CN104314560B - Non-equal proportion stratum comparison method and device before horizontal well window entering - Google Patents

Non-equal proportion stratum comparison method and device before horizontal well window entering Download PDF

Info

Publication number
CN104314560B
CN104314560B CN201410424313.XA CN201410424313A CN104314560B CN 104314560 B CN104314560 B CN 104314560B CN 201410424313 A CN201410424313 A CN 201410424313A CN 104314560 B CN104314560 B CN 104314560B
Authority
CN
China
Prior art keywords
drilling
well
horizontal well
positive
stratum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410424313.XA
Other languages
Chinese (zh)
Other versions
CN104314560A (en
Inventor
季岭
李维维
李晓良
张家良
王庆魁
夏国朝
孙建
王海波
周杰
黄旭
姜家营
赵冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201410424313.XA priority Critical patent/CN104314560B/en
Publication of CN104314560A publication Critical patent/CN104314560A/en
Application granted granted Critical
Publication of CN104314560B publication Critical patent/CN104314560B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/06Deflecting the direction of boreholes

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Earth Drilling (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention discloses a method and a device for comparing non-equal-proportion stratums before horizontal wells enter a window, wherein the method comprises the following steps: calculating the proportion of a forward drilling logging contrast profile according to the collected adjacent drilled vertical well logging contrast profile, the data of the forward drilling horizontal well logging while drilling, well deviation data and formation inclination data, printing the logging contrast profile corrected to be vertical depth of the forward drilling horizontal well tracking while drilling according to the proportion of the forward drilling logging contrast profile, comparing with the adjacent drilled vertical well logging contrast profile, and comparing with the original design of the forward drilling horizontal well according to the contrast result so as to control the window entry well deviation angle; the comparison device comprises a collection module, a calculation module and a comparison module. The method and the device realize accurate judgment of the drilled horizon and prediction of the window entry point, so that the horizontal well can smoothly drill into an oil layer.

Description

Horizontal well enters the non-equal proportion Strata Comparison method before window and contrast device
Technical field
Enter the Strata Comparison field before window the present invention relates to horizontal well, more particularly to a kind of horizontal well, which enters non-wait before window, to be compared Example Strata Comparison method.
Background technology
Horizontal well is to ensure accurately to enter window in implementation process, and early stage Strata Comparison is most important, it is necessary to according to horizontal well Enter the real brill situation of inclination section before window, it is careful to be carried out using well logging and well logging (LWD) data and surrounding fixed well data Contrast, judge depth and the reservoir change of target zone overlying reference lamina, so accurate prediction level well purpose layer depth with just The gap of horizontal well drilling original design depth, so as to carry out trajectory of horizontal adjustment in time.
During the Strata Comparison before horizontal well enters window, traditional control methods is by behind oblique deep school to vertical depth, with phase Contrasted in proportion with adjacent drilling straight-hole.When parallel occurrence stratum is passed through in well track, formation thickness that track is passed through etc. Actual (real) thickness in stratum, this control methods is applicable.But when there is certain inclination angle on stratum, this control methods will Cause certain error.When horizontal well angle buildup interval well track, which is passed through, has a down dip occurrence stratum, according to the stratum that equal proportion school is oblique Thickness is more than the actual (real) thickness on stratum;It is small according to the oblique formation thickness in equal proportion school when updip occurrence stratum is passed through in well track Actual (real) thickness in stratum, deviation is produced to the understanding bored up to target zone.
The content of the invention
In order to overcome the above-mentioned deficiency of existing control methods, well of improving the standard enters the contrast precision before window, and Accurate Prediction goes out Enter the formation variation feature before window, to carry out track adjustment in time, horizontal well is smoothly entered window, the present invention provides a kind of level Well enters the non-equal proportion Strata Comparison method before window and contrast device.
To achieve the above object, the technical solution adopted by the present invention is:
A kind of horizontal well enters the non-equal proportion Strata Comparison method before window, is contrasted according to the adjacent borehole logging tool of drill straight of collection Section, positive horizontal well drilling well logging data, hole deviation data and stratigraphic dip data, calculate positive brill well logging contrast section ratio, The well logging being corrected into after the vertical depth contrast for printing positive horizontal well drilling drilling tracking in described positive brill well logging contrast section ratio is cutd open Face, is contrasted with the adjacent borehole logging tool of drill straight contrast section, according to comparing result and the progress pair of positive horizontal well drilling original design Than so as to control into window hole angle.
A kind of above-mentioned horizontal well enters the non-equal proportion Strata Comparison method before window, and specific method is:
Step 1:The adjacent borehole logging tool of drill straight contrast section is collected, the adjacent borehole logging tool of drill straight contrast section ratio is K1
Step 2:Positive horizontal well drilling well logging data, hole deviation data are collected, the hole angle that can read any position is β;
Step 3:Stratigraphic dip α is collected, and judges pendage type;
Step 4:Attitude of stratum be for horizontal well path have a down dip inclination when, planned well through stratum vertical depth H with it is adjacent Drilling straight-hole differs △ h through the depth h on stratum, there is the relation of formula (1) between H and h, i.e., when planned well is entered with β angles When entering the stratum that inclination angle is α, the vertical depth through stratum passes through the ratio of depth of stratum with adjacent drilling straight-hole, if this compares It is worth for λ;
λ, the adjacent borehole logging tool of drill straight contrast section ratio K are calculated according to formula (1)1Again divided by λ calculates a positive brill Borehole logging tool contrast section ratio K2
Attitude of stratum is when being tilted for horizontal well path updip, adjacent drilling straight-hole passes through the depth h and design on stratum Well differs △ h through the vertical depth H on stratum, there is the relation of formula (2) between H and h, i.e., when planned well with β angles enters inclination angle For α stratum when, vertical depth and adjacent drilling straight-hole through stratum pass through the ratio of depth of stratum, if this ratio is λ;
λ, the adjacent borehole logging tool of drill straight contrast section ratio K are calculated according to formula (2)1Again divided by λ calculates a positive brill Borehole logging tool contrast section ratio K2
Step 5:In the positive drilling well well logging contrast section ratio K2Print being corrected into for positive horizontal well drilling drilling tracking vertical Well logging contrast section after depth, and be K with ratio1The adjacent borehole logging tool of drill straight contrast section contrasted, according to contrast knot Fruit is contrasted with positive horizontal well drilling original design, so as to control the hole angle into window.
A kind of above-mentioned horizontal well enters the non-equal proportion Strata Comparison method before window, the described hole angle side controlled into window Method is:When judging to be more than positive horizontal well drilling original design distance into window distance, reduce well compared with positive horizontal well drilling original design Creep at oblique angle;When judging to be less than positive horizontal well drilling original design distance into window distance, increase compared with positive horizontal well drilling original design Plus hole angle drilling;When judge into window distance and positive horizontal well drilling original design apart from it is consistent when, can be according to positive horizontal well drilling Original design continues to creep into.
A kind of horizontal well enters the non-equal proportion Strata Comparison device before window, including:
Collection module, the adjacent borehole logging tool of drill straight contrast section, positive horizontal well drilling well logging data, well for collection Oblique data and stratigraphic dip data;
Computing module, for collecting data according to collection module, calculates positive brill well logging contrast section ratio;
Comparison module, the correction for printing positive horizontal well drilling drilling tracking in described positive brill well logging contrast section ratio Section is contrasted into the well logging after vertical depth, is contrasted with the adjacent borehole logging tool of drill straight contrast section, according to comparing result and positive brill Horizontal well original design is contrasted, so as to control into window hole angle.
A kind of above-mentioned horizontal well enters the non-equal proportion Strata Comparison device before window, specifically includes:
Collection module, is further used for collecting the adjacent borehole logging tool of drill straight contrast section, the adjacent borehole logging tool of drill straight contrast Section ratio is K1;Positive horizontal well drilling well logging data are collected, hole deviation data, the hole angle that can read any position is β; Stratigraphic dip α is collected, and judges pendage type;
Computing module, it is that planned well passes through stratum when having a down dip to tilt for horizontal well path to be further used for attitude of stratum Vertical depth H differ △ h through the depth h on stratum with adjacent drilling straight-hole, the relation that there is formula (1) between H and h is worked as Planned well using β angles enter inclination angle as α stratum when, through vertical depth and the adjacent drilling straight-hole on stratum through depth of stratum Ratio, if this ratio is λ;
λ, the adjacent borehole logging tool of drill straight contrast section ratio K are calculated according to formula (1)1Again divided by λ calculates a positive brill Borehole logging tool contrast section ratio K2
Attitude of stratum is when being tilted for horizontal well path updip, adjacent drilling straight-hole passes through the depth h and design on stratum Well differs △ h through the vertical depth H on stratum, there is the relation of formula (2) between H and h, i.e., when planned well with β angles enters inclination angle For α stratum when, vertical depth and adjacent drilling straight-hole through stratum pass through the ratio of depth of stratum, if this ratio is λ;
λ, the adjacent borehole logging tool of drill straight contrast section ratio K are calculated according to formula (2)1Again divided by λ calculates a positive brill Borehole logging tool contrast section ratio K2
Comparison module, is further used in the positive drilling well well logging contrast section ratio K2Print positive horizontal well drilling drilling follow The well logging being corrected into after the vertical depth contrast section of track, and be K with ratio1The adjacent borehole logging tool of drill straight contrast section carry out pair Than being contrasted according to comparing result with positive horizontal well drilling original design, so as to control the hole angle into window.
A kind of above-mentioned horizontal well enters the non-equal proportion Strata Comparison device before window, and described comparison module is further used In when judging to be more than positive horizontal well drilling original design distance into window distance, reduce hole angle compared with positive horizontal well drilling original design Drilling;When judging to be less than positive horizontal well drilling original design distance into window distance, increase well compared with positive horizontal well drilling original design Creep at oblique angle;When judge into window distance and positive horizontal well drilling original design apart from it is consistent when, can be original according to positive horizontal well drilling Design continues to creep into.
The horizontal well that the present invention is provided enters the non-equal proportion Strata Comparison method before window, by studying attitude of stratum and level Well enters the relation of window Qian Jing tracks, using mathematical principle, and calculated level well, which enters window Qian Jing tracks and adjacent drilling straight-hole, to be contrasted Proportionate relationship, it is accurate to judge to have bored up to layer position, predict that, into window point, Guidance Levels well accurately enters window, solve tilted stratum brill Horizontal Well Drilling meets the problem of strata condition judges difficult, and formation variation situation can be judged early, wellbore trace is adjusted in time, is water Horizontal well smoothly enters window and laid a solid foundation.
Brief description of the drawings
Fig. 1 be attitude of stratum provided in an embodiment of the present invention be for horizontal well path have a down dip in tilted stratum inclined shaft with it is straight The relativity schematic diagram of well.
Fig. 2 is attitude of stratum provided in an embodiment of the present invention for for inclined shaft in horizontal well path updip tilted stratum and directly The relativity schematic diagram of well.
Embodiment
Field conduct success rate of the present invention is high, implements 6 mouthfuls of water horizontal wells, enters window success rate 100%.Below in conjunction with the accompanying drawings to this The embodiment of invention is described in further detail:
As shown in figure 1, be specifically described with the stratum that has a down dip, when stratigraphic dip is α, and planned well hole angle is β, design Well with adjacent drilling straight-hole through the depth h on stratum differs △ h through the vertical depth H on stratum, there is formula (1) between H and h Relation, i.e., when planned well enters inclination angle as α stratum using β angles, vertical depth and straight well through stratum pass through depth of stratum Ratio, if this ratio be λ.
,, should to ensure the accuracy of contrast and the integrality on stratum when being contrasted with adjacent drilling straight-hole for tilted stratum Positive drilling well is corrected into after vertical depth, the adjacent borehole logging tool of drill straight contrast section ratio K1Again divided by λ calculates a positive drilling well and surveyed Well contrast section ratio K2, proportionally K2It is K to print well logging contrast section and ratio1The adjacent borehole logging tool of drill straight contrast Section is contrasted.
Step 1:The adjacent borehole logging tool of drill straight contrast section is collected, the adjacent borehole logging tool of drill straight contrast section ratio is K1
Step:2:Positive horizontal well drilling well logging data, hole deviation data are collected, the hole angle that can read contrast position is β。
Step 3:The inclination alpha on contrast stratum is collected, and judges pendage type, such as Fig. 1 is that attitude of stratum is for water Horizontal well track has a down dip inclination.
Step 4:λ, the adjacent borehole logging tool of drill straight contrast section ratio K are calculated according to formula (1)1Again divided by λ calculates one Individual positive drilling well well logging contrast section ratio K2
Step 5:K in proportion2Print positive horizontal well drilling drilling tracking be corrected into after vertical depth well logging contrast section, with than Example is K1The adjacent borehole logging tool of drill straight contrast section contrasted, according to comparing result and positive horizontal well drilling original design progress Contrast, judges to be more than positive horizontal well drilling original design distance into window distance, reduces hole deviation compared with positive horizontal well drilling original design Angular bit enters, and judges to be less than positive horizontal well drilling original design distance into window distance, increases well compared with positive horizontal well drilling original design Creep at oblique angle.
As shown in Fig. 2 be specifically described with updip stratum, it is adjacent when stratigraphic dip is α, and planned well hole angle is β Drilling straight-hole with planned well through the vertical depth H on stratum differs △ h through the depth h on stratum, there is formula (2) between H and h Relation, i.e., when planned well enters inclination angle as α stratum using β angles, vertical depth and adjacent drilling straight-hole through stratum are passed through The ratio of depth of stratum, if this ratio is λ.
λ, the adjacent borehole logging tool of drill straight contrast section ratio K are calculated according to formula (2)1Again divided by λ calculates a positive brill Borehole logging tool contrast section ratio K2.Proportionally K2It is K to print well logging contrast section and ratio1Adjacent drill straight borehole logging tool Contrast section is contrasted.
Step 1:The adjacent borehole logging tool of drill straight contrast section is collected, the adjacent borehole logging tool of drill straight contrast section ratio is K1
Step:2:Positive horizontal well drilling well logging data, hole deviation data are collected, the hole angle that can read any position is β。
Step 3:Stratigraphic dip α is collected, and judges pendage type, such as Fig. 2 is that attitude of stratum is directed to horizontal well path Updip is tilted.
Step 4:λ, the adjacent borehole logging tool of drill straight contrast section ratio K are calculated according to formula (1)1Again divided by λ calculates one Individual positive drilling well well logging contrast section ratio K2
Step 5:K in proportion2Print positive horizontal well drilling drilling tracking be corrected into after vertical depth well logging contrast section, with than Example is K1The adjacent borehole logging tool of drill straight contrast section contrasted, according to comparing result and positive horizontal well drilling original design progress Contrast, judges to be more than positive horizontal well drilling original design distance into window distance, reduces hole deviation compared with positive horizontal well drilling original design Angular bit enters, and judges to be less than positive horizontal well drilling original design distance into window distance, increases well compared with positive horizontal well drilling original design Creep at oblique angle.
To on March 6th, 2014, co-occurrence 6 mouthfuls of water horizontal wells of tracking implementing of the present invention entered window success rate 100%.Show this hair The bright Strata Comparison before horizontal well enters window has accuracy high, the characteristics of coincidence rate is high.
Embodiment 1:Official's 86-36L wells
The well location collects the fault block of oil field king 27 in the huge port officials of feudal dynasties, and oil-bearing layer position is the oil of one section of Eogene hole Dian Zu holes jujube III Group, design, which is bored, meets oil reservoir 200m.Attitude of stratum has a down dip inclination for horizontal well path, when being drilled into 3189m (vertical depth 2974m), away from The key horizon bottom depth 3149m (vertical depth 2958m) nearer from herein, 72 ° of hole angle, 8.6 ° of stratigraphic dip.
Enter the non-equal proportion Strata Comparison method before window according to horizontal well
Step 1:Collect the adjacent official 82-42 of drilling straight-hole borehole logging tools contrast section, official 82-42 borehole logging tools contrast section ratio K1For 1:500.
Step:2:Positive horizontal well drilling well logging data, hole deviation data are collected, the hole angle β for reading contrast position is 72°。
Step 3:It is 8.6 ° to collect stratigraphic dip α, and judges pendage type, is that attitude of stratum is directed to horizontal well path Have a down dip inclination.
Step 4:It is 1.87 to calculate λ according to formula (1), the adjacent borehole logging tool of drill straight contrast section ratio K1(1:500) again Divided by λ calculates a positive drilling well well logging contrast section ratio K2For (1:935.4).
Step 5:K in proportion2(1:935.4) well logging being corrected into after the vertical depth contrast of positive horizontal well drilling drilling tracking is printed Section, is K with ratio1(1:500) the adjacent official 82-42 of drilling straight-hole borehole logging tools contrast section is contrasted, official's 86-36L wells The reference lamina at 3149m (vertical depth 2958m) place and official's 82-42 wells respective flag layer are 2936m, official 82-42 well 2936m reference laminas with 2957m distances in oil reservoir top are 21m, and window is entered in vertical depth 2997m (2958m+21m × 1.87) according to contrast prediction official 86-36L wells, Enter window with design 2995m basically identical, can continue to creep into according to design.
If according to conventional equal proportion Strata Comparison, prediction official 86-36L wells enter window in vertical depth 2979m (2958m+21m), Think that 16m (2995m-2979m) enters window in advance, it should as early as possible increase hole deviation angle, if be implemented, cause on the contrary it is late enter Window, wastes drilling depth, bores and meets less oil reservoir.
Official 86-36L enters window smoothly, and well logging oil/gas show preferably, enters and adjusts timely after window, net horizontal section has deepened 130m, Bore and meet oil reservoir 343.3m, stable yield is in 30t or so after operation.
Embodiment 2:Wind 45-18H wells
The well location is in the fault block of Zao 89, and oil-bearing layer position is the oily group of Eogene hole shop group aperture leakage 4, design Bore and meet oil reservoir 230m.Attitude of stratum for horizontal well path updip tilt, when being drilled into 2655m (vertical depth 2584m), distance herein compared with Near key horizon bottom depth 2640m (vertical depth 2578m), 63.9 ° of hole angle, 6.5 ° of stratigraphic dip.
Enter the non-equal proportion Strata Comparison method before window according to horizontal well
Step 1:Collect the adjacent borehole logging tool of the jujube of drilling straight-hole 87 contrast section, the borehole logging tool of jujube 87 contrast section ratio K1For 1: 500。
Step 2:Positive horizontal well drilling well logging data, hole deviation data are collected, the hole angle β for reading contrast position is 63.9°。
Step 3:It is 6.5 ° to collect stratigraphic dip α, and judges pendage type, is that attitude of stratum is directed to horizontal well path Updip is tilted.
Step 4:It is 0.8113 to calculate λ according to formula (2), the adjacent borehole logging tool of drill straight contrast section ratio K1(1:500) Again divided by λ calculates a positive drilling well well logging contrast section ratio K2For (1:405.65).
Step 5:K in proportion2(1:405.65) well logging pair being corrected into after vertical depth of positive horizontal well drilling drilling tracking is printed It is K with ratio than section1(1:500) the adjacent borehole logging tool of the jujube of drilling straight-hole 87 contrast section is contrasted, wind 45-18H wells The reference lamina at 2640m (vertical depth 2578m) place is 2570m, the well 2570m reference laminas of jujube 87 and oil reservoir with the well respective flag layer of official's jujube 87 It is 20m to push up 2590m distances, and window is entered in vertical depth 2594m (2578m+20m × 0.8113) according to contrast prediction wind 45-18H wells, than Originally design estimated 2605m and enter window 11m in advance, increase hole angle drilling compared with design.
If according to conventional equal proportion Strata Comparison, prediction wind 45-18H wells enter window in vertical depth 2598m (2578m+20m), Think that 7m (2605m-2598m) enters window in advance, although can also increase the drilling well of hole deviation angle, but increased speed can slow down, If be implemented, window can be entered in advance, it is possible to drill oil reservoir in advance.
Wind 45-18H enters window smoothly, and well logging oil/gas show preferably, enters and adjusts timely after window, bore and meet oil reservoir 247.5m, go into operation Stable yield is in 12t or so afterwards.
Embodiment 3:Wang14-33LJing
The well location collects oil field Guan142 block in the huge port officials of feudal dynasties, and oil-bearing layer position is the thick sandstone of Lower Mesozoic, and design, which is bored, meets oil Layer 170m.Attitude of stratum has a down dip inclination for horizontal well path, when being drilled into 2711m (vertical depth 2574m), distance nearer mark herein Will layer position bottom depth 2687m (vertical depth 2565m), 68 ° of hole angle, 9.2 ° of stratigraphic dip.
Enter the non-equal proportion Strata Comparison method before window according to horizontal well
Step 1:Collect the adjacent king 15-32 of drilling straight-hole borehole logging tools contrast section, king 15-32 borehole logging tools contrast section ratio K1For 1:500.
Step:2:Positive horizontal well drilling well logging data, hole deviation data are collected, the hole angle β for reading contrast position is 68°。
Step 3:It is 9.2 ° to collect stratigraphic dip α, and judges pendage type, is that attitude of stratum is directed to horizontal well path Have a down dip inclination.
Step 4:It is 1.67 to calculate λ according to formula (1), the adjacent borehole logging tool of drill straight contrast section ratio K1(1:500) again Divided by λ calculates a positive drilling well well logging contrast section ratio K2For (1:835).
Step 5:K in proportion2(1:835) well logging being corrected into after the vertical depth contrast for printing positive horizontal well drilling drilling tracking is cutd open Face, is K with ratio1(1:500) the adjacent king 15-32 of drilling straight-hole borehole logging tools contrast section is contrasted, Wang14-33LJing The reference lamina at 2687 (vertical depth 2565m) places and king's 15-32 wells respective flag layer are 2558m, king 15-32 well 2558m reference laminas with 2573m distances in oil reservoir top are 15m, are entered according to contrast prediction Wang14-33LJing in vertical depth 2590.1m (2565m+15m × 1.67) Window, early enters window 4.9m compared with design 2595m enters window, increases hole angle drilling compared with design.
If according to conventional equal proportion Strata Comparison, prediction official 86-36L wells enter window in vertical depth 2580m (2565m+15m), Think that 15m enters window in advance, hole angle drilling well will be increased at faster speed, if be implemented, cause it is late enter window, waste into Chi, bores and meets less oil reservoir.
King 14-33L enters window smoothly, and well logging oil/gas show preferably, but meets bottom water in order to avoid boring, and bores and meets oil reservoir 135m, throws Postpartum, stable yield was in 20t or so.
It should be noted last that, above embodiment is merely illustrative of the technical solution of the present invention and unrestricted, Although the present invention is described in detail with reference to example, it will be understood by those within the art that, can be to the present invention Technical scheme modify or equivalent substitution, without departing from the spirit and scope of technical solution of the present invention, it all should cover Among scope of the presently claimed invention.

Claims (4)

1. a kind of horizontal well enters the non-equal proportion Strata Comparison method before window, it is characterised in that method is as follows:
Section, positive horizontal well drilling well logging data, hole deviation data and stratum are contrasted according to the adjacent borehole logging tool of drill straight of collection Inclination data, calculates positive drilling well well logging contrast section ratio, and being logged well in described positive drilling well, the ratio printing of contrast section is positive to bore water The well logging being corrected into after the vertical depth contrast section of horizontal well drilling tracking, is contrasted with the adjacent borehole logging tool of drill straight contrast section, Contrasted according to comparing result with positive horizontal well drilling original design, so as to control into window hole angle;
Concretely comprise the following steps:
Step 1:The adjacent borehole logging tool of drill straight contrast section is collected, the adjacent borehole logging tool of drill straight contrast section ratio is K1
Step 2:Positive horizontal well drilling well logging data are collected, hole deviation data, the hole angle that can read any position is β;
Step 3:Stratigraphic dip α is collected, and judges pendage type;
Step 4:Attitude of stratum be for horizontal well path have a down dip inclination when, positive horizontal well drilling through stratum vertical depth H with it is adjacent Drilling straight-hole differs Δ h through the depth h on stratum, there is the relation of formula (1) between H and h, i.e., when positive horizontal well drilling is with β When angle enters the stratum that inclination angle is α, the vertical depth through stratum passes through the ratio of depth of stratum with adjacent drilling straight-hole, if this Individual ratio is λ;
<mrow> <mi>&amp;lambda;</mi> <mo>=</mo> <mfrac> <mi>H</mi> <mi>h</mi> </mfrac> <mo>=</mo> <mfrac> <mn>1</mn> <mrow> <mn>1</mn> <mo>-</mo> <mi>t</mi> <mi>g</mi> <mi>&amp;alpha;</mi> <mi>t</mi> <mi>g</mi> <mi>&amp;beta;</mi> </mrow> </mfrac> <mo>...</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
λ, the adjacent borehole logging tool of drill straight contrast section ratio K are calculated according to formula (1)1Again divided by λ calculates a positive drilling well well logging Contrast section ratio K2
Attitude of stratum is when being tilted for horizontal well path updip, adjacent drilling straight-hole passes through the depth h on stratum to bore level with positive Well differs Δ h through the vertical depth H on stratum, there is the relation of formula (2) between H and h, i.e., when positive horizontal well drilling is entered with β angles When inclination angle is α stratum, the vertical depth through stratum passes through the ratio of depth of stratum with adjacent drilling straight-hole, if this ratio For λ;
<mrow> <mi>&amp;lambda;</mi> <mo>=</mo> <mfrac> <mi>H</mi> <mi>h</mi> </mfrac> <mo>=</mo> <mfrac> <mn>1</mn> <mrow> <mn>1</mn> <mo>+</mo> <mi>t</mi> <mi>g</mi> <mi>&amp;alpha;</mi> <mi>t</mi> <mi>g</mi> <mi>&amp;beta;</mi> </mrow> </mfrac> <mo>...</mo> <mrow> <mo>(</mo> <mn>2</mn> <mo>)</mo> </mrow> </mrow>
λ, the adjacent borehole logging tool of drill straight contrast section ratio K are calculated according to formula (2)1Again divided by λ calculates a positive drilling well well logging Contrast section ratio K2
Step 5:In the positive drilling well well logging contrast section ratio K2Print being corrected into after vertical depth for positive horizontal well drilling drilling tracking Well logging contrast section, and be K with ratio1The adjacent borehole logging tool of drill straight contrast section contrasted, according to comparing result and just Horizontal well drilling original design is contrasted, so as to control the hole angle into window.
2. a kind of horizontal well as claimed in claim 1 enters the non-equal proportion Strata Comparison method before window, it is characterised in that:It is described The hole angle method into window that controls be:When judging to be more than positive horizontal well drilling original design distance into window distance, level is bored with positive Well original design is crept into compared to hole angle is reduced;When judging to be less than positive horizontal well drilling original design distance into window distance, with positive brill Horizontal well original design is compared to increase hole angle drilling;It is consistent with positive horizontal well drilling original design distance into window distance when judging When, continue to creep into according to positive horizontal well drilling original design.
3. a kind of horizontal well enters the non-equal proportion Strata Comparison device before window, it is characterised in that including:
Collection module, for collecting the adjacent borehole logging tool of drill straight contrast section, positive horizontal well drilling well logging data, hole deviation data With stratigraphic dip data;
