CN104318396A - 煤耗调度方法和系统 - Google Patents

煤耗调度方法和系统 Download PDF

Info

Publication number
CN104318396A
CN104318396A CN201410598658.7A CN201410598658A CN104318396A CN 104318396 A CN104318396 A CN 104318396A CN 201410598658 A CN201410598658 A CN 201410598658A CN 104318396 A CN104318396 A CN 104318396A
Authority
CN
China
Prior art keywords
coal consumption
load
state
curve
generating unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410598658.7A
Other languages
English (en)
Other versions
CN104318396B (zh
Inventor
王斐
吴青华
陈晓东
姚林
荆朝霞
郑杰辉
罗微
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Guangzhou Power Supply Bureau Co Ltd
Original Assignee
South China University of Technology SCUT
Guangzhou Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT, Guangzhou Power Supply Bureau Co Ltd filed Critical South China University of Technology SCUT
Priority to CN201410598658.7A priority Critical patent/CN104318396B/zh
Publication of CN104318396A publication Critical patent/CN104318396A/zh
Application granted granted Critical
Publication of CN104318396B publication Critical patent/CN104318396B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

本发明提供一种煤耗调度方法和系统,所述煤耗调度方法包括:分别获取火电机组在升负荷状态、降负荷状态和稳态下的煤耗实测数据;根据所述煤耗实测数据进行煤耗曲线拟合,得到升负荷曲线、降负荷曲线以及稳态曲线;计算使所述升负荷曲线、降负荷曲线以及稳态曲线满足预设条件的火电机组出力,根据所述火电机组出力确定调度方案;根据所述调度方案对火电机组进行调度。上述煤耗调度方法和系统,通过分别获取火电机组在升负荷状态、降负荷状态和稳态下的煤耗实测数据构造拟合函数曲线和煤耗模型,并针对各状态确定调度方案,根据调度方案对火电机组进行出力调度,使火电机组的煤耗调度根据不同的功耗类型确定,更有针对性,实现了能源的节约,降低了环境污染。

Description

煤耗调度方法和系统
技术领域
本发明涉及电力调度技术领域,特别是涉及一种煤耗调度方法和系统。
背景技术
能源与环境问题日益严重,而发电行业耗能污染严重,在宏观层面上,我国提出了节能发电调度的方案,而在具体技术细节上,充分利用机组特性的情况下的合理调度将有助于节能减排,提高发电综合效益。
南方某省安装煤耗在线监测系统并通过验收的电厂越来越多,煤耗在线监测系统获得的大量数据非常有利于获取更多的机组煤耗特性;现有技术中,煤耗曲线大多采用一条二次拟合曲线,认为机组在升负荷,降负荷和稳态运行下具有相同的煤耗特性,而对煤耗系统数据的分析发现在这三种状态下的煤耗特性存在差异,即在不同负荷状态下,运行点煤耗在煤耗曲线上的运动轨迹分别在不同的二次曲线上,因此采用一条二次曲线多煤耗进行监测分析不能准确反应煤耗的实时状况,难以实现火电机组出力的优化调度。
发明内容
基于此,有必要针对现有技术中煤耗调度只根据一条二次拟合曲线,调度方案不够优化的问题,提供一种煤耗调度方法和系统。
一种煤耗调度方法,包括:
分别获取火电机组在升负荷状态、降负荷状态和稳态下的煤耗实测数据;
根据所述煤耗实测数据进行煤耗曲线拟合,得到升负荷曲线、降负荷曲线以及稳态曲线;
计算使所述升负荷曲线、降负荷曲线以及稳态曲线满足预设条件的火电机组出力,根据所述火电机组出力确定调度方案;
根据所述调度方案对火电机组进行调度。
一种煤耗调度系统,包括:
获取模块,用于分别获取火电机组在升负荷状态、降负荷状态和稳态下的煤耗实测数据;
拟合模块,用于根据所述煤耗实测数据进行煤耗曲线拟合成升负荷曲线、降负荷曲线以及稳态曲线;
确定模块,用于计算使所述升负荷曲线、降负荷曲线以及稳态曲线满足预设条件的火电机组出力,根据所述火电机组出力确定调度方案;
调度模块,用于根据所述调度方案对火电机组进行调度。
上述煤耗调度方法和系统,通过分别获取火电机组在升负荷状态、降负荷状态和稳态下的煤耗实测数据构造对应的拟合函数曲线和煤耗模型,并针对各个状态确定不同的调度方案,根据上述调度方案对火电机组进行出力调度,使火电机组的煤耗调度根据不同的功耗类型确定,更有针对性,实现了能源的节约,降低了环境污染。
附图说明
图1为一个实施例的煤耗调度方法流程图;
图2为一个实施例的煤耗实测数据获取方法流程图;
图3所示为一个实施例大误差数据筛选方法流程图;
图4为一个实施例的火电机组的升负荷、降负荷、稳态曲线示意图;
图5为一个实施例的调度方案确定方法流程图;
图6为一个实施例的1号火电机组的升负荷、降负荷、稳态曲线示意图;
图7为一个实施例的2号火电机组的升负荷、降负荷、稳态曲线示意图;
图8为一个实施例的1号火电机组的整体曲线以及稳态曲线示意图;
图9为一个实施例的2号火电机组的整体曲线以及稳态曲线示意图;
图10为一个实施例的24小时内1号火电机组和2号火电机组分别在变负荷、整体状态下的负荷分配示意图;
图11为一个实施例的变负荷、整体状态下的调度的总煤耗情况分析曲线示意图;
图12为一个实施例的煤耗调度系统结构示意图;
图13为一个实施例的第一获取模块结构示意图;
图14为一个实施例的大误差数据筛选模块结构示意图;
图15为一个实施例的确定模块结构示意图。
具体实施方式
下面结合附图对本发明的煤耗调度方法和系统的具体实施方式作详细描述。
参考图1,图1所示为一个实施例的煤耗调度方法流程图,包括如下步骤:
S10,分别获取火电机组在升负荷状态、降负荷状态和稳态下的煤耗实测数据;
上述步骤S10中,煤耗实测数据可以包括火电机组的耗煤量,火电机组的理论负荷和实际负荷等物理量。
S30,根据所述煤耗实测数据进行煤耗曲线拟合成升负荷曲线、降负荷曲线以及稳态曲线;
S50,计算使所述升负荷曲线、降负荷曲线以及稳态曲线满足预设条件的火电机组出力,根据所述火电机组出力确定调度方案;
上述步骤S50中,可以求解使上述升负荷曲线、降负荷曲线以及稳态曲线满足预设条件的火电机组出力,其中,预设条件可以为使火电机组煤耗少等节能条件;火电机组的煤耗一般与其出力一致,因此煤耗调度方案可以根据出力确定。
S90,根据所述调度方案对火电机组进行调度。
上述煤耗调度方法和系统,通过分别获取火电机组在升负荷状态、降负荷状态和稳态下的煤耗实测数据构造对应的拟合函数曲线和煤耗模型,并针对各个状态确定不同的调度方案,根据上述调度方案对火电机组进行出力调度,使火电机组的煤耗调度根据不同的功耗类型确定,更有针对性,实现了能源的节约,降低了环境污染。
参考图2,图2所示为一个实施例的煤耗实测数据获取方法流程图,可以包括如下步骤:
S11,分别在升负荷状态、降负荷状态和稳态下,每隔预设时间间隔获取一次煤耗数据;
S12,计算在升负荷状态、降负荷状态和稳态下的预设时间段内所述煤耗数据的平均值;
S13,根据所述平均值计算煤耗实测数据。
上述实施例中,预设时间间隔可以为1分钟;预设时间段内可以为5分钟;每隔1分钟获取一次煤耗数据,并以时间段长为5分钟的煤耗数据的平均值,可以使所获取的煤耗实测数据更加规范、准确,更能反应当时火电机组的煤耗情况。
参考图3,图3所示为一个实施例大误差数据筛选方法流程图,如图示,上述步骤S10后还可以包括:
S21,检测所述煤耗实测数据随时间的变化趋势;
上述步骤S21中,煤耗变化趋势可以将煤耗实测数据中的各数据点定位到时间-煤耗量坐标图上进行观察并并分析;也可以通过计算煤耗实测数据中的各数据点的变化量进行分析。
S22,选择偏离相邻煤耗实测数据超过预设值的煤耗实测数据,得到煤耗实测数据中的大误差数据;
上述步骤S22中,预设值根据火电机组的具体工作环境以及所处工作状态确定。
S23,筛选出所述大误差数据。
上述实施例将煤耗实测数据中的误差比较大的进行筛选并排除,使后续根据煤耗实测数据拟合出的曲线能更准确的反应火电机台的出力情况。
在一个实施例中,上述升负荷曲线、降负荷曲线以及稳态曲线的函数表达式可以分别为:
F si ( P si ( t k ) ) = a si + b si P si ( t k ) + c si P si 2 ( t k ) ,
F ji ( P ji ( t k ) ) = a ji + b ji P ji ( t k ) + c ji P ji 2 ( t k ) ,
F i ( P i ( t k ) ) = a i + b i P i ( t k ) + c i P t 2 ( t k ) ,
其中,asi、bsi和csi为升负荷状态下第i机组的煤耗系数,aji、bji和cji为降负荷状态下第i火电机组的煤耗系数,ai、bi和ci为稳态下第i火电机组的煤耗系数;Psi(tk)、Pji(tk)、Pi(tk)分别表示tk时刻升负荷状态、降负荷状态以及稳态下第i火电机组的出力;Fsi(Psi(tk))、Fji(Pji(tk))、Fi(Pi(tk))分别表示tk时刻升负荷状态、降负荷状态以及稳态下第i火电机组的煤耗。
作为一个实施例,上述拟合后的升负荷曲线、降负荷曲线以及稳态曲线形状可以如图4所示,图4中,横坐标表示负荷值,单位为兆瓦(MW),纵坐标表示1号火电机组的煤耗率,单位为克每千瓦时(g/kWh)。
参考图5,图5所示为一个实施例的调度方案确定方法流程图,如图示,上述确定调度方案的方法可以包括如下步骤:
S51,分别根据升负荷曲线、降负荷曲线以及稳态曲线构造优化函数;
S52,分别计算在升负荷状态、降负荷状态和稳态下使优化函数取得最小值的火电机组的出力;
S53,根据所述出力分别确定所述升负荷状态、降负荷状态和稳态下的火电机组所需要的煤耗量;
S54,根据所述煤耗量确定调度方案。
上述实施例提供的调度方案确定方法能分别找出升负荷状态、降负荷状态和稳态下使火电机组煤耗最少的方案,有效节省了火电机组正常工作所用的能源。
在一个实施例中,上述升负荷状态、降负荷状态和稳态下的优化函数分别为:
COST s = min Σ i = 1 N Σ k = 1 S P si ( t k ) F si ( P si ( t k ) ) Δ t k ,
COST j = min Σ i = 1 N Σ k = 1 S P ji ( t k ) F ji ( P ji ( t k ) ) Δ t k ,
COST = min Σ i = 1 N Σ k = 1 S P i ( t k ) F i ( P i ( t k ) ) Δ t k ,
其中,Psi(tk)、Pji(tk)、Pi(tk)分别表示tk时刻升负荷状态、降负荷状态以及稳态下第i火电机组的出力;Fsi(Psi(tk))、Fji(Pji(tk))、Fi(Pi(tk))分别表示tk时刻升负荷状态、降负荷状态以及稳态下第i火电机组的煤耗;N为火电机组的总数,S为预设时间段数,Δtk为预设时间间隔,Δtk=tk+1-tk
本实施例中,第i机组在升负荷状态、降负荷状态以及稳态下的出力-煤耗曲线模型分别为:
F si ( P si ( t k ) ) = a si + b si P si ( t k ) + c si P si 2 ( t k ) ,
F ji ( P ji ( t k ) ) = a ji + b ji P ji ( t k ) + c ji P ji 2 ( t k ) ,
F i ( P i ( t k ) ) = a i + b i P i ( t k ) + c i P t 2 ( t k ) ,
其中,asi、bsi和csi为升负荷状态下第i火电机组的煤耗系数,aji、bji和cji为降负荷状态下第i火电机组的煤耗系数,ai、bi和ci为稳态下第i火电机组的煤耗系数;Psi(tk)、Pji(tk)、Pi(tk)分别表示tk时刻升负荷状态、降负荷状态以及稳态下第i机组的出力;Fsi(Psi(tk))、Fji(Pji(tk))、Fi(Pi(tk))分别表示tk时刻升负荷状态、降负荷状态以及稳态下第i火电机组的煤耗。
其中,升负荷状态下有:Psi(tk+1)-Psi(tk)≥P0,降负荷状态下有:Pji(tk+1)-Pji(tk)≤-P1;P0,P1为相应的火电机组升负荷状态和降负荷状态的约束量。
可以求使上述优化函数取得最小值并且满足下述使火电机组安全运行的约束条件下的火电机组出力。
其中,火电机组稳态下出力上限与下限约束条件:
P i min ≤ P i ( t k ) ≤ P i max ;
火电机组升负荷和降负荷约束条件:
P u i ( t k ) - P i 0 ( t k ) ≤ UR i
P i 0 ( t k ) - P d i ( t k ) ≤ DR i
其中,分别为第i机组的稳态下出力上限与下限;分别为下一时刻火电机组升负荷、降负荷的出力计算值,为上一时刻火电机组出力值,URi、DRi分别为第i机组的升负荷上限与降负荷下限。
求解满足上述约束条件并使上述优化函数取得最小值的火电机组的出力。
在一个实施例中,图6、7所示为分别对1号火电机组和2号火电机组在升负荷状态、降负荷状态、稳态进行煤耗实测数据,并根据上述煤耗实测数据进行拟合的曲线示意图。图8、9分别为1号火电机组和2号火电机组在不区分各状态拟合的整体曲线以及稳态曲线示意图。在图6-9中坐标表示负荷值,单位为兆瓦(MW),纵坐标表示对应的火电机组的煤耗,单位为吨每小时(t/h),#1表示1号火电机组,#2表示2号火电机组。
图6和图7可以说明,升负荷曲线,即升负荷下煤耗曲线;降负荷曲线,即降负荷下煤耗曲线;以及稳态曲线,即稳态负荷下煤耗曲线,三者有比较明显的差异,同一负荷水平下,升负荷状态下煤耗低于稳态情况下煤耗,降负荷状态下煤耗高于稳态情况下煤耗。
图8和图9可以说明整体曲线,即整体拟合下煤耗曲线以及稳态曲线,即稳态负荷下煤耗曲线的差异较小,也就是说,整体曲线可以反应稳态下的煤耗情况,而不能较为准确反应升负荷状态和降负荷状态下的煤耗情况。
根据图6-9中的拟合曲线,利用matlab将各拟合曲线计算成对应的函数方程如下,1号火电机组的整体曲线、升负荷曲线、降负荷曲线以及稳态曲线对应的函数方程分别为:
2号火电机组的整体曲线、升负荷曲线、降负荷曲线以及稳态曲线对应的函数方程分别为:
其中,P表示火电机组的出力;f(P)表示对应火电机组在各状态下的煤耗。
根据上述函数方程,分别在变负荷和整体数据分析情况下对1号、2号火电机组进行24小时煤耗调度,并对其调度进行记录并分析,得到如表1-3所示结果,其中,变负荷调度是指考虑火电机组的升负荷、变负荷以及稳态的煤耗调度;表1所示为24小时整体分析调度表;表2为24小时变负荷分析调度表,24小时整体、变负荷调度对比分析表;表中,1号机对应行的数据表示1号火电机组的在相应的分析状态下不同时间的出力值,2号机对应行的数据表示2号火电机组的在相应的分析状态下不同时间的出力值。
本实例中,24小时内1号火电机组和2号火电机组分别在变负荷、整体状态下的负荷分配情况如图10所示,图10中,横坐标表示时间,纵坐标表示负荷,单位为兆瓦(MW)。24小时内1号火电机组和2号火电机组分别在变负荷、整体状态下的调度的总煤耗情况分析曲线如图11所示,图11中,横坐标表示时间,纵坐标对应两个量值,一个为负荷,单位为兆瓦(MW),另一个为差值比,即变负荷状态各时刻的总煤耗与整体状态各时刻的总煤耗的差值与整体状态各时刻的总煤耗之间的比值,该比值反应变负荷状态相对比整体状态的总煤耗的节能效果。
表124小时整体分析调度表
时间 0:00 0:30 1:00 1:30 2:00 2:30 3:00 3:30
负荷(MW) 404 420 420 420 420 420 420 420
1号机 224 229 229 229 229 229 229 229
2号机 180 191 191 191 191 191 191 191
煤耗(t) 59.111 61.398 61.398 61.398 61.398 61.398 61.398 61.398
时间 4:00 4:30 5:00 5:30 6:00 6:30 7:00 7:30
负荷(MW) 420 420 420 420 420 420 430 440
1号机 229 229 229 229 229 229 233 236
2号机 191 191 191 191 191 191 197 204
煤耗(t) 61.398 61.398 61.398 61.398 61.398 61.439 62.795 64.162
时间 8:00 8:30 9:00 9:30 10:00 10:30 11:00 11:30
负荷(MW) 460 480 530 580 610 640 632 622
1号机 242 249 265 281 291 300 298 294
2号机 218 231 265 299 319 340 334 328
煤耗(t) 66.932 69.750 77.004 84.557 89.233 94.016 97.148 95.465
时间 12:00 12:30 13:00 13:30 14:00 14:30 15:00 15:30
负荷(MW) 580 570 576 582 588 600 610 620
1号机 281 278 280 282 283 287 291 294
2号机 299 292 296 300 305 313 319 326
煤耗(t) 88.466 86.816 83.942 84.865 85.793 87.662 89.233 90.815
时间 16:00 16:30 17:00 17:30 18:00 18:30 19:00 19:30
负荷(MW) 640 630 624 618 612 600 570 540
1号机 300 297 295 293 291 287 278 268
2号机 340 333 329 325 321 313 292 272
煤耗(t) 94.016 89.380 88.432 87.486 86.542 84.662 80.002 75.400
时间 20:00 20:30 21:00 21:30 22:00 22:30 23:00 23:30
负荷(MW) 520 500 480 460 452 446 440 434
1号机 262 255 249 242 240 238 236 234
2号机 258 245 231 218 212 208 204 200
煤耗(t) 72.365 69.355 66.372 63.414 62.238 61.359 60.482 59.607
表224小时变负荷分析调度表
时间 0:00 0:30 1:00 1:30 2:00 2:30 3:00 3:30
负荷(MW) 404 420 420 420 420 420 420 420
1号机 210 217 217 217 217 217 217 217
2号机 194 203 203 203 203 203 203 203
煤耗(t) 59.081 61.377 61.377 61.377 61.377 61.377 61.377 61.377
时间 4:00 4:30 5:00 5:30 6:00 6:30 7:00 7:30
负荷(MW) 420 420 420 420 420 420 430 440
1号机 217 217 217 217 217 185 191 198
2号机 203 203 203 203 203 235 239 242
煤耗(t) 61.377 61.377 61.377 61.377 61.377 61.082 62.486 63.898
时间 8:00 8:30 9:00 9:30 10:00 10:30 11:00 11:30
负荷(MW) 460 480 530 580 610 640 632 622
1号机 210 223 255 286 305 324 344 339
2号机 250 257 275 294 305 316 288 283
煤耗(t) 66.747 69.630 76.985 84.552 89.193 93.911 96.125 94.506
时间 12:00 12:30 13:00 13:30 14:00 14:30 15:00 15:30
负荷(MW) 580 570 576 582 588 600 610 620
1号机 315 310 284 287 291 299 305 312
2号机 265 260 292 295 297 301 305 308
煤耗(t) 87.760 86.168 83.939 84.859 85.782 87.638 89.193 90.757
时间 16:00 16:30 17:00 17:30 18:00 18:30 19:00 19:30
负荷(MW) 640 630 624 618 612 600 570 540
1号机 324 343 340 337 333 326 310 293
2号机 316 287 284 281 279 274 260 247
煤耗(t) 93.911 89.071 88.139 87.210 86.282 84.432 79.841 75.295
时间 20:00 20:30 21:00 21:30 22:00 22:30 23:00 23:30
负荷(MW) 520 500 480 460 452 446 440 434
1号机 282 271 260 249 244 241 237 234
2号机 238 229 220 211 208 205 203 200
煤耗(t) 72.291 69.307 66.344 63.402 62.230 61.354 60.480 59.607
表324小时整体、变负荷调度对比分析表
分析方式 一日总煤耗(t) 与第1项差值(t)
整体 3557.092 ‐‐
变负荷 3550.013 ‐7.709
表3中,一日总煤耗指24小时内,1号火电机组和2号火电机组所消耗的煤量的平均值,单位为吨(t)。表3说明,根据变负荷数据对火电机组的煤耗进行调度比根据整体数据调度24小时内每台火电机组大约可以节省7.709吨煤,相当于节约电煤0.199%。因此对火电机组进行变负荷数据分析更能体现了其工作特性,能使调度方案进一步得到优化。
参考图12,图12所示为一个实施例的煤耗调度系统结构示意图,包括:
获取模块10,用于分别获取火电机组在升负荷状态、降负荷状态和稳态下的煤耗实测数据;
拟合模块30,用于根据所述煤耗实测数据进行煤耗曲线拟合,得到升负荷曲线、降负荷曲线以及稳态曲线;
确定模块50,用于计算使所述升负荷曲线、降负荷曲线以及稳态曲线满足预设条件的火电机组出力,根据所述火电机组出力确定调度方案;
调度模块90,用于根据所述调度方案对火电机组进行调度。
参考图13,图13所示为一个实施例的第一获取模块结构示意图,可以包括:
间隔获取模块11,用于分别在升负荷状态、降负荷状态和稳态下,每隔预设时间间隔获取一次煤耗数据;
第一计算模块12,用于计算在升负荷状态、降负荷状态和稳态下的预设时间段内所述煤耗数据的平均值;
第二计算模块13,用于根据所述平均值计算煤耗实测数据。
参考图14,图14所示为一个实施例的大误差数据筛选模块结构示意图,如图所示,上述第一获取模块后还可以包括:
检测模块,用于检测所述煤耗实测数据随时间的变化趋势;
选择模块,用于选择偏离相邻煤耗实测数据超过预设值的煤耗实测数据,得到煤耗实测数据中的大误差数据;
筛选模块,用于筛选出所述大误差数据。
参考图15,图15所示为一个实施例的确定模块结构示意图,可以包括:
构造模块51,用于分别根据升负荷曲线、降负荷曲线以及稳态曲线构造优化函数;
第三计算模块52,用于分别计算在升负荷状态、降负荷状态和稳态下使优化函数取得最小值的火电机组的出力;
煤耗量确定模块53,用于根据所述出力分别确定所述升负荷状态、降负荷状态和稳态下的火电机组所需要的煤耗量;
方案确定模块54,用于根据所述煤耗量确定调度方案。
本发明的煤耗调度系统与本发明的煤耗调度方法一一对应,在上述煤耗调度方法的实施例阐述的技术特征及其有益效果均适用于煤耗调度系统的实施例中,特此声明。
以上所述实施例仅表达了本发明的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对本发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。因此,本发明专利的保护范围应以所附权利要求为准。

Claims (10)

1.一种煤耗调度方法,其特征在于,包括如下步骤:
分别获取火电机组在升负荷状态、降负荷状态和稳态下的煤耗实测数据;
根据所述煤耗实测数据进行煤耗曲线拟合,得到升负荷曲线、降负荷曲线以及稳态曲线;
计算使所述升负荷曲线、降负荷曲线以及稳态曲线满足预设条件的火电机组出力,根据所述火电机组出力确定调度方案;
根据所述调度方案对火电机组进行调度。
2.根据权利要求1所述的煤耗调度方法,其特征在于,所述分别获取火电机组在升负荷状态、降负荷状态和稳态下的煤耗实测数据的步骤包括如下步骤:
分别在升负荷状态、降负荷状态和稳态下,每隔预设时间间隔获取一次煤耗数据;
计算在升负荷状态、降负荷状态和稳态下的预设时间段内所述煤耗数据的平均值;
根据所述平均值计算煤耗实测数据。
3.根据权利要求1所述的煤耗调度方法,其特征在于,所述分别获取火电机组在升负荷状态、降负荷状态和稳态下的煤耗实测数据的步骤后还包括:
检测所述煤耗实测数据随时间的变化趋势;
选择偏离相邻煤耗实测数据超过预设值的煤耗实测数据,得到煤耗实测数据中的大误差数据;
筛选出所述大误差数据。
4.根据权利要求1所述的煤耗调度方法,其特征在于,所述升负荷曲线、降负荷曲线以及稳态曲线的函数表达式分别为:
F si ( P si ( t k ) ) = a si + b si P si ( t k ) + c si P si 2 ( t k ) ,
F ji ( P ji ( t k ) ) = a ji + b ji P ji ( t k ) + c ji P ji 2 ( t k ) ,
Fi(Pi(tk))=ai+biPi(tk)+ciPi 2(tk),
其中,asi、bsi和csi为升负荷状态下第i机组的煤耗系数,aji、bji和cji为降负荷状态下第i火电机组的煤耗系数,ai、bi和ci为稳态下第i火电机组的煤耗系数;Psi(tk)、Pji(tk)、Pi(tk)分别表示tk时刻升负荷状态、降负荷状态以及稳态下第i火电机组的出力;Fsi(Psi(tk))、Fji(Pji(tk))、Fi(Pi(tk))分别表示tk时刻升负荷状态、降负荷状态以及稳态下第i火电机组的煤耗。
5.根据权利要求1所述的煤耗调度方法,其特征在于,所述根据计算使所述升负荷曲线、降负荷曲线以及稳态曲线满足预设条件的火电机组出力,根据所述出力确定调度方案的步骤包括如下步骤:
分别根据升负荷曲线、降负荷曲线以及稳态曲线构造优化函数;
分别计算在升负荷状态、降负荷状态和稳态下使优化函数取得最小值的火电机组的出力;
根据所述出力分别确定所述升负荷状态、降负荷状态和稳态下的火电机组所需要的煤耗量;
根据所述煤耗量确定调度方案。
6.根据权利要求5所述的煤耗调度方法,其特征在于,所述升负荷状态、降负荷状态和稳态下的优化函数分别为:
COST s = min Σ i = 1 N Σ k = 1 S P si ( t k ) F si ( P si ( t k ) ) Δ t k ,
COST j = min Σ i = 1 N Σ k = 1 S P ji ( t k ) F ji ( P ji ( t k ) ) Δ t k ,
COST = min Σ i = 1 N Σ k = 1 S P i ( t k ) F i ( P i ( t k ) ) Δ t k ,
其中,Psi(tk)、Pji(tk)、Pi(tk)分别表示tk时刻升负荷状态、降负荷状态以及稳态下第i火电机组的出力;Fsi(Psi(tk))、Fji(Pji(tk))、Fi(Pi(tk))分别表示tk时刻升负荷状态、降负荷状态以及稳态下第i火电机组的煤耗;N为火电机组的总数,S为预设时间段数,Δtk为预设时间间隔。
7.一种煤耗调度系统,其特征在于,包括:
获取模块,用于分别获取火电机组在升负荷状态、降负荷状态和稳态下的煤耗实测数据;
拟合模块,用于根据所述煤耗实测数据进行煤耗曲线拟合,得到升负荷曲线、降负荷曲线以及稳态曲线;
确定模块,用于计算使所述升负荷曲线、降负荷曲线以及稳态曲线满足预设条件的火电机组出力,根据所述火电机组出力确定调度方案;
调度模块,用于根据所述调度方案对火电机组进行调度。
8.根据权利要求7所述的煤耗调度系统,其特征在于,所述第一获取模块包括:
间隔获取模块,用于分别在升负荷状态、降负荷状态和稳态下,每隔预设时间间隔获取一次煤耗数据;
第一计算模块,计算在升负荷状态、降负荷状态和稳态下的预设时间段内所述煤耗数据的平均值;
第二计算模块,用于根据所述平均值计算煤耗实测数据。
9.根据权利要求7所述的煤耗调度系统,其特征在于,所述第一获取模块后还包括:
检测模块,用于检测所述煤耗实测数据随时间的变化趋势;
选择模块,用于选择偏离相邻煤耗实测数据超过预设值的煤耗实测数据,得到煤耗实测数据中的大误差数据;
筛选模块,用于筛选出所述大误差数据。
10.根据权利要求7所述的煤耗调度系统,其特征在于,所述确定模块包括:
构造模块,用于分别根据升负荷曲线、降负荷曲线以及稳态曲线构造优化函数;
第三计算模块,用于分别计算在升负荷状态、降负荷状态和稳态下使优化函数取得最小值的火电机组的出力;
煤耗量确定模块,用于根据所述出力分别确定所述升负荷状态、降负荷状态和稳态下的火电机组所需要的煤耗量;
方案确定模块,用于根据所述煤耗量确定调度方案。
CN201410598658.7A 2014-10-29 2014-10-29 煤耗调度方法和系统 Active CN104318396B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410598658.7A CN104318396B (zh) 2014-10-29 2014-10-29 煤耗调度方法和系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410598658.7A CN104318396B (zh) 2014-10-29 2014-10-29 煤耗调度方法和系统

Publications (2)

Publication Number Publication Date
CN104318396A true CN104318396A (zh) 2015-01-28
CN104318396B CN104318396B (zh) 2018-03-27

Family

ID=52373624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410598658.7A Active CN104318396B (zh) 2014-10-29 2014-10-29 煤耗调度方法和系统

Country Status (1)

Country Link
CN (1) CN104318396B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104901341A (zh) * 2015-06-26 2015-09-09 华北电力大学 基于机组出力及变负荷速率的火力发电煤耗量计算方法
CN107634544A (zh) * 2017-09-19 2018-01-26 广东省粤电集团有限公司 火电机组的动态功率控制方法和系统
CN109785187A (zh) * 2019-03-14 2019-05-21 国网山东省电力公司电力科学研究院 一种发电机组供电煤耗检测数据校正方法
CN110518640A (zh) * 2019-09-05 2019-11-29 华北电力科学研究院有限责任公司 火电机组负荷响应状态评价方法和装置
CN111191881A (zh) * 2019-12-13 2020-05-22 大唐东北电力试验研究院有限公司 一种基于大数据的火电机组工业设备状态监测方法
CN112510704A (zh) * 2020-11-26 2021-03-16 贵州电网有限责任公司 一种在线煤耗曲线实时生成方法及系统
CN114849890A (zh) * 2022-04-28 2022-08-05 安徽立卓智能电网科技有限公司 一种基于优化磨煤机厂启动降低厂用电率的方法
CN111191881B (zh) * 2019-12-13 2024-05-14 大唐东北电力试验研究院有限公司 一种基于大数据的火电机组工业设备状态监测方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103056016A (zh) * 2012-12-26 2013-04-24 广东电网公司电力科学研究院 一种电站磨煤机节能优化出力的方法

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103056016A (zh) * 2012-12-26 2013-04-24 广东电网公司电力科学研究院 一种电站磨煤机节能优化出力的方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴永刚: "火电厂经济调度", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
王友 等: "自动发电控制下的火电厂厂级负荷优化分配", 《中国电机工程学报》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104901341A (zh) * 2015-06-26 2015-09-09 华北电力大学 基于机组出力及变负荷速率的火力发电煤耗量计算方法
CN104901341B (zh) * 2015-06-26 2017-08-04 华北电力大学 基于机组出力及变负荷速率的火力发电煤耗量计算方法
CN107634544A (zh) * 2017-09-19 2018-01-26 广东省粤电集团有限公司 火电机组的动态功率控制方法和系统
CN109785187A (zh) * 2019-03-14 2019-05-21 国网山东省电力公司电力科学研究院 一种发电机组供电煤耗检测数据校正方法
CN109785187B (zh) * 2019-03-14 2020-10-16 国网山东省电力公司电力科学研究院 一种发电机组供电煤耗检测数据校正方法
CN110518640A (zh) * 2019-09-05 2019-11-29 华北电力科学研究院有限责任公司 火电机组负荷响应状态评价方法和装置
CN111191881A (zh) * 2019-12-13 2020-05-22 大唐东北电力试验研究院有限公司 一种基于大数据的火电机组工业设备状态监测方法
CN111191881B (zh) * 2019-12-13 2024-05-14 大唐东北电力试验研究院有限公司 一种基于大数据的火电机组工业设备状态监测方法
CN112510704A (zh) * 2020-11-26 2021-03-16 贵州电网有限责任公司 一种在线煤耗曲线实时生成方法及系统
CN112510704B (zh) * 2020-11-26 2022-10-11 贵州电网有限责任公司 一种在线煤耗曲线实时生成方法及系统
CN114849890A (zh) * 2022-04-28 2022-08-05 安徽立卓智能电网科技有限公司 一种基于优化磨煤机厂启动降低厂用电率的方法

Also Published As

Publication number Publication date
CN104318396B (zh) 2018-03-27

Similar Documents

Publication Publication Date Title
CN104318396A (zh) 煤耗调度方法和系统
CN102621932B (zh) 一种数控机床服役过程的能量消耗预测方法
CN102486833B (zh) 装置的效能预测及故障检测的方法
CN106523260B (zh) 一种基于导叶开度的水电站机组效率排序和负荷分配方法
CN103631681A (zh) 一种在线修复风电场异常数据的方法
CN104808587A (zh) 一种基于机加工设备运行状态的稼动率统计方法
CN103424654A (zh) 一种敏感设备电压暂降敏感度的评估方法
CN104794492A (zh) 基于功率特征模型的机床设备加工运行状态在线识别方法
CN105141253A (zh) 基于光伏出力曲线斜率的光伏窃电识别方法
CN104615865A (zh) 一种建设工程施工碳排放量的定额估算方法及其应用
CN105184474B (zh) 一种考虑不规则限制运行区的水电站厂内经济调度方法
Wang et al. Developing a more comprehensive energy efficiency index for coal production: Indicators, methods and case study
CN103809550A (zh) 节费式电力能源管理装置及方法
CN104574221B (zh) 一种基于损失电量特征参数的光伏电站运行状态辨识方法
CN104578048B (zh) 枚举组合相继故障集的暂态安全稳定在线快速评估方法
CN103921173B (zh) 变频调速数控机床主轴电机输出功率的在线检测方法
CN110531702A (zh) 一种机床服役周期能效潜力获取方法
CN105021884A (zh) 用电设备待机功耗计算方法
CN109066791B (zh) 一种风电模拟弃风序列的确定方法和装置
Thompkins et al. Rolling mill cycloconverter condition assessment by harmonic current via time–frequency signature
CN102478421A (zh) 一种风力机叶片动态频率分析与设计方法
CN106249022A (zh) 交流暂态电压对直流控制保护系统影响的分析系统及方法
CN104239976A (zh) 一种考虑电力生产外部成本的电网购电优化方法
CN107194539B (zh) 一种考虑大气污染物防治的电力电量平衡方法
CN105160421A (zh) 一种基于周期滚动优化的火电厂磨机负荷预测方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant