CN104300488A - Connecting device and method for cable terminal with voltage of 35kV or below - Google Patents

Connecting device and method for cable terminal with voltage of 35kV or below Download PDF

Info

Publication number
CN104300488A
CN104300488A CN201410458439.9A CN201410458439A CN104300488A CN 104300488 A CN104300488 A CN 104300488A CN 201410458439 A CN201410458439 A CN 201410458439A CN 104300488 A CN104300488 A CN 104300488A
Authority
CN
China
Prior art keywords
cable
insulation
silicon rubber
interval
socketed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410458439.9A
Other languages
Chinese (zh)
Inventor
顾坤林
谢鑫
陶炳贞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIXING CITY SHENGDA COPPER INDUSTRY Co Ltd
Original Assignee
TAIXING CITY SHENGDA COPPER INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIXING CITY SHENGDA COPPER INDUSTRY Co Ltd filed Critical TAIXING CITY SHENGDA COPPER INDUSTRY Co Ltd
Priority to CN201410458439.9A priority Critical patent/CN104300488A/en
Publication of CN104300488A publication Critical patent/CN104300488A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G15/00Cable fittings
    • H02G15/08Cable junctions
    • H02G15/18Cable junctions protected by sleeves, e.g. for communication cable
    • H02G15/1806Heat shrinkable sleeves
    • H02G15/1813Wraparound or slotted sleeves
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G15/00Cable fittings
    • H02G15/08Cable junctions
    • H02G15/18Cable junctions protected by sleeves, e.g. for communication cable
    • H02G15/184Cable junctions protected by sleeves, e.g. for communication cable with devices for relieving electrical stress
    • H02G15/188Cable junctions protected by sleeves, e.g. for communication cable with devices for relieving electrical stress connected to a cable shield only
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G15/00Cable fittings
    • H02G15/08Cable junctions
    • H02G15/18Cable junctions protected by sleeves, e.g. for communication cable
    • H02G15/192Cable junctions protected by sleeves, e.g. for communication cable with support means for ends of the sleeves

Abstract

The invention relates to a connecting device and method for cable terminal with the voltage of 35kV or below. A cable copper conductor segment, a cable insulating layer segment and an outer copper strip shielding layer segment of the end of a cable are insulated and sealed by a silicon rubber insulating umbrella group, an insulating sleeve and an insulating protective tube respectively, the silicon rubber insulating umbrella group, the insulating sleeve and the insulating protective tube are sequentially connected end to end in a sleeving mode, the end of the silicon rubber insulating umbrella group is sealed by a sealing cap, and the end of the insulating protective tube is sealed by a wrapping waterproof strip layer. Construction is convenient, and sealing performance is good; the silicon rubber insulating umbrella group and a silicon rubber stress cone expand on the outer side, where a polypropylene strip is wound around, of a supporting tube in advance, after the polypropylene strip is pulled out, the silicon rubber insulating umbrella group and the silicon rubber stress cone shrink to the corresponding position of the cable, no open fire is needed for heating shrinkage, construction is convenient, and operation is safe.

Description

A kind of 35kV and following cable termination jockey and method of attachment
Technical field
The present invention relates to a kind of cable connecting arrangement, be specifically related to a kind of 35kV and following cable termination jockey and method of attachment.
Background technology
At present, cable termination jockey used on market all adopts fine copper cable terminal to crimp, using heat shrinkage insulation pipe as insulator, using thermal contraction PA tube as oversheath; During construction, with naked light baking thermal contraction PA tube, make it shrink and be attached to the outside of cable.Adopt and there is following defect in this way: 1. work with torches is not suitable for using at chemical industry combustible and explosive area, is also not suitable at altitude effect.2. with the bad grasp of naked light baking heat shrinking sleeve degree, larger by artifical influence factor; 3. use the terminal connector life-span of heat-shrinkable tube short, construction is inconvenient.
Summary of the invention
The object of the present invention is to provide a kind of easy construction, handling safety and good seal performance 35kV and following cable termination jockey and method of attachment.
For reaching above object, the technical scheme that the present invention takes is:
A kind of 35kV and following cable termination jockey, comprise cable body, cable body from-inner-to-outer is followed successively by cable copper conductor, cable insulation, outer copper strip shielding layer and external insulation layer, described cable body end exposes outer copper strip shielding interval, cable insulation interval and cable copper conductor segment successively after stepped stripping, described cable copper conductor end is connected with terminal equipment, it is characterized in that:
The boundary of described outer copper strip shielding interval and external insulation layer is socketed with insulation pillar, seals through wrapped water blocking tape between described insulation pillar end and external insulation layer;
The outside of described outer copper strip shielding interval is socketed with insulating sleeve, and described insulating sleeve is socketed on one end of insulation pillar;
Cable insulation interval is fixed on through semiconductive twining package tape in the end of described outer copper strip shielding interval, and described outer copper strip shielding layer and cable insulation intersection are socketed with silicon rubber stress cone;
The outside of described cable insulation interval is socketed with silicon rubber insulation cluster parachute, and described silicon rubber insulation cluster parachute is covered in silicon rubber stress cone, and silicon rubber insulation cluster parachute one end is socketed on insulating sleeve;
The intersection of described cable insulation interval and cable copper conductor segment is socketed with sealing cap, and described sealing cap one end is socketed on silicon rubber insulation cluster parachute.
Further, also comprise tinned copper wire braid over braid, described tinned copper wire braid over braid is connected with cable insulation through constant force collar.
A method of attachment for 35kV and following cable termination jockey, comprises the following steps:
The first step, by stepped for cable body end stripping, exposes the outer copper strip shielding interval of design length, cable insulation interval and cable copper conductor segment successively;
Second step, is fixed on outer copper strip shielding layer with constant force collar by tinned copper wire braid over braid, and copper strip shielding interval and external insulation interval intersection cover connect insulation pillar outside, and described insulation pillar and external insulation layer cooperation place seal with wrapped waterproof belt;
3rd step, outside copper strip shielding interval is socketed insulating sleeve, and one end of insulating sleeve is socketed on one end of insulation pillar, is fixed on cable insulation interval by the end of outer copper strip shielding layer with semiconductive twining package tape;
4th step, with continuous print polypropylene strips coiling stay pipe, described polypropylene strips end stretches out outside stay pipe; At the middle part of stay pipe socket predilation shape silicon rubber stress cone and silicon rubber insulation cluster parachute, described silicon rubber insulation cluster parachute is socketed on outside silicon rubber stress cone; Stay pipe is socketed on the end of cable body, make silicon rubber stress cone corresponding with cable insulation intersection with outer copper strip shielding layer, make silicon rubber insulation cluster parachute one end corresponding with the end of insulating sleeve, twitch the end of polypropylene strips until extract out completely, the silicon rubber stress cone of predilation and silicon rubber insulation cluster parachute are contracted in the corresponding section of cable;
5th step, sealing cap in the end sleeve of silicon rubber insulation cluster parachute, is connected the cable copper conductor stretching out sealing cap with terminal equipment.
After taking above technical scheme, beneficial effect of the present invention is:
Each section of the cable copper conductor segment of cable end, cable insulation interval and outer copper strip shielding interval forms the insulated enclosure of each section by silicon rubber insulation cluster parachute, insulating sleeve, insulation pillar head and the tail successively socket respectively, the end of silicon rubber insulation cluster parachute seals with sealing cap, the end of insulation pillar is sealed by wrapped waterproof belt, easy construction, good seal performance;
Silicon rubber insulation cluster parachute and silicon rubber stress cone are expanded in advance outside polypropylene strips coiling stay pipe, after polypropylene strips is extracted out, silicon rubber insulation cluster parachute and silicon rubber stress cone are contracted to the correspondence position of cable, without the need to using open firing to shrink, and easy construction, handling safety.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of stay pipe.
In figure: cable body 1, outer copper strip shielding interval 2, cable insulation interval 3, cable copper conductor segment 4, insulation pillar 5, insulating sleeve 6, silicon rubber stress cone 7, silicon rubber insulation cluster parachute 8, sealing cap 9, wrapped water blocking tape 10, semiconductive twining package tape 11, constant force collar 12, tinned copper wire braid over braid 13, stay pipe 14, polypropylene strips 15.
Embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is further described:
As shown in the figure, a kind of 35kV and following cable termination jockey, comprise cable body 1, the link of described cable is through stepped delamination, produce outer copper strip shielding interval 2, cable insulation interval 3 and cable copper conductor segment 4 in turn, described outer copper strip shielding interval 2 and the boundary of external insulation layer are socketed with the pillar 5 that insulate, seal through wrapped water blocking tape 10 between described insulation pillar 5 afterbody and external insulation layer; The outside of described outer copper strip shielding interval 2 is socketed with insulating sleeve 6, and the tail end of described insulating sleeve 6 is socketed on the head end of insulation pillar 5; Cable insulation interval 3 is fixed on through semiconductive twining package tape 11 in the end of described outer copper strip shielding interval 2, described outer copper strip shielding interval 2 is socketed with silicon rubber stress cone 7 with cable insulation interval 3 intersection, the outside of described cable insulation interval 3 is socketed with silicon rubber insulation cluster parachute 8, described silicon rubber insulation cluster parachute 8 is covered in outside silicon rubber stress cone 7, and the tail end of silicon rubber insulation cluster parachute is socketed on the head end of insulating sleeve; Described cable insulation interval 3 is socketed with sealing cap 9 with the intersection of cable copper conductor segment 4, and described sealing cap 9 tail end is socketed on the head end of silicon rubber insulation cluster parachute 8; Described cable copper conductor segment 4 is connected with terminal equipment.
Step when cable termination jockey is connected with terminal equipment is:
The first step, by the stepped stripping in cable body 1 end, exposes the outer copper strip shielding interval 2 of design length, cable insulation interval 3 and cable copper conductor segment 4 successively;
Second step, with constant force collar 12, outer copper strip shielding layer is fixed in one end of tinned copper wire braid over braid 13, copper strip shielding interval 2 and external insulation interval 3 intersection cover connect insulation pillar 5 outside, and described insulation pillar 5 seals with wrapped water blocking tape 10 with external insulation layer cooperation place;
3rd step, outside copper strip shielding interval 2 is socketed insulating sleeve 6, and one end of insulating sleeve 6 is socketed on one end of insulation pillar 5, is fixed on cable insulation interval 3 by the end of outer copper strip shielding layer with semiconductive twining package tape 11;
4th step, with continuous print polypropylene 15 coiling stay pipes 14, described polypropylene strips 14 end stretches out outside stay pipe 14; At the middle part of stay pipe 14 socket predilation shape silicon rubber stress cone 7 and silicon rubber insulation cluster parachute 8, described silicon rubber insulation cluster parachute 8 is socketed on outside silicon rubber stress cone 7; Stay pipe 14 cover is connected to the end of cable body, silicon rubber stress cone 7 is made to be positioned at outer copper strip shielding interval 2 and cable insulation interval 3 intersection, and make silicon rubber insulation cluster parachute 8 one end corresponding with the end of insulating sleeve 6, twitch the end of polypropylene strips 15 until extract out completely, the silicon rubber stress cone 7 of predilation and silicon rubber insulation cluster parachute 8 are contracted in the corresponding section of cable;
5th step, sealing cap 9 in the end sleeve of silicon rubber insulation cluster parachute 8, is connected the cable copper conductor segment 4 of stretching out sealing cap 9 with terminal equipment.

Claims (3)

1. a 35kV and following cable termination jockey, comprise cable body, cable body from-inner-to-outer is followed successively by cable copper conductor, cable insulation, outer copper strip shielding layer and external insulation layer, described cable body end exposes outer copper strip shielding interval, cable insulation interval and cable copper conductor segment successively after stepped stripping, described cable copper conductor end is connected with terminal equipment, it is characterized in that:
The boundary of described outer copper strip shielding interval and external insulation layer is socketed with insulation pillar, seals through wrapped water blocking tape between described insulation pillar end and external insulation layer;
The outside of described outer copper strip shielding interval is socketed with insulating sleeve, and described insulating sleeve is socketed on one end of insulation pillar;
Cable insulation interval is fixed on through semiconductive twining package tape in the end of described outer copper strip shielding interval, and described outer copper strip shielding interval and cable insulation interval intersection are socketed with silicon rubber stress cone;
The outside of described cable insulation is socketed with silicon rubber insulation cluster parachute, and described silicon rubber insulation cluster parachute is covered in silicon rubber stress cone, and silicon rubber insulation cluster parachute one end is socketed on insulating sleeve;
The intersection of described cable insulation interval and cable copper conductor segment is socketed with sealing cap, and described sealing cap one end is socketed on silicon rubber insulation cluster parachute.
2. a kind of 35kV according to claim 1 and following cable termination jockey, is characterized in that, also comprise tinned copper wire braid over braid, and described tinned copper wire braid over braid is connected with cable insulation through constant force collar.
3. a method of attachment for a kind of 35kV according to claim 1 and following cable termination jockey, is characterized in that, comprise the following steps:
The first step, by stepped for cable body end stripping, exposes the outer copper strip shielding interval of design length, cable insulation interval and cable copper conductor segment successively;
Second step, is fixed on outer copper strip shielding layer with constant force collar by tinned copper wire braid over braid, and copper strip shielding interval and external insulation interval intersection cover connect insulation pillar outside, and described insulation pillar and external insulation layer cooperation place seal with wrapped waterproof belt;
3rd step, outside copper strip shielding interval is socketed insulating sleeve, and one end of insulating sleeve is socketed on one end of insulation pillar, is fixed on cable insulation interval by the end of outer copper strip shielding layer with semiconductive twining package tape;
4th step, with continuous print polypropylene strips coiling stay pipe, described polypropylene strips end stretches out outside stay pipe; At the middle part of stay pipe socket predilation shape silicon rubber stress cone and silicon rubber insulation cluster parachute, described silicon rubber insulation cluster parachute is socketed on outside silicon rubber stress cone; Stay pipe is socketed on the end of cable body, make silicon rubber stress cone corresponding with cable insulation intersection with outer copper strip shielding layer, make silicon rubber insulation cluster parachute one end corresponding with the end of insulating sleeve, twitch the end of polypropylene strips until extract out completely, the silicon rubber stress cone of predilation and silicon rubber insulation cluster parachute are contracted in the corresponding section of cable;
5th step, sealing cap in the end sleeve of silicon rubber insulation cluster parachute, is connected the cable copper conductor stretching out sealing cap with terminal equipment.
CN201410458439.9A 2014-09-11 2014-09-11 Connecting device and method for cable terminal with voltage of 35kV or below Pending CN104300488A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410458439.9A CN104300488A (en) 2014-09-11 2014-09-11 Connecting device and method for cable terminal with voltage of 35kV or below

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410458439.9A CN104300488A (en) 2014-09-11 2014-09-11 Connecting device and method for cable terminal with voltage of 35kV or below

Publications (1)

Publication Number Publication Date
CN104300488A true CN104300488A (en) 2015-01-21

Family

ID=52320120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410458439.9A Pending CN104300488A (en) 2014-09-11 2014-09-11 Connecting device and method for cable terminal with voltage of 35kV or below

Country Status (1)

Country Link
CN (1) CN104300488A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105116310A (en) * 2015-08-27 2015-12-02 江苏普朗克电力科技有限公司 Novel high voltage cable test device
CN106025995A (en) * 2016-07-25 2016-10-12 常州市拓源电缆成套有限公司 Fireproof outdoor cable terminal for railways

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2283325Y (en) * 1996-07-19 1998-06-03 武汉市博大电气有限责任公司 Shrinking prefabricated cable fitting
CN201234115Y (en) * 2008-06-13 2009-05-06 北京国电四维电力技术有限公司 Shrinking dry outdoor electric cable terminal
CN201332254Y (en) * 2009-01-06 2009-10-21 3M创新有限公司 Cable terminal
CN201466661U (en) * 2009-07-17 2010-05-12 保定合力达电缆附件有限公司 Cold-shrinking intermediate joint
WO2014057381A1 (en) * 2012-10-09 2014-04-17 Tyco Electronics (Shanghai) Co. Ltd. Cold shrinkable termination for an electric power cable
CN204131073U (en) * 2014-09-11 2015-01-28 泰兴市圣达铜业有限公司 A kind of 35kV and following cable termination jockey

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2283325Y (en) * 1996-07-19 1998-06-03 武汉市博大电气有限责任公司 Shrinking prefabricated cable fitting
CN201234115Y (en) * 2008-06-13 2009-05-06 北京国电四维电力技术有限公司 Shrinking dry outdoor electric cable terminal
CN201332254Y (en) * 2009-01-06 2009-10-21 3M创新有限公司 Cable terminal
CN201466661U (en) * 2009-07-17 2010-05-12 保定合力达电缆附件有限公司 Cold-shrinking intermediate joint
WO2014057381A1 (en) * 2012-10-09 2014-04-17 Tyco Electronics (Shanghai) Co. Ltd. Cold shrinkable termination for an electric power cable
CN204131073U (en) * 2014-09-11 2015-01-28 泰兴市圣达铜业有限公司 A kind of 35kV and following cable termination jockey

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
柳涌: "《建筑电气设备施工技术手册》", 31 December 2010 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105116310A (en) * 2015-08-27 2015-12-02 江苏普朗克电力科技有限公司 Novel high voltage cable test device
CN106025995A (en) * 2016-07-25 2016-10-12 常州市拓源电缆成套有限公司 Fireproof outdoor cable terminal for railways

Similar Documents

Publication Publication Date Title
CN103972825B (en) Manufacture method around packet mode transition joint
CN204131073U (en) A kind of 35kV and following cable termination jockey
CN106848990B (en) A kind of docking calculation of 10kV twisted polyethylene cables
IN2014CN04610A (en)
CN105990807A (en) Production method of copper core cable soldered and sealed intermediate joint
CN105185482B (en) A kind of preparation method with the outer cable by structure of waterproof
WO2019179318A1 (en) Joint structure for high-voltage cable
WO2013117058A1 (en) High temperature super-conducting cable multi-segment connection device
CN105006304B (en) A kind of manufacture method of the cable with water-resistant core line structure
CN104300488A (en) Connecting device and method for cable terminal with voltage of 35kV or below
CN106505509A (en) A kind of 500kV cable systems transition joint mounting process
CN204131079U (en) A kind of 35kV and following cable intermediate junction device
US1497002A (en) Inclosure for spliced ends of electric cables
FI3477179T3 (en) A subsea cable system and a method for supplying electrical power to a subsea device
CN104283179A (en) Middle connection device and method for cables of 35kV or below
CN106340850A (en) Cable intermediate joint with high waterproof performance, and installation method thereof
CN103986098B (en) The manufacture method of medium-pressure power cable transition joint longitudinal water-blocking device
CN204190348U (en) A kind of aerial insulated cable splice insulation protector
CN103904592A (en) Method for manufacturing 10 kV cross linked polyethylene insulated thermal shrinkage terminal
CN201365095Y (en) 10 and 35 KV metal tube bus terminal insulated and shielded by vulcanized silicon rubber
CN201655984U (en) Primary cable joint of light
CN103915811A (en) Method for manufacturing 35 kV thermal shrinkage intermediate cable head
CN203721892U (en) 0.4kV low-voltage indoor crimping type connecting clamp
CN103944116A (en) Manufacturing method for cold-contraction cable terminal
KR100952900B1 (en) Self-contraction cable connector and self-contraction cable connecting unit and cable connecting method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150121

WD01 Invention patent application deemed withdrawn after publication