant technical fields, be all in like manner included in protection scope of the present invention.

Claims (9)

1. one kind is applicable to the high-grade highway transition segment structure under cold district casual labourer phase condition, comprise abutment and roadbed, abutment side is bridge, opposite side connects highway by roadbed, namely roadbed is arranged at the roadside of abutment, this roadbed comprises ground, soil matrix, road surface structare layer and attachment strap, it is characterized in that: ground is lower than abutment base, ground end face is concordant with the bottom surface of abutment base, soil matrix is provided with on ground, soil matrix is provided with road surface structare layer, attachment strap is embedded in road surface structare layer, and on attachment strap plane and plane on abutment and road surface structare layer road surface mutually concordant.
2. the high-grade highway transition segment structure be applicable under cold district casual labourer phase condition according to claim 1, it is characterized in that: ground adopts natural soft-clay to fill, soil matrix comprises Reinforced Sand soil layer and Roadbed Soil, wherein Reinforced Sand soil layer bottom surface contacts with ground end face and the length that extends to roadside of the bottom surface of Reinforced Sand soil layer is identical with the length that ground extends to roadside, Reinforced Sand soil layer is identical with roadbed filling height, and Reinforced Sand soil layer side is connected opposite side with abutment is connected with Roadbed Soil.
3. the high-grade highway transition segment structure be applicable under cold district casual labourer phase condition according to claim 2, is characterized in that: Reinforced Sand soil layer and the closely knit connection of Roadbed Soil, and Roadbed Soil forms to roadside the gradient that is less than or equal to 45 degree.
4. the high-grade highway transition segment structure be applicable under cold district casual labourer phase condition according to any one of claim 2-3, it is characterized in that: Reinforced Sand soil layer adopts geosynthetics to fill, geosynthetics is formed by sandy soil and geo-grid compacting, geosynthetics extends to the slope of Roadbed Soil from abutment, thus structure short under making Reinforced Sand soil layer form length.
5. the high-grade highway transition segment structure be applicable under cold district casual labourer phase condition according to claim 4, it is characterized in that: geo-grid one end is mounted on abutment, building-in depth is no less than 20 centimetres.
6. the high-grade highway transition segment structure be applicable under cold district casual labourer phase condition according to claim 5, is characterized in that: the build-in boudary portion of geo-grid and abutment is provided with the flexible cushion block being no less than 5 centimetres wide.
7. the high-grade highway transition segment structure be applicable under cold district casual labourer phase condition according to claim 4, is characterized in that: geo-grid adopts and is anchored on the platform back wall face of abutment through the swell fixture of anti-corrosion process and steel press strip.
8. the high-grade highway transition segment structure be applicable under cold district casual labourer phase condition according to claim 8, is characterized in that: steel press strip comprises the pressing plate being clamped in geo-grid top and the supporting steel plate being clamped in geo-grid bottom.
9. the high-grade highway transition segment structure be applicable under cold district casual labourer phase condition according to any one of claim 4-8, it is characterized in that: geo-grid extends at highway width and length direction, and many geo-grid are spaced from the top down and be arranged in Reinforced Sand soil layer in parallel to each other, the stretch modulus of this interval and geo-grid, design tensile strength and geo-grid are relevant apart from the degree of depth of road bed.
CN201410664878.5A 2014-11-10 2014-11-10 Road-bridge transition section structure of high-grade highway suitable for short construction period condition in cold region Active CN104358199B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410664878.5A CN104358199B (en) 2014-11-10 2014-11-10 Road-bridge transition section structure of high-grade highway suitable for short construction period condition in cold region

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410664878.5A CN104358199B (en) 2014-11-10 2014-11-10 Road-bridge transition section structure of high-grade highway suitable for short construction period condition in cold region

Publications (2)

Publication Number Publication Date
CN104358199A true CN104358199A (en) 2015-02-18
CN104358199B CN104358199B (en) 2017-01-18

Family

ID=52525498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410664878.5A Active CN104358199B (en) 2014-11-10 2014-11-10 Road-bridge transition section structure of high-grade highway suitable for short construction period condition in cold region

Country Status (1)

Country Link
CN (1) CN104358199B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105586818A (en) * 2015-12-18 2016-05-18 江苏兆通工程技术有限公司 Light foam layer for widening roadbed of road and construction process of light foam layer
CN106087758A (en) * 2016-08-06 2016-11-09 桂林理工大学 A kind of construction method of the road and bridge attachment structure for slowing down bumping at bridge-head
CN106087628A (en) * 2016-07-27 2016-11-09 浙江大学城市学院 Without conical slope cast-in-place baffle plate foam concrete light road bank structure and construction method
CN106120503A (en) * 2016-06-23 2016-11-16 武汉理工大学 A kind of platform back of the body reinforced grid design method preventing and treating Bridgehead-Jumping Disease
CN106192649A (en) * 2016-07-21 2016-12-07 桂林理工大学 A kind of construction method processing problem of bumping at bridge-head
CN109853313A (en) * 2019-01-17 2019-06-07 浙江绿艺园林工程有限公司 Pile foundation side soft soil foundation road eliminates frictional resistance structure and construction method
CN110258367A (en) * 2019-06-24 2019-09-20 中铁第四勘察设计院集团有限公司 Transition structure is contained on a kind of culvert and road
CN110804939A (en) * 2019-11-15 2020-02-18 浙江中浩项目管理有限公司 Reinforced structure of abutment jump car
CN111549598A (en) * 2020-04-26 2020-08-18 武汉理工大学 Collapsible loess area highway reinforced bridgehead roadbed and construction method
CN112281638A (en) * 2020-11-04 2021-01-29 武汉大学 Two-stage reinforced earth abutment with closely-arranged ribs and construction method thereof
CN113073537A (en) * 2021-04-25 2021-07-06 王拴保 Bridge approach structure of highway engineering and construction method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905089A (en) * 2017-11-21 2018-04-13 中冶南方城市建设工程技术有限公司 A kind of reinforcement platform back of the body for preventing bumping at bridge-head and its construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005113467A (en) * 2003-10-07 2005-04-28 Railway Technical Res Inst Method of constructing reinforced soil abutment and pier, and structures of the same
CN201530961U (en) * 2009-09-17 2010-07-21 西南交通大学 Transition section structure of liquefying soil foundation anti-seismic road and bridge of high-speed railway ballastless track
CN203855880U (en) * 2014-05-21 2014-10-01 福州大学 Structure for controlling rear-abutment setting and pavement cracking of seamless bridge with reinforced geotextiles

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005113467A (en) * 2003-10-07 2005-04-28 Railway Technical Res Inst Method of constructing reinforced soil abutment and pier, and structures of the same
CN201530961U (en) * 2009-09-17 2010-07-21 西南交通大学 Transition section structure of liquefying soil foundation anti-seismic road and bridge of high-speed railway ballastless track
CN203855880U (en) * 2014-05-21 2014-10-01 福州大学 Structure for controlling rear-abutment setting and pavement cracking of seamless bridge with reinforced geotextiles

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
TV EDGAR: "Effects of Geotextiles on Lateral Pressure and Deformation in Highway Embankments", 《GEOTEXTILES AND GEOMENBRANCES》 *
张华: "浅析减轻桥头跳车的措施", 《黑龙江交通科技》 *
赵利民: "铁路客运专线桥过渡段处置技术研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105586818A (en) * 2015-12-18 2016-05-18 江苏兆通工程技术有限公司 Light foam layer for widening roadbed of road and construction process of light foam layer
CN106120503A (en) * 2016-06-23 2016-11-16 武汉理工大学 A kind of platform back of the body reinforced grid design method preventing and treating Bridgehead-Jumping Disease
CN106192649A (en) * 2016-07-21 2016-12-07 桂林理工大学 A kind of construction method processing problem of bumping at bridge-head
CN106087628A (en) * 2016-07-27 2016-11-09 浙江大学城市学院 Without conical slope cast-in-place baffle plate foam concrete light road bank structure and construction method
CN106087628B (en) * 2016-07-27 2018-01-09 浙江大学城市学院 Without the cast-in-place baffle plate foam concrete light road bank structure of conical slope and construction method
CN106087758A (en) * 2016-08-06 2016-11-09 桂林理工大学 A kind of construction method of the road and bridge attachment structure for slowing down bumping at bridge-head
CN109853313A (en) * 2019-01-17 2019-06-07 浙江绿艺园林工程有限公司 Pile foundation side soft soil foundation road eliminates frictional resistance structure and construction method
CN109853313B (en) * 2019-01-17 2024-04-30 浙江绿艺建设有限公司 Pile foundation side soft soil foundation road friction resistance eliminating structure and construction method
CN110258367A (en) * 2019-06-24 2019-09-20 中铁第四勘察设计院集团有限公司 Transition structure is contained on a kind of culvert and road
CN110804939A (en) * 2019-11-15 2020-02-18 浙江中浩项目管理有限公司 Reinforced structure of abutment jump car
CN111549598A (en) * 2020-04-26 2020-08-18 武汉理工大学 Collapsible loess area highway reinforced bridgehead roadbed and construction method
CN111549598B (en) * 2020-04-26 2021-07-20 武汉理工大学 Construction method of highway reinforced bridgehead roadbed in collapsible loess region
CN112281638A (en) * 2020-11-04 2021-01-29 武汉大学 Two-stage reinforced earth abutment with closely-arranged ribs and construction method thereof
CN113073537A (en) * 2021-04-25 2021-07-06 王拴保 Bridge approach structure of highway engineering and construction method thereof
CN113073537B (en) * 2021-04-25 2022-03-01 王拴保 Bridge approach structure of highway engineering and construction method thereof

Also Published As

Publication number Publication date
CN104358199B (en) 2017-01-18

Similar Documents

Publication Publication Date Title
CN104358199B (en) Road-bridge transition section structure of high-grade highway suitable for short construction period condition in cold region
CN204418003U (en) A kind of bridge platform post processing combined system
Adams et al. Geosynthetic reinforced soil integrated bridge system, synthesis report
CN108547218A (en) The construction and its construction method of abutment rigid frame bridge
CN101691724A (en) Liquefied soil foundation quake-proof road-bridge transition section structure of ballastless track of high-speed railway
CN103741595B (en) A kind of bridgehead structures for administering bumping at bridge-head
CN111549598B (en) Construction method of highway reinforced bridgehead roadbed in collapsible loess region
CN101240548A (en) Two-stage stack-type cantilevered L-shaped blank wall and construction method thereof
CN203716051U (en) Soft soil foundation based bridgehead structure
CN201530961U (en) Transition section structure of liquefying soil foundation anti-seismic road and bridge of high-speed railway ballastless track
CN111455768A (en) Flexible roadbed asphalt concrete structure and construction method thereof
CN103306295A (en) Rigid frame pile supporting and blocking structure
CN106676992B (en) A kind of pull-type pile Reinforced Embankment design method of anchor that punishment bank is soft soil roadbed
CN106096307B (en) Platform carries on the back the calculation method that reinforcement administers the TGXG making interval of Bridgehead-Jumping Disease
Phares et al. Identification and evaluation of pavement-bridge interface ride quality improvement and corrective strategies.
CN111395063B (en) Light soil roadbed structure, roadbed system and design method
Schary Case studies on geocell-based reinforced roads, railways and ports
RU84393U1 (en) DEVELOPMENT OF ROAD CLOTHES
CN212771789U (en) Road subgrade and pavement structure combined with overhanging structure
CN110644311B (en) Anti-sedimentation roadbed structure and construction method
CN109033714A (en) A kind of design method controlling subgrade and pavement compatible deformation
CN208472551U (en) The construction of abutment rigid frame bridge
CN208533296U (en) One kind filling out the uneven section crack resistence asphalt pavement structure of digging
CN202730735U (en) Wedge-shaped geocell cement reinforced soil structure for road and bridge connection
CN206127853U (en) Adopt integral foundation structure's of grit stake dark bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: HARBIN INSTITUTE OF TECHNOLOGY Person in charge of patents

Document name: payment instructions