CN104332375A - 离子源数字pid控制参数自整定系统及方法 - Google Patents

离子源数字pid控制参数自整定系统及方法 Download PDF

Info

Publication number
CN104332375A
CN104332375A CN201410453377.2A CN201410453377A CN104332375A CN 104332375 A CN104332375 A CN 104332375A CN 201410453377 A CN201410453377 A CN 201410453377A CN 104332375 A CN104332375 A CN 104332375A
Authority
CN
China
Prior art keywords
ion source
anode
heater current
module
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410453377.2A
Other languages
English (en)
Other versions
CN104332375B (zh
Inventor
石文夫
谭红建
张政彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XI'AN AOHUA ELECTRONIC INSTRUMENT CO Ltd
Original Assignee
XI'AN AOHUA ELECTRONIC INSTRUMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XI'AN AOHUA ELECTRONIC INSTRUMENT CO Ltd filed Critical XI'AN AOHUA ELECTRONIC INSTRUMENT CO Ltd
Priority to CN201410453377.2A priority Critical patent/CN104332375B/zh
Publication of CN104332375A publication Critical patent/CN104332375A/zh
Application granted granted Critical
Publication of CN104332375B publication Critical patent/CN104332375B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01JELECTRIC DISCHARGE TUBES OR DISCHARGE LAMPS
    • H01J27/00Ion beam tubes
    • H01J27/02Ion sources; Ion guns
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Pharmaceuticals Containing Other Organic And Inorganic Compounds (AREA)
  • Nitrogen Condensed Heterocyclic Rings (AREA)

Abstract

本发明提供离子源数字PID控制参数白整定系统及方法,包括阳极电流测量模块、阳极高压脉冲产生模块、热丝电流控制模块、热丝电流测量模块、MCU主控模块以及上位机;阳极电流测量模块、阳极高压脉冲产生模块、热丝电流控制模块、热丝电流测量模块分别于MCU主控模块连接。整个系统在更换中子管之后,数字PID控制参数不用重新调整,可以有效的解决人工调试数字PID控制参数繁琐、耗时的问题,同时降低对调试人员调试经验的要求。

Description

离子源数字PID控制参数自整定系统及方法
技术领域
本发明涉及离子源数字PID控制参数自整定系统及方法。 
背景技术
随着可控中子源在石油测井领域的应用,中子管离子源控制技术应用越来越广泛。在实际使用过程中由于中子管类型不同,现有控制技术无法适应所有类型中子管,并且目前离子源控制技术存在以下问题: 
目前模拟PID电路参数的设定要求设计人员具有丰富的模拟电路调试经验,并且要调试人员反复调整电阻或电容等参数才能达到控制精度要求,其调试过程非常繁琐、耗时。 
目前PID控制系统使用前需要对三个PID参数进行设定。另外环境温度的变化使得中子管电阻发生变化导致整个系统出现性能变差,适用性变差的情况。并且在中子管产生中子过程中靶压变化引起阳极电流变化,控制系统不能快速的回到平衡位置,导致中子管不能稳定的产生中子,最终将影响测井结果的准确性。 
发明内容
本发明提出了一种基于离子源数字PID控制器自整定系统及方法,解决人工调试模拟PID控制系统参数耗时、繁琐的问题,同时解决目前离子源数字PID控制系统参数不能自整定的缺点。 
本发明的具体方案: 
该离子源数字PID控制参数自整定系统,包括阳极电流测量模块、阳极高压脉冲产生模块、热丝电流控制模块、热丝电流测量模块、MCU主控模块以及上位机; 
上述阳极电流测量模块、阳极高压脉冲产生模块、热丝电流控制模块、热丝电流测量模块分别于MCU主控模块连接; 
上述阳极电流测量模块由阳极电流测量电路组成,用于测试阳极电流; 
上述阳极高压脉冲产生模块由高压电源和阳极开关电路组成,用以产生 离子源电离时所需的高压脉冲; 
上述热丝电流控制模块由恒流源控制电路组成,用于产生离子源电离时所需要的热丝电流; 
上述热丝电流测量模块由热丝测量电路组成,用于测量热丝电流的大小; 
上述MCU主控模块用于接收上位机命令控制离子源电离; 
上述上位机由微型机和地面箱体组成,用于发送命令给MCU主控模块控制离子源系统进行电离。 
上述MCU主控模块由MCU、ADC电路、DAC电路和串口通讯组成,用于接收上位机命令控制离子源电离;上述MCU包括依次连接的平滑滤波单元、电流比较单元、模糊控制单元和数字PID控制单元;上述平滑滤波单元的输入端接阳极电流测量模块的输出端,上述数字PID控制单元的输出端接热丝电流控制模块的输入端。 
一种离子源数字PID控制参数自整定方法,包括以下步骤: 
1)上位机设定阳极电流,发送电离启动命令; 
2)MCU通过串口通讯接收上位机的命令,阳极高压脉冲产生模块产生离子源电离时所需的高压脉冲,热丝电流控制模块产生离子源电离时所需要的热丝电流; 
3)阳极电流测量电路对阳极电流进行采集,然后对采集数据进行平滑滤波并与设定的阳极电流进行比较,根据阳极电流变化的趋势和快慢确定数字PID控制待整定参数比例因子Kp、积分时间因子Ki、微分时间因子Kd, 
4)将待整定参数Kp,Ki,Kd送入PID调节器,根据计算结果控制热丝电流的增减来达到离子源控制系统的平衡。 
上述步骤3)中待整定参数Kp,Ki,Kd通过以下方式确定: 
3.1)生成49条模糊规则: 
1.If(E is NB)and(EC is NB)then(kp is PB)(ki is NB)(kd is PM) 
2.If(E is NB)and(EC is NM)then(kp is PB)(ki is NB)(kd is PM) 
3.If(E is NB)and(EC is NS)then(kp is PM)(ki is NM)(kd is PS) 
4.If(E is NB)and(EC is Z)then(kp is PM)(ki is NS)(kd is NB) 
5.If(E is NB)and(EC is PS)then(kp is PS)(ki is PS)(kd is NM) 
6.If(E is NB)and(EC is PM)then(kp is ZO)(ki is ZO)(kd is NS) 
7.If(E is NB)and(EC is PB)then(kp is ZO)(ki is ZO)(kd is NS) 
8.If(E is NM)and(EC is NB)then(kp is PB)(ki is NB)(kd is PM) 
9.If(E is NM)and(EC is NM)then(kp is PM)(ki is NM)(kd is PM) 
10.If(E is NM)and(EC is NS)then(kp is PS)(ki is NS)(kd is PS) 
11.If(E is NM)and(EC is Z)then(kp is NS)(ki is NS)(kd is NB) 
12.If(E is NM)and(EC is PS)then(kp is NM)(ki is PS)(kd is NM) 
13.If(E is NM)and(EC is PM)then(kp is ZO)(ki is ZO)(kd is NM) 
14.If(E is NM)and(EC is PB)then(kp is ZO)(ki is ZO)(kd is NS) 
15.If(E is NS)and(EC is NB)then(kp is PM)(ki is NM)(kd is ZO) 
16.If(E is NS)and(EC is NM)then(kp is PS)(ki is NS)(kd is PS) 
17.If(E is NS)and(EC is NS)then(kp is NS)(ki is NS)(kd is NS) 
18.If(E is NS)and(EC is Z)then(kp is NM)(ki is PS)(kd is NM) 
19.If(E is NS)and(EC is PS)then(kp is ZO)(ki is ZO)(kd is NS) 
20.If(E is NS)and(EC is PM)then(kp is NS)(ki is PS)(kd is NS) 
21.If(E is NS)and(EC is PB)then(kp is NS)(ki is PS)(kd is ZO) 
22.If(E is ZO)and(EC is NB)then(kp is PS)(ki is NS)(kd is ZO) 
23.If(E is ZO)and(EC is NM)then(kp is NS)(ki is NS)(kd is NS) 
24.If(E is ZO)and(EC is NS)then(kp is NM)(ki is NM)(kd is NS) 
25.If(E is ZO)and(EC is ZO)then(kp is ZO)(ki is ZO)(kd is ZO) 
26.If(E is ZO)and(EC is PS)then(kp is NS)(ki is NS)(kd is NS) 
27.If(E is ZO)and(EC is PM)then(kp is PS)(ki is PS)(kd is NS) 
28.If(E is ZO)and(EC is PB)then(kp is PM)(ki is PM)(kd is ZO) 
29.If(E is PS)and(EC is NB)then(kp is NM)(ki is NM)(kd is ZO) 
30.If(E is PS)and(EC is NM)then(kp is PS)(ki is PS)(kd is ZO) 
31.If(E is PS)and(EC is NS)then(kp is ZO)(ki is ZO)(kd is NS) 
32.If(E is PS)and(EC is ZO)then(kp is NM)(ki is NM)(kd is ZO) 
33.If(E is PS)and(EC is PS)then(kp is NS)(ki is NS)(kd is ZO) 
34.If(E is PS)and(EC is PM)then(kp is PS)(ki is PS)(kd is ZO) 
35.If(E is PS)and(EC is PB)then(kp is PM)(ki is PM)(kd is ZO) 
36.If(E is PM)and(EC is NB)then(kp is ZO)(ki is ZO)(kd is PS) 
37.If(E is PM)and(EC is NM)then(kp is ZO)(ki is ZO)(kd is NS) 
38.If(E is PM)and(EC is NS)then(kp is PS)(ki is PS)(kd is PS) 
39.If(E is PM)and(EC is Z)then(kp is PM)(ki is PS)(kd is PS) 
40.If(E is PM)and(EC is PS)then(kp is PM)(ki is PM)(kd is PM) 
41.If(E is PM)and(EC is PM)then(kp is PM)(ki is PM)(kd is PM) 
42.If(E is PM)and(EC is PB)then(kp is PB)(ki is PB)(kd is PB) 
43.If(E is PB)and(EC is NB)then(kp is ZO)(ki is ZO)(kd is PB) 
44.If(E is PB)and(EC is NM)then(kp is ZO)(ki is ZO)(kd is PB) 
45.If(E is PB)and(EC is NS)then(kp is PM)(ki is PM)(kd is PM) 
46.If(E is PB)and(EC is ZO)then(kp is PM)(ki is PM)(kd is PM) 
47.If(E is PB)and(EC is PS)then(kp is PM)(ki is PM)(kd is PM) 
48.If(E is PB)and(EC is PM)then(kp is PB)(ki is PB)(kd is PB) 
49.If(E is PB)and(EC is PB)then(kp is PB)(ki is PB)(kd is PB) 
其中:PB为极大值,PM为中值,PS为极小值,ZO为零值,NS为负的极小值,NM为负的中值,NB为负的极大值; 
3.2)建立控制规则表 
所述Kp控制规则表为: 
{PB,PB,PM,PM,PS,ZO,ZO}, 
{PB,PM,PS,NS,NM,ZO,ZO}, 
{PM,PS,NS,NM,ZO,NS,NS}, 
{PS,NS,NM,ZO,NS,PS,PM}, 
{NM,PS,ZO,NM,NS,PS,PM}, 
{ZO,ZO,PS,PM,PM,PM,PB}, 
{ZO,ZO,PM,PM,PM,PB,PB}; 
所述Ki规则表为: 
{NB,NB,NM,NS,PS,ZO,ZO}, 
{NB,NM,NS,NS,PS,ZO,ZO}, 
{NM,NS,NS,PS,ZO,PS,PS}, 
{NS,NS,NM,ZO,NS,PS,PM}, 
{NM,PS,ZO,NM,NS,PS,PM}, 
{ZO,ZO,PS,PS,PM,PM,PB}, 
{ZO,ZO,PM,PM,PM,PB,PB}; 
上述Kd规则表为: 
{PM,PM,PS,NB,NM,NS,NS}, 
{PM,PM,PS,NB,NM,NM,NS}, 
{ZO,PS,NS,NM,NS,NS,ZO}, 
{ZO,NS,NS,ZO,NS,NS,ZO}, 
{ZO,ZO,NS,ZO,ZO,ZO,ZO}, 
{PS,NS,PS,PS,PM,PM,PB}, 
