CN114252735B - Monitoring and judging method for positioning of 110kV line broken line branch - Google Patents

Monitoring and judging method for positioning of 110kV line broken line branch Download PDF

Info

Publication number
CN114252735B
CN114252735B CN202111570932.6A CN202111570932A CN114252735B CN 114252735 B CN114252735 B CN 114252735B CN 202111570932 A CN202111570932 A CN 202111570932A CN 114252735 B CN114252735 B CN 114252735B
Authority
CN
China
Prior art keywords
station
line
phase
state
armor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111570932.6A
Other languages
Chinese (zh)
Other versions
CN114252735A (en
Inventor
于晓蒙
孙文凯
王萌萌
胡振涛
马进
刘善军
姜恩泽
祁明
李迎涛
张逸康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Jiangsu Electric Power Co ltd Zhenjiang Power Supply Branch
Original Assignee
State Grid Jiangsu Electric Power Co ltd Zhenjiang Power Supply Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Jiangsu Electric Power Co ltd Zhenjiang Power Supply Branch filed Critical State Grid Jiangsu Electric Power Co ltd Zhenjiang Power Supply Branch
Priority to CN202111570932.6A priority Critical patent/CN114252735B/en
Publication of CN114252735A publication Critical patent/CN114252735A/en
Application granted granted Critical
Publication of CN114252735B publication Critical patent/CN114252735B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/088Aspects of digital computing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Mathematical Physics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Locating Faults (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention provides a monitoring and judging method for positioning a broken line branch of a 110kV line, which comprises the following steps: 1. judging the state of a first station line; 2. judging the state of a station B line; 3. judging the state of a third station line; 4. comprehensively judging the line state, and positioning the broken line phase and the broken line branch. The invention reduces the labor intensity of monitoring personnel and the reaction treatment time of abnormal accidents on the premise of improving the safe and reliable operation of the power grid, and provides technical support for the fault line inspection of power transmission operation personnel.

Description

Monitoring and judging method for positioning of 110kV line broken line branch
Technical Field
The invention relates to a monitoring and judging method for positioning a broken line branch of a 110kV line, and belongs to the technical field of 110kV transformer substations.
Background
As the power grid scale is continuously increased, the number of 110kV substations is also continuously increased, the scale of 110kV net racks is more and more complex, 110kVT connecting lines are more and more, and meanwhile, 110kV T connecting line disconnection accidents are more and more, so that the working intensity of monitoring staff is multiplied; for the positioning of a broken line branch of a 110kV line, the current automatic monitoring judging means is still in a blank state, and no technical means is used for distinguishing which branch is broken, so that the difficulty of transmission line inspection work is increased, and the accident processing efficiency is reduced; in order to improve the working efficiency of a monitor, reduce the working strength of the monitor and improve the handling efficiency of broken line accidents, the monitoring and judging method for positioning the broken line branch of the 110kV line is provided.
Disclosure of Invention
The invention provides a monitoring and judging method for positioning a broken line branch of a 110kV line, and aims to solve the problem that the existing technology cannot perform branch positioning on the broken line of the 110kV line.
The technical solution of the invention is as follows: a monitoring and judging method for positioning a 110kV line broken line branch circuit includes:
1. judging the state of a first station line;
2. judging the state of a station B line;
3. judging the state of a third station line;
4. comprehensively judging the line state, and positioning the broken line phase and the broken line branch.
Further, the determining the state of the station line specifically includes formula 1-formula 7:
U a armor =U B armor =U C armor =U 110kV (1);
Figure BDA0003423324380000021
Figure BDA0003423324380000022
Figure BDA0003423324380000023
I B armor =I C armor >I A armor >0 (5);
I A armor =I C armor >I B armor >0 (6);
I A armor =I B armor >I C armor >0 (7);
In U A armor 、U B armor 、U C armor 110kV bus phase voltages of the first station respectively, I A armor 、I B armor 、I C armor Three-phase current of 110kV line of first station, U 110kV Is 110kV bus rated phase voltage.
Further, when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 2, the system judges that the line state is as follows: "A station A phase broken wire"; when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 3, the system judges the line state as follows: 'A station B phase broken line'; when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 4, the system judges the line state as follows: 'A station C phase broken line'; when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 5, the system judges the line state as follows: "a station a is abnormal"; when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 6, the system judges the line state as follows: "a station B is abnormal"; when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 7, the system judges the line state as follows: "a station C is abnormal".
Further, the judging the state of the station b line specifically includes formula 8-formula 15:
U AB A =U B =U C B =U 110kV (8);
I AB A =I B =I C B >0 (9);
Figure BDA0003423324380000031
Figure BDA0003423324380000032
Figure BDA0003423324380000033
Figure BDA0003423324380000034
Figure BDA0003423324380000035
Figure BDA0003423324380000036
In U AB A 、U B 、U C B 110kV bus phase voltages of the second station respectively, I AB A 、I B 、I C B Three-phase current of 110kV line of second station respectively, U 110kV Is 110kV bus rated phase voltage.
Further, when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 8 and 9, the system judges that the line state is as follows: "station B is normal"; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 10 and 11, the system judges that the line state is as follows: 'station A phase broken line'; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 12 and 13, the system judges that the line state is as follows: b phase broken line of station B; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 14 and 15, the system judges that the line state is as follows: station C phase broken line.
Further, the judging of the state of the bus station line specifically includes the following formulas (16) - (23):
U a C =U B C =U C =U 110kV (16);
I A C =I B C =I C >0 (17);
Figure BDA0003423324380000041
Figure BDA0003423324380000042
Figure BDA0003423324380000043
Figure BDA0003423324380000044
Figure BDA0003423324380000045
Figure BDA0003423324380000046
In U A C 、U B C 、U C Respectively the phase voltages of 110kV buses of the third generation station, I A C 、I B C 、I C Three-phase current of the C station 110kV line and U 110kV Is 110kV bus rated phase voltage.
Further, when the monitoring master station system detects that the related telemetry data simultaneously satisfies the formulas 16 and 17, the system judges that the line state is: "Prop stand normal"; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 18 and 19, the system judges that the line state is as follows: 'third station A phase broken line'; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 20 and 21, the system judges that the line state is as follows: 'third phase B phase broken line'; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 22 and 23, the system judges that the line state is as follows: 'C phase disconnection of third station'.
