CN104297616B - A kind of 10kV distribution line broken string method for detecting interacted based on multi-system information - Google Patents

A kind of 10kV distribution line broken string method for detecting interacted based on multi-system information Download PDF

Info

Publication number
CN104297616B
CN104297616B CN201410505067.0A CN201410505067A CN104297616B CN 104297616 B CN104297616 B CN 104297616B CN 201410505067 A CN201410505067 A CN 201410505067A CN 104297616 B CN104297616 B CN 104297616B
Authority
CN
China
Prior art keywords
distribution
line
broken string
data
lines
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410505067.0A
Other languages
Chinese (zh)
Other versions
CN104297616A (en
Inventor
郑蜀江
安义
蔡木良
王华云
潘建兵
李博江
刘蓓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410505067.0A priority Critical patent/CN104297616B/en
Publication of CN104297616A publication Critical patent/CN104297616A/en
Application granted granted Critical
Publication of CN104297616B publication Critical patent/CN104297616B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

A kind of 10kV distribution line broken string method for detecting interacted based on multi-system information, it is realized by multiple operation monitoring system information interaction technology on the basis of existing grid operating monitoring system.The method provides 10kV distribution line line broken string warning informations using distributing transformer monitoring data for operations staff on the basis of the three-dimensional network of transformer station's outlet branch line distribution transforming typical low pressure side, solve 10kV distribution lines disconnection fault and find difficult realistic problem, method can be in provincial power network Operation Monitoring Center centralized arrangement simultaneously, unified O&M, realize the whole province 10kV distribution line line broken string detecting alarms, jump out conventional electric power system automatics often to stand the pattern of advancing equipment, greatly reduce equipment purchasing, installation and debugging, the input of daily O&M maintenance, lifting distribution operational reliability, the cost input of Utilities Electric Co. is greatly reduced while the potential safety hazard for reducing circuit breaking initiation human casualty accident, possess preferable economic benefit and safety benefit.

