CN104332897A - 电力线路施工双头紧线装置 - Google Patents
电力线路施工双头紧线装置 Download PDFInfo
- Publication number
- CN104332897A CN104332897A CN201410626962.8A CN201410626962A CN104332897A CN 104332897 A CN104332897 A CN 104332897A CN 201410626962 A CN201410626962 A CN 201410626962A CN 104332897 A CN104332897 A CN 104332897A
- Authority
- CN
- China
- Prior art keywords
- pull rod
- steel wire
- active pull
- wire rope
- geometrical clamp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 19
- 239000010959 steel Substances 0.000 claims abstract description 19
- 239000012212 insulator Substances 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
Abstract
本发明涉及电力线路施工双头紧线装置,其结构为,转动轴上依次设置齿轮和钢丝绳,齿轮连接操作杆,钢丝绳的两侧设置固定挡板,固定挡板的一端通过锁紧杆固定,固定挡板的另一端设置锁紧杆和逆止卡;固定挡板通过连接机构I连接活动拉杆I,活动拉杆I连接卡线器夹I;钢丝绳通过连接机构II连接活动拉杆II,活动拉杆II连接卡线器夹II。本发明对导线弧垂的调整精度高,施工人员操作简单,易于控制,降低成本,适于推广应用。
Description
技术领域
本发明涉及一种电力线路紧线辅助工具,尤其涉及一种电力线路施工双头紧线装置,主要适用于10KV及以下电力线路弧垂调整。
技术背景
农网改造以前,架设0.4kV电力线路采用的是镀锌铁横担和绝缘子。0.4kV电力线路弧垂调整,是利用紧线器带挂沟的一端挂在横担上,带卡线器的一端卡在导线上,然后进行弧垂调整。由于紧线器上的钢丝绳和回绑在绝缘子上的导线在一条直线上,导线在终端绝缘子上绑扎导线回头线时很不方便,有时还容易把低压导线绝缘层损坏。即使绑好导线后,导线弧垂也不一定合适,调整弧垂费力费时。
农网改造时,0.4kV电力线路采用四框式架设,对导线弧垂的要求精度比较高,技术性、工序性强,整体协作要求高,施工人员尤其是技术人员必须有较强的责任心,因此如何有效的组织施工,保证低压导线弧垂符合要求,就成了一个既关键又难以控制的问题。
发明内容
本发明针对上述现有技术中存在的不足,提供一种电力线路施工双头紧线装置,解决了现有技术中弧垂调整精度不易控制的问题。
本发明技术方案如下:
转动轴上依次设置齿轮和钢丝绳,齿轮连接操作杆,钢丝绳的两侧设置固定挡板,固定挡板的一端通过锁紧杆固定,固定挡板的另一端设置锁紧杆和逆止卡;固定挡板通过连接机构I连接活动拉杆I,活动拉杆I连接卡线器夹I;钢丝绳通过连接机构II连接活动拉杆II,活动拉杆II连接卡线器夹II。
所述的钢丝绳上设有固定管和活动管。
所述的连接机构I和连接机构II的结构为,U形连接板的顶面和两端分别设置螺栓螺孔。
所述的卡线器夹I和卡线器夹II的结构为,包括固定夹和活动夹,固定夹的一端和活动夹的一端相连,活动夹的另一端固定在活动拉杆端头,固定夹的另一端套装在活动拉杆上,固定夹和活动夹之间设有弹簧。
本发明与现有技术相比,具有如下效果:
对导线弧垂的调整精度高,施工人员操作简单,易于控制,降低成本,适于推广应用。
附图说明
图1为本发明结构示意图。
图中,1、转动轴,2、齿轮,3、钢丝绳,4、操作杆,5、固定挡板,6、锁紧杆,7、逆止卡,8、活动拉杆I,9、固定夹I,10、活动夹I,11、活动拉杆II,12、固定夹II,13、活动夹II,14、弹簧II,15、U形连接板。
具体实施方式
参照附图,结合具体实施例,对本发明进行详细说明如下。
实施例
如图1所示,转动轴1上依次设置齿轮2和钢丝绳3,齿轮连接操作杆4,钢丝绳3的两侧设置固定挡板5,固定挡板5的一端通过锁紧杆6固定,固定挡板5的另一端设置锁紧杆和逆止卡7;固定挡板通过连接机构I连接活动拉杆I 8的一端,活动拉杆I的另一端穿过固定夹I 9与活动夹I 10的一端连接;活动夹I的另一端与固定夹I连接,固定夹I和活动夹I之间设有弹簧I,活动夹I与固定夹I构成卡线器夹I;钢丝绳3通过连接机构II连接活动拉杆II 11的一端,活动拉杆II的另一端穿过固定夹II 12与活动夹II13的一端连接;活动夹II的另一端与固定夹II连接,固定夹II和活动夹II之间设有弹簧II 14,活动夹II与固定夹II构成卡线器夹II。
所述的钢丝绳上设有固定管和活动管,方便钢丝绳的连接打开和调整。
所述的连接机构I和连接机构II的结构为,U形连接板15的顶面和两端分别设置螺栓螺孔。
本发明的使用过程如下:
调整弧垂的施工人员上杆前,把紧线器的钢丝绳调到适当的长度,人员登上准备调整弧垂的终端杆,站在导线的外侧,将卡线器夹I的一端吊在终端绝缘线的回绑导线线头上卡紧,再将卡线器夹II吊在主导线上,把紧线收紧后,中间杆施工人员把导线绑线拆开。这时弧垂调整人员再把终端杆上的绝缘子绑回头导线的绑线拆除,利用紧线器调紧或调松导线,等待中间杆观测弧垂人员认为弧垂调好后,终端杆人员开始绑扎回绑线。因为终端杆绝缘子的回绑线上无障碍物,绑扎绑线非常方便,当绑线绑好后松开紧线器。调整弧垂工作结束。
以上所述是本发明的具体实施例及所运用的技术原理,任何基于本发明技术方案基础上的等效变换,均属于本发明的保护范围之内。
Claims (4)
1.电力线路施工双头紧线装置,其特征在于转动轴上依次设置齿轮和钢丝绳,齿轮连接操作杆,钢丝绳的两侧设置固定挡板,固定挡板的一端通过锁紧杆固定,固定挡板的另一端设置锁紧杆和逆止卡;固定挡板通过连接机构I连接活动拉杆I,活动拉杆I连接卡线器夹I;钢丝绳通过连接机构II连接活动拉杆II,活动拉杆II连接卡线器夹II。
2.根据权利要求1所述的电力线路施工双头紧线装置,其特征在于所述的钢丝绳上设有固定管和活动管。
3.根据权利要求1所述的电力线路施工双头紧线装置,其特征在于所述的连接机构I和连接机构II的结构为,U形连接板的顶面和两端分别设置螺栓螺孔。
4.根据权利要求1所述的电力线路施工双头紧线装置,其特征在于所述的卡线器夹I和卡线器夹II的结构为,包括固定夹和活动夹,固定夹的一端和活动夹的一端相连,活动夹的另一端固定在活动拉杆端头,固定夹的另一端套装在活动拉杆上,固定夹和活动夹之间设有弹簧。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410626962.8A CN104332897A (zh) | 2014-11-10 | 2014-11-10 | 电力线路施工双头紧线装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410626962.8A CN104332897A (zh) | 2014-11-10 | 2014-11-10 | 电力线路施工双头紧线装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104332897A true CN104332897A (zh) | 2015-02-04 |
Family
ID=52407577
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410626962.8A Pending CN104332897A (zh) | 2014-11-10 | 2014-11-10 | 电力线路施工双头紧线装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104332897A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106441683A (zh) * | 2016-08-30 | 2017-02-22 | 中国电力科学研究院 | 具有楔形体的钢丝绳张力测量系统及方法 |
CN107887845A (zh) * | 2017-12-18 | 2018-04-06 | 国网山东省电力公司龙口市供电公司 | 一种电力施工紧线装置 |
CN110635387A (zh) * | 2018-06-22 | 2019-12-31 | 国网江苏省电力有限公司如皋市供电分公司 | 一种电力线路紧线平衡测量装置 |
-
2014
- 2014-11-10 CN CN201410626962.8A patent/CN104332897A/zh active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106441683A (zh) * | 2016-08-30 | 2017-02-22 | 中国电力科学研究院 | 具有楔形体的钢丝绳张力测量系统及方法 |
CN107887845A (zh) * | 2017-12-18 | 2018-04-06 | 国网山东省电力公司龙口市供电公司 | 一种电力施工紧线装置 |
CN107887845B (zh) * | 2017-12-18 | 2023-06-23 | 国网山东省电力公司海阳市供电公司 | 一种电力施工紧线装置 |
CN110635387A (zh) * | 2018-06-22 | 2019-12-31 | 国网江苏省电力有限公司如皋市供电分公司 | 一种电力线路紧线平衡测量装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205429581U (zh) | 一种用于电子领域的锁杆结构 | |
CN103606854A (zh) | 超、特高压直流线路带电更换耐张绝缘子的作业方法 | |
CN104505766B (zh) | 一种带电更换变电站500kV耐张绝缘子串的工具及方法 | |
CN104332897A (zh) | 电力线路施工双头紧线装置 | |
CN203967713U (zh) | 用于吊装电缆的终端夹紧装置 | |
CN201944421U (zh) | 电缆绝缘支架 | |
CN204144784U (zh) | 一种可调式耐张导线承力绝缘子更换保护装置 | |
CN103887735A (zh) | 一种输电线路直线带电提线装置 | |
CN203787855U (zh) | 一种输电线路直线带电提线装置 | |
CN102646945B (zh) | 500kV带电更换合成绝缘子的方法 | |
CN102593624A (zh) | 一种输电线路专用接地线 | |
CN102185267B (zh) | 66kv地电位带电断接引流方法 | |
CN106450835A (zh) | 一种用于制鞋厂的高压线接地装置 | |
CN204349344U (zh) | 电力线路施工双头紧线装置 | |
CN203422397U (zh) | 高压试验用引线接头固定接地工具 | |
CN203218485U (zh) | 一种提拉式接地线线夹 | |
CN204205430U (zh) | 紧线辅助工具 | |
CN203434529U (zh) | 双钩紧线器 | |
CN206575086U (zh) | 绝缘紧线器拉板装置 | |
CN205159936U (zh) | 一种卡线器 | |
CN202749781U (zh) | 输电线路“三线分拉式”防风偏结构 | |
CN202917892U (zh) | 管型母线支柱绝缘子更换工具 | |
CN205846660U (zh) | 快速安装的架空线缆耐张线夹 | |
CN108598986A (zh) | 一种插拔式电缆头通用拆卸器 | |
CN205069909U (zh) | 电缆线夹及紧固系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150204 |
|
RJ01 | Rejection of invention patent application after publication |