CN104314585A - Pre-reinforcement method and pre-reinforcement structure for full section of tunnel - Google Patents

Pre-reinforcement method and pre-reinforcement structure for full section of tunnel Download PDF

Info

Publication number
CN104314585A
CN104314585A CN201410545526.8A CN201410545526A CN104314585A CN 104314585 A CN104314585 A CN 104314585A CN 201410545526 A CN201410545526 A CN 201410545526A CN 104314585 A CN104314585 A CN 104314585A
Authority
CN
China
Prior art keywords
tunnel
full section
face
reinforcement
free
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410545526.8A
Other languages
Chinese (zh)
Inventor
何知思
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
Shenhua Baoshen Railway Co Ltd
Original Assignee
China Shenhua Energy Co Ltd
Shenhua Baoshen Railway Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Energy Co Ltd, Shenhua Baoshen Railway Co Ltd filed Critical China Shenhua Energy Co Ltd
Priority to CN201410545526.8A priority Critical patent/CN104314585A/en
Publication of CN104314585A publication Critical patent/CN104314585A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a pre-reinforcement method and a pre-reinforcement structure for a full section of a tunnel. The method comprises the following steps: S1, arranging a plurality of conduits (1) in the surrounding rock of a to-be-excavated tunnel and along the contour line of a tunnel face (4), and grouting to the surrounding rock of the to-be-excavated tunnel through the conduits (1); S2, arranging a plurality of free-cutting anchor rods (2) in the to-be-excavated tunnel from the tunnel face (4); S3, excavating the tunnel face (4). The pre-reinforcement method and the pre-reinforcement structure disclosed by the invention are easy in field operation, reasonable in reinforcement cost, high in safety and good in reinforcement effect, and the problem that the working face of the tunnel collapses due to excessive extrusion deformation during a loess tunnel excavation and support process of full section excavation to influence the primary support stability is solved very well; as mechanized construction is not influenced by the free-cutting anchor rods during the construction process, so that the construction speed is quickened very well, the reasonable construction cost is kept, the construction safety, the construction quality, the construction period and the like are ensured, and the tunnel construction level is improved; the pre-reinforcement method and the pre-reinforcement structure have very good site construction value.

Description

Full section of tunnel pre-reinforcement method and structure
Technical field
The present invention relates to tunnelling technical field, particularly, relate to a kind of full section of tunnel pre-reinforcement method and structure.
Background technology
Along with the development of railway and highway, excavate in a lot of local needs the tunnel passing through Loess Layer.For the chiltern Loess Layer passing through stability extreme difference, the loess especially recently piled up, the dry density of soil is less, and porosity is larger, and compressive strain is large and permeability is strong.After immersion saturated, soil texture easily destroys, and cohesion reduces rapidly, and presents stronger settlement by soaking.There is saturated yielding joint district in ground under the effect of water, forms funnel and cratering sometimes.And joint plane is parallel with the steep bank on ground, stress release after tunnel excavation, easily produces unloading joint, unfavorable to Tunnel Stability, needs immediate support lining cutting.But present job site generally reinforces the country rock of tunneling while carrying out tunnelling, and construction cost is high and supporting effect is unsatisfactory, and work plane caves in affects preliminary bracing stability, and there is great security risk.
Because the above-mentioned shortcoming of prior art, need to provide a kind of new full section of tunnel pre-reinforcement method.
Summary of the invention
The object of this invention is to provide a kind of full section of tunnel pre-reinforcement method, it can solve in the loess tunnel excavation and support processes of full face excavation, and work plane caves in affects the problem of preliminary bracing stability.
To achieve these goals, the invention provides a kind of full section of tunnel pre-reinforcement method, it comprises the following steps:
S1, in country rock to be holed, arrange many conduits along the outline line of face, and by described conduit to wall rock grouting described to be holed;
S2, from face to waiting interior layout many free-machining anchor bars of holing;
S3, face to be excavated.
Preferably, in step sl, after first being closed by face with concrete, more described conduit is arranged; And/or, in step s 2, after first being closed by face with concrete, then arrange described free-machining anchor bar.
Preferably, described conduit is metal catheter tube wall offering through hole.
Preferably, described conduit extends in country rock to be holed from the outline line of face, and the angle between the tangent plane to be holed at the starting point place of described conduit and the axis of described conduit is b, wherein, and 10 °≤b≤20 °.
Preferably, the length L of described conduit is 4m ~ 6m, pushes ahead distance for carrying out a step S1 during a at face, wherein, and 2m≤a≤4m.
Preferably, described free-machining anchor bar is glass fiber anchor pole.
Preferably, step S2 comprises:
S21, from face to internal drilling to be holed;
S22, described free-machining anchor bar to be inserted in described hole, and fill the gap between described hole and described free-machining anchor bar with compo.
Preferably, described free-machining anchor bar and centerline parallel to be holed.
Preferably, the length M of described free-machining anchor bar is 5m ~ 7m, and the spacing between adjacent described free-machining anchor bar is 0.8m ~ 1m, pushes ahead distance carry out a step S2 for during c rice at face, wherein, and c≤M-1.
The present invention also provides a kind of full section of tunnel pre-reinforcement structure, and it comprises waits to hole and country rock, many conduits and Duo Gen free-machining anchor bar; Described conduit is arranged in country rock to be holed along the outline line of face, and forms surrounding rock consolidation circle by described conduit to wall rock grouting described to be holed; From face to waiting interior layout many free-machining anchor bars of holing.
Preferably, described conduit is metal catheter tube wall offering through hole.
Preferably, described conduit extends in country rock to be holed from the outline line of face, and the angle between the tangent plane to be holed at the starting point place of described conduit and the axis of described conduit is b, wherein, and 10 °≤b≤20 °.
Preferably, the length L of described conduit is 4m ~ 6m.
Preferably, the external diameter of conduit is 40mm ~ 45mm, and pipe thickness is 2mm ~ 5mm.
Preferably, described free-machining anchor bar is glass fiber anchor pole.
Preferably, described free-machining anchor bar and centerline parallel to be holed.
Preferably, the length M of described free-machining anchor bar is 5m ~ 7m, and the spacing between adjacent described free-machining anchor bar is 0.8m ~ 1m.
Conduit in technique scheme and the layout of free-machining anchor bar, be easy to execute-in-place, reinforcement cost is reasonable, safety is high and consolidation effect is excellent, solve in the loess tunnel excavation and support processes of full face excavation well, tunnel front occurs because extrusion deformation is excessive caving in thus affects the problem of preliminary bracing stability, has good practicality.Because free-machining anchor bar does not affect mechanical execution in work progress, accelerate construction speed well, and maintain rational construction cost, ensure that construction safety, quality and duration etc., improve constructing tunnel level, there is good site operation and be worth.
Other features and advantages of the present invention are described in detail in detailed description of the invention part subsequently.
Accompanying drawing explanation
Accompanying drawing is used to provide a further understanding of the present invention, and forms a part for manual, is used from explanation the present invention, but is not construed as limiting the invention with detailed description of the invention one below.In the accompanying drawings:
Fig. 1 is the structural representation of full section of tunnel pre-reinforcement structure of the present invention;
Fig. 2 is the cross sectional representation of full section of tunnel pre-reinforcement structure of the present invention
Description of reference numerals
1 conduit 2 free-machining anchor bar
3 steel arch-shelf 4 faces
F face direction of propulsion
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described in detail.Should be understood that, detailed description of the invention described herein, only for instruction and explanation of the present invention, is not limited to the present invention.
First, present embodiment provides a kind of full section of tunnel pre-reinforcement method, and this full section of tunnel pre-reinforcement method comprises the following steps:
S1, in country rock to be holed, arrange conduit 1 along the outline line of face 4, and by conduit 1 to wall rock grouting (as depicted in figs. 1 and 2) described to be holed;
S2, from face 4 to waiting interior layout many free-machining anchor bars 2 (as depicted in figs. 1 and 2) of holing;
S3, face 4 to be excavated.
Wherein, country rock refer to cavern all around around rock or soil, and the country rock in present embodiment refers to rock or the soil of tunnel surrounding.And, above-mentioned step S1 and step S2 all carries out according to when having conduit 1 and free-machining anchor bar 2 in waiting to hole, and can individually carry out also can carrying out simultaneously, but need ensure when excavating face 4, near face 4 wait hole in be furnished with free-machining anchor bar 2, and be furnished with conduit 1 in the country rock of correspondence.
Conduit 1 in present embodiment and the layout of free-machining anchor bar 2, be easy to execute-in-place, reinforcement cost is reasonable, safety is high and consolidation effect is excellent, solve in the loess tunnel excavation and support processes of full face excavation well, tunnel front occurs because extrusion deformation is excessive caving in thus affects the stability problem of preliminary bracing (such as steel arch-shelf 3), has good practicality.Because free-machining anchor bar 2 does not affect mechanical execution in work progress, accelerate construction speed well, and maintain rational construction cost, ensure the safety of construction, quality and duration etc., improve constructing tunnel level, there is good site operation and be worth.
During Specific construction operation, first according to the feature of Loess Layer, formulate the construction parameter of pre-reinforcement, as length, spacing, type, whether slip casting.As one preferred embodiment, in step sl, after first being closed by face 4 with concrete, then conduit 1 is arranged; And/or, in step s 2, after first being closed by face 4 with concrete, then arrange free-machining anchor bar 2.By first sprayed mortar, face 4 is closed, so that the layout of conduit 1 and/or free-machining anchor bar 2, and can prevent from occurring accidents such as subsiding in placement process.
Wherein, conduit 1 is preferably metal catheter tube wall offering through hole.Conduit 1 is applied to country rock to be holed at the outline line along face 4; and by conduit 1 to wall rock grouting; the certain thickness surrounding rock consolidation circle of formation around waiting to hole, then carries out excavation operation, to ensure construction safety under the protection of surrounding rock consolidation circle.
Particularly, conduit 1 extends in country rock to be holed from the outline line of face 4, and the angle between the tangent plane to be holed at the starting point place of conduit 1 and the axis of conduit 1 is b, wherein, 10 °≤b≤20 °, is preferably b=15 ° in the present embodiment.Further, conduit 1 is preferably the hot rolled seamless steel tube of external diameter 42mm, thick 3.5mm, and the length L of conduit 1 is 4m ~ 6m, pushes ahead distance for carrying out a step S1 during a at face 4 along face direction of propulsion F, wherein, and 2m≤a≤4m.The length L of conduit 1 is preferably 4.5m in the present embodiment, preferred advance distance a=3m, now, is about 0.4m along the spacing between conduit 1 adjacent on tunnel centerline direction.
Further, free-machining anchor bar 2 is preferably glass fiber anchor pole.Glass fiber anchor pole is the rod-like structure with higher-strength characteristic and larger fragility, and excavation mechinery can dig disconnected glass fiber anchor pole easily, and anchor metal can not be used to treat to hole and reinforce.The characterisitic parameter of this pre-reinforcement structure has the length of glass fiber anchor pole, lap length, geometry to distribute and gap length.
In the present embodiment, step S2 comprises:
S21, from face 4 to internal drilling to be holed;
S22, free-machining anchor bar 2 to be inserted in described hole, and with the gap between compo filler opening and free-machining anchor bar 2.
Particularly, first get out the hole of desired depth with auger boring machinery, then the glass fiber anchor pole of length-specific is inserted punch in hole, and inject compo immediately.All glass fiber anchor poles are excavated by machinery in digging process, when after tunnel excavation, when in face-advance core, the residue length of glass fiber anchor pole is not enough to guarantee to treat the pre-constraint of holing, then need to lay another group glass fiber anchor pole, excavation drilling depth is less than the length of glass fiber anchor pole.By that analogy, the excavation operation of circulation is formed, until tunnel excavation completes, to reach the object of continuous safe construction.
As one preferred embodiment, free-machining anchor bar 2 and centerline parallel to be holed.Free-machining anchor bar 2 is arranged in tunneling boring to be holed, and the length M of free-machining anchor bar 2 is 5m ~ 7m, and the spacing between adjacent free-machining anchor bar 2 is 0.8m ~ 1m, pushes ahead distance carry out a step S2 for during c rice at face 4, wherein, and c≤M-1.In the present embodiment, the length M of free-machining anchor bar 2 is preferably 6m, spacing between adjacent free-machining anchor bar 2 is preferably 1m, pushes ahead when distance is 5 meters carry out a step S2 at face 4, to ensure that the residue length of glass fiber anchor pole can guarantee pre-constraint to be holed.
In addition, present embodiment also provides a kind of full section of tunnel pre-reinforcement structure, and it comprises waits to hole and country rock, many conduits 1 and Duo Gen free-machining anchor bar 2; Conduit 1 is arranged in country rock to be holed along the outline line of face 4, and forms surrounding rock consolidation circle by conduit 1 to wall rock grouting to be holed; From face 4 to waiting interior layout many free-machining anchor bars 2 of holing.
Conduit 1 in present embodiment and the layout of free-machining anchor bar 2, be easy to execute-in-place, reinforcement cost is reasonable, safety is high and consolidation effect is excellent, solve in the loess tunnel excavation and support processes of full face excavation well, tunnel front occurs because extrusion deformation is excessive caving in thus affects the stability problem of preliminary bracing (such as steel arch-shelf 3), has good practicality.Because free-machining anchor bar 2 does not affect mechanical execution in work progress, accelerate construction speed well, and maintain rational construction cost, ensure the safety of construction, quality and duration etc., improve constructing tunnel level, there is good site operation and be worth.
Wherein, conduit 1 is preferably metal catheter tube wall offering through hole.Conduit 1 is applied to country rock to be holed at the outline line along face 4; and by conduit 1 to wall rock grouting; the certain thickness surrounding rock consolidation circle of formation around waiting to hole, then carries out excavation operation, to ensure construction safety under the protection of surrounding rock consolidation circle.
Particularly, conduit 1 extends in country rock to be holed from the outline line of face 4, and the angle between the tangent plane to be holed at the starting point place of conduit 1 and the axis of conduit 1 is b, wherein, 10 °≤b≤20 °, is preferably b=15 ° in the present embodiment.Further, the external diameter of conduit 1 is 40mm ~ 45mm, and pipe thickness is 2mm ~ 5mm, and wherein, conduit 1 preferably external diameter is 42mm, and pipe thickness is the hot rolled seamless steel tube of 3.5mm.The length L of conduit 1 is 4m ~ 6m, and the length L of conduit 1 is preferably 4.5m in the present embodiment, is about 0.4m along the spacing between conduit 1 adjacent on tunnel centerline direction.
Further, free-machining anchor bar 2 is preferably glass fiber anchor pole.Glass fiber anchor pole is the rod-like structure with higher-strength characteristic and larger fragility, and excavation mechinery can dig disconnected glass fiber anchor pole easily, and anchor metal can not be used to treat to hole and reinforce.The characterisitic parameter of this pre-reinforcement structure has the length of glass fiber anchor pole, lap length, geometry to distribute and gap length.
As one preferred embodiment, free-machining anchor bar 2 and centerline parallel to be holed.Free-machining anchor bar 2 is arranged in tunneling boring to be holed, and the length M of free-machining anchor bar 2 is 5m ~ 7m, and the spacing between adjacent free-machining anchor bar 2 is 0.8m ~ 1m.In the present embodiment, the length M of free-machining anchor bar 2 is preferably 6m, spacing between adjacent free-machining anchor bar 2 is preferably 1m, push ahead when distance is 5 meters at face 4 and arrange a free-machining anchor bar 2, to ensure that the residue length of glass fiber anchor pole can guarantee pre-constraint to be holed.
Below the preferred embodiment of the present invention is described in detail by reference to the accompanying drawings; but; the present invention is not limited to the detail in above-mentioned embodiment; within the scope of technical conceive of the present invention; can carry out multiple simple variant to technical scheme of the present invention, these simple variant all belong to protection scope of the present invention.
It should be noted that in addition, each the concrete technical characteristic described in above-mentioned detailed description of the invention, in reconcilable situation, can be combined by any suitable mode.In order to avoid unnecessary repetition, the present invention illustrates no longer separately to various possible combination.
In addition, also can be combined between various different embodiment of the present invention, as long as it is without prejudice to thought of the present invention, it should be considered as content disclosed in this invention equally.

Claims (17)

1. full section of tunnel pre-reinforcement method, is characterized in that, described full section of tunnel pre-reinforcement method comprises the following steps:
S1, in country rock to be holed, arrange many conduits (1) along the outline line of face (4), and by described conduit (1) to wall rock grouting described to be holed;
S2, from face (4) to waiting interior layout many free-machining anchor bars (2) of holing;
S3, face (4) to be excavated.
2. full section of tunnel pre-reinforcement method according to claim 1, is characterized in that, in step sl, after first being closed by face (4) with concrete, then arranges described conduit (1); And/or, in step s 2, after first being closed by face (4) with concrete, then arrange described free-machining anchor bar (2).
3. full section of tunnel pre-reinforcement method according to claim 1, is characterized in that, described conduit (1) is for tube wall offering the metal catheter of through hole.
4. full section of tunnel pre-reinforcement method according to claim 3, it is characterized in that, described conduit (1) extends in country rock to be holed from the outline line of face (4), angle between the tangent plane to be holed at the starting point place of described conduit (1) and the axis of described conduit (1) is b, wherein, 10 °≤b≤20 °.
5. full section of tunnel pre-reinforcement method according to claim 4, it is characterized in that, the length L of described conduit (1) is 4m ~ 6m, pushes ahead distance for carrying out a step S1 during a at described face (4), wherein, 2m≤a≤4m.
6. according to the full section of tunnel pre-reinforcement method in claim 1-5 described in any one, it is characterized in that, described free-machining anchor bar (2) is glass fiber anchor pole.
7. full section of tunnel pre-reinforcement method according to claim 6, it is characterized in that, step S2 comprises:
S21, from described face (4) to internal drilling to be holed;
S22, described free-machining anchor bar (2) to be inserted in described hole, and fill the gap between described hole and described free-machining anchor bar (2) with compo.
8. full section of tunnel pre-reinforcement method according to claim 6, is characterized in that, described free-machining anchor bar (2) and centerline parallel to be holed.
9. full section of tunnel pre-reinforcement method according to claim 8, it is characterized in that, the length M of described free-machining anchor bar (2) is 5m ~ 7m, spacing between adjacent described free-machining anchor bar (2) is 0.8m ~ 1m, push ahead distance at described face (4) and carry out a step S2 for during c rice, wherein, c≤M-1.
10. full section of tunnel pre-reinforcement structure, is characterized in that, described full section of tunnel pre-reinforcement structure comprises to be waited to hole and country rock, many conduits (1) and many free-machining anchor bars (2); Described conduit (1) is arranged in country rock to be holed along the outline line of face (4), and forms surrounding rock consolidation circle by described conduit (1) to wall rock grouting described to be holed; From face (4) to waiting interior layout many free-machining anchor bars (2) of holing.
11. full section of tunnel pre-reinforcement structures according to claim 10, it is characterized in that, described conduit (1) is for tube wall offering the metal catheter of through hole.
12. full section of tunnel pre-reinforcement structures according to claim 11, it is characterized in that, described conduit (1) extends in country rock to be holed from the outline line of face (4), angle between the tangent plane to be holed at the starting point place of described conduit (1) and the axis of described conduit (1) is b, wherein, 10 °≤b≤20 °.
13. full section of tunnel pre-reinforcement structures according to claim 12, is characterized in that, the length L of described conduit (1) is 4m ~ 6m.
14. full section of tunnel pre-reinforcement structures according to claim 13, is characterized in that, the external diameter of conduit (1) is 40mm ~ 45mm, and pipe thickness is 2mm ~ 5mm.
15., according to the full section of tunnel pre-reinforcement structure in claim 10-14 described in any one, is characterized in that, described free-machining anchor bar (2) is glass fiber anchor pole.
16. full section of tunnel pre-reinforcement structures according to claim 15, is characterized in that, described free-machining anchor bar (2) and centerline parallel to be holed.
17. full section of tunnel pre-reinforcement structures according to claim 16, it is characterized in that, the length M of described free-machining anchor bar (2) is 5m ~ 7m, the spacing between adjacent described free-machining anchor bar (2) is 0.8m ~ 1m.
CN201410545526.8A 2014-10-15 2014-10-15 Pre-reinforcement method and pre-reinforcement structure for full section of tunnel Pending CN104314585A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410545526.8A CN104314585A (en) 2014-10-15 2014-10-15 Pre-reinforcement method and pre-reinforcement structure for full section of tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410545526.8A CN104314585A (en) 2014-10-15 2014-10-15 Pre-reinforcement method and pre-reinforcement structure for full section of tunnel

Publications (1)

Publication Number Publication Date
CN104314585A true CN104314585A (en) 2015-01-28

Family

ID=52369880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410545526.8A Pending CN104314585A (en) 2014-10-15 2014-10-15 Pre-reinforcement method and pre-reinforcement structure for full section of tunnel

Country Status (1)

Country Link
CN (1) CN104314585A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105156137A (en) * 2015-08-31 2015-12-16 中国电建集团成都勘测设计研究院有限公司 Tunnel side wall primary-supporting method in V-VI level surrounding rock
CN105888675A (en) * 2016-06-22 2016-08-24 上海隧道工程有限公司 Construction method for shield crossing railway line
CN105909256A (en) * 2016-05-19 2016-08-31 大连理工大学 Large-span weak surrounding rock tunnel construction method adopting face pre-reinforcement core soil reserving three-step temporary inverted arch technology
CN106761775A (en) * 2016-12-14 2017-05-31 北京城建集团有限责任公司 A kind of construction method of water-stop curtain
CN106968686A (en) * 2017-03-28 2017-07-21 中国五冶集团有限公司 A kind of pipe shed construction method
CN107098622A (en) * 2017-05-18 2017-08-29 虞兴福 A kind of high-performance is combined the construction method that mortar reinforces existing subway tunnel structure
CN108571333A (en) * 2018-04-11 2018-09-25 郭士成 A kind of city underground section soft soil tunnel mechanization full face tunneling method
CN108571332A (en) * 2018-04-11 2018-09-25 王晓彤 One kind being used for city underground section soft soil tunnel leading pre-supporting method
CN109826657A (en) * 2019-03-08 2019-05-31 西南交通大学 One kind being used for soft rock tunnel solidifying of the working face device and its construction method
CN110593905A (en) * 2019-09-29 2019-12-20 同济大学 Method for constructing full section of tunnel with advanced pre-reinforcement, primary lining and secondary lining
CN112963153A (en) * 2021-02-07 2021-06-15 中交一公局集团有限公司 Tunnel advanced pre-support construction method
CN113236286A (en) * 2021-01-28 2021-08-10 中铁十九局集团第二工程有限公司 Construction method for controlling large deformation of tunnel face of soft rock tunnel
CN113338996A (en) * 2021-06-01 2021-09-03 北京市政建设集团有限责任公司 Shallow-buried subsurface excavation method construction tunnel full-section reinforcing method and system
CN114382500A (en) * 2022-01-21 2022-04-22 成都未来智隧科技有限公司 Maintain stable excavation of tunnel face and strut integration construction equipment
CN114382501A (en) * 2022-01-21 2022-04-22 成都未来智隧科技有限公司 Excavation and support integrated construction method for maintaining tunnel face stability

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4038776A1 (en) * 1989-12-07 1991-06-13 Bucher Franz Driving tunnel where rock face breaks away - involves oblique driving of anchor rods into solid roof rock and fixing ends in reinforced lining
CN101487393A (en) * 2009-02-20 2009-07-22 中铁西南科学研究院有限公司 Full-section pre-reinforcing construction method for tunnel free-machining anchor bar
CN202882938U (en) * 2012-08-24 2013-04-17 中铁十二局集团有限公司 Pre-reinforced structure of sand layer or soil layer tunnel face
CN103306687A (en) * 2012-10-31 2013-09-18 王卓 Construction method for deformation control via horizontal whirling jet grouting of long cantilever in soft-rock tunnel
CN204186394U (en) * 2014-10-15 2015-03-04 中国神华能源股份有限公司 Full section of tunnel pre-reinforcement structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4038776A1 (en) * 1989-12-07 1991-06-13 Bucher Franz Driving tunnel where rock face breaks away - involves oblique driving of anchor rods into solid roof rock and fixing ends in reinforced lining
CN101487393A (en) * 2009-02-20 2009-07-22 中铁西南科学研究院有限公司 Full-section pre-reinforcing construction method for tunnel free-machining anchor bar
CN202882938U (en) * 2012-08-24 2013-04-17 中铁十二局集团有限公司 Pre-reinforced structure of sand layer or soil layer tunnel face
CN103306687A (en) * 2012-10-31 2013-09-18 王卓 Construction method for deformation control via horizontal whirling jet grouting of long cantilever in soft-rock tunnel
CN204186394U (en) * 2014-10-15 2015-03-04 中国神华能源股份有限公司 Full section of tunnel pre-reinforcement structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
卿三惠等: "《高速铁路建造技术•施工卷(上)》", 31 October 2013, 中国铁道出版社 *
陈涛等: "隧道易切削锚杆全断面预加固的三维数值模拟", 《现代隧道技术》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105156137A (en) * 2015-08-31 2015-12-16 中国电建集团成都勘测设计研究院有限公司 Tunnel side wall primary-supporting method in V-VI level surrounding rock
CN105909256A (en) * 2016-05-19 2016-08-31 大连理工大学 Large-span weak surrounding rock tunnel construction method adopting face pre-reinforcement core soil reserving three-step temporary inverted arch technology
CN105888675A (en) * 2016-06-22 2016-08-24 上海隧道工程有限公司 Construction method for shield crossing railway line
CN106761775A (en) * 2016-12-14 2017-05-31 北京城建集团有限责任公司 A kind of construction method of water-stop curtain
CN106968686A (en) * 2017-03-28 2017-07-21 中国五冶集团有限公司 A kind of pipe shed construction method
CN107098622A (en) * 2017-05-18 2017-08-29 虞兴福 A kind of high-performance is combined the construction method that mortar reinforces existing subway tunnel structure
CN108571333A (en) * 2018-04-11 2018-09-25 郭士成 A kind of city underground section soft soil tunnel mechanization full face tunneling method
CN108571332A (en) * 2018-04-11 2018-09-25 王晓彤 One kind being used for city underground section soft soil tunnel leading pre-supporting method
CN109826657A (en) * 2019-03-08 2019-05-31 西南交通大学 One kind being used for soft rock tunnel solidifying of the working face device and its construction method
CN110593905A (en) * 2019-09-29 2019-12-20 同济大学 Method for constructing full section of tunnel with advanced pre-reinforcement, primary lining and secondary lining
CN110593905B (en) * 2019-09-29 2020-08-18 同济大学 Method for constructing full section of tunnel with advanced pre-reinforcement, primary lining and secondary lining
CN113236286A (en) * 2021-01-28 2021-08-10 中铁十九局集团第二工程有限公司 Construction method for controlling large deformation of tunnel face of soft rock tunnel
CN113236286B (en) * 2021-01-28 2024-03-05 中铁十九局集团第二工程有限公司 Construction method for controlling large deformation of tunnel face of soft rock tunnel
CN112963153A (en) * 2021-02-07 2021-06-15 中交一公局集团有限公司 Tunnel advanced pre-support construction method
CN113338996A (en) * 2021-06-01 2021-09-03 北京市政建设集团有限责任公司 Shallow-buried subsurface excavation method construction tunnel full-section reinforcing method and system
CN114382500A (en) * 2022-01-21 2022-04-22 成都未来智隧科技有限公司 Maintain stable excavation of tunnel face and strut integration construction equipment
CN114382501A (en) * 2022-01-21 2022-04-22 成都未来智隧科技有限公司 Excavation and support integrated construction method for maintaining tunnel face stability

Similar Documents

Publication Publication Date Title
CN104314585A (en) Pre-reinforcement method and pre-reinforcement structure for full section of tunnel
JP7125550B2 (en) SUPPORT STRUCTURE AND CONSTRUCTION METHOD FOR TWO-STAGE HIGH-SPEED CLOSING TUNNEL WITH INVERTED ARCH
CN112431599B (en) Tunnel excavation method for upper soft and lower hard stratum
CN103256060B (en) Moisture rich and weak mylonite large section tunnel surrounding rock consolidation and excavation method
CN104389628B (en) Landslide location tunnel reinforcement device and reinforced construction method
CN103321653B (en) Method of treating lining after collapse of underground cavern crown
CN105041333A (en) Method for treating tunnel collapse through dugand covered method
CN103628885A (en) Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel
CN109736827B (en) Method for excavating urban subway hard rock stratum communication channel by high-pressure gas expansion fracturing
CN101806217A (en) Three-line parallel small-clear-distance shallow-buried and bias tunnel group hole-entering construction method
CN102606168B (en) Construction method for preventing settlement and deformation of shallow-buried-excavation tunnel in excavation
CN204186394U (en) Full section of tunnel pre-reinforcement structure
CN102322027A (en) A kind of method that adopts the Mine Method expansion to dig shield tunnel construction subway station
CN104612696B (en) Construction method for large-section underground excavation subway station to pass through viaduct in fine sand layer by using column hole method
CN104074529A (en) A continuous double-shell reinforcement method for deep roadways and chambers
CN107165661A (en) A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method
CN104632249A (en) Tunnel system supporting technology used in loose and soft broken surrounding rock
CN105065037A (en) Double-layer arch center support construction method for highway soft rock tunnel
CN103089276A (en) Deep-shallow hole and high-low pressure coupling grouting technology
WO1999028595A1 (en) Whale skeleton construction method for tunnel having large section
CN106522981B (en) Pass through the method for protecting support in goaf tunnel
CN109184742B (en) Advanced pre-grouting method for high-pressure water-rich soft surrounding rock mountain tunnel
CN102606173A (en) Construction method for treating tunnel deformation segment and accelerating tunneling
CN207609428U (en) The ground handling well Shed-pipe Advanced Support pre-add solid system of existing object is worn under shield section
CN109184752A (en) A kind of coal mine supporting construction and its method for protecting support for passing through old kiln goaf

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150128