Description

A kind of 10kV distribution line broken string method for detecting interacted based on multi-system information
Technical field
The present invention relates to a kind of 10kV distribution line broken string method for detecting interacted based on multi-system information, belongs to power information Technical field of automation.
Background technology
In China's network system, 10kV circuits are not solidly grounded system, once there is singlephase earth fault in 10kV circuits Or even disconnection fault, 10kV protection for feed line directly will not trip, but show as this one phase voltage of feeder line place bus and be reduced to Zero, another two-phase voltage rises to 1.732 times of specified phase voltage, but the line voltage of this feeder line is still normal.
Singlephase earth fault is generally judged by the Small Electric Current Earthing And Routing Device installed in transformer station at present.Provincial electricity Net has quite a few transformer station not install Small Electric Current Earthing And Routing Device, and is provided with the power transformation of Small Electric Current Earthing And Routing Device Stand, due to Small Electric Current Earthing And Routing Device self problem, transformer station's integrated system can only judge that certain section of bus goes out to a portion Existing singlephase earth fault, it is impossible to accurately judge single-phase earthing or disconnection fault 10kV circuits.Advise further according to management and running Journey, due to not affecting user power utilization, 10kV circuits still run 2 hours in the case of it there is singlephase earth fault, but if send out Raw is disconnection fault, and still charging operation can bring very big potential safety hazard to circuit, can cause human casualty accident when serious.Therefore 10kV line disconnection failures are found in time, respective handling measure are taken for avoiding state's electricity grid company industrial accident from having Significance.
China power system 10kV systems are not solidly grounded system, distribution transformer mainly based on Dyn11 wiring, when When 10kV circuits occur singlephase earth fault, transformer station shows as this one phase voltage of feeder line place bus and is reduced to zero, another two-phase Voltage rises to 1.732 times of specified phase voltage, but the line voltage of this feeder line is still normal.If there is disconnection fault in 10kV circuits, And disconnection fault point is unearthed, now in transformer station, operating condition, without significant change, will not even report singlephase earth fault, if Break point is nearer apart from mains side, and operations staff can reduce to judge circuit operation exception by the phase current that breaks, if but breaking From mains side farther out, then the phase current reduces not substantially point, finds that failure brings very big difficulty in time to operations staff.In addition with The popularization of unattended operation transformer station, transformer station generally takes Centralized Monitoring pattern, and operator operator monitoring amount is big, It was found that the phase load electric current reduction difficulty of certain 10kV feeder line is very big.
Content of the invention
The purpose of the present invention is, in order to solve the detection problem of 10kV distribution lines broken string, the utility model proposes a kind of Based on the 10kV distribution line broken string method for detecting that multi-system information is interacted.
Realization the technical scheme is that, for the network system for being provided with EMS system and power information acquisition system, This method utilizes the singlephase earth fault alarm signal in the real-time managing and control system Real-time Collection EMS system of production, according in system Corresponding relation, search is connected on distribution transformer low-pressure side voltage signal on this section of bus on all 10kV feeder lines, such as finds There is distribution transformer low-pressure side voltage specific change occur, then judge that this feeder line there occurs that disconnection fault, system are sent at once Alarm signal takes treatment measures to repair personnel.
The step of realizing of 10kV distribution line broken string method for detecting that the present invention is a kind of to be interacted based on multi-system information is:
(1) the daily normal operation of the real-time managing and control system of production, collection EMS system and power information acquisition system are monitored 10kV distribution lines and distribution transformer operation information are simultaneously stored in data center;
(2) the 10kV distribution lines line broken string detecting application module in real-time managing and control system is produced according to distribution transformer monitoring data frequency 10kV distribution line single-phase earthing signals in rate retrieval data storage center;
(3) after 10kV distribution lines line broken string detecting application module detects 10kV distribution line single-phase earthing signals, according to The three-dimensional network of transformer station-outlet-branch line-distribution transforming-typical low pressure side, starts to retrieve the 10kV distribution lines Lower institute's tape splicing distribution transformer the last time and next time operational monitoring data;
(4) to distribution transformer, operational monitoring data are analyzed 10kV distribution lines line broken string detecting application module twice, When such as finding that certain power distribution voltage Monitoring Data reaches alarm threshold value, i.e., the distribution low-voltage side voltage has one mutually normally, and another two The amplitude of phase judges that between the 40%-60% of rated voltage amplitude, then the circuit may occur disconnection fault;
(5) 10kV distribution lines line broken string detecting application module sends the distribution line broken string alarm signal, with short message mode Supervisory control of substation personnel are notified to take break line treatment measure to the 10kV distribution lines.
The 10kV distribution lines line broken string detecting application module is software module, and its function is by distribution transformer low-pressure side Voltage magnitude variable quantity is counter to push away 10kV distribution lines broken string, and decision threshold range intervals are big;Can pass through to lift power information collection System improved the detecting speed broken by 10kV distribution lines to the operation information frequency acquisition of distribution transformer, at 30 minutes 10kV distribution line disconnection fault is inside detected;Generalized information system (GIS-Geographic Information System) information, 10kV distribution lines broken string is coordinated to detect Survey application module and also can achieve the fault location to 10kV distribution line break points.
The general principle of the present invention is that China power system 10kV systems are not solidly grounded system, distribution transformer master Will be based on Dyn11 wiring, when 10kV circuits occur singlephase earth fault, transformer station shows as this one phase of feeder line place bus Voltage is reduced to zero, and another two-phase voltage rises to 1.732 times of specified phase voltage, but the line voltage of this feeder line is still normal.If There is disconnection fault in 10kV circuits, and disconnection fault point is unearthed, now in transformer station operating condition without significant change, not even Singlephase earth fault can be reported, if break point is nearer apart from mains side, operations staff can reduce to judge by the phase current that breaks Circuit operation exception, if but break point from mains side farther out, the phase current reduces substantially, found to operations staff in time therefore Barrier brings very big difficulty.In addition with the popularization of unattended operation transformer station, transformer station generally takes Centralized Monitoring pattern, runtime value Class monitored by personnel workload is big, will find that a phase load electric current of certain 10kV feeder line reduces difficulty very big.Therefore, accurately and When detecting 10kV feeder lines there is disconnection fault, it is impossible to only rely on substation equipment operation information and judged, and will be in conjunction with the line Road distribution transformer operation information.There is Dyn11 distribution transformers fortune after Down-Line Fault Analysis break point with 10kV feeder lines below The change of row operating mode.
When normal, 10kV feeder line UA、UB、UCAmplitude is 5.77kV, 120 ° of phase, distribution transformer high-pressure side voltage UA' UB' UC' amplitudes are 5.77kV, 120 ° of phase, and distribution low-voltage side output voltage Ua, Ub, Uc amplitude is 220V, phase place 120 ° of difference, wiring schematic diagram is as shown in Figure 5.
When A phases break, 10kV feeder line UA、UB、UCAmplitude is 5.77kV, and 120 ° of phase, distribution transformer are high Pressure side A phase voltages are 0, and B, C phase voltage is 5.77kV, phase place with normal when keep constant, wiring schematic diagram is as shown in Figure 6.This When distribution transformer low-pressure side output voltage be phase that Ua, Ub, Uc amplitude is respectively 110V, 220V, 110V, a phase and c phase voltages Position is identical and 180 ° of phase with b phases.
The invention has the beneficial effects as follows, the inventive method is set up on the basis of existing grid operating monitoring system, need not Increase hardware device.This method is useful in provincial power network Operation Monitoring Center centralized arrangement, unified O&M, realizes that the whole province 10kV matches somebody with somebody Electric line disconnection monitoring, does not increase company of ground cities and counties of the whole province maintenance work amoun.
Description of the drawings
Fig. 1 is 10kV distribution line disconnection fault detecting flow process figures;
Fig. 2 is the real-time managing and control system of production and remaining system connected mode schematic diagram;
Fig. 3 is the real-time managing and control system Technical Architecture schematic diagram of production;
Fig. 4 is the real-time managing and control system building-block of logic of production;
Fig. 5 is the normal operation wiring schematic diagram of 10kV distribution lines;
Fig. 6 is 10kV distribution line broken string operation wiring schematic diagrams.
Specific embodiment
The present invention is embodied as in Jiangxi Province's electrical network:
The present invention implements to include data acquisition, the bus singlephase earth fault signal in collection transformer station's signal;10kV matches somebody with somebody Electric line line broken string detecting application module to distribution transformer operational monitoring and analysis, judge disconnection fault that circuit may occur and Send the distribution line broken string alarm signal.
The data acquisition of the present embodiment is using power information acquisition system and EMS (EMS).
EMS system has been had in all 12 prefecture-level companies of Jiangxi Province Power Network company at present, and EMS system achieves ground county and adjusts one Body, can realize all comprehensive monitorings and control from transformer station of the prefecture-level company and administrative company of county, by EMS system, can Obtain the corresponding relation of substation bus bar singlephase earth fault information and all 10kV feeder lines and 10kV buses.
Jiangxi Province Power Network company builds power information acquisition system, covers 130,000 public distribution transformers of the whole province, covers Rate up to 97.6%, by the data collection station Real-time Collection distribution transformer working voltage that is installed on distribution transformer, electricity Stream, power and electric quantity data, and by GPRS information transmissions to provincial company power information acquisition system main website.
As substation equipment operation information and distribution transformer operation information adhere to different system separately, public according to national grid Department's safety management regulations, EMS system data are stored in 1st area, and power information acquisition system data are stored in 3rd area, are to obtain two System data realizes that senior application, Jiangxi Province Power Network company have been built up the real-time managing and control system of production by exchange technology, passed through Develop data-interface respectively with EMS system and power information acquisition system, collect EMS system substation equipment operation information and Distribution transformer operation information, it is achieved that EMS system and the data sharing of power information acquisition system, produces real-time management and control at present System has been accessed with distribution transforming collecting device 132280 is adopted, and districts and cities and company of county plant stand access 1450, distribution line 9000 Bar, and corresponding low-pressure side user data.The three-dimensional network for building up transformer station-outlet-branch line-distribution transforming-typical low pressure side is opened up Flutter relation.Produce real-time managing and control system as shown in Figure 2 with remaining system connected mode.
The self-built data storage center of real-time managing and control system is produced, can will be collected from EMS system and used telecommunications Breath acquisition system information Store is in data center, and develops application service layer and presentation layer on the basis of data center, Application service layer is analyzed process on the basis of data center, realizes various application functions, presentation layer as system terminal, The web access functions of system terminal are achieved, user can realize the long-range visit to system by the communication information net of provincial company Ask function.The concrete framework of system is shown in Fig. 3, and logical hierarchy is divided sees Fig. 4.
As shown in figure 3, the real-time managing and control system general frame of production includes:
Data active layer:The data source of the system comes from major network PMS, rural power PMS, the plant stand EMS access system of various places, use Electric acquisition system, fault-indicating system, distribution automation, distribution transformer terminals monitoring.
Access service layer (Integration Center):The system is studied in CIM/CIS, WebServices technology and data normalization On the basis of, data are integrated, uniform data collection and data address bus platform is established, it is achieved that between each system application Point-to-point crossover network be connected to data/address bus come enter row information exchange transformation.In order to realize data in each system Between convenient exchange, switching centre of the data/address bus as data, it is achieved that electric network model and real-time grid data interim Real-time is stored, the newest section of bus storage electric network model and real time data.Data/address bus is responsible for obtaining number from data active layer According to, and data are provided to data center's layer.
Data storage layer (data center):Data storage layer is to obtain data by data access bus layer, sets up application Unrelated electric network data center, including real time data, historical data, artwork data etc., wherein real-time data base, historical data base Deng with standard, unified, open, transparent pattern, safe efficient, open, transparent data clothes are provided to multiple applications Business, is truly realized Distributed database service management.Data center adopts Unified coding, historical data to adopt device model object With standardization, normalization storage mode, realize that normalized data access service provides basis for each business datum.
Data analysis layer (service center):By data version management, Data Quality Analysis, fault trip analysis, data Arrangement, school of the functional realieys such as model management, historical data management, real time data releasing, artwork management to data centre data Test, calculate, analyzing etc. and maintenance management function is uniformly processed, making data meet the service application needs of various situations.And by number Significant information is excavated from the data of magnanimity according to the service such as service, aid decision, realize electrical network general and specific point Analysis, studies and judges including circuit, transformer tripping, current break is calculated, circuit transships calculating, distribution transforming again and transships calculating, the quality of data again Analysis, circuit, distribution transforming stoppage in transit analysis, the analysis of distribution transforming unusual service condition etc., to instruct the routine work of electrical network production run personnel.
Application presentation layer (data portal):Based on controller switching equipment Monitoring Data center and data, services, in conjunction with specific transactions Need and various analysis models, using collection SVG figure plug-in units, portlet technology, Flash icon-based techniques, Ajax the and Flex pages Technology etc. realizes distribution transforming real-time monitoring, distribution line monitoring, distribution fault tripping operation point in the uniform data exhibition platform of one The function such as analysis, distribution power supply capability analysis, distribution transformation analysis, realizes to transformer station-outlet-branch line-distribution transforming-low pressure allusion quotation The three-dimensional real-time management and control of type user, controls in real time 10kV outlets, distribution transforming, the voltage of user side, electric current, active, idle;To setting The standby general level of the health is analyzed, and analyzes electrical network weak link, and secondary distribution net is transformed, realize being analyzed power distribution network, diagnose, Assessment and evaluation.
10kV distribution lines broken string detecting function can be realized according to following steps:
1) the daily normal operation of the real-time managing and control system of production, collection EMS system and power information acquisition system are monitored 10kV distribution lines and distribution transformer operation information are simultaneously stored in data center;
2) the 10kV distribution lines line broken string detecting application module in real-time managing and control system is produced according to distribution transformer monitoring data frequency 10kV distribution line single-phase earthing signals in rate retrieval data storage center;
3) after 10kV distribution lines line broken string detecting application module detects 10kV distribution line single-phase earthing signals, according to change The three-dimensional network of power station-outlet-branch line-distribution transforming-typical low pressure side, starts to retrieve under the 10kV distribution lines Institute's tape splicing distribution transformer the last time and next time operational monitoring data;
4) to distribution transformer, operational monitoring data are analyzed 10kV distribution lines line broken string detecting application module twice, such as It was found that when certain power distribution voltage Monitoring Data reaches alarm threshold value, i.e., the distribution low-voltage side voltage has mutually normal, an another two-phase Amplitude judge that the circuit may occur disconnection fault between the 40%-60% of rated voltage amplitude, then;
5) 10kV distribution lines line broken string detecting application module sends the distribution line broken string alarm signal, logical with short message mode Know that supervisory control of substation personnel take break line treatment measure to the 10kV distribution lines.
The method has following technical characteristic:
1) realized with software function module form based on existing grid monitoring system, be not required to add any hardware;
2) principle is simple, and feature substantially, pushes away 10kV distribution wires by distribution transformer low-pressure side voltage amplitude variable quantity is counter Road is broken, and decision threshold range intervals are big, and application is convenient;
3) can be right to improve to the operation information frequency acquisition of distribution transformer by lifting power information acquisition system The detecting speed of 10kV distribution lines broken string, by current level, under most harsh conditions in 30 minutes can detect 10kV and match somebody with somebody Electric line disconnection fault;
4) coordinate generalized information system (GIS-Geographic Information System) information, can achieve the fault location to 10kV distribution line break points.

Claims (2)

1. a kind of based on multi-system information interact 10kV distribution line broken string method for detecting, it is characterised in that methods described profit With the real-time managing and control system of production, the singlephase earth fault alarm signal in Real-time Collection EMS system;According to the corresponding pass in system System, search are connected on the distribution transformer low-pressure side voltage signal on 10kV distribution lines on all 10kV feeder lines, judge that feeder line is sent out Raw disconnection fault, methods described realize that step is as follows:
(1) 10kV distribution lines and distribution transformer operation information that EMS system and power information acquisition system are monitored are collected And it is stored in data center;
(2) the 10kV distribution lines line broken string detecting application module produced in real-time managing and control system is examined according to distribution transformer monitoring data frequency 10kV distribution line single-phase earthing signals in rope data storage center;
(3) after 10kV distribution lines line broken string detecting application module detects 10kV distribution line single-phase earthing signals, according to power transformation Stand-the three-dimensional network of outlet-branch line-distribution transforming-typical low pressure side, start to retrieve institute under the 10kV distribution lines Tape splicing distribution transformer the last time and next time operational monitoring data;
(4) to distribution transformer, operational monitoring data are analyzed 10kV distribution lines line broken string detecting application module twice, such as send out When existing certain power distribution voltage Monitoring Data reaches alarm threshold value, i.e., the distribution low-voltage side voltage has one mutually normally, another two-phase Amplitude judges that between the 40%-60% of rated voltage amplitude, then the circuit may occur disconnection fault;
(5) 10kV distribution lines line broken string detecting application module sends the distribution line broken string alarm signal, is notified with short message mode Supervisory control of substation personnel take break line treatment measure to the 10kV distribution lines.
2. a kind of 10kV distribution line broken string method for detecting interacted based on multi-system information according to claim 1, which is special Levy and be, the 10kV distribution lines line broken string detecting application module is software module, and its function is by distribution transformer low-pressure side Voltage magnitude variable quantity is counter to push away 10kV distribution lines broken string, and decision threshold range intervals are big;By lifting power information collection system Uniting, the detecting speed broken by 10kV distribution lines is improved to the operation information frequency acquisition of distribution transformer, can be at 30 minutes 10kV distribution line disconnection fault is inside detected;Generalized information system information, 10kV distribution line line broken string detecting application modules is coordinated may be used also Realize the fault location to 10kV distribution line break points.
CN201410505067.0A 2014-09-28 2014-09-28 A kind of 10kV distribution line broken string method for detecting interacted based on multi-system information Active CN104297616B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410505067.0A CN104297616B (en) 2014-09-28 2014-09-28 A kind of 10kV distribution line broken string method for detecting interacted based on multi-system information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410505067.0A CN104297616B (en) 2014-09-28 2014-09-28 A kind of 10kV distribution line broken string method for detecting interacted based on multi-system information

Publications (2)

Publication Number Publication Date
CN104297616A CN104297616A (en) 2015-01-21
CN104297616B true CN104297616B (en) 2017-03-15

Family

ID=52317421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410505067.0A Active CN104297616B (en) 2014-09-28 2014-09-28 A kind of 10kV distribution line broken string method for detecting interacted based on multi-system information

Country Status (1)

Country Link
CN (1) CN104297616B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105405071A (en) * 2015-12-04 2016-03-16 国网浙江省电力公司 Method for constructing unified data model for enterprise
CN105743108B (en) * 2016-01-31 2018-06-26 科誉德电气(苏州)有限公司 A kind of 10kV low-voltage intelligent distribution network systems with three-phase imbalance monitoring function
CN105759164B (en) * 2016-04-05 2018-05-15 国网江西省电力科学研究院 A kind of broken neutral line detecting and localization method
CN106019067B (en) * 2016-05-13 2018-11-06 国网江西省电力有限公司电力科学研究院 A kind of method for detecting of Dyn11 types distribution transforming winding connecting joint open circuit fault
CN107329028A (en) * 2017-06-01 2017-11-07 国网江西省电力公司电力科学研究院 A kind of method for detecting of Yyn0 types distribution transforming winding connecting joint open circuit
CN107748315B (en) * 2017-09-14 2019-09-27 国家电网公司 A kind of Distribution Network Failure active forewarning method
CN108008248A (en) * 2017-11-27 2018-05-08 国网安徽省电力公司黄山供电公司 A kind of busbar small current neutral grounding warning system and method based on SCADA
CN109919523A (en) * 2019-04-10 2019-06-21 广州锐敏信息科技有限公司 The power grid peak load and heavy-overload big data analysis method calculated based on MapReduce polymerization
CN112667203B (en) * 2020-12-14 2024-02-27 南方电网数字电网研究院有限公司 Information security operation monitoring and early warning system beneficial to operation and maintenance flow management
CN113985216B (en) * 2021-12-09 2023-09-12 国网陕西省电力公司宝鸡供电公司 Power distribution network disconnection fault positioning method and system
CN114252735B (en) * 2021-12-21 2023-07-14 国网江苏省电力有限公司镇江供电分公司 Monitoring and judging method for positioning of 110kV line broken line branch

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU729532A1 (en) * 1976-08-23 1980-04-25 Объединенный Институт Ядерных Исследований Arrangement for detecting line faults at single-phase earthing
CN102636731A (en) * 2012-04-12 2012-08-15 上海交通大学 Power distribution network single-phase disconnection judging and addressing method based on load measuring and recording system
CN103592567A (en) * 2013-10-23 2014-02-19 广东电网公司佛山供电局 Grid fault locating system and method based on multisystem information integration
CN103884962A (en) * 2014-03-12 2014-06-25 珠海创能科世摩电气科技有限公司 Intelligent overhead line fault positioning and monitoring system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU729532A1 (en) * 1976-08-23 1980-04-25 Объединенный Институт Ядерных Исследований Arrangement for detecting line faults at single-phase earthing
CN102636731A (en) * 2012-04-12 2012-08-15 上海交通大学 Power distribution network single-phase disconnection judging and addressing method based on load measuring and recording system
CN103592567A (en) * 2013-10-23 2014-02-19 广东电网公司佛山供电局 Grid fault locating system and method based on multisystem information integration
CN103884962A (en) * 2014-03-12 2014-06-25 珠海创能科世摩电气科技有限公司 Intelligent overhead line fault positioning and monitoring system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
低压配电线路断线原因、危害及防范措施;邹玮平;《农村电工》;20101231(第11期);第21-22页 *
单相断线故障对城市输配电网的影响分析;王斐 等;《广东电力》;20110731;第24卷(第7期);第25-30、48页 *
基于多数据源融合的实时电网故障分析及实现;夏可青 等;《电力系统自动化》;20131225;第37卷(第24期);第81-88页 *

Also Published As

Publication number Publication date
CN104297616A (en) 2015-01-21

Similar Documents

Publication Publication Date Title
CN104297616B (en) A kind of 10kV distribution line broken string method for detecting interacted based on multi-system information
CN103454517B (en) Capacitance type potential transformer on-line monitoring method
CN104219315B (en) A kind of operation monitoring system of power information acquisition system and method for supervising thereof
CN203166626U (en) Intelligent traction substation
CN101409008B (en) Integrated system for monitor, management and remotely meter-reading of power distribution network
CN105427039A (en) Efficient processing method of distribution network repair work orders based on responsibility areas
CN110658415B (en) Low-voltage distribution line fault detection method and system
CN101216503A (en) Hierarchical type electricity anti-theft system and method
CN104092297A (en) Monitoring system and method for monitoring running performance of power grid system in real time
CN103259333B (en) Intelligent alarm and comprehensive analysis of fault system
CN102495850A (en) Method for splicing multi-stage multi-region interconnected power grid relay protection model
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN103728949B (en) A kind of Hydropower Unit integrated control unit
CN103632311A (en) Fault examining system and method for power grid operation
CN104635198A (en) Remote monitoring and diagnosing method for electric energy metering device with timely fault finding function
CN104678348A (en) Remote monitoring and diagnosing method for electric energy metering device with high efficiency
CN103872770A (en) Different power supply region feeder automation collocation method based on wiring mode
Thomas et al. Distribution automation leading to a smarter grid
CN110739770B (en) Relay protection tube control system based on information fusion
CN104714206A (en) Remote monitoring and diagnosing method for electric energy metering device capable of finding faults timely
CN103915900A (en) Rail transit power monitoring direct current load monitoring method
CN106340963A (en) Electric power distribution room intelligent commission maintenance monitoring system
CN103545805B (en) Modeling-based railway power supply arm monitoring method
CN104142648A (en) Management and control terminal of urban rail traffic low-voltage power distribution system
CN104656050A (en) Manpower-saving remote monitoring and diagnosing method for electric energy metering device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180724

Address after: 330096 No. 88, min Qiang Road, private science and Technology Park, Nanchang, Jiangxi

Co-patentee after: State Grid Corporation of China

Patentee after: Power Science Research Institute of Jiangxi Electric Power Co., Ltd.

Address before: 100761 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing

Co-patentee before: State's net Jiangxi Province Electric power Science Academe

Patentee before: State Grid Corporation of China

TR01 Transfer of patent right