{PB,PB,PM,PM,PM,PB,PB}; 
3.3)利用重心法进行反模糊处理得出Kp,Ki,Kd值。 
上述步骤4)的具体步骤为: 
将Kp,Ki,Kd代入公式 
DAOut=Ki*Sum(E1....En)-Kp*E–Kd*EC; 
计算出来的DAOut通过单片机送到DA达到控制灯丝电流大小。 
上述的离子源数字PID控制参数自整定方法,还包括将采集到的阳极电流、热丝电流传给上位机进行实时显示的步骤。 
本发明的优点: 
整个系统在自整定过程中不需要调节硬件参数。 
整个系统在更换中子管之后,数字PID控制参数不用重新调整,可以有效的解决人工调试数字PID控制参数繁琐、耗时的问题,同时降低对调试人员调试经验的要求。 
附图说明
图1是本发明的逻辑结构图; 
图2是本发明的阳极电流测量电路原理图; 
图3是本发明的阳极高压脉冲产生原理框图; 
图4是本发明的灯丝电流控制电路原理图; 
图5是本发明的灯丝电流测量电路原理图; 
图6是本发明的PID自整定系统结构图。 
具体实施方式
本发明的离子源数字PID参数自整定系统由阳极电流测量模块、阳极高压脉冲产生模块、热丝电流控制模块、热丝电流测量模块、MCU主控模块以及上位机组成。 
参见图2,阳极电流测量模块由阳极电流测量电路组成,用于测试阳极电流。 
阳极高压脉冲产生模块由高压电源和阳极开关电路组成,用以产生离子源电离时所需的高压脉冲。 
热丝电流控制模块由恒流源控制电路组成,用于产生离子源电离时所需要的热丝电流。 
热丝电流测量模块由热丝测量电路组成,用于测量热丝电流的大小。 
MCU主控模块由MCU、ADC、DAC和串口通讯组成用于接收上位机命令控制离子源电离。 
上位机由微型机和地面箱体组成,用于发送命令给MCU主控模块控制离子源系统进行电离。 
MCU通过串口通讯接收上位机的软件设定的阳极电流、电离启动命令后,首先通过阳极电流测量电路对阳极电流进行采集,然后对采集数据进行平滑滤波并与设定阳极电流进行比较,根据阳极电流变化的趋势和快慢确定数字PID控制待整定参数Kp,Ki,Kd,以此控制热丝电流的增减来达到离子源控制系统的平衡;整个过程中MCU还需要将采集到的阳极电流、热丝电流传给上位机进行实时显示,以便观测整个自整定过程。 
本发明是一套用于离子源数字PID控制参数自整定系统,其原理框图如附图1所示,包括:阳极电流测量模块、阳极高压脉冲产生模块、热丝电流控制模块、热丝电流测量模块、MCU主控模块以及上位机。 
本发明模糊控制器的输入模糊语言变量取为E、EC,本发明离子源数字PID控制参数自整定系统Kp,Ki,Kd参数确定如下: 
首先建立Kp控制规则表: 
{PB,PB,PM,PM,PS,ZO,ZO}, 
{PB,PM,PS,NS,NM,ZO,ZO}, 
{PM,PS,NS,NM,ZO,NS,NS}, 
{PS,NS,NM,ZO,NS,PS,PM}, 
{NM,PS,ZO,NM,NS,PS,PM}, 
{ZO,ZO,PS,PM,PM,PM,PB}, 
{ZO,ZO,PM,PM,PM,PB,PB} 
建立Ki规则表: 
{NB,NB,NM,NS,PS,ZO,ZO}, 
{NB,NM,NS,NS,PS,ZO,ZO}, 
{NM,NS,NS,PS,ZO,PS,PS}, 
{NS,NS,NM,ZO,NS,PS,PM}, 
{NM,PS,ZO,NM,NS,PS,PM}, 
{ZO,ZO,PS,PS,PM,PM,PB}, 
{ZO,ZO,PM,PM,PM,PB,PB} 
建立Kd规则表: 
{PM,PM,PS,NB,NM,NS,NS}, 
{PM,PM,PS,NB,NM,NM,NS}, 
{ZO,PS,NS,NM,NS,NS,ZO}, 
{ZO,NS,NS,ZO,NS,NS,ZO}, 
{ZO,ZO,NS,ZO,ZO,ZO,ZO}, 
{PS,NS,PS,PS,PM,PM,PB}, 
{PB,PB,PM,PM,PM,PB,PB} 
其中:PB为极大值,PM为中值,PS为极小值,ZO为零值,NS为负的极小值,NM为负的中值,NB为负的极大值; 
本发明离子源数字PID控制参数自整定系统算法具体内容如下: 
分析被控对象,确定被控量即控制系统指标。 
确定模糊控制器的结构 
设计模糊变量语言 
根据模糊规则确定模糊控制规则表 
利用重心法进行反模糊处理得出Kp,Ki,Kd值 
将Kp,Ki,Kd代入公式 
DAOut=Ki*Sum(E1....En)-Kp*E–Kd*EC;计算出来的DAOut通过单片机送到DA达到控制灯丝电流大小。 
生成49条模糊规则如下: 
1.If(E is NB)and(EC is NB)then(kp is PB)(ki is NB)(kd is PM) 
2.If(E is NB)and(EC is NM)then(kp is PB)(ki is NB)(kd is PM) 
3.If(E is NB)and(EC is NS)then(kp is PM)(ki is NM)(kd is PS) 
4.If(E is NB)and(EC is Z)then(kp is PM)(ki is NS)(kd is NB) 
5.If(E is NB)and(EC is PS)then(kp is PS)(ki is PS)(kd is NM) 
6.If(E is NB)and(EC is PM)then(kp is ZO)(ki is ZO)(kd is NS) 
7.If(E is NB)and(EC is PB)then(kp is ZO)(ki is ZO)(kd is NS) 
8.If(E is NM)and(EC is NB)then(kp is PB)(ki is NB)(kd is PM) 
9.If(E is NM)and(EC is NM)then(kp is PM)(ki is NM)(kd is PM) 
10.If(E is NM)and(EC is NS)then(kp is PS)(ki is NS)(kd is PS) 
11.If(E is NM)and(EC is Z)then(kp is NS)(ki is NS)(kd is NB) 
12.If(E is NM)and(EC is PS)then(kp is NM)(ki is PS)(kd is NM) 
13.If(E is NM)and(EC is PM)then(kp is ZO)(ki is ZO)(kd is NM) 
14.If(E is NM)and(EC is PB)then(kp is ZO)(ki is ZO)(kd is NS) 
15.If(E is NS)and(EC is NB)then(kp is PM)(ki is NM)(kd is ZO) 
16.If(E is NS)and(EC is NM)then(kp is PS)(ki is NS)(kd is PS) 
17.If(E is NS)and(EC is NS)then(kp is NS)(ki is NS)(kd is NS) 
18.If(E is NS)and(EC is Z)then(kp is NM)(ki is PS)(kd is NM) 
19.If(E is NS)and(EC is PS)then(kp is ZO)(ki is ZO)(kd is NS) 
20.If(E is NS)and(EC is PM)then(kp is NS)(ki is PS)(kd is NS) 
21.If(E is NS)and(EC is PB)then(kp is NS)(ki is PS)(kd is ZO) 
22.If(E is ZO)and(EC is NB)then(kp is PS)(ki is NS)(kd is ZO) 
23.If(E is ZO)and(EC is NM)then(kp is NS)(ki is NS)(kd is NS) 
24.If(E is ZO)and(EC is NS)then(kp is NM)(ki is NM)(kd is NS) 
25.If(E is ZO)and(EC is ZO)then(kp is ZO)(ki is ZO)(kd is ZO) 
26.If(E is ZO)and(EC is PS)then(kp is NS)(ki is NS)(kd is NS) 
27.If(E is ZO)and(EC is PM)then(kp is PS)(ki is PS)(kd is NS) 
28.If(E is ZO)and(EC is PB)then(kp is PM)(ki is PM)(kd is ZO) 
29.If(E is PS)and(EC is NB)then(kp is NM)(ki is NM)(kd is ZO) 
30.If(E is PS)and(EC is NM)then(kp is PS)(ki is PS)(kd is ZO) 
31.If(E is PS)and(EC is NS)then(kp is ZO)(ki is ZO)(kd is NS) 
32.If(E is PS)and(EC is ZO)then(kp is NM)(ki is NM)(kd is ZO) 
33.If(E is PS)and(EC is PS)then(kp is NS)(ki is NS)(kd is ZO) 
34.If(E is PS)and(EC is PM)then(kp is PS)(ki is PS)(kd is ZO) 
35.If(E is PS)and(EC is PB)then(kp is PM)(ki is PM)(kd is ZO) 
36.If(E is PM)and(EC is NB)then(kp is ZO)(ki is ZO)(kd is PS) 
37.If(E is PM)and(EC is NM)then(kp is ZO)(ki is ZO)(kd is NS) 
38.If(E is PM)and(EC is NS)then(kp is PS)(ki is PS)(kd is PS) 
39.If(E is PM)and(EC is Z)then(kp is PM)(ki is PS)(kd is PS) 
40.If(E is PM)and(EC is PS)then(kp is PM)(ki is PM)(kd is PM) 
41.If(E is PM)and(EC is PM)then(kp is PM)(ki is PM)(kd is PM) 
42.If(E is PM)and(EC is PB)then(kp is PB)(ki is PB)(kd is PB) 
43.If(E is PB)and(EC is NB)then(kp is ZO)(ki is ZO)(kd is PB) 
44.If(E is PB)and(EC is NM)then(kp is ZO)(ki is ZO)(kd is PB) 
45.If(E is PB)and(EC is NS)then(kp is PM)(ki is PM)(kd is PM) 
46.If(E is PB)and(EC is ZO)then(kp is PM)(ki is PM)(kd is PM) 
47.If(E is PB)and(EC is PS)then(kp is PM)(ki is PM)(kd is PM) 
48.If(E is PB)and(EC is PM)then(kp is PB)(ki is PB)(kd is PB) 
49.If(E is PB)and(EC is PB)then(kp is PB)(ki is PB)(kd is PB) 。

