CN104319748A - Quick adjustment method for parallel line branching factor in substation area distance protection section III - Google Patents
Quick adjustment method for parallel line branching factor in substation area distance protection section III Download PDFInfo
- Publication number
- CN104319748A CN104319748A CN201410539684.2A CN201410539684A CN104319748A CN 104319748 A CN104319748 A CN 104319748A CN 201410539684 A CN201410539684 A CN 201410539684A CN 104319748 A CN104319748 A CN 104319748A
- Authority
- CN
- China
- Prior art keywords
- circuit
- phase
- distance
- iii
- setting value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Emergency Protection Circuit Devices (AREA)
Abstract
The invention relates to a quick adjustment method for a parallel line branching factor in a substation area distance protection section III, and belongs to the field of a power system protection and control technology. The method comprises the steps of judging whether a protective starting line is a parallel line structure, quickly modifying the parallel line branching factor if the protective starting line is a parallel line structure and trip or switch on is caused, and then calculating a distance ground section III and a phase distance ground connection III in accordance with a current protective setting value after the definite value of the distance section III is quickly modified, and judging whether fault is caused; directly performing protection algorithm processing if the protective starting line is not a parallel line structure. According to the quick adjustment method provided by the invention, the contradiction of the substation area distance protection section III in flexibility and selectivity can be overcome; furthermore, a parallel line running condition can be quickly adjusted, so as to improve the reliability of the motion in the substation area distance protection section III.
Description
Technical field
The invention belongs to protecting electrical power system and control technology field, particularly a kind of territory, station distance protection III section parallel lines braning factor fast adjustment method being applied to intelligent substation.
Background technology
Intelligent substation has advantageous advantage in secondary device compatibility, interoperability, data resource sharing etc., brings digitized change to electric power system.Based on IEC61850 standard, the jumping/station such as combined floodgate information, the electric current and voltage information domain information of the full station equipment of transformer station is shared.The Protective strategy sharing information based on territory, station is in the ascendant.The applicant has disclosed a kind of protecting control method of Digitized transformation station equipment and the multi-function device of first integrated transformer substation protection and control in patent CN101478146A; A kind of Fast starting and phasor calculating method of intelligent substation integrated protection is disclosed in patent CN102761106A.
Patent CN102403701A put forward the adaptive distance protection method of double-circuit line of intelligent substation; according to adjacent lines analog quantity information and the position of the switch information of Real-time Collection; judge adjacent lines running status belongs to which kind of situation following: 1. adjacent lines both sides are normally run; 2. adjacent lines both sides sky is hung and is run; 3. adjacent lines both sides hang ground operation; according to result of determination, this circuit of dynamic conditioning distance I section definite value.But the method does not consider adjacent lines generation single-phase fault, the single-phase power flow transfer situation caused after protection first time single-phase tripping operation; And due to the quick acting of distance I section, the method has problems in real-time, be difficult to realize.
The self-adaptive sites method of distance III section is not yet mentioned.
Summary of the invention
The object of the invention is the deficiency for solving prior art; a kind of station territory distance protection III section parallel lines braning factor fast adjustment method is proposed; when changing for intelligent substation parallel lines on off state, improve the reliability of station territory distance protection III section action.
The one station territory distance protection III section parallel lines braning factor fast adjustment method that the present invention proposes, it is characterized in that, the method comprises the following steps:
Step 1) judge whether protection starting circuit L1 is parallel lines structure, if enter step 2); Otherwise directly carry out step 4) carry out protection algorism process;
Step 2) according to GOOSE message information, judge whether the parallel lines of circuit L1 have tripping operation or close a floodgate, if having jumping or combined floodgate information, then carry out steps 3); Otherwise, enter step 4);
Step 3) according to the jumping of the parallel circuit of circuit L1 or combined floodgate information, braning factor is adjusted, specifically comprises:
If single-phase jumping or combined floodgate information, then adjust this phase, the braning factor represented with A phase is:
K′
Ab=1/M
In formula, K '
abfor parallel circuit A phase trip after amendment braning factor, M be jump or close a floodgate after parallel lines A phase return number;
Again A phase ground distance III section setting value is revised as:
Z
set.A.III=K
Kz
1l
local+K
KK′
AbZ
set.II_remote
In formula, Z
set.A.IIIfor the A phase ground distance III section setting value of circuit L1; K
kfor safety factor, generally get 0.7 ~ 0.8; z
1for the unit length positive sequence impedance of circuit L1, l
localfor circuit L1 and line length; Z
set.II_remotefor the subordinate circuit distance II section setting value of circuit L1; K '
abfor parallel circuit A phase trip after amendment braning factor;
If three-phase breaker tripping and closing information, then all modify to three-phase impedance of adjusting, adjustment braning factor is:
K′
b=1/M
In formula, K '
bfor amended braning factor, M is that the parallel lines after jumping or closing a floodgate return number;
III section of adjusting the distance again setting value is modified:
Z
set.III=K
Kz
1l
local+K
KK′
bZ
set.II_remote
In formula, Z
set.IIIfor distance ground connection III section, the phase spacing ground connection III section setting value of circuit L1, three-phase is all changed; K
kfor safety factor, generally get 0.7 ~ 0.8; z
1for the unit length positive sequence impedance of circuit L1, l
localfor circuit L1 and line length at the corresponding levels; Z
set.II_remotefor subordinate circuit distance II section setting value; K '
bfor amended braning factor;
Step 4) carry out distance ground connection III section, the calculating of phase spacing ground connection III segment protect according to current protection seting value.
Feature of the present invention and beneficial effect:
The feature of territory, station distance protection III section parallel lines braning factor fast adjustment method proposed by the invention is: the GOOSE tripping operation message shared based on intelligent substation war territory; after transformer station's parallel lines on off state changes; adjust the setting value that braning factor revises distance protection then as early as possible, the method is applicable to station territory ground distance protection III section and territory, station phase distance protection III section.
This beneficial effect of the invention is: the malfunction avoiding causing because protection definite value is different from real-time branch coefficient, tripping situation, improves the reliability of territory distance protection III section action of standing.
Accompanying drawing explanation
Fig. 1 is application station of the present invention territory distance protection III section parallel lines braning factor fast adjustment method schematic diagram.
Embodiment
The present invention propose one station territory distance protection III section parallel lines braning factor fast adjustment method, by reference to the accompanying drawings and embodiment be described in detail as follows.
As shown in Figure 1, the method comprises the following steps territory, the station distance protection III section parallel lines braning factor fast adjustment method flow process that the present invention proposes:
Step 1) judge whether protection starting circuit L1 is parallel lines structure, if enter step 2); Otherwise directly carry out step 4) carry out protection algorism process;
Step 2) according to GOOSE message information, judge whether the parallel lines of circuit L1 have tripping operation or close a floodgate, if having jumping or combined floodgate information, then carry out steps 3); Otherwise, enter step 4);
Step 3) according to the jumping of the parallel circuit of circuit L1 or combined floodgate information, braning factor is adjusted, specifically comprises:
If single-phase jumping or combined floodgate information, then adjust this phase, the braning factor represented with A phase is:
K′
Ab=1/M
In formula, K '
abfor parallel circuit A phase trip after amendment braning factor, M be jump or close a floodgate after parallel lines A phase return number;
Again A phase ground distance III section setting value is revised as:
Z
set.A.III=K
Kz
1l
local+K
KK′
AbZ
set.II_remote
In formula, Z
set.A.IIIfor the A phase ground distance III section setting value of circuit L1; K
kfor safety factor, generally get 0.7 ~ 0.8; z
1for the unit length positive sequence impedance of circuit L1, l
localfor circuit L1 and line length; Z
set.II_remotefor the subordinate circuit distance II section setting value of circuit L1; K '
abfor parallel circuit A phase trip after amendment braning factor;
If three-phase breaker tripping and closing information, then all modify to three-phase impedance of adjusting, adjustment braning factor is:
K′
b=1/M
In formula, K '
bfor amended braning factor, M is that the parallel lines after jumping or closing a floodgate return number;
III section of adjusting the distance again setting value is modified:
Z
set.III=K
Kz
1l
local+K
KK′
bZ
set.II_remote
In formula, Z
set.IIIfor distance ground connection III section, the phase spacing ground connection III section setting value of circuit L1, three-phase is all changed; K
kfor safety factor, generally get 0.7 ~ 0.8; z
1for the unit length positive sequence impedance of circuit L1, l
localfor circuit L1 and line length at the corresponding levels; Z
set.II_remotefor subordinate circuit distance II section setting value; K '
bfor amended braning factor;
Step 4) carry out distance ground connection III section, phase spacing ground connection III segment protect calculating (concrete grammar belongs to routine techniques) according to current protection seting value.
On the basis that station domain information is shared, territory distance backup protection of standing can know the switch changed position information of many circuits.When after circuit L1 protection starting, before carrying out distance protection III section handling procedure, according to GOOSE message, rapid adjustment is carried out to the braning factor of parallel lines, then regulate protection definite value.Such rapid adjustment braning factor effectively can improve the performance of parallel lines distance protection III section, especially to the selectivity of power flow transfer single-phase during accident overload.
Claims (1)
1. territory distance protection III section of standing a parallel lines braning factor fast adjustment method, it is characterized in that, the method comprises the following steps:
Step 1) judge whether protection starting circuit L1 is parallel lines structure, if enter step 2); Otherwise directly carry out step 4) carry out protection algorism process;
Step 2) according to GOOSE message information, judge whether the parallel lines of circuit L1 have tripping operation or close a floodgate, if having jumping or combined floodgate information, then carry out steps 3); Otherwise, enter step 4);
Step 3) according to the jumping of the parallel circuit of circuit L1 or combined floodgate information, braning factor is adjusted, specifically comprises:
If single-phase jumping or combined floodgate information, then adjust this phase, the braning factor represented with A phase is:
K′
Ab=1/M
In formula, K '
abfor parallel circuit A phase trip after amendment braning factor, M be jump or close a floodgate after parallel lines A phase return number;
Again A phase ground distance III section setting value is revised as:
Z
set.A.III=K
Kz
1l
local+K
KK′
AbZ
set.II_remote
In formula, Z
set.A.IIIfor the A phase ground distance III section setting value of circuit L1; K
kfor safety factor, value is 0.7 ~ 0.8; z
1for the unit length positive sequence impedance of circuit L1, l
localfor circuit L1 and line length; Z
set.II_remotefor the subordinate circuit distance II section setting value of circuit L1; K '
abfor parallel circuit A phase trip after amendment braning factor;
If three-phase breaker tripping and closing information, then all modify to three-phase impedance of adjusting, adjustment braning factor is:
K′
b=1/M
In formula, K '
bfor amended braning factor, M is that the parallel lines after jumping or closing a floodgate return number;
III section of adjusting the distance again setting value is modified:
Z
set.III=K
Kz
1l
local+K
KK′
bZ
set.II_remote
In formula, Z
set.IIIfor distance ground connection III section, the phase spacing ground connection III section setting value of circuit L1, three-phase is all changed; K
kfor safety factor, generally get 0.7 ~ 0.8; z
1for the unit length positive sequence impedance of circuit L1, l
localfor circuit L1 and line length at the corresponding levels; Z
set.II_remotefor subordinate circuit distance II section setting value; K '
bfor amended braning factor;
Step 4) carry out distance ground connection III section, the calculating of phase spacing ground connection III segment protect according to current protection seting value.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410539684.2A CN104319748B (en) | 2014-10-13 | 2014-10-13 | Quick adjustment method for parallel line branching factor in substation area distance protection section III |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410539684.2A CN104319748B (en) | 2014-10-13 | 2014-10-13 | Quick adjustment method for parallel line branching factor in substation area distance protection section III |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104319748A true CN104319748A (en) | 2015-01-28 |
CN104319748B CN104319748B (en) | 2017-04-12 |
Family
ID=52374947
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410539684.2A Active CN104319748B (en) | 2014-10-13 | 2014-10-13 | Quick adjustment method for parallel line branching factor in substation area distance protection section III |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104319748B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104901263A (en) * | 2015-05-15 | 2015-09-09 | 国网冀北电力有限公司 | Branch coefficient calculation method for setting calculation of power system |
CN105552862A (en) * | 2015-12-31 | 2016-05-04 | 国家电网公司 | Regional backup protection method for setting and simplifying distance III section protection |
CN108345706A (en) * | 2017-01-24 | 2018-07-31 | 中国石油化工股份有限公司 | A kind of emulation mode that power supply is cut soon and model |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101813736A (en) * | 2009-04-15 | 2010-08-25 | 河南省电力公司 | Distance protection measurement method of double-circuit line on the same pole |
CN102403701A (en) * | 2011-11-23 | 2012-04-04 | 河海大学 | Self-adaptive distance protection method for double-circuit line of intelligent substation |
CN102437557A (en) * | 2011-12-15 | 2012-05-02 | 河南省电力公司洛阳供电公司 | Quick-acting and selective parallel double-circuit running lines (110kV) and quick-action and selection method thereof |
CN103779851A (en) * | 2014-02-28 | 2014-05-07 | 广东电网公司电力调度控制中心 | Distant back-up protection checking method for ultra-high-voltage line |
-
2014
- 2014-10-13 CN CN201410539684.2A patent/CN104319748B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101813736A (en) * | 2009-04-15 | 2010-08-25 | 河南省电力公司 | Distance protection measurement method of double-circuit line on the same pole |
CN102403701A (en) * | 2011-11-23 | 2012-04-04 | 河海大学 | Self-adaptive distance protection method for double-circuit line of intelligent substation |
CN102437557A (en) * | 2011-12-15 | 2012-05-02 | 河南省电力公司洛阳供电公司 | Quick-acting and selective parallel double-circuit running lines (110kV) and quick-action and selection method thereof |
CN103779851A (en) * | 2014-02-28 | 2014-05-07 | 广东电网公司电力调度控制中心 | Distant back-up protection checking method for ultra-high-voltage line |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104901263A (en) * | 2015-05-15 | 2015-09-09 | 国网冀北电力有限公司 | Branch coefficient calculation method for setting calculation of power system |
CN104901263B (en) * | 2015-05-15 | 2017-12-29 | 国网冀北电力有限公司 | A kind of branch coefficient calculation method of power system adaptive setting |
CN105552862A (en) * | 2015-12-31 | 2016-05-04 | 国家电网公司 | Regional backup protection method for setting and simplifying distance III section protection |
CN105552862B (en) * | 2015-12-31 | 2017-11-17 | 国家电网公司 | The region-type back-up protection method simplified for III of Distance section protection seting |
CN108345706A (en) * | 2017-01-24 | 2018-07-31 | 中国石油化工股份有限公司 | A kind of emulation mode that power supply is cut soon and model |
CN108345706B (en) * | 2017-01-24 | 2021-10-08 | 中国石油化工股份有限公司 | Power supply fast switching simulation method and model |
Also Published As
Publication number | Publication date |
---|---|
CN104319748B (en) | 2017-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Aghdam et al. | Variable tripping time differential protection for microgrids considering DG stability | |
Hsieh et al. | Adaptive relay setting for distribution systems considering operation scenarios of wind generators | |
Sneath et al. | DC fault protection of a nine-terminal MMC HVDC grid | |
CN105226607B (en) | A kind of extra-high voltage direct-current layer-specific access system 100Hz harmonic protection methods | |
Coster et al. | Effect of DG on distribution grid protection | |
CN103956712B (en) | Grounding distance protection solution method adaptive to overload state | |
CN104319748A (en) | Quick adjustment method for parallel line branching factor in substation area distance protection section III | |
CN102403701B (en) | Self-adaptive distance protection method for double-circuit line of intelligent substation | |
Marvik et al. | A two-layer detection strategy for protecting multi-terminal HVDC systems against faults within a wide range of impedances | |
CN109980615A (en) | Eliminate section switch and busbar breaker dead-zone fault relay protecting method | |
CN107645155B (en) | Distribution network line distance protecting method after large-scale distributed photo-voltaic power supply access | |
CN100420115C (en) | Actuation of 50 Hz protection definite value by current instruction | |
CN103616610A (en) | Simulation method of monitoring signals in power grid fault line | |
CN103384062A (en) | Isolation control system of grid power distribution fault detection | |
CN103779847B (en) | Based on the guard method of SV network samples common-tower double-circuit lines single-phase earthing voltage ratio phase | |
CN104052033B (en) | A kind of guard method based on zero-sequence current correlation coefficient identification fault branch | |
Ikhide et al. | Limitations of di/dt technique in DC line protection | |
CN109842204A (en) | Stand-by heat line electricity source based on optical-fibre channel controls in-put of spare power supply method | |
CN109861181A (en) | A kind of relay protecting method for eliminating segmentation and busbar breaker dead-zone fault | |
CN204230894U (en) | A kind of One Common Earthing Electrode operation interlock circuit | |
CN103368153A (en) | Accelerated factor-based power transmission line negative sequence current protective method | |
CN104300514B (en) | Stand domain ground distance protection III section self adaptation offset characteristic setting methods | |
CN201117594Y (en) | Universal type circuit breaker possessing reclosing device | |
CN103779850B (en) | Based on directly adopting straight jumping communication mode double-circuit line single-phase earthing distance protecting method | |
CN203883464U (en) | Controllable small-resistor arc-extinguishing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |