CN104299480B - Intelligent switch and control method, intelligent control network - Google Patents

Intelligent switch and control method, intelligent control network Download PDF

Info

Publication number
CN104299480B
CN104299480B CN201310274443.5A CN201310274443A CN104299480B CN 104299480 B CN104299480 B CN 104299480B CN 201310274443 A CN201310274443 A CN 201310274443A CN 104299480 B CN104299480 B CN 104299480B
Authority
CN
China
Prior art keywords
alternating current
relay
time point
actuating
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310274443.5A
Other languages
Chinese (zh)
Other versions
CN104299480A (en
Inventor
徐志方
郇延文
张洪波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haier Group Corp
Qingdao Haier Intelligent Home Appliance Technology Co Ltd
Original Assignee
Haier Group Corp
Qingdao Haier Intelligent Home Appliance Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haier Group Corp, Qingdao Haier Intelligent Home Appliance Technology Co Ltd filed Critical Haier Group Corp
Priority to CN201310274443.5A priority Critical patent/CN104299480B/en
Publication of CN104299480A publication Critical patent/CN104299480A/en
Application granted granted Critical
Publication of CN104299480B publication Critical patent/CN104299480B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Relay Circuits (AREA)

Abstract

The present invention relates to a kind of intelligent switch and control method, intelligent control network.This control method includes: obtain the control instruction of controlled load;Detection is passed through the instantaneous value of the alternating current of the relay that controlled load connects;The frequency of described alternating current is determined according to described instantaneous value relation over time, and by the time point of this frequency acquisition zero-crossing of alternating current;Time point according to zero-crossing of alternating current and actuating of relay time delay, determine the time point controlling the actuating of relay;According to the time point of the described control actuating of relay, control the actuating of relay.The present invention can not only effectively protective relay and intelligent switch, extend relay and intelligent switch life-span, and the time controlling the actuating of relay can be determined for the action that relay is intrinsic time delay flexibly, therefore can realize the self adaptation to different relays.

Description

Intelligent switch and control method, intelligent control network
Technical field
The present invention relates to switching technique field, particularly relate to a kind of intelligent switch and control method thereof, Intelligent control network.
Background technology
In on-off control field, generally by driving the actuating of relay to control the open and close of load, continue Electrical equipment, in Guan Bi or the moment of disconnection, often produces bigger surge voltage, relay is caused damage Bad, the life-span causing relay or the electrical switch with relay is shorter.
Summary of the invention
Brief overview about the present invention given below, in order to some side about the present invention is provided The basic comprehension in face.Should be appreciated that this general introduction is not that the exhaustive about the present invention is summarized.It It is not intended to determine the key of the present invention or pith, is not the model of the intended limitation present invention Enclose.Its purpose is only to provide some concept in simplified form, more detailed in this, as discuss after a while The thin preamble described.
The present invention provides a kind of intelligent switch and control method, intelligent control network, it is possible to effectively protect Protect relay and intelligent switch, extend relay and intelligent switch life-span.
On the one hand, the present invention provides a kind of intelligent switch, including:
At least one relay, is used for connecting load;
Detection device, is passed through the instantaneous value of the alternating current of the relay that controlled load connects for detection;
Acquisition module, including for determining described exchange according to described instantaneous value relation over time The frequency acquisition module of the frequency of electricity, and for by the time of this frequency acquisition zero-crossing of alternating current The time-obtaining module of point;
Time Calculation module, when the time point according to zero-crossing of alternating current and the actuating of relay postpone Between, calculate the time point controlling the actuating of relay;
Controller, controls the actuating of relay for the time point according to described control relay.
On the other hand, the invention provides a kind of intelligent control network, including above-mentioned intelligent switch, institute State intelligent switch connection and have load.
On the other hand, the present invention also provides for the control method of a kind of intelligent switch, including:
Obtain the control instruction of controlled load;
Detection is passed through the instantaneous value of the alternating current of the relay that controlled load connects;
The frequency of described alternating current is determined according to described instantaneous value relation over time, and by being somebody's turn to do The time point of frequency acquisition zero-crossing of alternating current;
Time point according to zero-crossing of alternating current and actuating of relay time delay, determine control relay The time point of action;
According to the time point of the described control actuating of relay, control the action of relay.
In the technical scheme that the present invention provides, it is passed through and the controlled relay loading and being connected by detection The instantaneous value of alternating current, and the frequency of alternating current is determined according to the time dependent relation of instantaneous value of detection Rate, owing to can determine the time point of zero-crossing of alternating current, and according to alternating current mistake according to ac frequency The time point of zero point and actuating of relay time delay, calculate the time point controlling relay, therefore When receiving the control instruction for controlling load, relay, example can be controlled at suitable time point As controlled the actuating of relay before zero crossing so that relay just action near zero point phase place, Effectively protective relay is not by heavy current impact, and cost is relatively low.Therefore, this programme can not only have Effect protective relay and intelligent switch, extend relay and intelligent switch life-span, and can be for continuing Electrical equipment determines the time point controlling the actuating of relay flexibly at intrinsic action time delay, therefore can realize Self adaptation to different relays.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below by right In embodiment or description of the prior art, the required accompanying drawing used is briefly described, it should be apparent that, Accompanying drawing in describing below is only some embodiments of the present invention, for those of ordinary skill in the art From the point of view of, on the premise of not paying creative work, it is also possible to obtain the attached of other according to these accompanying drawings Figure.
The block diagram of a kind of intelligent switch that Fig. 1 provides for the embodiment of the present invention one;
Fig. 2 is the phase curve figure of the alternating current that the present invention obtains according to the instantaneous value of alternating current;
The block diagram of a kind of intelligent control network that Fig. 3 provides for the embodiment of the present invention two;
The flow chart of the control method of a kind of intelligent switch that Fig. 4 provides for the embodiment of the present invention three.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with this Accompanying drawing in inventive embodiments, clearly and completely retouches the technical scheme in the embodiment of the present invention State, it is clear that described embodiment is a part of embodiment of the present invention rather than whole embodiments. Element described in the accompanying drawing of the present invention or a kind of embodiment and feature can with one or Element shown in other accompanying drawings more or embodiment and feature combine.It should be noted that, in order to Clearly purpose, accompanying drawing and explanation eliminate unrelated to the invention, those of ordinary skill in the art Known parts and the expression of process and description.Based on the embodiment in the present invention, the common skill in this area All other embodiments that art personnel are obtained on the premise of not paying creative work, broadly fall into The scope of protection of the invention.
Embodiment one
The block diagram of a kind of intelligent switch that Fig. 1 provides for the embodiment of the present invention one.This intelligent switch connects Having load, it is specifically for controlling the state of load, in a kind of optional structure, on this intelligent switch Can be provided with local input module, this local input module can include, such as, is arranged on this intelligent switch Upper, for controlling to be connected to the button of the load of this intelligent switch;Also can be provided with such as on intelligent switch, Remote communication module, for remotely receiving control instruction from other intelligent switch, so that this intelligent switch Control to be connected to the state of its load.
As it is shown in figure 1, the intelligent switch that the present embodiment provides includes: at least one relay 12, Detection device 14, acquisition module 16, Time Calculation module 18 and controller 19, acquisition module 16 are connected with detection device 14 and Time Calculation module 18, Time Calculation module 18 and controller 19 connect.Controller 19 specifically can be connected with relay 12 by drive circuit.This at least one Relay 12 is used for connecting load, and when needing the state changing a certain load, controller can be at this Under the triggering triggering control instruction that is lower or that remotely receive of ground button, control to connect controlled load Relay 12 action.The actuating of relay, specifically can include that controlling relay is opened or closed.Above-mentioned Controlled load refers to, the load corresponding with the control instruction that controller 19 obtains.Above-mentioned acquisition module 16, Time Calculation module 18 can integrate with controller 19.
Such as, can come to controller by triggering the button of corresponding controlled load on this intelligent switch 19 input control instructions.Or, the control instruction that controller 19 can send according to other intelligent switch, Control the actuating of relay being connected with controlled load.
Detection device 14 is passed through the instantaneous of the alternating current of the relay 12 that controlled load connects for detection Value, specifically, alternating current is before being passed through relay, and device 14 detects its instantaneous value the most after testing.
Acquisition module 16 includes frequency acquisition module 162, for the wink of receiving detection device 14 detection Duration.Frequency acquisition module 162 is for determining alternating current according to instantaneous value relation over time Frequency.
Acquisition module 16 also includes time-obtaining module 164, for by frequency acquisition module 162 The time point of the frequency acquisition zero-crossing of alternating current obtained.
Time Calculation module 18 is used for, and time point and the actuating of relay according to zero-crossing of alternating current prolong Time late, calculate the time point controlling relay.Above-mentioned " controlling the time point of relay " can refer to, Such as, send, to relay, the time being used for driving the signal of the actuating of relay rather than relay is real The time of border action.
Controller 19 is used for, and controls the actuating of relay according to the time point of described control relay.Control Device 19 processed specifically for: controlled before the time point of zero-crossing of alternating current controlled load connect continue Electrical equipment action, wherein the difference of the time of the time point of the time point of zero crossing and control relay is, quilt Control loads the action time delay that the relay connected is intrinsic, i.e. controller 19 is by alternating current zero passage The time point of point deducts actuating of relay time delay, as the time point controlling relay.Such as, If action time delay of the relay 12 being connected with current controlled load is t millisecond, exchange Electricity zero crossing time point is t0, then controller 19 is when (t0-t), sends and controls this relay The control signal of device 12 action, after relay is triggered, through the time delay of intrinsic t millisecond, can Just at the t0 moment, the namely time point of zero-crossing of alternating current, disconnect according to this control instruction Or Guan Bi.In this way, it is ensured that relay action when the instantaneous value minimum of alternating current.
In such scheme, it is passed through the instantaneous of the alternating current of relay that is connected with controlled load by detection Value, and determine the frequency of alternating current according to the time dependent relation of instantaneous value of detection, due to can root The time point of zero-crossing of alternating current is determined according to ac frequency, and according to the time point of zero-crossing of alternating current With actuating of relay time delay, calculate the time point controlling relay, therefore receive for Control load control instruction time, can suitable time point control relay, such as zero crossing it The front control actuating of relay so that relay just action near zero point phase place, effectively protects relay Device is not by heavy current impact, and cost is relatively low.Therefore, this programme can not only effective protective relay And intelligent switch, extend relay and intelligent switch life-span, and can be for intrinsic the moving of relay Make to determine the time point controlling the actuating of relay flexibly time delay, therefore can realize different relays Self adaptation.
Above-mentioned " action near zero point phase place " does not implies that, strictly action at zero point phase place, But allow certain error, it is also possible to action away from the phase point close to zero point.
Further, frequency acquisition module 162 obtains alternating current phases song according to the instantaneous value of alternating current Line, frequency according to alternating current phases curve acquisition alternating current.The phase curve of alternating current can be fine Reaction alternating current instantaneous value rule over time, be conducive to quickly determine ac frequency.
Fig. 2 is the phase curve figure of the alternating current that the present invention obtains according to the instantaneous value of alternating current.That is, Frequency acquisition module 162 can obtain such as figure according to the instantaneous value of the alternating current of detection device 14 detection Phase curve shown in 2.In Fig. 2, horizontal axis representing time, the longitudinal axis represents curtage amplitude. As in figure 2 it is shown, the zero point phase place of alternating current, refer to the point that the phase curve of alternating current is compared with transverse axis, Such as a, b, c, d point;Peak phase, refers at the crest of phase curve of alternating current, such as e, f At point, or the trough of the phase curve of alternating current, such as g, h point.
Above-mentioned detection device 14 can include photoelectrical coupler, and such as EL(field causes) 817S paster, Utilize photoelectrical coupler, can implement, detect exactly the instantaneous value of alternating current.
Alternatively, frequency acquisition module 162 obtain alternating current frequency time, specifically for:
At the first phase point that two amplitudes of crest two side draw of alternating current phases curve are equal;
At the second phase point that next two amplitude of crest two side draw of alternating current phases curve are equal;
Take the first time point corresponding to center of said two first phase point line, and described two The second time point corresponding to individual second phase point line center;
According to the time difference between described second time point and first time point, calculate described alternating current Frequency.
Next crest above-mentioned refers to, the arbitrary crest after crest between two first phase points, That is, above-mentioned two crest can be adjacent, it is possible to non-conterminous, as long as can be according to the second time point and first Time difference between time point obtains the frequency of alternating current.
Such as, frequency acquisition module 162 can be at a crest (such as e point) of alternating current phases curve Take phase point i on the ascending curve of side, the decline curve of this crest opposite side take phase point j, Amplitude at phase point i and j is equal, and the line center corresponding t3 moment of phase point i with j.
Further, frequency acquisition module 162 is also on the ascending curve of next crest (such as f point) side Take phase point k, the decline curve of this next crest opposite side takes phase point l, phase point k and Amplitude at l is equal, and the line center corresponding t9 moment of phase point k with l.
Then, frequency acquisition module 162 takes t9 moment and the time interval in t3 moment, between this time Every cycle of alternating current can be represented, seek the inverse in the cycle of alternating current, the frequency of alternating current can be calculated Rate.
Two phase values equal by taking amplitude respectively in crest both sides, and take these two phase values even Time point corresponding to line center, make use of the symmetry of phase curve, can obtain frequency more accurately Value, reduces and individually takes the zero point of phase curve or peak value to calculate the error of ac frequency.
According to the ac frequency obtained, it may be determined that alternating current when zero crossing, such as, determining After the frequency of alternating current, it may be determined that alternating current will at t11 moment zero crossing, if the action of relay Time delay is (t11-t10) millisecond, then controller 19 controls the actuating of relay in the t10 moment, I.e. to relay send control signal, relay under the triggering of this control signal, time delay (t11- T10) it is opened or closed after millisecond.
Embodiment two
The block diagram of a kind of intelligent control network that Fig. 3 provides for the embodiment of the present invention two.As it is shown on figure 3, This intelligent control network includes above-mentioned intelligent switch, and this intelligent switch connects load.
The intelligent control network of the present embodiment can include can between multiple intelligent switch, and each intelligent switch By the way of long-range, send control instruction to the controller 19 of other intelligent switch, and each intelligence is opened Pass can include that multiple relay, the plurality of relay are connected to different loads, when needs control wherein one When the state of certain load of individual intelligent switch changes, controller 19 can be at corresponding local keys of key Obtain control instruction under triggering, or remotely receive corresponding control instruction from other intelligent switch, and Control corresponding relay 12 so that it is action near the zero point phase place of alternating current.
The operation principle of the intelligent switch that the operation principle of each intelligent switch is a kind of with embodiment is identical, no Repeating.
The intelligent control network that the present embodiment provides, intelligent switch therein is passed through with controlled by detection The instantaneous value of the alternating current of the relay that load connects, and the instantaneous value according to detection is time dependent Relation determines the frequency of alternating current, owing to can determine the time of zero-crossing of alternating current according to ac frequency Point, and according to the time point of zero-crossing of alternating current and actuating of relay time delay, calculate control and continue The time point of electrical equipment, therefore when receiving the control instruction for controlling load, can be when suitable Between point control relay, such as before zero crossing control the actuating of relay so that relay just exists Action near zero point phase place, effective protective relay is not by heavy current impact, and cost is relatively low.Therefore, This programme can not only effectively protective relay and intelligent switch, extend relay and intelligent switch longevity Life, and the control actuating of relay can be determined flexibly time delay for the action that relay is intrinsic Time point, therefore can realize the self adaptation to different relays.
Embodiment three
The flow chart of the control method of a kind of intelligent switch that Fig. 4 provides for the embodiment of the present invention three.As Shown in Fig. 4, the method comprises the following steps S41, S43, S45, S47.
Step S41: obtain the control instruction of controlled load;
Step S43: detection is passed through the instantaneous value of the alternating current of the relay that controlled load connects;
Step S45: determine the frequency of described alternating current according to described instantaneous value relation over time, And by the time point of this frequency acquisition zero-crossing of alternating current;
Step S47: according to the time point of zero-crossing of alternating current and actuating of relay time delay, determine Control the time point of the actuating of relay;;
Step S49: according to the time point of the described control actuating of relay, controls the actuating of relay.
The effective protective relay of such scheme not by heavy current impact, extend while relay life, Cost is relatively low, is suitable for different relays.
In step S45, " determine described alternating current according to described instantaneous value relation over time Frequency " specifically include: according to the instantaneous value acquisition alternating current phases curve of described alternating current, and according to The frequency of described alternating current phases curve acquisition alternating current.Such as can obtain according to the instantaneous value of alternating current Alternating current phases curve as shown in Figure 2, to represent alternating current instantaneous value relation over time.
Further, specifically include " according to the frequency of alternating current phases curve acquisition alternating current ":
At the first phase point that two amplitudes of crest two side draw of alternating current phases curve are equal, such as phase Site i, j;
At the second phase point that next two amplitude of crest two side draw of alternating current phases curve are equal, as Phase point k, l;
Take the first time point corresponding to center of said two first phase point line, such as t3, with And the second time point corresponding to said two second phase point line center, such as t9;
According to the time difference between described second time point and first time point, calculate described alternating current Frequency, as the time difference between t9 and t3 represents the cycle of alternating current, by inverted to the cycle The frequency of alternating current can be obtained.
Two phase values equal by taking amplitude respectively in crest both sides, and take these two phase values even Time point corresponding to line center, make use of the symmetry of phase curve, can obtain frequency more accurately Value, reduces and individually takes the zero point of phase curve or error that peak computational ac frequency brings.
Alternatively, in step S47, " determining the time point controlling the actuating of relay " specifically includes: The time point of zero-crossing of alternating current is deducted actuating of relay time delay, as controlling the actuating of relay Time point.
Alternatively, in step S41, obtain the control instruction of controlled load " specifically include: setting Under the triggering of the button on intelligent switch, obtain the control instruction of controlled load.Alternatively, in step In rapid S41, obtain the control instruction of controlled load " specifically include: remotely receive other intelligent switch The control instruction sent.
In the various embodiments described above of the present invention, the sequence number of embodiment and/or sequencing are merely convenient of to be retouched State, do not represent the quality of embodiment.Description to each embodiment all emphasizes particularly on different fields, certain embodiment In do not have describe in detail part, may refer to the associated description of other embodiments.
One of ordinary skill in the art will appreciate that: realize all or part of step of said method embodiment Suddenly can be completed by the hardware that programmed instruction is relevant, aforesaid program can be stored in a computer In read/write memory medium, this program upon execution, performs to include the step of said method embodiment; And aforesaid storage medium includes: read only memory (Read-Only Memory is called for short ROM), Random access memory (Random Access Memory is called for short RAM), magnetic disc or CD etc. The various media that can store program code.
In the embodiments such as apparatus and method of the present invention, it is clear that each parts or each step are to divide Solve, combine and/or decompose after reconfigure.These decompose and/or reconfigure and should be regarded as the present invention Equivalents.Meanwhile, in description to the specific embodiment of the invention above, implement for one Mode describes and/or the feature that illustrates can be in same or similar mode one or more other Embodiment uses, combined with the feature in other embodiment, or substitute other embodiment In feature.
It should be emphasized that term " include/comprise " referring to when using herein feature, key element, step or The existence of assembly, but it is not precluded from depositing of one or more further feature, key element, step or assembly Or additional.
Last it is noted that although the present invention and advantage thereof have been described in detail above, but should When understanding in the situation without departing from the spirit and scope of the present invention being defined by the claims appended hereto Under can carry out various change, substitute and convert.And, the scope of the present invention is not limited only to description Described process, equipment, means, the specific embodiment of method and steps.Common in this area Technical staff will readily appreciate that from the disclosure, according to the present invention can use execution with Function that this described corresponding embodiment is essentially identical or obtain the result essentially identical with it, show Have and process, equipment, means, method or step the most to be developed.Therefore, appended power Profit requires to be directed in the range of them including such process, equipment, means, method or step.

Claims (8)

1. an intelligent switch, it is characterised in that including:
At least one relay, is used for connecting load;
Detection device, for detecting the instantaneous of the alternating current of the relay being passed through controlled load connection Value;
Acquisition module, including described for determining according to described instantaneous value relation over time The frequency acquisition module of the frequency of alternating current, and for by this frequency acquisition alternating current zero passage The time-obtaining module of the time point of point;
Time Calculation module, for prolonging according to time point and the actuating of relay of zero-crossing of alternating current Time late, calculate the time point controlling the actuating of relay;
Controller, controls the actuating of relay for the time point according to the described control actuating of relay.
Intelligent switch the most according to claim 1, it is characterised in that described frequency obtains Delivery block is additionally operable to instantaneous value according to described alternating current and obtains alternating current phases curve, and according to The frequency of described alternating current phases curve acquisition alternating current.
Intelligent switch the most according to claim 1, it is characterised in that described detection fills Put and include photoelectrical coupler.
4. an intelligent control network, opens including the intelligence described in any one of claim 1-3 Close.
5. the control method of an intelligent switch, it is characterised in that including:
Obtain the control instruction of controlled load;
Detection is passed through the instantaneous value of the alternating current of the relay that controlled load connects;
Determine the frequency of described alternating current according to described instantaneous value relation over time, and lead to Cross the time point of this frequency acquisition zero-crossing of alternating current;
Time point according to zero-crossing of alternating current and actuating of relay time delay, determine that control continues The time point of electrical equipment action;
According to the time point of the described control actuating of relay, control the actuating of relay.
The control method of intelligent switch the most according to claim 5, it is characterised in that It is concrete " to determine the frequency of described alternating current according to described instantaneous value relation over time " Including:
Instantaneous value according to described alternating current obtains alternating current phases curve, and according to described exchange Electricity phase curve obtains the frequency of alternating current.
The control method of intelligent switch the most according to claim 6, it is characterised in that " according to the frequency of described alternating current phases curve acquisition alternating current " specifically includes:
At the first phase point that two amplitudes of crest two side draw of alternating current phases curve are equal;
In the second phase that next two amplitude of crest two side draw of alternating current phases curve are equal Point;
Take the first time point corresponding to center of said two first phase point line, Yi Jisuo State the second time point corresponding to two second phase point line centers;
According to the time difference between described second time point and first time point, calculate described friendship The frequency of stream electricity.
The control method of intelligent switch the most according to claim 5, it is characterised in that Described " determining the time point controlling the actuating of relay " specifically includes: by zero-crossing of alternating current Time point deducts actuating of relay time delay, as the time point controlling the actuating of relay.
CN201310274443.5A 2013-07-02 2013-07-02 Intelligent switch and control method, intelligent control network Expired - Fee Related CN104299480B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310274443.5A CN104299480B (en) 2013-07-02 2013-07-02 Intelligent switch and control method, intelligent control network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310274443.5A CN104299480B (en) 2013-07-02 2013-07-02 Intelligent switch and control method, intelligent control network

Publications (2)

Publication Number Publication Date
CN104299480A CN104299480A (en) 2015-01-21
CN104299480B true CN104299480B (en) 2016-08-24

Family

ID=52319187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310274443.5A Expired - Fee Related CN104299480B (en) 2013-07-02 2013-07-02 Intelligent switch and control method, intelligent control network

Country Status (1)

Country Link
CN (1) CN104299480B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105242728A (en) * 2015-10-28 2016-01-13 小米科技有限责任公司 Method and device controlling power on/off of intelligent socket, and the intelligent socket
CN108363318A (en) * 2018-02-11 2018-08-03 四川虹美智能科技有限公司 A kind of method, system and a kind of control chip of the switching of control on off state
CN108766835A (en) * 2018-06-05 2018-11-06 深圳绿米联创科技有限公司 Intelligent switch and its control method
CN108896813A (en) * 2018-06-29 2018-11-27 广东美的环境电器制造有限公司 A kind of detection method of zero cross signal, system, device and computer storage medium
CN112864731A (en) * 2021-01-13 2021-05-28 宁波公牛数码科技有限公司 Smart jack and control method for smart jack
CN113203890B (en) * 2021-05-10 2022-08-30 深圳市海和科技股份有限公司 Load control method, device and storage medium
CN115527804A (en) * 2022-10-19 2022-12-27 聆思半导体技术(苏州)有限公司 Intelligent switch delay control time self-adjusting method, chip and circuit

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB956896A (en) * 1960-09-23 1964-04-29 Standard Telephones Cables Ltd Circuit arrangement for detecting the signal of the greatest value from a set of signals
CN201118539Y (en) * 2007-09-27 2008-09-17 王廷严 Intelligent compound switch
CN101599660A (en) * 2008-06-06 2009-12-09 深圳市海洋王照明科技股份有限公司 A kind of alternating current is changing method and system at random
CN201994588U (en) * 2011-02-22 2011-09-28 李彬雄 Intelligent switch

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB956896A (en) * 1960-09-23 1964-04-29 Standard Telephones Cables Ltd Circuit arrangement for detecting the signal of the greatest value from a set of signals
CN201118539Y (en) * 2007-09-27 2008-09-17 王廷严 Intelligent compound switch
CN101599660A (en) * 2008-06-06 2009-12-09 深圳市海洋王照明科技股份有限公司 A kind of alternating current is changing method and system at random
CN201994588U (en) * 2011-02-22 2011-09-28 李彬雄 Intelligent switch

Also Published As

Publication number Publication date
CN104299480A (en) 2015-01-21

Similar Documents

Publication Publication Date Title
CN104299480B (en) Intelligent switch and control method, intelligent control network
CN103728514B (en) Fault diagnosis method for low-voltage frequency converter
CN106526474A (en) Zero-crossing operation test system and method for load switch for electric energy meter
CN105738765A (en) Power distribution network fault positioning method based on feeder line terminals and genetic algorithm
CN107800119B (en) A kind of dc circuit breaker simulation model and method
CN104270026A (en) Three-level wave-by-wave current limiting control method and system
CN103838222B (en) Industrial automation control system double are the active-standby switch unit of hot-backup system
CN104570786B (en) Multi-load interlock circuit and its control method
CN108206522A (en) A kind of status of electric power monitoring method and system
CN104993582B (en) The control method and device of power system
CN102110985A (en) Reactive power compensation device for thyristor cyclically-switched capacitor
CN103955161B (en) A kind of supervisory circuit and electronic equipment
CN106058907A (en) Method of inputting line into DC network in multi-end flexible DC power transmission system
CN203299594U (en) Electrical equipment control system based on sine wave voltage
CN105892379B (en) A kind of method and intelligent controller to pre- power purchase arrearage trip(ping) circuit implementing monitoring
CN104503235A (en) Condition monitoring method based on improved BP neural network for power plant equipment
CN201780353U (en) Fault line selection device for distribution line of low current grounding system
CN202281825U (en) Intelligent electric energy meter built-in load switch test circuit
CN105867344A (en) Method and device for monitoring state of temperature control equipment
CN107340721B (en) Automatic conversion device of flexible direct-current real-time simulation interface
CN105914889A (en) Power distribution monitoring instrument capable of changing phase sequence automatically and working method thereof
CN109103850A (en) Storage medium, the short-circuit protection control method of bidirectional power converter, apparatus and system
CN105811387A (en) Novel coupling power fault current limiter
CN109193573A (en) Storage medium, the short-circuit protection control method of bidirectional power converter, apparatus and system
CN207234680U (en) Multifunctional power module, more power adapters and polymorphic type impulse generator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20180702