CN104297793A - 一种在地震剖面上绘制地层的方法 - Google Patents

一种在地震剖面上绘制地层的方法 Download PDF

Info

Publication number
CN104297793A
CN104297793A CN201310303982.7A CN201310303982A CN104297793A CN 104297793 A CN104297793 A CN 104297793A CN 201310303982 A CN201310303982 A CN 201310303982A CN 104297793 A CN104297793 A CN 104297793A
Authority
CN
China
Prior art keywords
stratum
face
drafting
reference field
bottom face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310303982.7A
Other languages
English (en)
Inventor
杨平
李海银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
BGP Inc
Original Assignee
China National Petroleum Corp
BGP Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, BGP Inc filed Critical China National Petroleum Corp
Priority to CN201310303982.7A priority Critical patent/CN104297793A/zh
Publication of CN104297793A publication Critical patent/CN104297793A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

本发明是一种在地震剖面上绘制地层的方法,当以地震剖面最小时间或深度值作为基准面时绘制地层的底面,将地层的底面正上方且紧邻底面的地层的底面作为地层的顶面;如果地层的底面正上方没有其它地层,则将底面正上方的基准面作为地层的顶面;在地震剖面上将地层的顶面和底面之间的部分进行半透明的充填,完成地层的绘制。本发明可以在地震剖面的解释过程中,以曲边形的方式直接绘制出地层,并可快速实现地层的增加、分割与合并,从而可以完成任意多套地层的绘制,并能直接显示出地层的位置、形态及相互关系。

Description

一种在地震剖面上绘制地层的方法
技术领域
本发明涉及石油及天然气勘探、开发技术,具体是一种在地震剖面上绘制地层的方法。
背景技术
在石油及天然气工业中,地层是具有一定厚度及平面展布范围的岩石层。石油及天然气是蕴藏在特定的地层中的。现代石油及天然气的勘探、开发在很大程度上需要利用地震勘探技术来确定目标地层的位置、形态及相互关系,并用于井位设计与储量计算。地震勘探总体上讲可以分为地震资料采集、处理和解释三大环节,上述地层的位置、形态及相互关系的确定,就是在资料解释环节最终实现的。
由于地层在三维空间上是一个体,因此它在地震剖面(垂直截面)上表现为一个曲边形。地层的顶面或底面通常被称为层位,层位在地震剖面上则表现为一条曲线。现有的软件不直接绘制地层,而是通过绘制层位来间接表示地层。即是在地震剖面上,用不同颜色的曲线绘制出代表地层顶面(或底面)的层位,人们通过分析层位之间的相互关系来认识地层的位置、形态及相互关系。由于这种方法是用曲线表示地层的顶、底面,而不是用曲边形直接表示地层,它最大的缺点就是不直观,进行地层分析不方便,有时会误导形态及相互关系的判断。
发明内容
本发明的目的是提供一种直观地表示出地层位置、形态及相互关系的在地震剖面上绘制地层的方法。
本发明通过如下步骤实现:
1)采集得到地震资料,处理后得到地震剖面;
2)当以地震剖面最小时间或深度值作为基准面B时:
绘制地层La的底面Ba;将地层La的底面Ba正上方且紧邻底面Ba的地层Lb的底面Bb作为地层La的顶面Ta;如果地层La的底面Ba正上方没有其它地层,则将底面Ba正上方的基准面B作为地层La的顶面Ta
3)当以最大时间或深度值作为基准面B时:
绘制地层La的顶面Ta;将地层La的顶面Ta正下方且紧邻顶面Ta的地层Lb的顶面Tb作为地层La的底面Ba;如果地层La的顶面Ta正下方没有其它地层,则将顶面Ta正下方的基准面B作为地层La的底面Ba
4)在地震剖面上将地层La的顶面Ta和底面Ba之间的部分进行半透明的充填,完成地层La的绘制。
步骤2)和步骤3)所述的绘制地层La的底面Ba或顶面Ta采用点和点之间直线插值法,或点和点之间按照最大、最小、或固定振幅值插值法。
步骤4)所述的半透明充填的图案、颜色及透明度任选。
本发明可以在地震剖面的解释过程中,以曲边形的方式直接绘制出地层,并可快速实现地层的增加、分割与合并,从而可以完成任意多套地层的绘制,并能直接显示出地层的位置、形态及相互关系。为后续地质分析研究提供了一种更直观的层位显示结果。
本发明要实现在地震剖面上用曲边形直接绘制出地层,以取代传统的用曲线来间接表示地层的方法。可以直接绘制出地层,并直观地表示出其位置、形态及相互关系的方法,使得地震资料解释的结果更加有利于地质分析。
本发明是在现有层位绘制方法的基础上,通过后台操作来实现地层的绘制的。不会增加解释人员的工作量,也不会大幅度改变现有的操作方法和习惯,实现和应用都非常方便。
附图说明
图1是本发明以地震剖面最小时间值作为基准面B时绘制地层La的示意图;
图2是本发明以地震剖面最大时间值作为基准面B时绘制地层La的示意图;
图3是本发明将地层L3分割为地层La和Lb的示意图;
图4是本发明将地层L3和L4合并为地层La的示意图。
具体实施方式
实例1:下面以一条剖面的地层绘制过程为例,对本发明进行详细说明。
1)采集得到地震资料,处理后得到地震剖面;
2)当以地震剖面最小时间或深度值作为基准面B时:
绘制地层La的底面Ba;将地层La的底面Ba正上方且紧邻底面Ba的地层Lb的底面Bb作为地层La的顶面Ta;如果地层La的底面Ba正上方没有其它地层,则将底面Ba正上方的基准面B作为地层La的顶面Ta
图1是以地震剖面最小时间值作为基准面B时绘制地层La的示意图。图中地震剖面的最小时间值为1760ms,以其作为基准面B。绘制地层La的底面Ba后,在段,底面Ba正上方且紧邻底面Ba的地层为Lc,因此以地层Lc的底面Bc作为地层La的顶面Ta;在段,底面Ba正上方且紧邻底面Ba的地层为Lb,因此以地层Lb的底面Bb作为地层La的顶面Ta;在段,底面Ba正上方没有其它地层,则将基准面B作为地层La的顶面Ta
3)当以最大时间或深度值作为基准面B时:
绘制地层La的顶面Ta;将地层La的顶面Ta正下方且紧邻顶面Ta的地层Lb的顶面Tb作为地层La的底面Ba;如果地层La的顶面Ta正下方没有其它地层,则将顶面Ta正下方的基准面B作为地层La的底面Ba
图2是以地震剖面最大时间值作为基准面B时绘制地层La的示意图。图中地震剖面的最大时间值为2060ms,以其作为基准面B。绘制地层La的顶面Ta后,在段,顶面Ta正下方没有其它地层,则将基准面B作为地层La的底面Ba;在段,顶面Ta正下方且紧邻顶面Ta的地层为Lb,因此以地层Lb的顶面Tb作为地层La的底面Ba;在段,顶面Ta正下方且紧邻顶面Ta的地层为Lc,因此以地层Lc的顶面Tc作为地层La的底面Ba
4)在地震剖面上将地层La的顶面Ta和底面Ba之间的部分进行半透明的充填,完成地层La的绘制。
如图1和图2所示,在地震剖面上将地层La的顶面Ta和底面Ba之间的部分进行半透明的充填,完成地层La的绘制。
步骤2)和步骤3)所述的绘制地层La的底面Ba或顶面Ta采用点和点之间直线插值法,或点和点之间按照最大、最小、或固定振幅值插值法。
步骤4)所述的半透明充填的图案、颜色及透明度任选。
实例2:出于精细分析地层的需要,可以利用本发明所述的方法将一个地层分割为两个地层。举例说明如下:
如图3所示,在以地震剖面最小时间值作为基准面B时,将地层L3分割为上部地层La和下部地层Lb两套地层。首先绘制上部地层La的底面Ba,利用本发明步骤2)的方法计算La的顶面Ta,并按照本发明步骤4)的方法完成地层La的顶面Ta和底面Ba之间的半透明充填;然后以地层L3的底面B3作为地层Lb的底面Bb,利用本发明步骤2)的方法计算Lb的顶面Tb,并按照本发明步骤4)的方法完成地层Lb的顶面Tb和底面Bb之间的半透明充填;由此完成地层L3的分割。
实例3:出于宏观分析地层的需要,可以利用本发明所述的方法将两个地层合并为一个地层。举例说明如下:
如图4所示,在以地震剖面最小时间值作为基准面B时,将地层L3和地层L4合并为一个地层La。首先删除地层L3的底面B3;然后以地层L4的底面B4作为地层La的底面Ba,按照本发明步骤2)的方法计算La的顶面Ta,并按照本发明步骤4)的方法完成地层La的顶面Ta和底面Ba之间的半透明充填;由此完成地层L3与L4的合并。

Claims (3)

1.一种在地震剖面上绘制地层的方法,特点是通过如下步骤实现:
1)采集得到地震资料,处理后得到地震剖面;
2)当以地震剖面最小时间或深度值作为基准面B时:
绘制地层La的底面Ba;将地层La的底面Ba正上方且紧邻底面Ba的地层Lb的底面Bb作为地层La的顶面Ta;如果地层La的底面Ba正上方没有其它地层,则将底面Ba正上方的基准面B作为地层La的顶面Ta
3)当以最大时间或深度值作为基准面B时:
绘制地层La的顶面Ta;将地层La的顶面Ta正下方且紧邻顶面Ta的地层Lb的顶面Tb作为地层La的底面Ba;如果地层La的顶面Ta正下方没有其它地层,则将顶面Ta正下方的基准面B作为地层La的底面Ba
4)在地震剖面上将地层La的顶面Ta和底面Ba之间的部分进行半透明的充填,完成地层La的绘制。
2.根据权利要求1的方法,特点是步骤2)和步骤3)所述的绘制地层La的底面Ba或顶面Ta采用点和点之间直线插值法,或点和点之间按照最大、最小、或固定振幅值插值法。
3.根据权利要求1的方法,特点是步骤4)所述的半透明充填的图案、颜色及透明度任选。
CN201310303982.7A 2013-07-19 2013-07-19 一种在地震剖面上绘制地层的方法 Pending CN104297793A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310303982.7A CN104297793A (zh) 2013-07-19 2013-07-19 一种在地震剖面上绘制地层的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310303982.7A CN104297793A (zh) 2013-07-19 2013-07-19 一种在地震剖面上绘制地层的方法

Publications (1)

Publication Number Publication Date
CN104297793A true CN104297793A (zh) 2015-01-21

Family

ID=52317595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310303982.7A Pending CN104297793A (zh) 2013-07-19 2013-07-19 一种在地震剖面上绘制地层的方法

Country Status (1)

Country Link
CN (1) CN104297793A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107729105A (zh) * 2017-09-29 2018-02-23 中国石油化工股份有限公司 一种基于Web的地震底图与剖面联动方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010036294A1 (en) * 2000-04-26 2001-11-01 Elf Exploration Production Method of chrono-stratigraphic interpretation of a seismic cross section or block
CN1797037A (zh) * 2004-12-29 2006-07-05 中国石油天然气集团公司 一种地震波波阻抗反演的方法
CN102646141A (zh) * 2012-02-17 2012-08-22 上海同岩土木工程科技有限公司 一种非等深钻孔的地质剖面图自动成图方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010036294A1 (en) * 2000-04-26 2001-11-01 Elf Exploration Production Method of chrono-stratigraphic interpretation of a seismic cross section or block
CN1797037A (zh) * 2004-12-29 2006-07-05 中国石油天然气集团公司 一种地震波波阻抗反演的方法
CN102646141A (zh) * 2012-02-17 2012-08-22 上海同岩土木工程科技有限公司 一种非等深钻孔的地质剖面图自动成图方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄铮: "青东地区新生代地层格架及展布特征", 《中国优秀硕士学位论文全文数据库 基础科学辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107729105A (zh) * 2017-09-29 2018-02-23 中国石油化工股份有限公司 一种基于Web的地震底图与剖面联动方法

Similar Documents

Publication Publication Date Title
McDonnell et al. Quantifying the origin and geometry of circular sag structures in northern Fort Worth Basin, Texas: Paleocave collapse, pull-apart fault systems, or hydrothermal alteration?
Toscani et al. Plio-Quaternary tectonic evolution of the Northern Apennines thrust fronts (Bologna-Ferrara section, Italy): seismotectonic implications
CN104695862B (zh) 一种致密砂岩岩性气藏水平井钻井地质设计方法
CN100429528C (zh) 一种沉积相控制预测砂岩油藏储层属性的方法
CN105469443A (zh) 基于地质路线(prb)过程双重建模生成三维地质图的方法
CN104314563A (zh) 一种煤层气储层可压裂性的测井定量评价方法
Yuan et al. Structural characteristics of Keshen segmentation in Kelasu structural belt and its petroleum geological significance
CN106504324A (zh) 一种基于ActiveX技术的工程地质二三维剖面一体化绘制方法
Pola et al. Architecture of the western margin of the North Adriatic foreland: the Schio-Vicenza fault system
CN108107473B (zh) 地震偏移时间剖面构造畸变现象的校正方法
CN105653834B (zh) 基于层序地层原理的断裂瞬时活动定量确定方法
WO2012006604A3 (en) Methods and Devices for Transformation of Collected Data for Improved Visualization Capability
CN104809266A (zh) 一种基于样条曲线的工作面煤层赋存情况精确预测方法
CN104179498A (zh) 分带模拟饱和度方法
CN108121009A (zh) 开发后期复杂断块变速构造成图方法
Cong et al. Direct control of normal fault in hydrocarbon migration and accumulation in northwestern Bozhong subbasin, Bohai Bay Basin, China
CN105652341A (zh) 一种考虑古构造影响的快捷定量化古地貌恢复方法
CN107609265A (zh) 一种基于蚂蚁追踪的地层应力场有限元模拟方法及系统
CN102621594B (zh) 一种层理构造识别方法及系统
CN104297793A (zh) 一种在地震剖面上绘制地层的方法
CN109658512B (zh) 浅地层剖面三维多体建模方法
Pedroni From Production to Consumption: The Cultural Industry of Fashion, Inter-disciplinary
CN104234706A (zh) 一种含煤性测井敏感参数评价方法
CN107991702B (zh) 正断层时序的简单精准判定方法
Bian et al. Thin-skinned and thick-skinned tear faults in central Tarim Basin

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150121