Claims (6)

1.一种离子源数字PID控制参数自整定系统,其特征在于:包括阳极电流测量模块、阳极高压脉冲产生模块、热丝电流控制模块、热丝电流测量模块、MCU主控模块以及上位机;
所述阳极电流测量模块、阳极高压脉冲产生模块、热丝电流控制模块、热丝电流测量模块分别于MCU主控模块连接;
所述阳极电流测量模块由阳极电流测量电路组成,用于测试阳极电流;
所述阳极高压脉冲产生模块由高压电源和阳极开关电路组成,用以产生离子源电离时所需的高压脉冲;
所述热丝电流控制模块由恒流源控制电路组成,用于产生离子源电离时所需要的热丝电流;
所述热丝电流测量模块由热丝测量电路组成,用于测量热丝电流的大小;
所述MCU主控模块用于接收上位机命令控制离子源电离;
所述上位机由微型机和地面箱体组成,用于发送命令给MCU主控模块控制离子源系统进行电离。
2.根据权利要求1所述的离子源数字PID控制参数自整定系统,其特征在于:
所述MCU主控模块由MCU、ADC电路、DAC电路和串口通讯组成,用于接收上位机命令控制离子源电离;所述MCU包括依次连接的平滑滤波单元、电流比较单元、模糊控制单元和数字PID控制单元;所述平滑滤波单元的输入端接阳极电流测量模块的输出端,所述数字PID控制单元的输出端接热丝电流控制模块的输入端。
3.一种离子源数字PID控制参数自整定方法,其特征在于:包括以下步骤:
1)上位机设定阳极电流,发送电离启动命令;
2)MCU通过串口通讯接收上位机的命令,阳极高压脉冲产生模块产生离子源电离时所需的高压脉冲,热丝电流控制模块产生离子源电离时所需要的热丝电流;
3)阳极电流测量电路对阳极电流进行采集,然后对采集数据进行平滑滤波并与设定的阳极电流进行比较,根据阳极电流变化的趋势和快慢确定数字PID控制待整定参数比例因子Kp、积分时间因子Ki、微分时间因子Kd,
4)将待整定参数Kp,Ki,Kd送入PID调节器,根据计算结果控制热丝电流的增减来达到离子源控制系统的平衡。
4.根据权利要求3所述的离子源数字PID控制参数自整定方法,其特征在于:
所述步骤3)中待整定参数Kp,Ki,Kd通过以下方式确定:
3.1)生成49条模糊规则:
1.If(E is NB)and(EC is NB)then(kp is PB)(ki is NB)(kd is PM)
2.If(E is NB)and(EC is NM)then(kp is PB)(ki is NB)(kd is PM)
3.If(E is NB)and(EC is NS)then(kp is PM)(ki is NM)(kd is PS)
4.If(E is NB)and(EC is Z)then(kp is PM)(ki is NS)(kd is NB)
5.If(E is NB)and(EC is PS)then(kp is PS)(ki is PS)(kd is NM)
6.If(E is NB)and(EC is PM)then(kp is ZO)(ki is ZO)(kd is NS)
7.If(E is NB)and(EC is PB)then(kp is ZO)(ki is ZO)(kd is NS)
8.If(E is NM)and(EC is NB)then(kp is PB)(ki is NB)(kd is PM)
9.If(E is NM)and(EC is NM)then(kp is PM)(ki is NM)(kd is PM)
10.If(E is NM)and(EC is NS)then(kp is PS)(ki is NS)(kd is PS)
11.If(E is NM)and(EC is Z)then(kp is NS)(ki is NS)(kd is NB)
12.If(E is NM)and(EC is PS)then(kp is NM)(ki is PS)(kd is NM)
13.If(E is NM)and(EC is PM)then(kp is ZO)(ki is ZO)(kd is NM)
14.If(E is NM)and(EC is PB)then(kp is ZO)(ki is ZO)(kd is NS)
15.If(E is NS)and(EC is NB)then(kp is PM)(ki is NM)(kd is ZO)
16.If(E is NS)and(EC is NM)then(kp is PS)(ki is NS)(kd is PS)
17.If(E is NS)and(EC is NS)then(kp is NS)(ki is NS)(kd is NS)
18.If(E is NS)and(EC is Z)then(kp is NM)(ki is PS)(kd is NM)
19.If(E is NS)and(EC is PS)then(kp is ZO)(ki is ZO)(kd is NS)
20.If(E is NS)and(EC is PM)then(kp is NS)(ki is PS)(kd is NS)
21.If(E is NS)and(EC is PB)then(kp is NS)(ki is PS)(kd is ZO)
22.If(E is ZO)and(EC is NB)then(kp is PS)(ki is NS)(kd is ZO)
23.If(E is ZO)and(EC is NM)then(kp is NS)(ki is NS)(kd is NS)
24.If(E is ZO)and(EC is NS)then(kp is NM)(ki is NM)(kd is NS)
25.If(E is ZO)and(EC is ZO)then(kp is ZO)(ki is ZO)(kd is ZO)
26.If(E is ZO)and(EC is PS)then(kp is NS)(ki is NS)(kd is NS)
27.If(E is ZO)and(EC is PM)then(kp is PS)(ki is PS)(kd is NS)
28.If(E is ZO)and(EC is PB)then(kp is PM)(ki is PM)(kd is ZO)
29.If(E is PS)and(EC is NB)then(kp is NM)(ki is NM)(kd is ZO)
30.If(E is PS)and(EC is NM)then(kp is PS)(ki is PS)(kd is ZO)
31.If(E is PS)and(EC is NS)then(kp is ZO)(ki is ZO)(kd is NS)
32.If(E is PS)and(EC is ZO)then(kp is NM)(ki is NM)(kd is ZO)
33.If(E is PS)and(EC is PS)then(kp is NS)(ki is NS)(kd is ZO)
34.If(E is PS)and(EC is PM)then(kp is PS)(ki is PS)(kd is ZO)
35.If(E is PS)and(EC is PB)then(kp is PM)(ki is PM)(kd is ZO)
36.If(E is PM)and(EC is NB)then(kp is ZO)(ki is ZO)(kd is PS)
37.If(E is PM)and(EC is NM)then(kp is ZO)(ki is ZO)(kd is NS)
38.If(E is PM)and(EC is NS)then(kp is PS)(ki is PS)(kd is PS)
39.If(E is PM)and(EC is Z)then(kp is PM)(ki is PS)(kd is PS)
40.If(E is PM)and(EC is PS)then(kp is PM)(ki is PM)(kd is PM)
41.If(E is PM)and(EC is PM)then(kp is PM)(ki is PM)(kd is PM)
42.If(E is PM)and(EC is PB)then(kp is PB)(ki is PB)(kd is PB)
43.If(E is PB)and(EC is NB)then(kp is ZO)(ki is ZO)(kd is PB)
44.If(E is PB)and(EC is NM)then(kp is ZO)(ki is ZO)(kd is PB)
45.If(E is PB)and(EC is NS)then(kp is PM)(ki is PM)(kd is PM)
46.If(E is PB)and(EC is ZO)then(kp is PM)(ki is PM)(kd is PM)
47.If(E is PB)and(EC is PS)then(kp is PM)(ki is PM)(kd is PM)
48.If(E is PB)and(EC is PM)then(kp is PB)(ki is PB)(kd is PB)
49.If(E is PB)and(EC is PB)then(kp is PB)(ki is PB)(kd is PB)
其中:PB为极大值,PM为中值,PS为极小值,ZO为零值,NS为负的极小值,NM为负的中值,NB为负的极大值;
3.2)建立控制规则表
所述Kp控制规则表为:
{PB,PB,PM,PM,PS,ZO,ZO},
{PB,PM,PS,NS,NM,ZO,ZO},
{PM,PS,NS,NM,ZO,NS,NS},
{PS,NS,NM,ZO,NS,PS,PM},
{NM,PS,ZO,NM,NS,PS,PM},
{ZO,ZO,PS,PM,PM,PM,PB},
{ZO,ZO,PM,PM,PM,PB,PB};
所述Ki规则表为:
{NB,NB,NM,NS,PS,ZO,ZO},
{NB,NM,NS,NS,PS,ZO,ZO},
{NM,NS,NS,PS,ZO,PS,PS},
{NS,NS,NM,ZO,NS,PS,PM},
{NM,PS,ZO,NM,NS,PS,PM},
{ZO,ZO,PS,PS,PM,PM,PB},
{ZO,ZO,PM,PM,PM,PB,PB};
所述Kd规则表为:
{PM,PM,PS,NB,NM,NS,NS},
{PM,PM,PS,NB,NM,NM,NS},
{ZO,PS,NS,NM,NS,NS,ZO},
{ZO,NS,NS,ZO,NS,NS,ZO},
{ZO,ZO,NS,ZO,ZO,ZO,ZO},
{PS,NS,PS,PS,PM,PM,PB},
{PB,PB,PM,PM,PM,PB,PB};
3.3)利用重心法进行反模糊处理得出Kp,Ki,Kd值。
5.根据权利要求3所述的离子源数字PID控制参数自整定方法,其特征在于:
所述步骤4)的具体步骤为:
将Kp,Ki,Kd代入公式
DAOut=Ki*Sum(E1....En)-Kp*E–Kd*EC;
计算出来的DAOut通过单片机送到DA达到控制灯丝电流大小。
6.根据权利要求3或4或5所述的离子源数字PID控制参数自整定方法,其特征在于:还包括将采集到的阳极电流、热丝电流传给上位机进行实时显示的步骤。
CN201410453377.2A 2014-09-05 2014-09-05 离子源数字pid控制参数自整定系统及方法 Active CN104332375B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410453377.2A CN104332375B (zh) 2014-09-05 2014-09-05 离子源数字pid控制参数自整定系统及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410453377.2A CN104332375B (zh) 2014-09-05 2014-09-05 离子源数字pid控制参数自整定系统及方法

Publications (2)

Publication Number Publication Date
CN104332375A true CN104332375A (zh) 2015-02-04
CN104332375B CN104332375B (zh) 2016-12-28

Family

ID=52407085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410453377.2A Active CN104332375B (zh) 2014-09-05 2014-09-05 离子源数字pid控制参数自整定系统及方法

Country Status (1)

Country Link
CN (1) CN104332375B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106406284A (zh) * 2016-10-27 2017-02-15 北京新能源汽车股份有限公司 检测比例积分微分控制器的参数标定效果的方法及装置
CN109856961A (zh) * 2019-03-11 2019-06-07 深圳市安健科技股份有限公司 一种球管电压控制方法、装置及计算机可读存储介质
CN111176356A (zh) * 2019-12-31 2020-05-19 中山市博顿光电科技有限公司 离子源恒流控制装置、方法以及离子源系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5111053A (en) * 1990-02-19 1992-05-05 Seiko Instruments, Inc. Controlling a liquid metal ion source by analog feedback and digital CPU control
JPH10208653A (ja) * 1997-01-27 1998-08-07 Hitachi Ltd イオン源装置及びこれを用いた集束イオンビーム装置
CN1503309A (zh) * 2002-11-14 2004-06-09 ���µ����ʽ���� 预知离子源中灯丝寿命的方法和离子源装置
CN102445901A (zh) * 2010-10-13 2012-05-09 北京中科信电子装备有限公司 一种离子源自动稳弧流的方法
CN102446685A (zh) * 2010-10-13 2012-05-09 北京中科信电子装备有限公司 一种离子源坩埚控制方法
CN102709139A (zh) * 2012-05-23 2012-10-03 四川大学 一种用于输出单原子氢离子束的场发射离子源

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5111053A (en) * 1990-02-19 1992-05-05 Seiko Instruments, Inc. Controlling a liquid metal ion source by analog feedback and digital CPU control
JPH10208653A (ja) * 1997-01-27 1998-08-07 Hitachi Ltd イオン源装置及びこれを用いた集束イオンビーム装置
CN1503309A (zh) * 2002-11-14 2004-06-09 ���µ����ʽ���� 预知离子源中灯丝寿命的方法和离子源装置
CN102445901A (zh) * 2010-10-13 2012-05-09 北京中科信电子装备有限公司 一种离子源自动稳弧流的方法
CN102446685A (zh) * 2010-10-13 2012-05-09 北京中科信电子装备有限公司 一种离子源坩埚控制方法
CN102709139A (zh) * 2012-05-23 2012-10-03 四川大学 一种用于输出单原子氢离子束的场发射离子源

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106406284A (zh) * 2016-10-27 2017-02-15 北京新能源汽车股份有限公司 检测比例积分微分控制器的参数标定效果的方法及装置
CN106406284B (zh) * 2016-10-27 2018-11-02 北京新能源汽车股份有限公司 检测比例积分微分控制器的参数标定效果的方法及装置
CN109856961A (zh) * 2019-03-11 2019-06-07 深圳市安健科技股份有限公司 一种球管电压控制方法、装置及计算机可读存储介质
CN109856961B (zh) * 2019-03-11 2022-02-11 深圳市安健科技股份有限公司 一种球管电压控制方法、装置及计算机可读存储介质
CN111176356A (zh) * 2019-12-31 2020-05-19 中山市博顿光电科技有限公司 离子源恒流控制装置、方法以及离子源系统

Also Published As

Publication number Publication date
CN104332375B (zh) 2016-12-28

Similar Documents

Publication Publication Date Title
CN107516895B (zh) 配电网快速仿真方法、装置、存储介质及其计算机设备
KR101795901B1 (ko) 데이터시트 기반의 태양광 패널의 시뮬레이션 방법 및 장치
CN104332375A (zh) 离子源数字pid控制参数自整定系统及方法
KR102067095B1 (ko) 디지털 트윈 장치
CN106443381A (zh) 动态电弧模型构建方法与系统
CN113128764A (zh) 烘丝机出口含水率预测模型的生成及基于其的调控方法
CN108828934A (zh) 一种基于模型辨识的模糊pid控制方法及装置
WO2018232930A1 (zh) 一种工业生产设备的智能监控系统及方法
Janky et al. ASDEX Upgrade flight simulator development
CN104632416A (zh) 一种燃气轮机转速控制方法
CN106529013B (zh) 一种高压直流附加频率控制方法
Carvalho et al. ISTTOK control system upgrade
CN103631991B (zh) 原动机调速系统参数辨识系统及方法
CN110364922A (zh) 一种激光器控制方法及其相关设备
Ravenel et al. Architecture of WEST plasma control system
CN204695144U (zh) 一种电力设备户外箱体环境实时监控系统
Xu et al. Online prediction method for power system frequency response analysis based on swarm intelligence fusion model
Zamyatin et al. Filter compensating devices connection technique
CN103425047A (zh) 发电机组协调控制系统和方法
CN102790348A (zh) 高重频ArF准分子激光器脉冲能量控制系统
CN106202678A (zh) 航天接口数据单转换为仿真模型框架的方法及系统
CN111738874A (zh) 基于启动模型的电网新设备投运步骤自动生成方法和装置
CN106451437B (zh) 一种并网变换器多机系统建模稳定性分析设计方法
CN105607622A (zh) 核电站电子卡件仿真和故障监控系统及方法
CN111290289A (zh) 一种发动机硬件在回路仿真系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 710061 Shaanxi province Xi'an Cuihua Road No. 254 Jialin building room 207

Applicant after: XI'AN AOHUA ELECTRONIC INSTRUMENT CO.,LTD.

Address before: 710061 Shaanxi province Xi'an Cuihua Road No. 254 Jialin building room 207

Applicant before: XI'AN AOHUA ELECTRONIC INSTRUMENT Co.,Ltd.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Ion source digital PID control parameter self-setting system and method

Effective date of registration: 20170621

Granted publication date: 20161228

Pledgee: Xi'an innovation financing Company limited by guarantee

Pledgor: XI'AN AOHUA ELECTRONIC INSTRUMENT CO.,LTD.

Registration number: 2017990000511

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20211112

Granted publication date: 20161228

Pledgee: Xi'an innovation financing Company limited by guarantee

Pledgor: XI'AN AOHUA ELECTRONIC INSTRUMENT CO.,LTD.

Registration number: 2017990000511

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Digital PID control parameter self-tuning system and method of ion source

Effective date of registration: 20211116

Granted publication date: 20161228

Pledgee: Xi'an innovation financing Company limited by guarantee

Pledgor: XI'AN AOHUA ELECTRONIC INSTRUMENT CO.,LTD.

Registration number: Y2021610000331

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230302

Granted publication date: 20161228

Pledgee: Xi'an innovation financing Company limited by guarantee

Pledgor: XI'AN AOHUA ELECTRONIC INSTRUMENT CO.,LTD.

Registration number: Y2021610000331

PC01 Cancellation of the registration of the contract for pledge of patent right