CN104310238A - Manpower hoisting mechanism for masonry - Google Patents

Manpower hoisting mechanism for masonry Download PDF

Info

Publication number
CN104310238A
CN104310238A CN201410440252.6A CN201410440252A CN104310238A CN 104310238 A CN104310238 A CN 104310238A CN 201410440252 A CN201410440252 A CN 201410440252A CN 104310238 A CN104310238 A CN 104310238A
Authority
CN
China
Prior art keywords
arm
hoisting mechanism
pillar
supporting rod
branch arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410440252.6A
Other languages
Chinese (zh)
Other versions
CN104310238B (en
Inventor
王凤来
刁领双
孙绪杰
闫明石
邓冬梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Zhongcheng new building materials Co.,Ltd.
Original Assignee
HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd filed Critical HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201410440252.6A priority Critical patent/CN104310238B/en
Publication of CN104310238A publication Critical patent/CN104310238A/en
Application granted granted Critical
Publication of CN104310238B publication Critical patent/CN104310238B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a manpower hoisting mechanism for masonry, and relates to a hoisting mechanism. In the prior art, the lightweight articles cannot be transported in a small range vertically or horizontally, and in order to solve the problem, the manpower hoisting mechanism is provided. The manpower hoisting mechanism comprises a detachable upper support and a detachable lower support; wherein the upper support comprises an upper pillar, a lifting arm, an extend pillar, an upper support arm, and a rope locking device, and the lower support comprises a lower pillar, a support leg, a lower support arm, a front/back buckle adjusting bolt, and a rotation shaft. The extend pillar is fixed on the upper pillar, the top end of the extend pillar is provided with the lifting arm which can stretch out and draw back freely; the two ends of the lifting arm are respectively provided with a fixed pulley, the two ends of the upper support arm are respectively connected to one end of the lifting arm and the extend pillar through bolts, and one side edge of the upper pillar is provided with the rope locking device for fixing ropes. The manpower hoisting mechanism is used to hoist and transport cargoes.

Description

One is built by laying bricks or stones and is used manpower hoisting mechanism
Technical field
The present invention relates to a kind of hoisting mechanism, be specifically related to one and build by laying bricks or stones and use manpower hoisting mechanism.
Background technology
In Construction of Civil Engineering, because building has certain altitude, need that building materials is risen to certain altitude and construct.Conveniently construct, need to arrange the scope of operation such as scaffold, springboard.And the conveying of material, take diverse ways by weight.Weight less as clay brick etc., directly can be transmitted by manpower.But the material larger to weight, if the post block weight of enclosing wall column is more than 40 kilograms, carries out vertical transport by manpower more painstaking.Adopt large-scale vertical transportation means as tower crane etc., improper again.
Summary of the invention
The object of the invention is to solve in existing Construction of Civil Engineering, the problem of horizontal or vertical transport among a small circle cannot be carried out trial of strength material.And then provide one to build by laying bricks or stones to use manpower hoisting mechanism.
Technical scheme of the present invention is: one is built by laying bricks or stones and used manpower hoisting mechanism, comprise detachable upper bracket and lower bracket, wherein, upper bracket comprises upper supporting column, arm, extending pillar, upper branch arm and rope Locking device, and lower bracket comprises lower supporting rod, supporting leg, lower branch arm, positive left-hand thread adjusting bolt and rotating shaft;
Extending pillar bottom is fixed on upper supporting column, extending pillar top is provided with the arm of retractable, arm two ends are respectively equipped with fixed pulley, and upper branch arm two ends are connected with one end of arm and extending pillar respectively by bolt, and upper supporting column one side is provided with the rope Locking device for stationary rope;
Lower supporting rod upper end be provided with rotating shaft, rotating shaft and upper supporting column are rotationally connected, supporting leg is connected with lower supporting rod lower end and has been provided with securing device, connect lower branch arm two ends to be connected with supporting leg and lower supporting rod respectively, positive left-hand thread adjusting bolt for free adjustment lower limb arm lengths is located at lower branch arm midway location, and the free end of supporting leg is provided with lower margin.
Beneficial effect of the present invention is as follows: of the present invention building by laying bricks or stones uses manpower hoisting mechanism, by movable pulley being reduced the setting of half lifting weight, reduce the difficulty of vertical transport, and it can rotate along the horizontal plane, large article successfully can be lifted put in place, while improve speed of application, also reduce labour intensity.
Accompanying drawing explanation
Fig. 1 is the structural representation that the present invention builds with manpower hoisting mechanism by laying bricks or stones.
Fig. 2 is the upper bracket structural representation that the present invention builds with manpower hoisting mechanism by laying bricks or stones.
Fig. 3 is the lower support structure schematic diagram that the present invention builds with manpower hoisting mechanism by laying bricks or stones.
All parts label is as follows: upper bracket 1, lower bracket 2, upper supporting column 11, arm 12, extending pillar 13, upper branch arm 14, rope Locking device 15, lower supporting rod 21, supporting leg 22, lower branch arm 23, positive left-hand thread adjusting bolt 24, rotating shaft 25, lower margin 26.
Detailed description of the invention
Detailed description of the invention one: composition graphs 1 to Fig. 3 illustrates present embodiment, manpower hoisting mechanism is used in building by laying bricks or stones of present embodiment, comprise detachable upper bracket 1 and lower bracket 2, wherein, upper bracket 1 comprises upper supporting column 11, arm 12, extending pillar 13, upper branch arm 14 and rope Locking device 15, and lower bracket 2 comprises lower supporting rod 21, supporting leg 22, lower branch arm 23, positive left-hand thread adjusting bolt 24 and rotating shaft 25;
Extending pillar 13 bottom is fixed on upper supporting column 11, extending pillar 13 top is provided with the arm 12 of retractable, arm 12 two ends are respectively equipped with fixed pulley, upper branch arm 14 two ends are connected with one end of arm 12 and extending pillar 13 respectively by bolt, and upper supporting column 11 1 side is provided with the rope Locking device 15 for stationary rope;
Upper branch arm is bolted arm and is connected with extending pillar, bolt place can disconnect and arm can be folded to by upper supporting column, convenient mobile and transport, extending pillar can free-extension and have anchor fitting on upper supporting column, the requirement that hoisting height changes flexibly is met with this, upper supporting column is provided with rope Locking device, for stationary rope position.
Lower supporting rod 21 upper end be provided with rotating shaft 25, rotating shaft 25 and upper supporting column 11 are rotationally connected, supporting leg 22 is connected with lower supporting rod 21 lower end and has been provided with securing device, connect lower branch arm 23 two ends to be connected with supporting leg 22 and lower supporting rod 21 respectively, positive left-hand thread for free adjustment lower limb arm lengths 23 regulates spiral shell 24 bolt to be located at lower branch arm 23 midway location, and the free end of supporting leg 22 is provided with lower margin.
Supporting leg is connected on lower supporting rod, can free-extension, and have securing device to fix, the supporting leg first half is connected with lower limb arm, lower limb arm is bolted in the middle part of lower supporting rod, and be provided with positive left-hand thread adjusting bolt in the middle of lower limb arm, for free adjustment lower limb arm lengths, to meet the stability that lower bracket supports, the workyard environment of simultaneous adaptation complexity, the bolt junction of lower limb arm and lower supporting rod can disconnect, such supporting leg just can be folded to by lower supporting rod, so that mobile and transport, the support body intermediate rotary shaft of lower supporting rod upper end is connected with upper supporting column, rotating freely for upper supporting column, object is flexibly lifted to reach in design.
Carrier parts is connected by intermediate rotary shaft, and its length can regulate, and fixes its length by inhibiting device.The upper supporting column top of upper bracket connects arm, and its length can regulate, and arm can also fold into the degree parallel with pillar, convenient transport.Arm two ends are respectively provided with pulley, and rope passes pulley and connects a handgrip in bottom, and handgrip is used for capturing weight in hoisting process.Lower supporting rod is provided with four journal stirrups, for being connected and fixed lower branch arm.Lower supporting rod bottom is connected with a circular base plate, four supporting legs are provided with bottom lower supporting rod, supporting leg can stretch and have securing device to fix, supporting leg there is journal stirrup be connected with lower branch arm, positive left-hand thread adjusting bolt is established in the middle part of lower branch arm, in order to adjust the length of lower branch arm, to regulate supporting leg angle, the adjustment height of leg ends fixed supporting leg.
After suspension hook employing movable pulley form weight arrival predetermined altitude, fixed the height of weight by the rope Locking device on support.Now can, by pulling rope Locking device support, make weight around holder pivots, can fixed support when forwarding to above desired location, loosen rope, carry out the decline of weight, until predetermined altitude.Loosen bracket fixing device, rotate upper supporting column, carry out the lifting of next weight.
Detailed description of the invention two: composition graphs 1 to Fig. 3 illustrates present embodiment, the quantity of the supporting leg 22 of present embodiment is four, and is symmetrical arranged.Other composition is identical with detailed description of the invention one with annexation.
Detailed description of the invention three: composition graphs 1 to Fig. 3 illustrates present embodiment, lower supporting rod 21 bottom of present embodiment is connected with a circular base plate, lower branch arm 23 is bolted the medium position at lower supporting rod, and other composition is identical with detailed description of the invention one with annexation.
Of the present invention building by laying bricks or stones can operate use by a people with manpower hoisting mechanism, and use procedure is as follows:
1. the weight that user need lift is placed on suspension hook; 2. user exerts oneself stay cord, and hoisting heavy, until predetermined altitude; 3. user rotates upper bracket, makes it arrive the top of predetermined construction part; 4. user fixes upper bracket; 5. user falls weight; 6. user's lancet lifts next time.
Use principle illustrates: the setting that present invention employs movable pulley, at least can economize exerting oneself of half.Such as, for the weight of about 50 kilograms, the actual power applying about 25 kilograms of user.The weight size that the present invention can promote, outside the Pass having with scantling, material, the most importantly center-of-gravity position of weight and hanging apparatus summation, the region that the fulcrum being no more than four supporting legs surrounds.
Foregoing is only preferred embodiment of the present invention; not for limiting embodiment of the present invention; those of ordinary skill in the art are according to central scope of the present invention and spirit; can carry out corresponding flexible or amendment very easily, therefore protection scope of the present invention should be as the criterion with the protection domain required by claims.

Claims (3)

1. build by laying bricks or stones and use manpower hoisting mechanism for one kind, it is characterized in that, comprise detachable upper bracket (1) and lower bracket (2), wherein, upper bracket (1) comprises upper supporting column (11), arm (12), extending pillar (13), upper branch arm (14) and rope Locking device (15), and lower bracket (2) comprises lower supporting rod (21), supporting leg (22), lower branch arm (23), positive left-hand thread adjusting bolt (24) and rotating shaft (25);
Extending pillar (13) bottom is fixed on upper supporting column (11), extending pillar (13) top is provided with the arm (12) of retractable, arm (12) two ends are respectively equipped with fixed pulley, upper branch arm (14) two ends are connected with one end of arm (12) and extending pillar (13) respectively by bolt, and upper supporting column (11) side is provided with the rope Locking device (15) for stationary rope;
Lower supporting rod (21) upper end be provided with rotating shaft (25), rotating shaft (25) and upper supporting column (11) are rotationally connected, supporting leg (22) is connected with lower supporting rod (21) lower end and has been provided with securing device, connect lower branch arm (23) two ends to be connected with supporting leg (22) and lower supporting rod (21) respectively, positive left-hand thread for free adjustment lower limb arm lengths (23) regulates spiral shell (24) bolt to be located at lower branch arm (23) midway location, and the free end of supporting leg (22) is provided with lower margin (26).
2. according to claim 1 building by laying bricks or stones uses manpower hoisting mechanism, it is characterized in that, the quantity of supporting leg (22) is four, and is symmetrical arranged.
3. according to claim 1 building by laying bricks or stones uses manpower hoisting mechanism, it is characterized in that, lower supporting rod (21) bottom is connected with a circular base plate, and lower branch arm (23) is bolted the medium position at lower supporting rod.
CN201410440252.6A 2014-09-01 2014-09-01 One is built by laying bricks or stones and is used manpower hoisting mechanism Active CN104310238B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410440252.6A CN104310238B (en) 2014-09-01 2014-09-01 One is built by laying bricks or stones and is used manpower hoisting mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410440252.6A CN104310238B (en) 2014-09-01 2014-09-01 One is built by laying bricks or stones and is used manpower hoisting mechanism

Publications (2)

Publication Number Publication Date
CN104310238A true CN104310238A (en) 2015-01-28
CN104310238B CN104310238B (en) 2016-10-05

Family

ID=52365596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410440252.6A Active CN104310238B (en) 2014-09-01 2014-09-01 One is built by laying bricks or stones and is used manpower hoisting mechanism

Country Status (1)

Country Link
CN (1) CN104310238B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104925687A (en) * 2015-06-24 2015-09-23 国网山东东明县供电公司 Electric lifting device and working method thereof
CN108383011A (en) * 2018-04-28 2018-08-10 国网安徽省电力有限公司望江县供电公司 A kind of small-sized hanging apparatus of distribution transformer
CN113173507A (en) * 2021-05-13 2021-07-27 筑橙机器人科技(昆山)有限公司 Wheel type manual hoisting carrier

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004026315A (en) * 2002-05-10 2004-01-29 Kokuho:Kk Cargo handling device
CN2878313Y (en) * 2005-11-24 2007-03-14 张公建 Material hoister
DE202009016924U1 (en) * 2009-12-15 2010-04-08 Em Holding Gmbh & Co.Kg Collapsible small crane

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004026315A (en) * 2002-05-10 2004-01-29 Kokuho:Kk Cargo handling device
CN2878313Y (en) * 2005-11-24 2007-03-14 张公建 Material hoister
DE202009016924U1 (en) * 2009-12-15 2010-04-08 Em Holding Gmbh & Co.Kg Collapsible small crane

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104925687A (en) * 2015-06-24 2015-09-23 国网山东东明县供电公司 Electric lifting device and working method thereof
CN108383011A (en) * 2018-04-28 2018-08-10 国网安徽省电力有限公司望江县供电公司 A kind of small-sized hanging apparatus of distribution transformer
CN113173507A (en) * 2021-05-13 2021-07-27 筑橙机器人科技(昆山)有限公司 Wheel type manual hoisting carrier

Also Published As

Publication number Publication date
CN104310238B (en) 2016-10-05

Similar Documents

Publication Publication Date Title
CN104310238A (en) Manpower hoisting mechanism for masonry
CN203998713U (en) A kind of gig and elevator system
CN206088882U (en) Hoisting accessory for building
CN205241084U (en) Lifting machine
CN205472336U (en) Loop wheel machine that construction was used
CN103213900A (en) Movable hanger capable of automatically balancing loads of hanging points
CN204897283U (en) Small -size crane is used to fitment
CN207406013U (en) A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING curtain wall lifting device
CN208054796U (en) A kind of cement block boom hoisting
CN204899247U (en) Building site stirrup shipment hanging flower basket device
CN208883353U (en) A kind of crane support frame easy to repair
CN202829363U (en) Column type lifting frame for overhauling mineralizer of flotation machine
CN110002349A (en) A kind of detachable hanging apparatus
CN205527409U (en) Portable hoist
CN205270846U (en) Valve casting is with watering a packet transportation support frame
CN204661172U (en) A kind of suspension transferring machine shelving
CN203212241U (en) Light-weight indoor crane
CN206665992U (en) A kind of plant equipment mast-up
CN205954146U (en) Silicon wafer stick hoisting device
CN206203763U (en) Self-driving floor hanging apparatus
CN214531787U (en) Height-adjustable's scaffold frame
CN104876132A (en) Handling machine unit frame
CN214879551U (en) Lifting mechanism for stainless steel bar
CN210915029U (en) Roof hoisting equipment for house building construction
CN208088800U (en) A kind of Multifunctional decorating lifting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 150000 floor 4, building 7, advertising industrial park, Harbin Economic and Technological Development Zone, No. 469, Xianfeng Road, Nangang concentration area, economic development zone, Harbin, Heilongjiang

Patentee after: Harbin Dacheng Green Building Co.,Ltd.

Address before: 150009 floor 5, building 7, electronic information industrial park, economic development zone, No. 469, Xianfeng Road, Nangang concentration area, Harbin Economic Development Zone, Harbin, Heilongjiang Province

Patentee before: HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20211208

Address after: 150000 Ma Hekou, Xinxing village, Xiaoling Town, Acheng District, Harbin City, Heilongjiang Province

Patentee after: Heilongjiang Zhongcheng new building materials Co.,Ltd.

Address before: 150000 floor 4, building 7, advertising industrial park, Harbin Economic and Technological Development Zone, No. 469, Xianfeng Road, Nangang concentration area, economic development zone, Harbin, Heilongjiang

Patentee before: Harbin Dacheng Green Building Co.,Ltd.

TR01 Transfer of patent right