Computing module, for the data collected according to collection module, calculates positive drilling well well logging contrast section ratio;
Comparison module, for printing being corrected into for positive horizontal well drilling drilling tracking in described positive drilling well well logging contrast section ratio Well logging contrast section after vertical depth, is contrasted with the adjacent borehole logging tool of drill straight contrast section, and water is bored with positive according to comparing result Horizontal well original design is contrasted, so as to control into window hole angle;
The collection module is further used for collecting the adjacent borehole logging tool of drill straight contrast section, and the adjacent borehole logging tool of drill straight contrast is cutd open Face ratio is K1;Positive horizontal well drilling well logging data are collected, hole deviation data, the hole angle that can read any position is β;Receive Collect stratigraphic dip α, and judge pendage type;
It is that positive horizontal well drilling passes through ground when having a down dip to tilt for horizontal well path that the computing module, which is further used for attitude of stratum, The vertical depth H of layer differs △ h with adjacent drilling straight-hole through the depth h on stratum, the relation that there is formula (1) between H and h, i.e., When positive horizontal well drilling enters inclination angle as α stratum using β angles, vertical depth and adjacent drilling straight-hole through stratum pass through stratum The ratio of depth, if this ratio is λ;
<mrow> <mi>&amp;lambda;</mi> <mo>=</mo> <mfrac> <mi>H</mi> <mi>h</mi> </mfrac> <mo>=</mo> <mfrac> <mn>1</mn> <mrow> <mn>1</mn> <mo>-</mo> <mi>t</mi> <mi>g</mi> <mi>&amp;alpha;</mi> <mi>t</mi> <mi>g</mi> <mi>&amp;beta;</mi> </mrow> </mfrac> <mo>...</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
λ, the adjacent borehole logging tool of drill straight contrast section ratio K are calculated according to formula (1)1Again divided by λ calculates a positive drilling well well logging Contrast section ratio K2
Attitude of stratum is when being tilted for horizontal well path updip, adjacent drilling straight-hole passes through the depth h on stratum to bore level with positive Well differs △ h through the vertical depth H on stratum, there is the relation of formula (2) between H and h, i.e., when positive horizontal well drilling is entered with β angles When inclination angle is α stratum, the vertical depth through stratum passes through the ratio of depth of stratum with adjacent drilling straight-hole, if this ratio For λ;
<mrow> <mi>&amp;lambda;</mi> <mo>=</mo> <mfrac> <mi>H</mi> <mi>h</mi> </mfrac> <mo>=</mo> <mfrac> <mn>1</mn> <mrow> <mn>1</mn> <mo>+</mo> <mi>t</mi> <mi>g</mi> <mi>&amp;alpha;</mi> <mi>t</mi> <mi>g</mi> <mi>&amp;beta;</mi> </mrow> </mfrac> <mo>...</mo> <mrow> <mo>(</mo> <mn>2</mn> <mo>)</mo> </mrow> </mrow>
λ, the adjacent borehole logging tool of drill straight contrast section ratio K are calculated according to formula (2)1Again divided by λ calculates a positive drilling well well logging Contrast section ratio K2
The comparison module is further used in the positive drilling well well logging contrast section ratio K2Print positive horizontal well drilling drilling tracking Be corrected into after vertical depth well logging contrast section, and with ratio be K1The adjacent borehole logging tool of drill straight contrast section contrasted, Contrasted according to comparing result with positive horizontal well drilling original design, so as to control the hole angle into window.
4. a kind of horizontal well as claimed in claim 3 enters the non-equal proportion Strata Comparison device before window, it is characterised in that described Comparison module be further used for when judge into window distance be more than positive horizontal well drilling original design distance, it is original with positive horizontal well drilling Design is crept into compared to hole angle is reduced;When judging to be less than positive horizontal well drilling original design distance into window distance, with positive horizontal well drilling Original design is compared to increase hole angle drilling;When judge into window distance and positive horizontal well drilling original design apart from it is consistent when, according to Positive horizontal well drilling original design continues to creep into.
CN201410424313.XA 2014-08-26 2014-08-26 Non-equal proportion stratum comparison method and device before horizontal well window entering Active CN104314560B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410424313.XA CN104314560B (en) 2014-08-26 2014-08-26 Non-equal proportion stratum comparison method and device before horizontal well window entering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410424313.XA CN104314560B (en) 2014-08-26 2014-08-26 Non-equal proportion stratum comparison method and device before horizontal well window entering

Publications (2)

Publication Number Publication Date
CN104314560A CN104314560A (en) 2015-01-28
CN104314560B true CN104314560B (en) 2017-10-17

Family

ID=52369855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410424313.XA Active CN104314560B (en) 2014-08-26 2014-08-26 Non-equal proportion stratum comparison method and device before horizontal well window entering

Country Status (1)

Country Link
CN (1) CN104314560B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106324698B (en) * 2015-06-30 2018-09-11 中国石油化工股份有限公司 Strata Comparison method and system for oil-gas bearing basin
CN106869792B (en) * 2017-04-14 2018-10-19 中国石油集团渤海钻探工程有限公司 Coal bed gas horizontal well horizontal segment selects the method for chasing after layer or sidetracking after going out layer
CN113700470B (en) * 2021-06-18 2024-05-24 中国石油化工股份有限公司 Correction method for logging data of directional well
CN115142837B (en) * 2022-07-08 2024-05-14 陕西延长石油(集团)有限责任公司 Track design method for horizontal well vector windowing

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7191850B2 (en) * 2004-10-28 2007-03-20 Williams Danny T Formation dip geo-steering method
US7925442B2 (en) * 2008-10-14 2011-04-12 Chevron U.S.A. Inc. Pseudo logs to improve stratigraphic correlation between sedimentary basins
CN102996114A (en) * 2011-09-14 2013-03-27 王维 Inclined hole correction method of logging information
CN102392601B (en) * 2011-10-09 2013-11-27 中国石油化工股份有限公司 Method for determining hole trajectory of multi-target horizontal well
CN102518433B (en) * 2011-12-31 2015-07-08 中国石油天然气股份有限公司 Target point adjusting method for horizontal well of thin carbonate reservoir
CN102635347B (en) * 2012-03-30 2014-12-10 中国电子科技集团公司第二十二研究所 Method for quantitatively enabling thin interbed to be equivalent to formation with horizontal and vertical resistivities
CN103883311A (en) * 2013-03-22 2014-06-25 中国石油化工股份有限公司 Composite oriented drilling target-entering situation prediction method
CN103790577B (en) * 2013-07-23 2016-08-10 中国石油化工股份有限公司 Depth Domain based on the virtual straight well of horizontal well horizontal segment constraint inversion method

Also Published As

Publication number Publication date
CN104314560A (en) 2015-01-28

Similar Documents

Publication Publication Date Title
CN106285476B (en) A kind of horizontal drilling Real-time Seismic geological syntheses guidance method
CN105317375B (en) Horizontal well is inducted into Target process and device
CN104481400B (en) A kind of three-dimensional horizontal well track control method
CN103774989B (en) Treat that drilling well Trajectory Design horizontal well geosteering analyzes method with boring dynamic modeling
CN108019150B (en) A kind of boring method and system
CN108625782B (en) A kind of horizontal well inclination section geosteering method
CN103774988B (en) Real-time while-drilling gamma forward modeling geo-steering drilling method
CN104314560B (en) Non-equal proportion stratum comparison method and device before horizontal well window entering
CN102518433B (en) Target point adjusting method for horizontal well of thin carbonate reservoir
CN104975808A (en) Deep horizontal well drilling track regulating method
CN103510853B (en) A kind of coal bed gas horizontal well integrated guidance method
CN106437512A (en) Tracking-while-drilling controlling method for landing track of shale gas horizontal well
CN107676038B (en) While-drilling geosteering method for horizontal well trajectory in inclined thin reservoir
CN105545289A (en) Drilling well and adjacent drilled well active anti-collision method
CN102162355A (en) Geosteering method for landing horizontal well
CN105604483B (en) Horizontal well target point design method based on isochronous interface deduction
CN110965938B (en) Horizontal well geosteering method based on element logging
CN110513043B (en) Vertical drilling process deviation correction control method based on automatic guiding drilling tool
CN102322256A (en) Horizontal well landing guiding method
CN102953679B (en) Borehole design method
CN103590828B (en) Method for evaluating formation pressure by logging dck index method
CN110821403B (en) Drilling trajectory control method and device and storage medium
CN113236221A (en) Trajectory control method for geological steering drilling
CN101936154A (en) Method for guiding drilling and bridging of horizontal coal bed methane well
CN113738345B (en) Method for judging drilling situation based on conventional while-drilling tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant