CN104340755B CN201410270064.3A CN201410270064A CN104340755B CN 104340755 B CN104340755 B CN 104340755B CN 201410270064 A CN201410270064 A CN 201410270064A CN 104340755 B CN104340755 B CN 104340755B
Authority
CN
China
Prior art keywords
unit
characteristic value
element characteristic
fiber machinery
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410270064.3A
Other languages
Chinese (zh)
Other versions
CN104340755A (en
Inventor
野间英治
村山贤
村山贤一
西山能弘
本多智幸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Murata Machinery Ltd
Original Assignee
Murata Machinery Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Murata Machinery Ltd filed Critical Murata Machinery Ltd
Publication of CN104340755A publication Critical patent/CN104340755A/en
Application granted granted Critical
Publication of CN104340755B publication Critical patent/CN104340755B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Spinning Or Twisting Of Yarns (AREA)

Abstract

The present invention relates to the element characteristic value processing method of fiber machinery and fiber machinery.The control device (15) that fiber machinery (automatic bobbin winder (100)) possesses multiple processing units (11 ...) of processing yarns Y and can communicate with the unit control unit (11C ...) of above-mentioned processing unit (11 ...).What above-mentioned control device (15) possessed specified above-mentioned processing unit (11 ...) keeps out of the way object specifying part (icon 51a, 51b), from the receiving division (blanket control unit (15C)) of said units control unit (11C ...) receiving unit characteristic value of appointed above-mentioned processing unit (11 ...) and the storage part (blanket control unit (15C)) for storing unit identification information and the said units characteristic value received together.

Description

The element characteristic value processing method of fiber machinery and fiber machinery
Technical field
The present invention relates to the element characteristic value processing method of fiber machinery and fiber machinery.
Background technology
In the past, as the fiber machinery being made of multiple processing units of processing yarn, it is known that such as Japanese Unexamined Patent Publication The fiber machinery that 2012-218915 publications or Japanese Unexamined Patent Publication 2013-67484 publications are recorded.This fiber machinery tool The standby control device that can be communicated with the unit control unit of processing unit.
However, processing unit unit control unit storage by the processing unit operating obtained from data (hereinafter referred to as " element characteristic value ").Therefore, when replacing unit control unit, it is necessary to other storage medium backoff unit characteristic values and in list First control unit writes back after replacing.Replace the electronic circuit board that unit control unit refers to replace Component units control unit.
On the other hand, the functional group of processing unit possesses electronic circuit board respectively, as can replace the electronic circuit The fiber machinery of substrate, such as have in the fiber machinery described in Japanese Unexamined Patent Application Publication 2008-540284 publications.However, in Japan In special table 2008-540284 publications, the replacement for unit control unit is not recorded without exception, is not considered completely special on unit The processing (keep out of the way to other storage mediums and write back to unit control unit) of value indicative.From the point of view of such background, one kind it is expected Being capable of easily backoff unit characteristic value and the easily technology of writeback unit characteristic value.
The content of the invention
Present invention provide it is a kind of being capable of easily backoff unit characteristic value and easily writeback unit characteristic value Technology.
That is the 1st invention be related to possess processing yarn multiple processing units and can be with the unit control of above-mentioned processing unit The fiber machinery for the control device that portion processed communicates.Above-mentioned control device possesses:Keep out of the way object specifying part, it specifies above-mentioned place Manage unit;Receiving division, its said units control unit receiving unit characteristic value from specified above-mentioned processing unit;And storage Portion, it stores unit identification information and the said units characteristic value received together.Thereby, it is possible to from unit control unit to depositing Keep out of the way the element characteristic value of any appointed processing unit in storage portion.In addition, by by unit identification information and element characteristic value Store together, processing unit and the relation of element characteristic value can be made uncomplicated.
For the 2nd invention, in the involved fiber machinery of the 1st invention, above-mentioned control device is summed up on multiple State the host control device that unit control unit is summed up.Thereby, it is possible to correspond to multiple processing units using a control device.
For the 3rd invention, in the involved fiber machinery of the 1st invention or the 2nd invention, above-mentioned control device is The chassis control device set for all said units control unit common lands for belonging to chassis.Thereby, it is possible to utilize a control Device processed corresponds to all processing units.
For the 4th invention, in the fiber machinery in the invention of the 1st invention~the 3rd involved by any invention, above-mentioned control What device processed possessed specified above-mentioned processing unit writes back object specifying part and the said units control to specified above-mentioned processing unit Portion processed sends the sending part of said units characteristic value.It is any appointed thereby, it is possible to be write back from storage part to unit control unit The element characteristic value of processing unit.
It is above-mentioned to move back in the fiber machinery in the invention of the 1st invention~the 3rd involved by any invention for the 5th invention Keeping away object specifying part can be by determining dot element and terminal unit is designated as the above-mentioned processing unit of keeping out of the way object.By This, can simply be designated as the processing unit for keeping out of the way object of element characteristic value from multiple processing units.
For the 6th invention, in the involved fiber machinery of the 4th invention, the above-mentioned object specifying part that writes back can lead to Cross and determine that dot element and terminal unit are designated as writing back the above-mentioned processing unit of object.Thereby, it is possible to from multiple processing The processing unit for writing back object of element characteristic value is simply designated as in unit.
It is above-mentioned to move back in the fiber machinery in the invention of the 1st invention~the 3rd involved by any invention for the 7th invention Keeping away object specifying part can be by determining starting point group and terminal group the group of above-mentioned processing unit that is designated as keeping out of the way object.By This, can simply be designated as the group for keeping out of the way object of element characteristic value from multiple processing units.
For the 8th invention, in the involved fiber machinery of the 4th invention, the above-mentioned object specifying part that writes back can lead to Cross and determine starting point group and terminal group to be designated as writing back the group of the above-mentioned processing unit of object.Thereby, it is possible to from multiple processing The group for writing back object of element characteristic value is simply designated as in unit.
For the 9th invention, in the fiber machinery in the invention of the 1st invention~the 8th involved by any invention, above-mentioned list First characteristic value includes the monitoring value being updated with the processing of yarn.Controlled thereby, it is possible to keep out of the way monitoring value, and in unit Portion writes back after replacing.
For the 10th invention, in the involved fiber machinery of the 9th invention, above-mentioned monitoring value includes the winding of yarn Length.Thereby, it is possible to make spooling length keep out of the way as monitoring value, and write back after the replacement of unit control unit.
It is above-mentioned in the fiber machinery in the invention of the 1st invention~the 9th involved by any invention for the 11st invention Element characteristic value includes the position adjustment value of movable member.Replaced thereby, it is possible to retreating position adjusted value, and in unit control unit After write back.
For the 12nd invention, in the involved fiber machinery of the 9th or the 10th invention, said units control unit is pressed Impinge upon in the transmission of said units characteristic value and/or above-mentioned monitoring value does not change in the reception of said units characteristic value Mode be controlled.Thereby, it is possible to realize keeping out of the way and writing back for correct monitoring value.
For the 13rd invention, in the involved fiber machinery of any of invention of the 4th invention~the 12nd invention, on The setting value of storage part storage treatment conditions is stated, above-mentioned control device rises above-mentioned setting value and said units characteristic value one Send.Thus, the operation without in addition transmission setting value.
It is above-mentioned in the fiber machinery in the invention of the 4th invention~the 13rd involved by any invention for the 14th invention Storage part storage control program, above-mentioned control device send above-mentioned control program together with said units characteristic value.Thus, nothing Need the operation of other sending control program.
For the 15th invention, in the involved fiber machinery of the 14th invention, above-mentioned control device is originally sent State control program.Thereby, it is possible to prevent in the state of control program is not installed, transmitting element characteristic value.
For the 16th invention, in the fiber machinery of the involved invention of the 14th invention or the 15th invention, possess Show the display unit of information, in the case of not being stored with above-mentioned control program in above-mentioned storage part, above-mentioned control device makes State the message that the preservation of above-mentioned control program is asked in display unit display.Thereby, it is possible to reliably send to control to unit control unit Program.
17th invention is that possess multiple processing units of processing yarn and can be controlled with the unit of above-mentioned processing unit The element characteristic value processing method of the fiber machinery for the control device that portion communicates, above-mentioned control device perform:Specify above-mentioned Processing unit keeps out of the way object designating step;From the said units control unit receiving unit feature of appointed above-mentioned processing unit The reception process of value;And the storage process for storing unit identification information and the said units characteristic value received together.By This, can preserve the element characteristic value of any appointed processing unit from unit control unit to storage part.It is in addition, single by inciting somebody to action First characteristic value stores together with unit identification information, and thus processing unit and the relation of element characteristic value are uncomplicated.
For the 18th invention, in the element characteristic value processing method of the involved fiber machinery of the 17th invention, on State control device perform specify above-mentioned processing unit write back object designating step and by said units characteristic value to appointed The transmission process that the said units control unit of above-mentioned processing unit is sent.Thereby, it is possible to be write back from storage part to unit control unit The element characteristic value of any appointed processing unit.
Brief description of the drawings
Figure 1A represents the integrally-built figure of automatic bobbin winder.
Figure 1B is the overall structure diagram for representing spinning frame.
Fig. 2 is the figure for the communication system for representing automatic bobbin winder.
Fig. 3 is the figure for the communication system for representing spinning frame.
Fig. 4 is the figure of the communication system for the fiber machinery for representing other embodiment.
Fig. 5 is the figure for the picture for representing designated treatment unit.
Fig. 6 is the figure for representing to specify the picture of the yarn splicing device as processing unit.
Fig. 7 is the figure for representing to specify the picture of the doffer as processing unit.
Embodiment
First, to the automatic bobbin winder 100 of an example of the fiber machinery as representative, simply illustrate.
Figure 1A shows the overall structure of automatic bobbin winder 100.In addition, Fig. 2 shows the communication system of automatic bobbin winder 100.
Automatic bobbin winder 100 is mainly by multiple processing units 11, bobbin preparation device 12, doffer 13, auxiliary machinery device 14 and blanket control device 15 form.Multiple processing units 11 are set up in parallel along chassis long side direction.
In the case where the yarns Y unwind from yarn feeding bobbin B1 finds yarn defect part, processing unit 11 passes through removing The yarn defect part adjusts yarn quality.Moreover, processing unit 11 makes mound bobbins B2 rotations carry out winding yarn Y, so that at this Package P is made on mound bobbins B2.In this way, processing unit 11 is to adjust the yarn quality of yarns Y and wind the yarns Y to be made The winding unit of P is wrapped.
Processing unit 11 possesses unit control unit 11C.The action of unit control unit 11C control process unit 11.Unit control Portion 11C processed is the electronic circuit board for being provided with various electronic units.Specifically, unit control unit 11C possesses CPU (Central Processing Unit:Central processing unit), ROM (Read Only Memory:Read-only storage) and RAM (Random Access Memory:Random access memory).Unit control unit can also possess HDD (Hard Disk Drive:Hard disk drive).CPU is by performing the control program being stored in ROM, to make processing according to the content of control program Unit 11 operates.The data that RAM storages operate to obtain by processing unit 11, i.e. element characteristic value.In addition, after RAM storages The setting value stated.In addition, unit control unit 11C possesses communication port, can be between order wire and blanket control device 15 Into the transmitting-receiving of horizontal electrical signal.It can be used including the transmitting-receiving between the device between unit control unit 11C and blanket control device 15 Wired communication mode and/or communication.
Bobbin preparation device 12 covers the yarn feeding bobbin B1 from spinning frame supply using suction line, and by being sucked from top Air catches the end of yarns Y.Moreover, bobbin preparation device 12 in the state of yarn feeding bobbin B1 is connected with suction line, leads to Cross and suck air from below to make the end of yarns Y fall in the inner side of yarn feeding bobbin B1.In this way, bobbin preparation device 12 pass through by Assigned position is configured at wound on the end of the yarns Y of yarn feeding bobbin B1, to enable processing unit 11 to be continuously made package P. In addition, bobbin preparation device 12 can be described as the processing unit needed for the operating of processing unit 11.Therefore, bobbin preparation device 12 Also it can be defined as forming " the processing unit 16 " of automatic bobbin winder 100.
Bobbin preparation device 12 as processing unit 16 possesses unit control unit 12C.Unit control unit 12C controls bobbin The action of preparation device 12.Unit control unit 12C is the electronic circuit board for being provided with various electronic units.Unit control unit 12C is the structure identical with unit control unit 11C.
Doffer 13 can be moved along the direction that is set up in parallel of processing unit 11.Doffer 13, which is moved to, receives finger The processing unit 11 shown, will recycle as the package P of full volume state.Moreover, doffer 13 is installed newly for processing unit 11 Mound bobbins B2.In this way, doffer 13 as the package P of full volume state by will recycle and install new mound bobbins B2, to enable processing unit 11 to be continuously made package P.In addition, doffer 13 can be described as the operating institute of processing unit 11 The processing unit needed.Therefore, doffer 13 can also be defined as forming " the processing unit 16 " of automatic bobbin winder 100.
Doffer 13 as processing unit 16 possesses unit control unit 13C.Unit control unit 13C controls doffer 13 action.Unit control unit 13C is the electronic circuit board for being provided with various electronic units.Unit control unit 13C is and list Structure identical first control unit 11C and 12C.
Auxiliary machinery device 14 includes air blower and/or conveyer belt.Air blower as auxiliary machinery device 14 is configured in air blast In cabinet.Air blast cabinet is connected with attraction pipeline, using air blower as attraction source, attracts throughout to manage the fiber that unit 11 produces Bits etc. simultaneously recycle.In addition, the conveyer belt as auxiliary machinery device 14 conveys yarn feeding bobbin B1 and/or package P.In this way, subsidiary engine Device 14 attracts to flow and convey yarn feeding bobbin B1 and/or package P by producing, to enable processing unit 11 to be continuously made P is wrapped.In addition, auxiliary machinery device 14 can be described as the processing unit needed for the operating of processing unit 11.Therefore, auxiliary machinery device 14 It can be defined as forming " the processing unit 16 " of automatic bobbin winder 100.
Auxiliary machinery device 14 as processing unit 16 possesses unit control unit 14C.Unit control unit 14C controls auxiliary machinery device 14 action.Unit control unit 14C is the electronic circuit board for being provided with various electronic units.Unit control unit 14C is and list First control unit 11C, 12C and 13C identical structure.
Blanket control device 15 is that the chassis control set to belonging to all unit control unit 11C ... common lands on chassis fills Put.Thereby, it is possible to correspond to multiple processing units 11 ... using a control device.In addition, blanket control device 15 can also be made For the more upper control device of chassis control device, multiple chassis are summed up.Blanket control device 15 has from processing unit 11 And unit control unit 11C, 12C, 13C, 14C of processing unit 16 receive electric signal and collect work(to grasp the information of operating condition Energy.In addition, blanket control device 15 have to unit control unit 11C, 12C of processing unit 11 and processing unit 16,13C, 14C sends electric signal and indicates the operating instruction function of operating condition.Moreover, blanket control device 15 is when indicating operating condition Send various setting values.Setting value refers to be made the numerical value of the winding speed needed for package P etc..In this way, blanket control device 15 Being capable of suitably control process unit 11, bobbin preparation device 12, doffer 13 and auxiliary machinery device 14.However, blanket control The control object of device 15 processed is not limited to processing unit 11, bobbin preparation device 12, doffer 13 and auxiliary machinery device 14, and it is related to all devices that automatic bobbin winder 100 possesses.
Blanket control device 15 possesses blanket control unit 15C.The blanket blanket control device 15 of control unit 15C controls moves Make.Blanket control unit 15C is the electronic circuit board for being provided with various electronic units.Blanket control unit 15C is controlled with unit Portion 11C, 12C, 13C and 14C identical structure.CPU is by performing the control program being stored in ROM, according to control journey The content of sequence realizes information collecting function and operating instruction function.RAM is stored from processing unit 11 and the list of processing unit 16 The data that first control unit 11C, 12C, 13C, 14C are sent.For example, it have sent list from unit control unit 11C, 12C, 13C, 14C In the case of first characteristic value, the element characteristic value is stored.In this way, blanket control unit 15C possesses the element characteristic value for receiving and sending Receiving division.In addition, blanket control unit 15C possesses the storage part (RAM) stored to the element characteristic value of transmission.Unit is special Value indicative can be stored in HDD.Storage part stores unit identification information together with element characteristic value.In this automatic bobbin winder 100 In, unit identification information refers to can determine that some element characteristic value and which processing unit 11,16 corresponding information are (such as single Member numbering).Moreover, blanket control unit 15C possesses the transmission to unit control unit 11C, 12C, 13C, 14C transmitting element characteristic value Portion.
In addition, blanket control device 15 possesses display unit 15a and operation portion 15b.Shown in display unit 15a each for carrying out Setting screen of kind setting etc..In this automatic bobbin winder 100, display unit 15a is touch panel, thus display unit 15a with Operation portion 15b is integral.However, operation portion 15b can also be keyboard etc..
Next, the spinning frame 200 of other examples of the fiber machinery as representative is simply illustrated.
Figure 1B shows the overall structure of spinning frame 200.In addition, Fig. 3 shows the communication system of spinning frame 200.
Spinning frame 200 is mainly by multiple processing units 21, yarn splicing device 22, doffer 23, auxiliary machinery device 24 and total Control device 25 is included to form.Multiple processing units 21 are set up in parallel along chassis long side direction.
Processing unit 21 carries out the sliver of supply drawing-off, and manufactures yarns Y by the sliver twisting of counter extensioin.And And processing unit 21 makes mound bobbins B3 rotations carry out winding yarn Y, package P is made on mound bobbins B3.In this way, processing Unit 21 is to manufacture yarns Y from sliver and wind the yarns Y to be made the weaving unit of package P.
Processing unit 21 possesses unit control unit 21C (in this spinning frame in each group G being made of multiple processing units 21 In 200, possesses a unit control unit 21C for eight processing units 21).Unit control unit 21C control process unit 21 Action.Unit control unit 21C is the electronic circuit board for being provided with various electronic units.If being concretely demonstrated, unit Control unit 21C possesses CPU (Central Processing Unit), ROM (Read Only Memory) and RAM (Random Access Memory).CPU is by performing the control program being stored in ROM, according to the content of control program Operate processing unit 21.The data that RAM storages operate to obtain by processing unit 21, i.e. element characteristic value.In addition, RAM Store setting value described later.In addition, unit control unit 21C possesses communication port, can be via order wire and blanket control device 25 into horizontal electrical signal transmitting-receiving.It can make including the transmitting-receiving between the device between unit control unit 21C and blanket control device 25 With wired communication mode and/or communication.
Yarn splicing device 22 can be moved along the direction that is set up in parallel of processing unit 21.Yarn splicing device 22, which is moved to, receives finger The processing unit 21 shown, catches the end of the yarns Y of disconnection.Moreover, yarn splicing device 22 makes mutual yarn by rotary air stream Line Y winds and engages the yarns Y.In this way, yarn splicing device 22 becomes a yarns Y by engaging the yarns Y of disconnection, come Processing unit 21 is set continuously to be made package P.In addition, yarn splicing device 22 can be described as needed for the operating of processing unit 21 Processing unit.Therefore, yarn splicing device 22 can be defined as forming " the processing unit 26 " of spinning frame 200.
Yarn splicing device 22 as processing unit 26 possesses unit control unit 22C.Unit control unit 22C controls yarn splicing device 22 action.Unit control unit 22C is the electronic circuit board for being provided with various electronic units.Unit control unit 22C is and list Structure identical first control unit 21C.
Doffer 23 can be moved along the direction that is set up in parallel of processing unit 21.Doffer 23, which is moved to, receives finger The processing unit 21 shown, will recycle as the package P of full volume state.Moreover, doffer 23 is installed newly for processing unit 21 Mound bobbins B3.In this way, doffer 23 as the package P of full volume state by will recycle and install new mound bobbins B3, to enable processing unit 21 to be continuously made package P.In addition, doffer 23 can be described as the operating of processing unit 21 Required processing unit.Therefore, doffer 23 can also be defined as forming " the processing unit 26 " of spinning frame 200.
Doffer 23 as processing unit 26 possesses unit control unit 23C.Unit control unit 23C controls doffer 23 action.Unit control unit 23C is the electronic circuit board for being provided with various electronic units.Unit control unit 23C is and list Structure identical first control unit 21C and 22C.
Auxiliary machinery device 24 includes air blower.Air blower as auxiliary machinery device 24 is configured in air blast cabinet.Air blast cabinet It is connected with attraction pipeline, using air blower as attraction source, attracts throughout to manage Soft flocks of the generation of unit 11 etc. and recycle.This Sample, auxiliary machinery device 24 attract stream by producing, to enable processing unit 21 to be continuously made package P.In addition, auxiliary machinery device 24 It can be described as the processing unit needed for the operating of processing unit 21.Therefore, auxiliary machinery device 24 can also be defined as forming spinning frame 200 " processing unit 26 ".
Auxiliary machinery device 24 as processing unit 26 possesses unit control unit 24C.Unit control unit 24C controls auxiliary machinery device 24 action.Unit control unit 24C is the electronic circuit board for being provided with various electronic units.Unit control unit 24C is and list First control unit 21C, 22C and 23C identical structure.
Blanket control device 25 is that the chassis control set to belonging to all unit control unit 21C ... common lands on chassis fills Put.Thereby, it is possible to correspond to multiple processing units 21 ... using a control device.In addition, blanket control device 25 can also be made For the more upper control device of chassis control device, multiple chassis are summed up.Blanket control device 25 has from processing unit 21 And unit control unit 21C, 22C, 23C, 24C of processing unit 26 receive electric signal and collect work(to grasp the information of operating condition Energy.In addition, blanket control device 25 have to unit control unit 21C, 22C of processing unit 21 and processing unit 26,23C, 24C sends electric signal and indicates the operating instruction function of operating condition.Moreover, blanket control device 25 is when indicating operating condition Send various setting values.Setting value refers to be made the numerical value of the winding speed needed for package P etc..In this way, blanket control device 25 Being capable of suitably control process unit 21, yarn splicing device 22, doffer 23 and auxiliary machinery device 24.Wherein, control dress is summed up The control object for putting 25 is not limited to processing unit 21, yarn splicing device 22, doffer 23 and auxiliary machinery device 24, and is related to The all devices that spinning frame 200 possesses.
Blanket control device 25 possesses blanket control unit 25C.The blanket blanket control device 25 of control unit 25C controls moves Make.Blanket control unit 25C is the electronic circuit board for being provided with various electronic units.Blanket control unit 25C is controlled with unit Portion 21C, 22C, 23C and 24C identical structure.CPU is by performing the control program being stored in ROM, according to control journey The content of sequence realizes information collecting function and operating instruction function.RAM is stored from processing unit 21 and the list of processing unit 26 The data that first control unit 21C, 22C, 23C, 24C are sent.For example, it have sent list from unit control unit 21C, 22C, 23C, 24C In the case of first characteristic value, the element characteristic value is stored.In this way, blanket control unit 25C possesses the element characteristic value for receiving and sending Receiving division.In addition, blanket control unit 25C possesses the storage part (RAM) stored to the element characteristic value of transmission.Unit is special Value indicative can also be stored in HDD.Storage part stores unit identification information together with element characteristic value.In this spinning frame 200, Unit identification information refers to can determine some element characteristic value information (such as group #) corresponding with which group G, Huo Zheneng It is enough to determine and 26 corresponding information (such as element number) of which processing unit.Moreover, blanket control unit 25C possesses to unit control The sending part of portion 21C, 22C, 23C, 24C transmitting element characteristic value processed.
In addition, blanket control device 25 possesses display unit 25a and operation portion 25b.Shown in display unit 25a each for carrying out Setting screen of kind setting etc..In this spinning frame 200, display unit 25a is touch panel, so display unit 25a and operation Portion 25b is integral.However, operation portion 25b can also be keyboard etc..
Next, the fiber machinery involved by other embodiment is illustrated.
Fig. 4 shows the communication system of the fiber machinery involved by other embodiment.Herein, as automatic bobbin winder 300 And illustrate.
Automatic bobbin winder 300 mainly by multiple processing units 31, group control device 32, bobbin preparation device 33, doff dress Put 34, auxiliary machinery device 35 and blanket control device 36 is formed.Bobbin preparation device 33, doffer 34 and auxiliary machinery device 35 It can be defined as forming " the processing unit 37 " of automatic bobbin winder 300.Automatic bobbin winder 300 possess group control device 32 this Point is different from automatic bobbin winder 100.Therefore, only group control device 32 is illustrated.
Group control device 32 configure be made of multiple processing units 31 each group G (in this automatic bobbin winder 300, A group control device 32 is configured with for eight processing units 31).In addition, it is configured with one for multiple groups of control devices 32 Blanket control device 36.
Group control device 32 has receives electric signal to grasp operating condition from the unit control unit 31C of processing unit 31 Information collecting function.In addition, group control device 32 has sends electric signal to indicate to the unit control unit 31C of processing unit 31 The operating instruction function of operating condition.Moreover, group control device 32 sends various setting values when indicating operating condition.Setting value Refer to be made the numerical value of the winding speed needed for package P etc..Group control device 32 can carry out telecommunications with blanket control device 36 Number transmitting-receiving, sum up control device 36 from this and receive instruction and control each processing unit 31.In addition, group control device 32 it may be said that It is the processing unit needed for the operating of processing unit 31.Therefore, group control device 32 can also be defined as forming automatic bobbin winder 300 " processing unit 37 ".
Group control device 32 as processing unit 37 possesses unit control unit 32C.Unit control unit 32C control groups control The action of device 32.Unit control unit 32C is the electronic circuit board for being provided with various electronic units.Unit control unit 32C is With the identical structure such as unit control unit 31C.CPU is by performing the control program being stored in ROM, according to control program Content realizes information collecting function and operating instruction function.RAM stores the number sent from the unit control unit 31C of processing unit 31 According to.For example, in the case where have sent element characteristic value from unit control unit 31C, the element characteristic value is stored.In this way, unit Control unit 32C possesses the receiving division for receiving the element characteristic value sent.In addition, unit control unit 32C possesses the unit to transmission The storage part (RAM) that characteristic value is stored.Element characteristic value can also be stored in HDD.Storage part unit, which identifies unit, to be believed Breath stores together with characteristic value.In this automatic bobbin winder 300, unit identification information refers to can determine some element characteristic value With 31 corresponding information (such as element number) of which processing unit.Moreover, unit control unit 32C possesses to unit control unit The sending part of 31C transmitting element characteristic values.
In addition, group control device 32 possesses display unit 32a and operation portion 32b.Shown in display unit 32a various for carrying out The setting screen of setting.In this automatic bobbin winder 300, display unit 32a is touch panel, so display unit 32a and operation Portion 32b is integral.However, operation portion 32b can also be keyboard etc..
In addition, as described above, automatic bobbin winder 300 is directed to configures a blanket control device to multiple groups of control devices 32 36.Blanket control device 36 has the function of that information collecting function and operating indicate in the same manner as group control device 32.Blanket control The unit spy that the blanket control unit 36C of device 36 possesses the receiving division for receiving the element characteristic value that have sent and storage is sent The storage part (RAM) of value indicative.Moreover, the blanket control unit 36C of blanket control device 36 possesses sends list to unit control unit 32C The sending part of first characteristic value.In other words, the function identical with organizing control device 32 can be realized by summing up control device 36.
Next, in the fiber machinery of such structure, to being capable of easily backoff unit characteristic value and can be easy The technology of ground writeback unit characteristic value illustrates.
When replacing unit control unit 11C, 21C, 31C of processing unit 11,21,31, it is necessary to be designated as the place of object Manage unit 11,21,31.Replace the electricity that unit control unit 11C, 21C, 31C refer to replace Component units control unit 11C, 21C, 31C Sub-circuit substrate.
Fig. 5 shows the picture 5A of designated treatment unit 11,21,31.Above-mentioned picture 5A be shown in display unit 15a, 25a, 32a。
(on keeping out of the way for element characteristic value)
In image 5A, operation box 51 is provided with.In operation box 51 as keep out of the way object specifying part show icon 51a, 51b.Moreover, icon 51o is shown as the portion of executing instruction in operation box 51.
In automatic bobbin winder 100, it is used to specify in multiple processing units 11 as the icon 51a for keeping out of the way object specifying part Become element characteristic value keep out of the way object rise dot element." playing dot element " can be defined as N number of processing unit 11 In the case of from first to N reference numerals, become digital processing unit minimum in the processing unit 11 of object.Pressing In the case of icon 51a, display is used for the image for having inputted dot element.However, it is also possible to for the inputs such as keyboard can be used Structure.If in addition, playing the specified completion of dot element, show the numbering of above-mentioned processing unit 11 (in Fig. 5 in icon 51a Middle display " X " is used as X processing unit 11).
In addition, icon 51b is used to specify the terminal for keeping out of the way object as element characteristic value in multiple processing units 11 Unit." terminal unit " can be defined as N number of processing unit 11 from first to N reference numerals in the case of, become Maximum digital processing unit in the processing unit 11 of object.In the case where pressing icon 51b, display is used to input terminal The image of unit.However, it is also possible to for the structure of the inputs such as keyboard can be used.If in addition, the specified completion of terminal unit, The numbering (showing that " Y " is used as Y processing units 11 in Fig. 5) of above-mentioned processing unit 11 is shown in icon 51b.
By the way that as such structure, carrying out the operator for keeping out of the way instruction of element characteristic value can simply be designated as The processing unit 11 for keeping out of the way object of element characteristic value.Icon 51o is pressed by operator to determine appointed processing unit 11.At this time, sum up control unit 15C designating unit identification information and send element characteristic value and send requirement.Unit control unit 11C is rung It should require and transmitting element characteristic value.Afterwards, operator replace the operation of unit control unit 11C.In addition, do not become single The other processing units 11 for keeping out of the way object of first characteristic value can also operate as usual in replacement operation, without stopping.
In the operation of above-mentioned designated treatment unit 11, other processing units can be specified by pressing icon 51o 11.In other words, if pressing icon 51o and being determined to become the processing unit 11 for keeping out of the way object, can reassign as moving back That keeps away object plays dot element and terminal unit.This can be used as showing the structure of multiple icon 51a, 51b in operation box 51 and Realize.(such as from first to the 3rd, the 5th to the eight) structure as according to more than, can specify multiple unit scopes.This Outside, " unit scope " refers to continuous a group processing unit 11.
Can be phase by having made dot element and terminal unit moreover, in the operation of above-mentioned designated treatment unit 11 With numbering specify a processing unit 11.In other words, if being used as dot element to specify Z processing units 11 and as eventually Dot element specifies Z processing units 11, then can only specify Z processing units 11.In this way, it for example can only specify the first processing Unit 11.In addition, it can also specify discontinuous multiple processing units 11 (such as first, the four, the 7th processing units 11).
Similarly, in automatic bobbin winder 300, group control device 32 can carry out following operation.I.e. as keeping out of the way pair The starting point list for keeping out of the way object as element characteristic value in multiple processing units 31 can be specified as the icon 51a of specifying part Member.In the case where pressing icon 51a, display is used for the image for having inputted dot element.If moreover, play the specified complete of dot element Into then showing the numbering (in Fig. 5 show " X " be used as X processing unit 11) of above-mentioned processing unit 31 in icon 51a.
In addition, icon 51b can specify the terminal for keeping out of the way object as element characteristic value in multiple processing units 31 Unit.In the case where pressing icon 51b, display is used for the image for inputting terminal unit.Moreover, if terminal unit is specified complete Into then showing the numbering (in Fig. 5 show " Y " be used as Y processing units 11) of above-mentioned processing unit 11 in icon 51b.
By the way that as such structure, carrying out the operator for keeping out of the way instruction of element characteristic value can simply be designated as The processing unit 31 for keeping out of the way object of element characteristic value.Icon 51o is pressed by operator to determine appointed processing unit 31.At this time, unit control unit 32C designating unit identification information and send element characteristic value send require.Unit control unit 31C is rung It should require and transmitting element characteristic value.Afterwards, operator replace the operation of unit control unit 31C.In addition, do not become single The other processing units 31 for keeping out of the way object of first characteristic value can also operate as usual in replacement operation, without stopping.
In the operation of above-mentioned designated treatment unit 31, other processing units can be specified by pressing icon 51o 31.In other words, if pressing icon 51o and being determined to become the processing unit 31 for keeping out of the way object, can reassign as moving back That keeps away object plays dot element and terminal unit.This can be used as showing the structure of multiple icon 51a, 51b in operation box 51 and Realize.Structure as according to more than, can specify multiple unit scopes (such as first to the three, the 5th to the 8th).
Moreover, in the operation of above-mentioned designated treatment unit 31, can be by becoming dot element and terminal unit It is identically numbered to specify a processing unit 31.In other words, if being used as dot element to specify Z processing units 31 and conduct Terminal unit specifies Z processing units 31, then can only specify Z processing units 31.In this way, for example can only it specify at first Manage unit 31.In addition, it can also specify discontinuous multiple processing units 31 (such as first, the four, the 7th processing units 31).
In such manner, it is possible to keep out of the way from unit control unit 11C, 31C to storage part (blanket control unit 15C, unit control unit 32C) The element characteristic value of any appointed processing unit 11,31.In addition, by by element characteristic value together with unit identification information Storage, to make processing unit 11,31 uncomplicated with the relation of element characteristic value.
Moreover, in spinning frame 200 and automatic bobbin winder 300, blanket control device 25,36 can carry out following behaviour Make.It is used to specify becoming in the group G being made of multiple processing units 21,31 as the icon 51a for keeping out of the way object specifying part The starting point group for keeping out of the way object of element characteristic value." starting point group " can be defined as forming for by multiple processing units 21,31 Group G from first to N reference numerals in the case of, become digital group minimum in the group G of object.Pressing icon 51a In the case of, display is used for the image for inputting starting point group.However, it is also possible to use the structure of the inputs such as keyboard.If in addition, rise The specified completion of point group, then show the numbering (showing that " X " is used as Group X G in Fig. 5) of above-mentioned group G in icon 51a.
In addition, icon 51b, which is used to specify in the group being made of multiple processing units 21,31, becomes moving back for element characteristic value Keep away the terminal group of object." terminal group " can be defined as by the group G that multiple processing units 21,31 are formed from first to In the case of N reference numerals, become digital group maximum in the group G of object.In the case where pressing icon 51b, display is used In the image of input terminal group.However, it is also possible to for the structure of the inputs such as keyboard can be used.In addition, if terminal group is specified Complete, then the numbering (showing that " Y " is used as Y group G in Fig. 5) of above-mentioned group G is shown in icon 51b.
By the way that as such structure, carrying out the operator for keeping out of the way instruction of element characteristic value can simply be designated as The group G for keeping out of the way object of element characteristic value.Icon 51o is pressed by operator to determine appointed group of G.At this time, control is summed up Portion 25C, 36C designating unit identification information processed simultaneously sends the transmission requirement of element characteristic value.Unit control unit 21C, 32C response should be wanted Ask and transmitting element characteristic value.Afterwards, operator replace the operation of unit control unit 21C, 32C.In addition, do not becoming single First characteristic value is kept out of the way in other groups of G of object, and processing unit 21,31 can also operate as usual in replacement operation, Without stopping.
In the operation of above-mentioned designated groups G, other groups of G can be specified by pressing icon 51o.In other words, if Press icon 51o and be determined to become the group G for keeping out of the way object, then can reassign as the starting point group and terminal of object is kept out of the way Group.This also can show the structure of multiple icon 51a, 51b in operation box 51 and realize.Structure more than, can specify Multiple groups of scopes (such as first to the three, the 5th to the 8th).In addition, " group scope " refers to continuous group G.
Moreover, in the operation of above-mentioned designated groups G, can by make starting point group and terminal form for be identically numbered come Specify a group G.In other words, if specifying Z groups G as starting point group and specifying Z group G as terminal group, can only refer to Fixed Z groups G.In this way, it for example can only specify first group of G.In addition, can also specify discontinuous multiple groups of G (first, the 4th, 7th group of G).
In such manner, it is possible to keep out of the way any be designated from unit control unit 21C, 32C to storage part (blanket control unit 25C, 36C) Processing unit 21 or organize control device 32 element characteristic value.In addition, by by element characteristic value and unit identification information Store together, to make processing unit 21 or group control device 32 and the relation of element characteristic value uncomplicated.
(on writing back for element characteristic value)
Operation box 52 is provided with image 5A.It is used as in operation box 52 and writes back object specifying part display icon 52a, 52b. Moreover, icon 52o is shown as the portion of executing instruction in operation box 52.
In automatic bobbin winder 100, it is used to specify in multiple processing units 11 as the icon 52a for writing back object specifying part Become element characteristic value write back object rise dot element." playing dot element " is as defined above and states.Pressing the feelings of icon 52a Under condition, similarly display is used for the image for having inputted dot element.Moreover, above-mentioned processing unit 11 is shown in icon 52a Numbering (shows that " X " is used as X processing unit 11) in Figure 5.
In addition, icon 52b is used to specify the terminal for writing back object as element characteristic value in multiple processing units 11 Unit." terminal unit " is as defined above and states.In the case where pressing icon 52b, similarly display is used to input terminal unit Image.Moreover, show that the numbering of above-mentioned processing unit 11 (shows that " Y " is used as Y processing units in Fig. 5 in icon 52b 11)。
By the way that as such structure, carrying out the operator for writing back instruction of element characteristic value can simply be designated as The processing unit 11 for writing back object of element characteristic value.Icon 52o is pressed by operator to determine appointed processing unit 11.Afterwards, control unit 15C is summed up to send unit identification information together with element characteristic value.Each unit control unit 11C grasps peace The setting of rotary switch on electronic circuit board, and by being compareed with unit identification information, to identify the unit of oneself Characteristic value.However, it is not limited to such method.It is not from blanket alternatively, it is also possible to be configured to each unit control unit 11C The element characteristic value of oneself is searched in multiple element characteristic values that control unit 15C is sent, and each unit control unit 11C designating unit Identification information simultaneously sends the transmission requirement of element characteristic value, and blanket control unit 15C transmissions require corresponding with the transmission of element characteristic value Element characteristic value.In addition, the other processing units 11 for writing back object for not becoming element characteristic value are also such as logical in replacement operation It can often operate like that, without stopping.
In the operation of above-mentioned designated treatment unit 11, other processing units can be specified by pressing icon 52o 11.In other words, if pressing icon 52o and being determined to become the processing unit 11 for writing back object, can reassign as writing That returns object plays dot element and terminal unit.This also can show the structure of multiple icon 52a, 52b in operation box 52 and realize. Structure as according to more than, can specify multiple unit scopes (such as first to the three, the 5th to the 8th).In addition, " unit Scope " is such as above-mentioned.
Moreover, in the operation of above-mentioned designated treatment unit 11, can be by having made dot element become with terminal unit It is identically numbered to specify a processing unit 11.In other words, if being used as dot element to specify Z processing units 11 and conduct Terminal unit specifies Z processing units 11, then can only specify Z processing units 11.In this way, for example can only it specify at first Manage unit 11.In addition, it can also specify discontinuous multiple processing units 11 (first, the four, the 7th processing units 11).
Similarly, in automatic bobbin winder 300, group control device 32 can carry out following operation.I.e. as writing back pair The starting point list for writing back object as element characteristic value in multiple processing units 31 can be specified as the icon 52a of specifying part Member.In the case where pressing icon 52a, display is used for the image for having inputted dot element.If moreover, play the specified complete of dot element Into then showing the numbering (in Fig. 5 show " X " be used as X processing unit 11) of above-mentioned processing unit 31 in icon 52a.
In addition, icon 52b can specify the terminal for writing back object as element characteristic value in multiple processing units 31 Unit.In the case where pressing icon 52b, display is used for the image for inputting terminal unit.Moreover, if terminal unit is specified complete Into then showing the numbering (in Fig. 5 show " Y " be used as Y processing units 11) of above-mentioned processing unit 11 in icon 52b.
By the way that as such structure, carrying out the operator for keeping out of the way instruction of element characteristic value can simply be designated as The processing unit 31 for writing back object of element characteristic value.Icon 52o is pressed by operator to determine appointed processing unit 31.Thus, unit control unit 32C sends unit identification information together with element characteristic value.Electronics electricity is installed on by setting Rotary switch on base board carrys out generating unit identification information.However it is not limited to this method.Alternatively, it is also possible to be configured to 31 designating unit identification information of processing unit simultaneously sends the transmission requirement of element characteristic value, and unit control unit 32C is sent and the unit Characteristic value sends and requires corresponding element characteristic value.In addition, do not become the other processing units for writing back object of element characteristic value 31 can also operate as usual in replacement operation, without stopping.
In the operation of above-mentioned designated treatment unit 31, other processing units can be specified by pressing icon 52o 31.In other words, if pressing icon 52o and being determined to become the processing unit 31 for writing back object, can reassign as writing That returns object plays dot element and terminal unit.This can be used as showing the structure of multiple icon 52a, 52b in operation box 52 and Realize.Structure as according to more than, can specify multiple unit scopes (such as first to the three, the 5th to the 8th).
Moreover, in the operation of above-mentioned designated treatment unit 31, can be by having made dot element become with terminal unit It is identically numbered to specify a processing unit 31.In other words, if being used as dot element to specify Z processing units 31 and conduct Terminal unit specifies Z processing units 31, then can only specify Z processing units 31.In this way, for example can only it specify at first Manage unit 31.In addition, it can also specify discontinuous multiple processing units 31 (first, the four, the 7th processing units 31).
In such manner, it is possible to write back from storage part (blanket control unit 15C, unit control unit 32C) to unit control unit 11C, 31C The element characteristic value of any appointed processing unit 11,31.In addition, by by element characteristic value together with unit identification information Send, to make processing unit 11,31 uncomplicated with the relation of element characteristic value.
Moreover, in spinning frame 200 and automatic bobbin winder 300, blanket control device 25,36 can carry out following behaviour Make.It is used to specify becoming in the group G being made of multiple processing units 21,31 as the icon 52a for writing back object specifying part The starting point group for writing back object of element characteristic value.In the case where pressing icon 52a, similarly display is used to input starting point group Image.Moreover, the numbering (showing that " X " is used as Group X G in Fig. 5) of above-mentioned group G is shown in icon 52a.
In addition, icon 52b be used to specify in the group G being made of multiple processing units 21,31 as element characteristic value Write back the terminal group of object.In the case where pressing icon 52b, display is used for the image for inputting terminal group.Moreover, in icon The numbering (showing that " Y " is used as Y group G in Fig. 5) of above-mentioned group G is shown in 52b.
By the way that as such structure, carrying out the operator for writing back instruction of element characteristic value can simply be designated as The group G for writing back object of element characteristic value.Icon 52o is pressed by operator to determine appointed group of G.Afterwards, control is summed up Portion 25C, 36C processed send unit identification information together with element characteristic value.Each unit control unit 21C, 32C, which are grasped, is installed on electricity The setting of rotary switch on sub-circuit substrate, and by being compareed with unit identification information, to identify the element characteristic value of oneself. However it is not limited to this method.It is not from blanket control unit alternatively, it is also possible to be configured to each unit control unit 21C, 32C The element characteristic value of oneself is searched in multiple element characteristic values that 25C, 36C are sent, and each unit control unit 21C, 32C specify list First identification information simultaneously sends the transmission requirement of element characteristic value, sums up control unit 25C, 36C transmission and is wanted with element characteristic value transmission Seek corresponding element characteristic value.In addition, other groups of G of object are write back do not become element characteristic value, processing unit 21,31 It can also be operated as usual in replacement operation, without stopping.
In the operation of above-mentioned designated groups G, other groups of G can be specified by pressing icon 52o.In other words, if Press icon 52o and be determined to become the group G for writing back object, then can reassign as the starting point group and terminal of object is write back Group.This also can show the structure of multiple icon 52a, 52b in operation box 52 and realize.Structure as according to more than, can Perform multiple groups of scopes (such as first to the three, the 5th to the 8th).In addition, " group scope " is such as above-mentioned.
Moreover, in the operation of above-mentioned designated groups G, can by make starting point group and terminal form for be identically numbered come Specify a group G.In other words, if specifying Z groups G as starting point group and specifying Z group G as terminal group, can only refer to Fixed Z groups G.In this way, for example only specify first group of G.In addition, it can also specify discontinuous multiple groups of G (first, the four, the 7th Group G).
In such manner, it is possible to write back any be designated from storage part (blanket control unit 25C, 36C) to unit control unit 21C, 32C Processing unit 21 or organize control device 32 element characteristic value.In addition, by by element characteristic value and unit identification information Send together, to make processing unit 21 or group control device 32 and the relation of element characteristic value uncomplicated.
In unit control unit 12C, 22C ... that replacement is waited as the bobbin preparation device 12 ... of processing unit 16,26,37 When, it is necessary to be designated as the processing unit 16,26,37 of object.Below, by way of example, be conceived to yarn splicing device 22 and the dress that doffs 23 are put to illustrate.
Fig. 6 shows to specify the picture 5B of the yarn splicing device 22 as processing unit 26.Above-mentioned picture 5B is shown in display Portion 25a.
(on keeping out of the way for element characteristic value)
Operation box 54 is provided with image 5B.Six check boxes are shown as keeping out of the way object specifying part in operation box 54 (Checkbox)54a、54b….Show check box 54a, 54b ... of the number identical with the number of units of yarn splicing device 22.Moreover, In operation box 54 icon 54o is shown as the portion of executing instruction.
In spinning frame 200, as keeping out of the way check box 54a, 54b ... of object specifying part for being designated as element characteristic The yarn splicing device 22 for keeping out of the way object of value.For example, in the case where pressing check box 54a and check box 54b, input and specify correspondence Yarn splicing device 22 this meaning.However, it is also possible to for the structure of the inputs such as keyboard can be used.At this time, in check box Check mark (Check mark) is shown in 54a, 54b.
By the way that as such structure, carrying out the operator for keeping out of the way instruction of element characteristic value can simply be designated as The yarn splicing device 22 for keeping out of the way object of element characteristic value.Icon 54o is pressed by operator to determine appointed yarn splicing device 22.At this time, control unit 25C designating unit identification informations are summed up, and sends element characteristic value and sends requirement.Unit control unit 22C Respond the requirement and transmitting element characteristic value.Afterwards, operator replace the operation of unit control unit 22C.In addition, do not become The grade of processing unit 21 for keeping out of the way object of element characteristic value in replacement operation with that can operate as usual, without stop.
In such manner, it is possible to keep out of the way from unit control unit 22C to storage part (blanket control unit 25C) any appointed as at Manage the element characteristic value of the yarn splicing device 22 of unit 26.In addition, by the way that element characteristic value is stored together with unit identification information, It is uncomplicated as the yarn splicing device 22 and the relation of element characteristic value of processing unit 26 to make.
(on writing back for element characteristic value)
Operation box 55 is provided with image 5B.Six check boxes are shown as writing back object specifying part in operation box 55 55a、55b….Show check box 55a, 55b ... of the number identical with the number of units of yarn splicing device 22.Moreover, in operation box 55 It is middle to be used as the portion of executing instruction to show icon 55o.
In spinning frame 200, as writing back check box 55a, 55b ... of object specifying part for being designated as element characteristic The yarn splicing device 22 for writing back object of value.For example, in the case where pressing check box 55a and check box 55b, input and specify correspondence Yarn splicing device 22 this meaning.However, it is also possible to for the structure of the inputs such as keyboard can be used.At this time, in check box Check mark is shown in 55a, 55b.
By the way that as such structure, carrying out the operator for writing back instruction of element characteristic value can simply be designated as The yarn splicing device 22 for writing back object of element characteristic value.Icon 55o is pressed by operator to determine appointed yarn splicing device 22.Afterwards, control unit 25C is summed up to send unit identification information together with element characteristic value.Each unit control unit 22C grasps peace The setting of rotary switch on electronic circuit board, and by being compareed with unit identification information, to identify the unit of oneself Characteristic value.However it is not limited to this method.It is not from blanket control alternatively, it is also possible to be configured to each unit control unit 22C The element characteristic value of oneself is searched in multiple element characteristic values that portion 25C is sent, and each unit control unit 22C designating unit identifies Information, and send element characteristic value and send requirement, blanket control unit 25C, which sends to send with the element characteristic value, requires corresponding list First characteristic value.In addition, do not become element characteristic value the grade of processing unit 21 for writing back object in replacement operation also as usually that Sample can operate, without stopping.
In such manner, it is possible to write back from storage part (blanket control unit 25C) to unit control unit 22C any appointed as at Manage the element characteristic value of the yarn splicing device 22 of unit 26.In addition, by the way that element characteristic value is sent together with unit identification information, It is uncomplicated as the yarn splicing device 22 and the relation of element characteristic value of processing unit 26 to make.
Fig. 7 shows to specify the picture 5C of the doffer 23 as processing unit 26.Above-mentioned picture 5C is shown in display Portion 25a.
(on keeping out of the way for element characteristic value)
Operation box 57 is provided with image 5C.A check box is shown as keeping out of the way object specifying part in operation box 57 57a (the check box 57a of the display number identical with the number of units of doffer 23).Moreover, refer in operation box 57 as execution Show that portion shows icon 57o.
In spinning frame 200, it is used to be designated as moving back for element characteristic value as the check box 57a for keeping out of the way object specifying part Keep away the doffer 23 of object.In the case where pressing check box 57a, this meaning for specifying doffer 23 is inputted.However, It can also be the structure that can use the inputs such as keyboard.At this time, check mark is shown in check box 57a.
By the way that as such structure, carrying out the operator for keeping out of the way instruction of element characteristic value can simply be designated as The doffer 23 for keeping out of the way object of element characteristic value.Icon 57o is pressed by operator to determine appointed doffer 23.Thus, control unit 25C designating unit identification informations are summed up, and sends element characteristic value and sends requirement.Unit control unit 23C Respond the requirement and transmitting element characteristic value.Afterwards, operator replace the operation of unit control unit 23C.In addition, do not become The grade of processing unit 21 for keeping out of the way object of element characteristic value can also operate as usual in replacement operation, without stopping.
In such manner, it is possible to keep out of the way from unit control unit 23C to storage part (blanket control unit 25C) any appointed as at Manage the element characteristic value of the doffer 23 of unit 26.In addition, by the way that element characteristic value is stored together with unit identification information, It is uncomplicated as the doffer 23 and the relation of element characteristic value of processing unit 26 to make.
(on writing back for element characteristic value)
Moreover, operation box 58 is provided with image 5C.In operation box 58 as write back object specifying part show one answer Select frame 58a.Show the check box 58a of the number identical with the number of units of doffer 23.Also, it is used as and holds in operation box 58 Row instruction unit shows icon 58o.
It is for being designated as element characteristic value as the check box 58a of object specifying part is write back in spinning frame 200 Write back the doffer 23 of object.In the case where pressing check box 58a, this meaning for specifying doffer 23 is inputted. However, it is also possible to for the structure of the inputs such as keyboard can be used.At this time, check mark is shown in check box 58a.
By the way that as such structure, carrying out the operator for writing back instruction of element characteristic value can simply be designated as The doffer 23 for writing back object of element characteristic value.Icon 58o is pressed by operator to determine appointed doffer 23.Afterwards, control unit 25C is summed up to send unit identification information together with element characteristic value.Each unit control unit 23C grasps peace The setting of rotary switch on electronic circuit board, and by being compareed with unit identification information, to identify the unit of oneself Characteristic value.However it is not limited to this method.It is not from blanket control alternatively, it is also possible to be configured to each unit control unit 23C The element characteristic value of oneself is searched in multiple element characteristic values that portion 25C is sent, and each unit control unit 23C designating unit identifies Information, and send element characteristic value and send requirement, blanket control unit 25C, which sends to send with the element characteristic value, requires corresponding list First characteristic value.In addition, do not become element characteristic value the grade of processing unit 21 for writing back object in replacement operation also as usually that Sample can operate, without stopping.
In such manner, it is possible to write back from storage part (blanket control unit 25C) to unit control unit 23C any appointed as at Manage the element characteristic value of the doffer 23 of unit 26.In addition, by the way that element characteristic value is sent together with unit identification information, It is uncomplicated as the doffer 23 and the relation of element characteristic value of processing unit 26 to make.
Herein, element characteristic value is illustrated in more detail.
In this application, it is element characteristic value that will pass through processing unit 11 ... operating and the data definition obtained.Unit is special Value indicative includes being updated i.e. so-called monitoring value with the processing of yarns Y.Monitoring value refers to spooling length, cycle counter Data, other management data etc..Since element characteristic value includes monitoring value, institute is so as to keep out of the way monitoring value, and control in unit Write back after portion's 11C ... replacements.
In addition, element characteristic value includes the position adjustment value of movable member.Position adjustment value refers in the school of movable member The numerical value used in standard.Since element characteristic value includes position adjustment value, institute is so as to retreating position adjusted value, and in unit control Write back after 11C ... replacements in portion processed.
In addition, unit control unit 11C ... according in the transmission of element characteristic value and/or element characteristic value reception The middle not changed mode of monitoring value is controlled.Thereby, it is possible to realize keeping out of the way and writing back for correct monitoring value.In addition, In the case of producing any mistake in the transmission or reception of element characteristic value, unit control unit 11C ... is automatically repeatedly The communication of element characteristic value.In this case, only produce the logical of first control unit 11C ... of mistake automatically element characteristic value repeatedly Letter.
Next, to applying for that the further feature point of involved fiber mechanical (100,200,300) illustrates.
In the fiber mechanical (100,200,300) involved by the application, blanket control unit 15C as storage part, 25C, 36C and unit control unit 32C can store the setting value for the treatment of conditions.Setting value refers to be made the volume needed for package P Around the numerical value of speed etc..Moreover, blanket control device 15,25,36 and group control device 32 can be special by setting value and unit Value indicative is sent together.Thus, work of the fiber involved by the application mechanical (100,200,300) without in addition sending setting value Industry.
Moreover, blanket control unit 15C, 25C, 36C and unit control unit 32C as storage part can store control journey Sequence.Above-mentioned control program is not to be installed in blanket control unit 15C, 25C, 36C and unit control unit 32C, but is used In installed in other processing units 11 ....Moreover, blanket control device 15,25,36 and group control device 32 will can control Sent together with program and element characteristic value etc..Thus, in addition the fiber involved by the application mechanical (100,200,300) is without sending out Send the operation of control program.
In addition, blanket control device 15,25,36 and group control device 32 are in sending control program and element characteristic value In the case of sending, control program is originally sent.This is because prevent in the state of control program is not installed, transmitting element Characteristic value etc..In addition, control device 15,25,36 and group control device 32 are summed up in the case of writeback unit characteristic value, As during non-storing control program, making display in blanket control unit 15C, 25C, 36C and unit control unit 32C of storage part Portion 15a, 25a, 32a, 36a show message.Message is the content of the preservation to the control program of storage part request transmission.Example Such as, in the case of the control program that transmission is preserved in storage part, operator can utilize preserve the control program can Mobile model storage medium.Alternatively, it is also possible to for from other chassis passing through the acquisitions such as wireless communication control program and preserve knot Structure.In such manner, it is possible to reliably to unit control unit 11C ... sending control programs.

Claims (49)

1. a kind of fiber machinery, be possess processing yarn multiple processing units and can be with the unit control of the processing unit The fiber machinery for the control device that portion processed communicates, it is characterised in that
The control device possesses:
Keep out of the way object specifying part, it specifies the processing unit;
Receiving division, its described unit control unit receiving unit characteristic value from the appointed processing unit;And
Storage part, it stores unit identification information and the element characteristic value received together.
2. fiber machinery according to claim 1, it is characterised in that
The control device is the host control device for summing up multiple unit control units.
3. fiber machinery according to claim 1, it is characterised in that
The control device is the chassis control device set for all unit control unit common lands for belonging to chassis.
4. fiber machinery according to claim 2, it is characterised in that
The control device is the chassis control device set for all unit control unit common lands for belonging to chassis.
5. fiber machinery according to any one of claims 1 to 4, it is characterised in that
What the control device possessed the specified processing unit writes back object specifying part and to the appointed processing unit The unit control unit send the sending part of the element characteristic value.
6. fiber machinery according to any one of claims 1 to 4, it is characterised in that
The object specifying part of keeping out of the way can be by determining that dot element and terminal unit are designated as keeping out of the way described in object Processing unit.
7. fiber machinery according to claim 5, it is characterised in that
The object specifying part that writes back can be by determining that dot element and terminal unit are designated as writing back described in object Processing unit.
8. fiber machinery according to any one of claims 1 to 4, it is characterised in that
The object specifying part of keeping out of the way can be designated as the processing for keeping out of the way object by determining starting point group and terminal group The group of unit.
9. fiber machinery according to claim 5, it is characterised in that
The object specifying part that writes back can be designated as writing back the processing of object by determining starting point group and terminal group The group of unit.
10. the fiber machinery according to any one of Claims 1 to 4,7,9, it is characterised in that
The element characteristic value includes the monitoring value being updated with the processing of yarn.
11. fiber machinery according to claim 5, it is characterised in that
The element characteristic value includes the monitoring value being updated with the processing of yarn.
12. fiber machinery according to claim 6, it is characterised in that
The element characteristic value includes the monitoring value being updated with the processing of yarn.
13. fiber machinery according to claim 8, it is characterised in that
The element characteristic value includes the monitoring value being updated with the processing of yarn.
14. fiber machinery according to claim 10, it is characterised in that
The monitoring value includes the spooling length of yarn.
15. the fiber machinery according to any one of claim 11~13, it is characterised in that
The monitoring value includes the spooling length of yarn.
16. the fiber machinery according to any one of Claims 1 to 4,7,9,11~13, it is characterised in that
The element characteristic value includes the position adjustment value of movable member.
17. fiber machinery according to claim 5, it is characterised in that
The element characteristic value includes the position adjustment value of movable member.
18. fiber machinery according to claim 6, it is characterised in that
The element characteristic value includes the position adjustment value of movable member.
19. fiber machinery according to claim 8, it is characterised in that
The element characteristic value includes the position adjustment value of movable member.
20. fiber machinery according to claim 10, it is characterised in that
The element characteristic value includes the position adjustment value of movable member.
21. fiber machinery according to claim 10, it is characterised in that
The unit control unit is according in the transmission of the element characteristic value and/or in the reception of the element characteristic value The not changed mode of monitoring value is controlled.
22. the fiber machinery according to any one of claim 11~13, it is characterised in that
The unit control unit is according in the transmission of the element characteristic value and/or in the reception of the element characteristic value The not changed mode of monitoring value is controlled.
23. fiber machinery according to claim 14, it is characterised in that
The unit control unit is according in the transmission of the element characteristic value and/or in the reception of the element characteristic value The not changed mode of monitoring value is controlled.
24. fiber machinery according to claim 15, it is characterised in that
The unit control unit is according in the transmission of the element characteristic value and/or in the reception of the element characteristic value The not changed mode of monitoring value is controlled.
25. the fiber machinery according to any one of claim 7,9,11~14,17~21,23,24, it is characterised in that
The setting value of the storage part storage treatment conditions,
The control device sends the setting value together with the element characteristic value.
26. fiber machinery according to claim 5, it is characterised in that
The setting value of the storage part storage treatment conditions,
The control device sends the setting value together with the element characteristic value.
27. fiber machinery according to claim 6, it is characterised in that
The setting value of the storage part storage treatment conditions,
The control device sends the setting value together with the element characteristic value.
28. fiber machinery according to claim 8, it is characterised in that
The setting value of the storage part storage treatment conditions,
The control device sends the setting value together with the element characteristic value.
29. fiber machinery according to claim 10, it is characterised in that
The setting value of the storage part storage treatment conditions,
The control device sends the setting value together with the element characteristic value.
30. fiber machinery according to claim 15, it is characterised in that
The setting value of the storage part storage treatment conditions,
The control device sends the setting value together with the element characteristic value.
31. fiber machinery according to claim 16, it is characterised in that
The setting value of the storage part storage treatment conditions,
The control device sends the setting value together with the element characteristic value.
32. fiber machinery according to claim 22, it is characterised in that
The setting value of the storage part storage treatment conditions,
The control device sends the setting value together with the element characteristic value.
33. the fiber machinery according to any one of claim 7,9,11~14,17~21,23,24,26~32, it is special Sign is,
The storage part storage control program,
The control device sends the control program together with the element characteristic value.
34. fiber machinery according to claim 5, it is characterised in that
The storage part storage control program,
The control device sends the control program together with the element characteristic value.
35. fiber machinery according to claim 6, it is characterised in that
The storage part storage control program,
The control device sends the control program together with the element characteristic value.
36. fiber machinery according to claim 8, it is characterised in that
The storage part storage control program,
The control device sends the control program together with the element characteristic value.
37. fiber machinery according to claim 10, it is characterised in that
The storage part storage control program,
The control device sends the control program together with the element characteristic value.
38. fiber machinery according to claim 15, it is characterised in that
The storage part storage control program,
The control device sends the control program together with the element characteristic value.
39. fiber machinery according to claim 16, it is characterised in that
The storage part storage control program,
The control device sends the control program together with the element characteristic value.
40. fiber machinery according to claim 22, it is characterised in that
The storage part storage control program,
The control device sends the control program together with the element characteristic value.
41. fiber machinery according to claim 25, it is characterised in that
The storage part storage control program,
The control device sends the control program together with the element characteristic value.
42. fiber machinery according to claim 33, it is characterised in that
The control device is originally sent the control program.
43. the fiber machinery according to any one of claim 34~41, it is characterised in that
The control device is originally sent the control program.
44. fiber machinery according to claim 33, it is characterised in that
Possess the display unit of display information,
In the case of not being stored with the control program in the storage part, the control device shows the display unit please Seek the message of the preservation of the control program.
45. the fiber machinery according to any one of claim 34~41, it is characterised in that
Possess the display unit of display information,
In the case of not being stored with the control program in the storage part, the control device shows the display unit please Seek the message of the preservation of the control program.
46. fiber machinery according to claim 42, it is characterised in that
Possess the display unit of display information,
In the case of not being stored with the control program in the storage part, the control device shows the display unit please Seek the message of the preservation of the control program.
47. fiber machinery according to claim 43, it is characterised in that
Possess the display unit of display information,
In the case of not being stored with the control program in the storage part, the control device shows the display unit please Seek the message of the preservation of the control program.
48. a kind of element characteristic value processing method of fiber machinery, be possess processing yarn multiple processing units and can be with The element characteristic value processing method of the fiber machinery for the control device that the unit control unit of the processing unit communicates, it is special Sign is,
The control device performs:
That specifies the processing unit keeps out of the way object designating step;
From the reception process of the unit control unit receiving unit characteristic value of the appointed processing unit;And
The storage process that unit identification information and the element characteristic value received are stored together.
49. the element characteristic value processing method of fiber machinery according to claim 48, it is characterised in that
The control device perform specify the processing unit write back object designating step and by the unit identification information and The transmission process that the element characteristic value is sent to the unit control unit of the appointed processing unit together.
CN201410270064.3A 2013-07-24 2014-06-17 The element characteristic value processing method of fiber machinery and fiber machinery Expired - Fee Related CN104340755B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013153562A JP2015024870A (en) 2013-07-24 2013-07-24 Textile machine and processing method for unit specific value of textile machine
JP2013-153562 2013-07-24

Publications (2)

Publication Number Publication Date
CN104340755A CN104340755A (en) 2015-02-11
CN104340755B true CN104340755B (en) 2018-04-27

Family

ID=52489858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410270064.3A Expired - Fee Related CN104340755B (en) 2013-07-24 2014-06-17 The element characteristic value processing method of fiber machinery and fiber machinery

Country Status (2)

Country Link
JP (1) JP2015024870A (en)
CN (1) CN104340755B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0616967A2 (en) * 1993-03-24 1994-09-28 W. SCHLAFHORST AG & CO. Automatic winder with several transport loops for textile bobbins, which present partially common transport tracks
EP1460016A1 (en) * 2003-03-17 2004-09-22 Murata Kikai Kabushiki Kaisha Automatic winder
CN101351585A (en) * 2006-01-27 2009-01-21 欧瑞康纺织有限及两合公司 Method for storing operational state data of an electromotive drive of a textile machine that encompasses a plurality of workstations which are driven by an individual motor as well as drive for carry
CN102951493A (en) * 2011-08-24 2013-03-06 村田机械株式会社 Textile machine and information transmission system for textile machine
CN103010830A (en) * 2011-09-21 2013-04-03 村田机械株式会社 Textile machine and textile machine system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0616967A2 (en) * 1993-03-24 1994-09-28 W. SCHLAFHORST AG & CO. Automatic winder with several transport loops for textile bobbins, which present partially common transport tracks
EP1460016A1 (en) * 2003-03-17 2004-09-22 Murata Kikai Kabushiki Kaisha Automatic winder
CN101351585A (en) * 2006-01-27 2009-01-21 欧瑞康纺织有限及两合公司 Method for storing operational state data of an electromotive drive of a textile machine that encompasses a plurality of workstations which are driven by an individual motor as well as drive for carry
CN102951493A (en) * 2011-08-24 2013-03-06 村田机械株式会社 Textile machine and information transmission system for textile machine
CN103010830A (en) * 2011-09-21 2013-04-03 村田机械株式会社 Textile machine and textile machine system

Also Published As

Publication number Publication date
CN104340755A (en) 2015-02-11
JP2015024870A (en) 2015-02-05

Similar Documents

Publication Publication Date Title
CN104038795B (en) Numeric display unit and its control method
US20170346919A1 (en) Bluetooth device and bluetooth device name managing method
US20120169479A1 (en) Rfid system, rfid cable system, and rfid cable laying method
CN107624244A (en) The method of display device and the display for controlling display device
CN110609912B (en) Component information recording method, device, equipment and readable storage medium
US20030023418A1 (en) Apparatus and method for simulating production with electronic-component mounting apparatus
CN104469501B (en) A kind of set-top box automatic setting method based on serial communication protocol
EP2869149A1 (en) Setting control device of a textile device
CN107702273A (en) Air conditioning control method and device
EP3397798B1 (en) Method for detecting and remotely managing sensors and/or devices for feeding textile and/or metallic yarns installed on one or more textile machines, and system thereof
CN107886589A (en) Information processor, information processing system, information processing method
CN104340755B (en) The element characteristic value processing method of fiber machinery and fiber machinery
CN108141631A (en) Display device and the method for controlling display device
CN103914034A (en) Instrument controlling device and instrument controlling method
CN110036645A (en) Program ending content shows trigger
CN110071744A (en) Bluetooth equipment test method, device and storage medium
CN102970475A (en) Information processing apparatus, information processing method, program, and information processing system
CN108737487A (en) Method of data synchronization and device, storage medium and electronic device
EP3344808B1 (en) Arrangement and method for optimizing a weaving process
CN208326361U (en) Warehousing system with vision guide and corresponding manufacture system and demo system
IT9020894A1 (en) DEVICE FOR THE CONTROL OF THE OPERATION OF MACHINES IN PARTICULAR OF TEXTILE MACHINES ABLE TO LEARN THE OPERATING CYCLE OF THE latter AND TO CORRECT THE PROBLEMS ERRORS IN SUCH SELF-LEARNING PHASE
CN100552109C (en) The setting display unit of fibre machinery
CN109117907A (en) A kind of fly frame spool retrospective device and method
US20140116308A1 (en) Device and non-transitory computer-readable medium
CN104484149A (en) Offline playing method and device of LED display screen synchronous control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180427

Termination date: 20200617