Further, the comprehensive judgment circuit state locates the disconnection phase and the disconnection branch, specifically includes that the main station monitoring system carries out comprehensive judgment according to the circuit states of the first station, the second station and the third station, specifically includes:
when the conditions of 'A-phase disconnection', 'B-phase disconnection', 'C-phase disconnection' are met, the system judges that the line state is 'branch one-A-phase disconnection';
when the conditions of abnormal A station A phase, broken B station A phase and normal C station are met, the system judges that the line state is broken branch two A phases;
when the conditions of abnormal A station A, normal B station and broken A C station are met, the system judges that the line state is branch three A phase broken;
when the conditions of 'A station B phase disconnection', 'B station B phase disconnection', 'C station B phase disconnection' are met, the system judges that the line state is 'branch one B phase disconnection';
when the conditions of 'abnormal A station B', 'B phase broken line', 'C station normal' are met, the system judges that the line state is 'branch two B phase broken line';
when the conditions of 'abnormal first station B', 'normal second station' and 'third station B phase disconnection' are met, the system judges that the line state is 'branch three B phase disconnection';
when the conditions of 'A station C phase disconnection', 'B station C phase disconnection', 'C station C phase disconnection' are met, the system judges that the line state is 'branch one C phase disconnection';
when the conditions of 'abnormal first station C', 'second station C disconnection', 'third station normal' are met, the system judges that the line state is 'branch second C disconnection';
when the conditions of 'abnormal first station C', 'normal second station' and 'third station C disconnection' are met, the system judges that the line state is 'branch three C disconnection'.
Further, the first station is a transformer station on the power supply side, the second station and the third station are transformer stations on the load side, the first station is connected with the main circuit of the power grid through a branch I, the second station is connected with the main circuit of the power grid through a branch II, and the third station is connected with the main circuit of the power grid through a branch III.
Further, said is U 110kV The 110kV bus is rated for line voltage, and in actual operation, the voltage is a qualified range of 110kV bus voltage.
Furthermore, the monitoring master station system is a data analysis processing system of a power grid monitoring dispatching end and is commonly used as a SCADA system.
The invention has the beneficial effects that:
1) The invention is convenient for the monitoring system to realize the automatic line breaking branch positioning function after the 110kV line breaking branch positioning is applied, reduces the labor intensity of monitoring personnel and the reaction treatment time of abnormal accidents on the premise of improving the safe and reliable operation of a power grid, and provides technical support for the fault line inspection of power transmission operating personnel;
2) The invention is convenient to further improve the automation and intelligent degree of the monitoring profession, and provides a reliable technical means for converting the manual judgment by a monitor into the automatic judgment by a computer.
Drawings
Fig. 1 is a schematic diagram of the grid rack wiring in embodiment 1.
Fig. 2 is a logic diagram of the state of the a-station line in embodiment 1.
Fig. 3 is a logic diagram of the state of the b-station line in embodiment 1.
Fig. 4 is a logic diagram of the status of the bus station line in embodiment 1.
Fig. 5 is a schematic diagram of the state logic of the branch circuit in embodiment 1.
Detailed Description
A monitoring and judging method for positioning a 110kV line broken line branch circuit includes:
1. judging the state of a first station line;
2. judging the state of a station B line;
3. judging the state of a third station line;
4. comprehensively judging the line state, and positioning the broken line phase and the broken line branch.
The judging of the state of the A station line specifically comprises the following steps of formula 1-formula 7:
U a armor =U B armor =U C armor =U 110kV (1);
Figure BDA0003423324380000071
Figure BDA0003423324380000072
Figure BDA0003423324380000073
I B armor =I C armor >I A armor >0 (5);
I A armor =I C armor >I B armor >0 (6);
I A armor =I B armor >I C armor >0 (7);
In U A armor 、U B armor 、U C armor 110kV bus phase voltages of the first station respectively, I A armor 、I B armor 、I C armor Three-phase current of 110kV line of first station, U 110kV Is 110kV bus rated phase voltage.
When the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 2, the system judges the line state as follows: "A station A phase broken wire"; when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 3, the system judges the line state as follows: 'A station B phase broken line'; when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 4, the system judges the line state as follows: 'A station C phase broken line'; when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 5, the system judges the line state as follows: "a station a is abnormal"; when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 6, the system judges the line state as follows: "a station B is abnormal"; when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 7, the system judges the line state as follows: "a station C is abnormal".
The judging of the station B line state specifically comprises the following steps of formula 8-formula 15:
U AB A =U B =U C B =U 110kV (8);
I AB A =I B =I C B >0 (9);
Figure BDA0003423324380000081
Figure BDA0003423324380000082
Figure BDA0003423324380000083
Figure BDA0003423324380000084
Figure BDA0003423324380000085
Figure BDA0003423324380000086
In U AB A 、U B 、U C B 110kV bus phase voltages of the second station respectively, I AB A 、I B 、I C B Three-phase current of 110kV line of second station respectively, U 110kV Is 110kV bus rated phase voltage.
When the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 8 and 9, the system judges that the line state is as follows: "station B is normal"; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 10 and 11, the system judges that the line state is as follows: 'station A phase broken line'; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 12 and 13, the system judges that the line state is as follows: b phase broken line of station B; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 14 and 15, the system judges that the line state is as follows: station C phase broken line.
The judging of the state of the line of the third station specifically comprises a formula (16) -a formula (23):
U a C =U B C =U C =U 110kV (16);
I A C =I B C =I C >0 (17);
Figure BDA0003423324380000091
Figure BDA0003423324380000092
Figure BDA0003423324380000093
Figure BDA0003423324380000094
Figure BDA0003423324380000095
Figure BDA0003423324380000096
In U A C 、U B C 、U C Respectively the phase voltages of 110kV buses of the third generation station, I A C 、I B C 、I C Three-phase current of the C station 110kV line and U 110kV Is 110kV bus rated phase voltage.
When the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 16 and 17, the system judges that the line state is as follows: "Prop stand normal"; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 18 and 19, the system judges that the line state is as follows: 'third station A phase broken line'; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 20 and 21, the system judges that the line state is as follows: 'third phase B phase broken line'; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 22 and 23, the system judges that the line state is as follows: 'C phase disconnection of third station'.
The comprehensive judgment circuit state is that the positioning broken lines are the same, broken line branches, and specifically comprises a main station monitoring system for carrying out comprehensive judgment according to the circuit states of a first station, a second station and a third station, and specifically comprises the following steps:
when the conditions of 'A-phase disconnection', 'B-phase disconnection', 'C-phase disconnection' are met, the system judges that the line state is 'branch one-A-phase disconnection';
when the conditions of abnormal A station A phase, broken B station A phase and normal C station are met, the system judges that the line state is broken branch two A phases;
when the conditions of abnormal A station A, normal B station and broken A C station are met, the system judges that the line state is branch three A phase broken;
when the conditions of 'A station B phase disconnection', 'B station B phase disconnection', 'C station B phase disconnection' are met, the system judges that the line state is 'branch one B phase disconnection';
when the conditions of 'abnormal A station B', 'B phase broken line', 'C station normal' are met, the system judges that the line state is 'branch two B phase broken line';
when the conditions of 'abnormal first station B', 'normal second station' and 'third station B phase disconnection' are met, the system judges that the line state is 'branch three B phase disconnection';
when the conditions of 'A station C phase disconnection', 'B station C phase disconnection', 'C station C phase disconnection' are met, the system judges that the line state is 'branch one C phase disconnection';
when the conditions of 'abnormal first station C', 'second station C disconnection', 'third station normal' are met, the system judges that the line state is 'branch second C disconnection';
when the conditions of 'abnormal first station C', 'normal second station' and 'third station C disconnection' are met, the system judges that the line state is 'branch three C disconnection'.
The first station is a transformer station on the power supply side, the second station and the third station are transformer stations on the load side, the first station is connected with the main circuit of the power grid through a first branch, the second station is connected with the main circuit of the power grid through a second branch, and the third station is connected with the main circuit of the power grid through a third branch.
Said is U 110kV The 110kV bus is rated for line voltage, and in actual operation, the voltage is a qualified range of 110kV bus voltage.
The monitoring master station system is a data analysis processing system of a power grid monitoring dispatching end and is commonly used as a SCADA system.
The equations in equations 1-23 should be approximately equal in practice, with an error of no more than 30%.
The invention applies the parameters of bus voltage, line current and the like of a plurality of substations as locking conditions, thereby improving the judgment accuracy.
Example 1
The technical solutions of the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention, and it is apparent that the described embodiments are only some embodiments of the present invention, not all embodiments.
A monitoring and judging method for positioning a 110kV line broken line branch comprises the following steps:
judging the state of the first station line, wherein the formulas are from the condition 1 to the condition 7;
judging the state of the station B line, wherein the formulas are from condition 8 to condition 15;
judging the state of the third station line, wherein the formulas are from the condition 16 to the condition 23;
comprehensively judging the state of the line, positioning the broken line to be identical and breaking the line branch.
A first station:
U a armor =U B armor =U C armor =U 110kV (condition 1);
Figure BDA0003423324380000121
Figure BDA0003423324380000122
Figure BDA0003423324380000123
I b armor =I C armor >I A armor >0 (condition 5);
I a armor =I C armor >I B armor >0 (condition 6);
I a armor =I B armor >I C armor >0 (condition 7).
Station B:
U AB A =U B =U C B =U 110kV (condition 8);
I AB A =I B =I C B >0 (condition 9);
Figure BDA0003423324380000124
Figure BDA0003423324380000125
Figure BDA0003423324380000126
Figure BDA0003423324380000127
Figure BDA0003423324380000131
Figure BDA0003423324380000132
c, station:
U a C =U B C =U C =U 110kV (condition 16);
I a C =I B C =I C >0 (condition 17);
Figure BDA0003423324380000133
Figure BDA0003423324380000134
Figure BDA0003423324380000135
Figure BDA0003423324380000136
Figure BDA0003423324380000137
Figure BDA0003423324380000138
wherein U is A armor 、U B armor 、U C armor For the phase voltage of 110kV bus of the first station, I A armor 、I B armor 、I C armor For the three-phase current of the 110kV line of the first station, U AB A 、U B 、U C B Is 110kV bus phase voltage of the second station, I AB A 、I B 、I C B Is the three-phase current of 110kV line of the second station, U A C 、U B C 、U C For the phase voltage of the 110kV bus of the third station, I A C 、I B C 、I C For the three-phase current of the 110kV line of the third station, U 110kV Is 110kV bus rated phase voltage.
A first station: when the monitoring master station system detects relevant telemetry data, the method simultaneously meets the following conditions:
in condition 1 and condition 2, the system judges the line state as follows: "A station A phase broken wire";
in condition 1 and condition 3, the system judges the line state as follows: 'A station B phase broken line';
in condition 1 and condition 4, the system judges the line state as follows: 'A station C phase broken line';
in condition 1 and condition 5, the system judges the line state as follows: "a station a is abnormal";
in condition 1 and condition 6, the system judges the line state as follows: "a station B is abnormal";
in condition 1 and condition 7, the system judges the line state as follows: "a station C is abnormal".
Station B: when the monitoring master station system detects relevant telemetry data, the method simultaneously meets the following conditions:
in the conditions 8 and 9, the system judges the line state as follows: "station B is normal";
in conditions 10 and 11, the system judges the line state as follows: 'station A phase broken line';
under conditions 12 and 13, the system determines that the line state is: b phase broken line of station B;
under conditions 14 and 15, the system determines that the line state is: station C phase broken line.
C, station: when the monitoring master station system detects relevant telemetry data, the method simultaneously meets the following conditions:
under conditions 16 and 17, the system determines that the line state is: "Prop stand normal";
under conditions 18 and 19, the system determines that the line state is: 'third station A phase broken line';
under conditions 20 and 21, the system determines that the line state is: 'third phase B phase broken line';
under conditions 22 and 23, the system determines that the line state is: 'C phase disconnection of third station'.
And (3) comprehensive judgment: the master station monitoring system carries out comprehensive judgment according to the line states of the first station, the second station and the third station:
the system meets the conditions of 'A-phase disconnection', 'B-phase disconnection', 'C-phase disconnection', and the system judges that the line state is 'branch one-A-phase disconnection';
the system meets the conditions of abnormal A-phase A, broken B-phase A and normal C-phase A, and judges that the line state is broken branch two-phase A;
the system meets the conditions of abnormal A-phase station A, normal B-phase station and C-phase station A disconnection, and judges that the line state is branch three-A-phase disconnection;
the method meets the requirements of 'A station B phase disconnection', 'B station B phase disconnection', 'C station B phase disconnection', and the system judges that the line state is 'branch one B phase disconnection';
the system meets the conditions of 'abnormal A station B', 'B phase broken line of B station', 'C station normal', and the system judges that the line state is 'branch two B phase broken line';
the system meets the conditions of 'abnormal A station B', 'normal B station' and 'C station B phase disconnection', and judges that the line state is 'branch three B phase disconnection';
the system meets the conditions of 'A station C phase disconnection', 'B station C phase disconnection', 'C station C phase disconnection', and the system judges that the line state is 'branch one C phase disconnection';
the system meets the conditions of abnormal first station C, broken second station C and normal third station, and judges that the line state is broken second branch C;
the system meets the conditions of abnormal first station C, normal second station and C phase disconnection of third station, and judges the line state as three C phase disconnection of branch.
The embodiment can use the current technical conditions under the condition of not adding equipment, and is convenient for a system to synthesize the 110kV line disconnection branch positioning alarm signal.

Claims (3)

1. A monitoring and judging method for positioning a 110kV line broken line branch is characterized by comprising the following steps:
1) Judging the state of a first station line;
2) Judging the state of the station B line;
3) Judging the state of the line of the third station;
4) Comprehensively judging the state of the line, and positioning the broken line phase and the broken line branch;
the judging of the state of the A station line specifically comprises the following steps of formula 1-formula 7:
U a armor =U B armor =U C armor =U 110kV (1);
Figure FDA0004273969000000011
Figure FDA0004273969000000013
I B armor =I C armor >I A armor >0 (5);
I A armor =I C armor >I B armor >0 (6);
I A armor =I B armor >I C armor >0 (7);
In the middle of,U A armor 、U B armor 、U C armor 110kV bus phase voltages of the first station respectively, I A armor 、I B armor 、I C armor Three-phase current of 110kV line of first station, U 110kV Rated phase voltage of 110kV bus;
when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 2, the system judges the line state as follows: "A station A phase broken wire"; when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 3, the system judges the line state as follows: 'A station B phase broken line'; when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 4, the system judges the line state as follows: 'A station C phase broken line'; when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 5, the system judges the line state as follows: "a station a is abnormal"; when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 6, the system judges the line state as follows: "a station B is abnormal"; when the monitoring master station system detects that the relative telemetry data of the first station simultaneously satisfies the formulas 1 and 7, the system judges the line state as follows: "a station C is abnormal";
the judging of the station B line state specifically comprises the following steps of formula 8-formula 15:
U AB A =U B =U C B =U 110kV (8);
I AB A =I B =I C B >0 (9);
Figure FDA0004273969000000021
Figure FDA0004273969000000022
Figure FDA0004273969000000023
Figure FDA0004273969000000024
Figure FDA0004273969000000025
Figure FDA0004273969000000026
In U AB A 、U B 、U C B 110kV bus phase voltages of the second station respectively, I AB A 、I B 、I C B Three-phase current of 110kV line of second station respectively, U 110kV Rated phase voltage of 110kV bus;
when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 8 and 9, the system judges that the line state is as follows: "station B is normal"; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 10 and 11, the system judges that the line state is as follows: 'station A phase broken line'; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 12 and 13, the system judges that the line state is as follows: b phase broken line of station B; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 14 and 15, the system judges that the line state is as follows: 'station C phase broken line';
the judging of the state of the line of the third station specifically comprises a formula (16) -a formula (23):
U a C =U B C =U C =U 110kV (16);
I A C =I B C =I C >0 (17);
Figure FDA0004273969000000031
Figure FDA0004273969000000032
Figure FDA0004273969000000033
Figure FDA0004273969000000034
Figure FDA0004273969000000035
Figure FDA0004273969000000036
In U A C 、U B C 、U C Respectively the phase voltages of 110kV buses of the third generation station, I A C 、I B C 、I C Three-phase current of the C station 110kV line and U 110kV Rated phase voltage of 110kV bus;
when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 16 and 17, the system judges that the line state is as follows: "Prop stand normal"; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 18 and 19, the system judges that the line state is as follows: 'third station A phase broken line'; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 20 and 21, the system judges that the line state is as follows: 'third phase B phase broken line'; when the monitoring master station system detects that the related telemetry data simultaneously meets the formulas 22 and 23, the system judges that the line state is as follows: 'C phase disconnection of third station';
the comprehensive judgment circuit state is that the positioning broken lines are the same, broken line branches, and specifically comprises a main station monitoring system for carrying out comprehensive judgment according to the circuit states of a first station, a second station and a third station, and specifically comprises the following steps:
when the conditions of 'A-phase disconnection', 'B-phase disconnection', 'C-phase disconnection' are met, the system judges that the line state is 'branch one-A-phase disconnection';
when the conditions of abnormal A station A phase, broken B station A phase and normal C station are met, the system judges that the line state is broken branch two A phases;
when the conditions of abnormal A station A, normal B station and broken A C station are met, the system judges that the line state is branch three A phase broken;
when the conditions of 'A station B phase disconnection', 'B station B phase disconnection', 'C station B phase disconnection' are met, the system judges that the line state is 'branch one B phase disconnection';
when the conditions of 'abnormal A station B', 'B phase broken line', 'C station normal' are met, the system judges that the line state is 'branch two B phase broken line';
when the conditions of 'abnormal first station B', 'normal second station' and 'third station B phase disconnection' are met, the system judges that the line state is 'branch three B phase disconnection';
when the conditions of 'A station C phase disconnection', 'B station C phase disconnection', 'C station C phase disconnection' are met, the system judges that the line state is 'branch one C phase disconnection';
when the conditions of 'abnormal first station C', 'second station C disconnection', 'third station normal' are met, the system judges that the line state is 'branch second C disconnection';
when the conditions of 'abnormal first station C', 'normal second station' and 'third station C disconnection' are met, the system judges that the line state is 'branch three C disconnection'.
2. The monitoring and judging method for positioning of a broken line branch of a 110kV line according to claim 1 is characterized in that the first station is a transformer substation on a power supply side, the second station and the third station are transformer substations on a load side, the first station is connected with a main circuit of a power grid through a branch I, the second station is connected with the main circuit of the power grid through a branch II, and the third station is connected with the main circuit of the power grid through a branch III.
3. The monitoring and judging method for positioning a broken line branch of a 110kV line according to claim 1, wherein the monitoring master station system is a power grid monitoring dispatching end data analysis processing system.
CN202111570932.6A 2021-12-21 2021-12-21 Monitoring and judging method for positioning of 110kV line broken line branch Active CN114252735B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111570932.6A CN114252735B (en) 2021-12-21 2021-12-21 Monitoring and judging method for positioning of 110kV line broken line branch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111570932.6A CN114252735B (en) 2021-12-21 2021-12-21 Monitoring and judging method for positioning of 110kV line broken line branch

Publications (2)

Publication Number Publication Date
CN114252735A CN114252735A (en) 2022-03-29
CN114252735B true CN114252735B (en) 2023-07-14

Family

ID=80796251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111570932.6A Active CN114252735B (en) 2021-12-21 2021-12-21 Monitoring and judging method for positioning of 110kV line broken line branch

Country Status (1)

Country Link
CN (1) CN114252735B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117388759B (en) * 2023-12-07 2024-02-23 国网辽宁省电力有限公司 Bus disconnection discriminating method and device utilizing transformer substation monitoring data

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008089549A (en) * 2006-10-05 2008-04-17 Nec Electronics Corp Failure spot estimation system of multiple failure in logic circuit, failure spot estimation method, and failure spot estimation program
CN101452041A (en) * 2008-12-26 2009-06-10 湖北省电力试验研究院 Electrical power distribution network single-phase earth fault type and phase distinguishing method
WO2011069548A1 (en) * 2009-12-10 2011-06-16 Abb Technology Ag Line fault detector
AU2013201064B1 (en) * 2013-02-25 2014-08-28 Nexans A Line Break Detection System
CN104297616A (en) * 2014-09-28 2015-01-21 国家电网公司 10kV distribution line breaking detection method based on multi-system information interaction
CN105224667A (en) * 2015-10-10 2016-01-06 国家电网公司 Based on multistation end fault diagnosis and the aid decision-making method of electrical network intelligent monitoring information
CN110320432A (en) * 2019-06-04 2019-10-11 国网江苏省电力有限公司无锡供电分公司 Single-phase wire break fault detection and guard method and system
CN110389276A (en) * 2019-08-06 2019-10-29 安徽凯川电力保护设备有限公司 A kind of singlephase earth fault management system and method
CN110988600A (en) * 2019-12-23 2020-04-10 武汉大学 Power distribution network line break fault section positioning method
CN211206745U (en) * 2019-08-06 2020-08-07 安徽凯川电力保护设备有限公司 Single-phase earth fault management system
CN111856210A (en) * 2020-07-27 2020-10-30 云南电力技术有限责任公司 Method and device for judging fault type of power distribution network line

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7496459B2 (en) * 2007-04-03 2009-02-24 International Business Machines Corporation Intelligent, self-propelled automatic grid crawler high impedance fault detector and high impedance fault detecting system
US10649020B2 (en) * 2016-05-16 2020-05-12 Schweitzer Engineering Laboratories, Inc. High-impedance fault detection using coordinated devices

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008089549A (en) * 2006-10-05 2008-04-17 Nec Electronics Corp Failure spot estimation system of multiple failure in logic circuit, failure spot estimation method, and failure spot estimation program
CN101452041A (en) * 2008-12-26 2009-06-10 湖北省电力试验研究院 Electrical power distribution network single-phase earth fault type and phase distinguishing method
WO2011069548A1 (en) * 2009-12-10 2011-06-16 Abb Technology Ag Line fault detector
AU2013201064B1 (en) * 2013-02-25 2014-08-28 Nexans A Line Break Detection System
CN104297616A (en) * 2014-09-28 2015-01-21 国家电网公司 10kV distribution line breaking detection method based on multi-system information interaction
CN105224667A (en) * 2015-10-10 2016-01-06 国家电网公司 Based on multistation end fault diagnosis and the aid decision-making method of electrical network intelligent monitoring information
CN110320432A (en) * 2019-06-04 2019-10-11 国网江苏省电力有限公司无锡供电分公司 Single-phase wire break fault detection and guard method and system
CN110389276A (en) * 2019-08-06 2019-10-29 安徽凯川电力保护设备有限公司 A kind of singlephase earth fault management system and method
CN211206745U (en) * 2019-08-06 2020-08-07 安徽凯川电力保护设备有限公司 Single-phase earth fault management system
CN110988600A (en) * 2019-12-23 2020-04-10 武汉大学 Power distribution network line break fault section positioning method
CN111856210A (en) * 2020-07-27 2020-10-30 云南电力技术有限责任公司 Method and device for judging fault type of power distribution network line

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
某变电站500kV母线保护TA断线保护闭锁分析;冯顺;曲欣;王毅;葛琳朝;陈思思;;电气技术(第07期);全文 *
电网运行异常状态诊断分析专家系统的应用研究;李鹏;洪梅子;李君;张振;刘勤;文博;;湖北电力(第01期);全文 *
高压电缆线路在线监测技术及应用探析;曾生健;黄小青;左金泉;罗军川;廖明星;马进;高铁军;;电气时代(第12期) *

Also Published As

Publication number Publication date
CN114252735A (en) 2022-03-29

Similar Documents

Publication Publication Date Title
CN202737576U (en) Intelligent measure-control apparatus used for low voltage power distribution network
CN114252735B (en) Monitoring and judging method for positioning of 110kV line broken line branch
CN110609165A (en) Method for automatically detecting wiring errors and correcting data of online power quality monitoring device
CN102510039A (en) Automatic switching circuit for multi-functional direct current ice melting and switching method thereof
CN108181550B (en) Alternating current micro-grid fault type judgment and phase selection method
CN108539855A (en) High-speed dsp controls power grid intellectual monitoring regulating compensation and Protection control system
CN101615772A (en) A kind of transmission line de-icing method of line end injecting reactive current
CN114252734B (en) 220kV tie line single-phase disconnection monitoring and distinguishing method
CN109900989B (en) Start-up phase sequence detection and protection method applied to three-phase SVG
CN111426983A (en) Single-phase earth fault positioning system of power distribution overhead cable hybrid line
CN108847656B (en) Distribution network grounding line selection protection system based on self-adaptive dynamic contribution rate
CN111654102B (en) 10 kilovolt distribution station spare power automatic switching abnormal state intelligent diagnosis system
CN211826314U (en) Wind turbine generator system testing arrangement that is incorporated into power networks
CN210780123U (en) Fully centralized monitoring protection device for electrical equipment of wind power booster station
CN210863908U (en) On-line monitoring system for operation state of high-voltage power capacitor of transformer substation
CN217590263U (en) High-frequency direct-current power supply parallel operation communication switching device
CN111123043A (en) Wind turbine generator system testing arrangement that is incorporated into power networks
CN212229000U (en) A wiring switching device for transformer power failure test
CN111585283A (en) Intelligent spare power automatic switching device online switching method based on data pre-judgment
CN212905159U (en) Capacitor bank capacity measuring device for switch cabinet
CN213934004U (en) Residual current detection device
CN110837026A (en) Power distribution network fault detection device, system and method
CN113890192B (en) Intelligent control system and method applied to electrical optimization
CN213125570U (en) Intelligent anti-cross-over-grade coal mine underground high-voltage feed switch comprehensive protection measurement and control device
CN219611330U (en) Three-phase integrated cabinet type fault current limiter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant