CN104290777A - Shunting operation record playback method - Google Patents

Shunting operation record playback method Download PDF

Info

Publication number
CN104290777A
CN104290777A CN201410490076.7A CN201410490076A CN104290777A CN 104290777 A CN104290777 A CN 104290777A CN 201410490076 A CN201410490076 A CN 201410490076A CN 104290777 A CN104290777 A CN 104290777A
Authority
CN
China
Prior art keywords
signal machine
operating path
section
locomotive
path
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410490076.7A
Other languages
Chinese (zh)
Other versions
CN104290777B (en
Inventor
言圣
杨献
李辉
董潭洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuzhou CRRC Times Electric Co Ltd
Original Assignee
Zhuzhou CSR Times Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuzhou CSR Times Electric Co Ltd filed Critical Zhuzhou CSR Times Electric Co Ltd
Priority to CN201410490076.7A priority Critical patent/CN104290777B/en
Publication of CN104290777A publication Critical patent/CN104290777A/en
Application granted granted Critical
Publication of CN104290777B publication Critical patent/CN104290777B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a shunting operation record playback method. The shunting operation record playback method comprises the following steps of 1 obtaining limiting conditions of shunting operation record playback; 2 obtaining corresponding shunting operation records and station yard graph data files based on the limiting conditions; 3 drawing a station yard graph underlying graph according to the station yard drawing data files; 4 performing shunting operation record playback based on the station yard graph underlying graph. By means of the shunting operation record playback method, shunting operation records in a specific period or a specific locomotive can be quickly and accurately played back, a playback result is more intuitive, and accordingly daily analysis on shunting operation record data is facilitated.

Description

A kind of method of playback shunting movement record
Technical field
The present invention relates to railway traffic field, relate to a kind of method of playback shunting movement record specifically.
Background technology
On rail yard, the running state of locomotive is shunting movement record by locomotive operation monitor system log (SYSLOG) usually.In order to understand the history run of locomotive on field, station, need to carry out playback to logout of shunting.Existing back method is that shunting movement recording data files is translated into sequence of events file.File after translation is opened in a specific way and checks, thus obtain monitoring running velocity curve.
Although existing method can based on shunting movement recording data files playback shunting movement record, its playback result is directly perceived not.Meanwhile, existing shunting movement record back method is also not easy to retrieval, can not the carrying out practically of playback specified time particular vehicle quickly and easily, can not meet the requirement that shunting movement record data daily is analyzed.Therefore need a kind of new shunting movement record back method to obtain more preferably playback result.
Summary of the invention
Can not meet the problem of the requirement that existing shunting movement record data daily is analyzed for existing shunting movement record back method, the invention provides a kind of method of playback shunting movement record, described method comprises following steps:
Step one, obtains the qualifications of shunting movement record described in playback;
Step 2, obtains corresponding shunting movement record and yards design data file based on described qualifications;
Step 3, draws yards design base map according to described yards design data file;
Step 4, based on shunting movement record described in the playback of described yards design base map.
In one embodiment, described step 3 comprises the following steps:
Analyze described yards design data file, thus the type of each unit and the position of correspondence on acquisition station field;
On described yards design base map, draw corresponding icon according to the type of each unit on field, described station and the position of correspondence, thus complete described yards design base map.
In one embodiment, described step 4 comprises following steps:
Obtain operating path step, obtain the operating path of locomotive according to described shunting movement record;
Draw operating path step, described operating path is plotted on described yards design base map;
Playback logout step, is recorded on described operating path according to the corresponding locomotive location information of dynamic drafting time lapse according to described shunting movement.
In one embodiment, described step 4 also comprises playback signal machine state step, is recorded on described operating path according to the corresponding signal status information of dynamic drafting time lapse according to described shunting movement.
In one embodiment, in described acquisition operating path step, described operating path comprises local operating path, and described local operating path is the operating path of described locomotive between adjacent two described signals.
In one embodiment, described acquisition operating path step comprises following steps:
Obtain current demand signal machine step, from described shunting movement record, obtain the record data of described locomotive first signal of process on field, described station, described first signal is set as current demand signal machine;
Obtain front signal machine step, from described shunting movement record, obtain the record data of the front signal machine corresponding with described current demand signal machine;
Obtain local operating path step, based on the local operating path of described yards design data file locomotive according to the record data acquisition of described current demand signal machine and described front signal machine;
According to described shunting movement record, operating path determining step, judges whether the final position in described locomotive operation path crosses described front signal machine;
Current demand signal machine step of updating, when the final position in described locomotive operation path crosses described front signal machine, upgrade current demand signal machine, described front signal machine is set as current demand signal machine and again performs obtaining front signal machine step, acquisition local operating path step and operating path determining step;
Obtain operating path and stop step, when the final position in described locomotive operation path is before described front signal machine or on described front signal machine, build described operating path according to all described local operating path, described acquisition operating path step completes.
In one embodiment, described acquisition local operating path step comprises following steps:
Determine service direction step, determine the service direction of described locomotive based on described yards design data file according to the record data of described current demand signal machine and described front signal machine;
Setting current road segment step, determine according to the record data of described current demand signal machine the section that described current demand signal machine is corresponding based on described yards design data file, setting section corresponding to described current demand signal machine is current road segment;
Setting stops section step, determines the section that described front signal machine is corresponding based on described yards design data file according to the record data of described front signal machine, sets section corresponding to described front signal machine as stopping section;
Determine section, front step, determine the section, front be connected with described current road segment on the service direction of described locomotive according to described current road segment;
Stop section determining step, judge that whether section, described front is consistent with described termination section;
Upgrade current road segment step, when section, described front and described termination section are inconsistent, section, described front are set as current road segment also performs again and describedly determine section, front step;
Combination local operating path step, when section, described front is consistent with described termination section, connect section corresponding to described current demand signal machine successively and in the described section, all fronts determining to determine in the step of section, front, thus obtain the local operating path between described current demand signal machine and described front signal machine.
In one embodiment, described operating path also comprises initial path, described initial path by described locomotive from cycling start position row sail to described locomotive process first signal between path.
In one embodiment, described operating path also comprises transition path, and described transition path is the path of described locomotive between the entrance of the field, next one station that last signal when place, next stop process sails into described locomotive.
In one embodiment, described step 4 also comprises carry over determining step, judge whether the position of described locomotive crosses described yards design base map based on described shunting movement record, when described yards design base map is crossed in the position of described locomotive, obtain the data file of next yards design corresponding based on described shunting movement record.
Compared with prior art, tool of the present invention has the following advantages:
The playback result of back method of the present invention is more directly perceived, facilitates consultation and understands;
Can the shunting movement record of playback specific time period or particular locomotive fast and accurately based on back method of the present invention, thus be convenient to carry out the analysis of shunting movement record data daily.
Further feature of the present invention or advantage will be set forth in the following description.Further, Partial Feature of the present invention or advantage will be become apparent by specification sheets, or be understood by implementing the present invention.Object of the present invention and certain advantages realize by step specifically noted in specification sheets, claims and accompanying drawing or obtain.
Accompanying drawing explanation
Accompanying drawing is used to provide a further understanding of the present invention, and forms a part for specification sheets, with embodiments of the invention jointly for explaining the present invention, is not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is according to one embodiment of the invention flowchart;
Fig. 2 is a part of according to an embodiment of the invention flowchart;
Fig. 3 is a part of according to an embodiment of the invention flowchart;
Fig. 4 is according to one embodiment of the invention yards design middle conductor unit simplified schematic diagram;
Fig. 5 is according to track switch unit simplified schematic diagram in one embodiment of the invention yards design.
Detailed description of the invention
Embodiments of the present invention are described in detail below with reference to drawings and Examples, enforcement personnel of the present invention whereby can fully understand how application engineering means solve technical matters in the present invention, and reach the implementation procedure of technique effect and specifically implement the present invention according to above-mentioned implementation procedure.It should be noted that, only otherwise form conflict, each embodiment in the present invention and each feature in each embodiment can be combined with each other, and the technical scheme formed is all within protection scope of the present invention.
The problem of the requirement that existing shunting movement record data daily is analyzed can not be met for existing shunting movement record back method, the invention provides a kind of method of playback shunting movement record.Diagram of circuit below in conjunction with Fig. 1 specifically describes the implementation of back method of the present invention.Step shown in the diagram of circuit of accompanying drawing can perform in the computer system comprising such as one group of computer executable instructions.Although show the logical order of each step in flow charts, in some cases, can be different from the step shown or described by order execution herein.
Adopt back method of the present invention, as shown in Figure 1, first perform step S100, obtain the qualifications of playback shunting movement record.In the present embodiment, qualifications comprises target locomotive, playback duration scope, playback spatial dimension etc.Be understood that, in practical implementation, do not need to provide all qualificationss, or several in qualifications only need be provided usually.The a certain particular locomotive of such as playback all shunting movement record data in a period of time.Can the shunting movement record of playback specific time period or particular locomotive fast and accurately based on back method of the present invention, thus be convenient to carry out the analysis of shunting movement record data daily.
Then perform step S110, obtain shunting movement record based on qualifications.In the present embodiment, first corresponding shunting movement record is chosen according to qualifications.Then shunting movement record is resolved.In the process, need the numbering (title) filtering out all signals on locomotive operation path from shunting movement record, and the sequencing of signal on operating path.
Then step S120 is performed, based on qualifications acquisition station field pattern data file.Then perform step S140, draw yards design base map according to yards design data file.In step S140, first the present embodiment analyzes the yards design data file got, thus from yards design data file, extract the type of each unit and the position of correspondence on departures field.Then on yards design base map, draw corresponding icon according to the type of each unit and the position of correspondence on field, station, thus complete yards design base map.
In the present embodiment, the unit of standing on field comprises line segment, track switch and signal.Because the present invention is based on existing yards design data, the details type of each unit on field of therefore standing also with existing yards design data consistent, just repeat no more here.Coordinate points according to line segment, track switch and signal draws out each data type icon in software interface, corresponding line segment and track switch is connected, complete yards design of completing.Back method of the present invention is based on yards design playback shunting movement record, and playback result is more directly perceived, facilitates consultation and understands.
Next just can based on yards design base map according to shunting movement record playback shunting movement record.In the process, first perform step S130, obtain operating path step.In this step, the operating path of locomotive is obtained according to shunting movement record.Then perform step S150, operating path plot step, operating path is plotted on the yards design base map that obtains in step S140.Finally just step S160 can be performed, data readback step.The step S160 of the present embodiment not only comprises locomotive operation replay procedure and also comprises signal state replay procedure.Wherein, locomotive operation playback be recorded in yards design base map according to shunting movement locomotive operation path on according to dynamic drafting locomotive location information time lapse; The playback of signal state be recorded in yards design base map according to shunting movement operating path on according to the corresponding signal status information of dynamic drafting time lapse.
Based on the difference of on-the-spot running condition, locomotive has dissimilar operating path.Different playback qualificationss also causes the obtain manner of operating path different simultaneously.Therefore, in the present embodiment, the acquisition process of operating path is divided into several stages.When the data readback step (S160) in each stage terminates, need to perform step S170, playback terminates determining step.In step S170, judge based on playback qualifications the playback target whether current playback reaches predetermined.In time reaching predetermined playback target, it is yes that playback terminates determining step judged result, enters step S180, and whole playback operation terminates.
The present embodiment draws yards design according to the station number of shunting monitoring log file record, field dynamic loading yards design data file.Because a shunting monitoring log file may need to load multiple yards design data file to draw yards design, therefore the present embodiment also comprises step S190, carry over determining step.Be no when playback terminates determining step (S170) judged result, playback needs to proceed, and now enters step S190.
In step S190, judge whether the operating path of locomotive next stage crosses current yards design base map based on shunting movement record.When the operating path of locomotive next stage crosses current yards design base map, then carry over judged result is yes.Now again perform step S120, obtain yards design data file new accordingly based on shunting movement record.Then again perform step S130 based on new yards design data file, carry out the acquisition operating path step in next stage.When the operating path of locomotive next stage is on current yards design base map, then carry over judged result is no.Now directly again perform step S130, carry out the acquisition operating path step in next stage.
What the present embodiment adopted is the acquisition operating path step (S130) often completing a stage, just performs corresponding operating path and draws (S150) and data readback (S160) step.Be understood that, also can adopt the acquisition operating path step first completing all stages, then perform in entirety and obtain operating path and data readback step.
In another embodiment of the invention, the acquisition operating path step in a stage is first carried out.Then judge whether the path obtained reaches predetermined demand (S170).If do not reach reservation demand, then proceed the acquisition operating path (S130) in next stage.If the path obtained reaches pre-provisioning request, then all operating paths obtained are plotted on the base map of field, corresponding station (S150).Finally on drawn operating path, carry out data readback (S160).
Following continuation is described for the embodiment shown in Fig. 1.Because the obtaining step of operating path is in the present embodiment divided into multiple stage, thus each stage just obtaining operating path step be below described in detail.As shown in Figure 2, when obtaining operating path, first to perform step S200, obtaining initialize signal machine.In the present embodiment, from shunting movement record, obtain the record data of locomotive first signal of process on field, station, first signal is defined as initialize signal machine.According to order time lapse, extract the record data of first signal obtained in Fig. 1 step S110.
In actual moving process, the operating path of locomotive is divided into several different type.One of them type is initial path, initial path be locomotive from truck position (locomotive, truck position is generally positioned at native gear place) drive to before first signal between path.Be understood that, initial path is a path only comprising a signal, and signal is positioned at the terminal in path.Therefore, in the present embodiment, after execution step S200, need to perform step S210, judge whether comprise initial path in the required operating path obtained.
In step S210, according to the record data combining station field pattern data file of initialize signal machine that step S200 obtains, judge that whether initialize signal machine is the endpoint signal machine in initial path.If initialize signal machine is the endpoint signal machine in initial path, then perform step S220, combining station field pattern data file is according to the corresponding initial path of the record data acquisition of initialize signal machine.Then corresponding and initial path step S150 (operating path plot step), step S160 (data readback step) is performed successively.
When the data readback step (S160) for initial path completes or initialize signal machine is not the endpoint signal machine in initial path, next perform step S230, obtain current demand signal machine.In the process obtaining operating path, if step S230 performs first time, then the initialize signal machine obtained in step S200 is set as current demand signal machine.
Similar initial path, the type of the operating path of locomotive also comprises transition path.Last signal of current yards design of process that transition path is locomotive sails the path between the entrance of field, the next stop into locomotive.Be understood that equally, for field, a certain specific station, transition path is a path only comprising a signal, and signal is positioned at the starting point in path.Therefore the present embodiment also comprises step S240, judges whether to there is transition path.
In step S240, according to the record data combining station field pattern data file of current demand signal machine that step S230 obtains, judge that whether current demand signal machine is the home signal machine in transition path.If current demand signal machine is the home signal machine in transition path, then perform step S250, combining station field pattern data file is according to the corresponding transition path of the record data acquisition of current demand signal machine.Then corresponding and transition path step S150 (operating path plot step), step S160 (data readback step) is performed successively.Be understood that, namely locomotive sails out of our station field behind transition path.
The type of the operating path of locomotive also comprises local operating path.Local operating path refers to the operating path of locomotive between adjacent two signals.When judging in step S240 that current demand signal machine is not the home signal machine in transition path, the local operating path of locomotive next just can be obtained.In the present embodiment, first perform step S260, obtain front signal machine.Temporally passage to take out in turn in shunting movement log file relative to the record data of the next signal machine of current demand signal machine and the signal of taking-up is set as front signal machine.
Following execution step S270, obtains local operating path.In this step, obtain the local operating path of locomotive according to the record data of current demand signal machine and front signal machine based on yards design data file.It is the detailed process obtaining locomotive local operating path shown in Fig. 3.As shown in Figure 3, first perform step S400, setting current road segment.In step S400, first based on the section that yards design data file is corresponding according to the record data determination current demand signal machine of current demand signal machine.Then section corresponding for current demand signal machine is set as current road segment.
Following execution step S410, determines service direction, based on the service direction of yards design data file according to the record data determination locomotive of current demand signal machine and front signal machine.In step S410, the coordinate corresponding in yards design according to the record data acquisition signal machine of current demand signal machine and front signal machine.With the coordinate of current demand signal machine for origin coordinates, stop coordinate with the coordinate of front signal machine, calculate the service direction that locomotive is current.
Next carry out step S420, setting stops section.First based on the section that yards design data file is corresponding according to the record data determination front signal machine of front signal machine.Then section corresponding for front signal machine is set as stopping section.
Following execution step S440, determines section, front.In step S440, determine the section, front be connected with current road segment on the service direction of locomotive according to current road segment based on yards design data logging.In the present embodiment, section comprises line segment and track switch.
As shown in Figure 4, A, B, C and D are the schematic diagram of four kinds of line segments on yards design, represent four kinds of locomotive operation circuits respectively.Black line wherein in square frame is the circulation line of locomotive, wherein: A be level to; B is Vertical dimension; C is left to bottom right oblique; D is that the oblique of upper right is arrived in lower-left.Be understood that, several line segment head and the tail are connected the circulation line that namely can form one section of locomotive successively.
In yards design data logging, each line segment record comprises connected precursor section record and follow-up section record.If current road segment is line segment, then first determine that the section, front of current line segment on locomotive operation direction is precursor section or follow-up section.Then the precursor section that acquisition is connected with current road segment from yards design data logging or follow-up section are as section, front.
The connection mode of the track switch on locomotive operation circuit is different from line segment.Now describe for a simple track switch type.Figure 5 shows that the schematic diagram of a simple track switch unit.In figure, the part of black line is the travel line of locomotive.Can be seen there is route 501 with unit center O for starting point fails to agree by Fig. 5, have route 503 to the right, have route 502 to upper right.Route 501,502,503 is intersected in O point.Definition 501 is railroad turnout base position, and 503 is track switch location, and 502 is track switch antiposition.
If current road segment is track switch, then need first to judge the connection location of section on the reversing sense of service direction and current road segment.If last section connects location (503) or the antiposition (502) of track switch, then obtaining the section connecting railroad turnout base position (501) is section, front; If last section connects the base position (501) of track switch, need to carry out search to determine section, front.Choose the location (503) of track switch or antiposition (502) as entry direction, search for the section be connected according to service direction successively.If the section that front signal machine is corresponding can be searched, then obtain the section that connect corresponding to entry direction as section, front.In search procedure:
1) if the search carried out along the section be connected enters the reversing sense of service direction, then the entry direction mistake of current search, needs to reselect entry direction;
2) if on service direction, current search to the position in section exceed the position in section corresponding to front signal machine, then the entry direction mistake of current search, needs to reselect entry direction;
3) if on service direction, search the section that signal beyond front signal machine is corresponding, then the entry direction mistake of current search, needs to reselect entry direction;
4) if search for the section be connected less than the next one, then the entry direction mistake of current search, needs to reselect entry direction.
In the present embodiment, take first to search for antiposition (502), then the mode of searching for location (503) is searched for.
In step S440, after getting section, front, first the record data in the section, front got are stored, then perform step S450, judge that whether section, front is consistent with termination section.If section, front is inconsistent with termination section, then perform step S460, upgrade current road segment.In step S460, the section, front obtained in step S440 is set as new current road segment.Then again perform step S440 based on new current road segment, obtain new section, front.And step S450 is performed to new section, front.
If section, front is consistent with termination section, then perform step S470, combination local operating path.In step S470, connect section corresponding to current demand signal machine successively and determine in step S440 and the section, all fronts stored, thus obtaining the local operating path between described current demand signal machine and described front signal machine.Now the acquisition operating path step in a stage also completes thereupon.
Local can perform the step S150 (drafting operating path) shown in Fig. 1 and step S160 (data readback) after obtaining operating path for the local operating path got.Operating path due to locomotive may comprise multiple local operating path, and therefore the present embodiment also comprises step S280 as shown in Figure 2, operating path determining step.In step S280, judge whether the final position in locomotive operation path crosses front signal machine according to shunting movement record.When the final position in locomotive operation path is before front signal machine or on front signal machine, then illustrate the locomotive operation of this playback terminate in front signal machine before or on.Now perform step S180 (playback terminates).
When the final position in locomotive operation path crosses front signal machine, illustrate that locomotive is crossed follow-up the continuing of front signal machine and sailed.Now need to carry out step S231, upgrade current demand signal machine.In step S231, a upper front signal machine obtained in the operating path stage is set as new current demand signal machine.Next again perform step S240 based on new current demand signal machine, thus start the acquisition operating path step of new stage.
In practical operation, stop the situation of data readback owing to running into midway sometimes.For this situation, the present embodiment adds step S290 between step S280 and step S231.After step S280 judges that the final position in locomotive operation path crosses front signal machine, first perform step S290, judge whether to there is interruptive command.If there is interruptive command, then directly enter step S180 (playback terminates); If there is no interruptive command, then proceed step S231.
To sum up, back method of the present invention is based on yards design playback shunting movement record, and playback result is more directly perceived, facilitates consultation and understands; And can the shunting movement record of playback specific time period or particular locomotive fast and accurately based on back method of the present invention, thus be convenient to carry out the analysis of shunting movement record data daily.
Although embodiment disclosed in this invention is as above, the embodiment that described content just adopts for the ease of understanding the present invention, and be not used to limit the present invention.Method of the present invention also can have other various embodiments.When not deviating from essence of the present invention, those of ordinary skill in the art are when making various corresponding change or distortion according to the present invention, but these change accordingly or are out of shape the protection domain that all should belong to claim of the present invention.

Claims (10)

1. a method for playback shunting movement record, described method comprises following steps:
Step one, obtains the qualifications of shunting movement record described in playback;
Step 2, obtains corresponding shunting movement record and yards design data file based on described qualifications;
Step 3, draws yards design base map according to described yards design data file;
Step 4, based on shunting movement record described in the playback of described yards design base map.
2. the method for claim 1, is characterized in that, described step 3 comprises the following steps:
Analyze described yards design data file, thus the type of each unit and the position of correspondence on acquisition station field;
On described yards design base map, draw corresponding icon according to the type of each unit on field, described station and the position of correspondence, thus complete described yards design base map.
3. method as claimed in claim 2, it is characterized in that, described step 4 comprises following steps:
Obtain operating path step, obtain the operating path of locomotive according to described shunting movement record;
Draw operating path step, described operating path is plotted on described yards design base map;
Playback logout step, is recorded on described operating path according to the corresponding locomotive location information of dynamic drafting time lapse according to described shunting movement.
4. method as claimed in claim 3, it is characterized in that, described step 4 also comprises playback signal machine state step, is recorded on described operating path according to the corresponding signal status information of dynamic drafting time lapse according to described shunting movement.
5. method as claimed in claim 3, is characterized in that, in described acquisition operating path step, described operating path comprises local operating path, and described local operating path is the operating path of described locomotive between adjacent two described signals.
6. method as claimed in claim 5, it is characterized in that, described acquisition operating path step comprises following steps:
Obtain current demand signal machine step, from described shunting movement record, obtain the record data of described locomotive first signal of process on field, described station, described first signal is set as current demand signal machine;
Obtain front signal machine step, from described shunting movement record, obtain the record data of the front signal machine corresponding with described current demand signal machine;
Obtain local operating path step, based on the local operating path of described yards design data file locomotive according to the record data acquisition of described current demand signal machine and described front signal machine;
According to described shunting movement record, operating path determining step, judges whether the final position in described locomotive operation path crosses described front signal machine;
Current demand signal machine step of updating, when the final position in described locomotive operation path crosses described front signal machine, upgrade current demand signal machine, described front signal machine is set as current demand signal machine and again performs obtaining front signal machine step, acquisition local operating path step and operating path determining step;
Obtain operating path and stop step, when the final position in described locomotive operation path is before described front signal machine or on described front signal machine, build described operating path according to all described local operating path, described acquisition operating path step completes.
7. method as claimed in claim 6, is characterized in that, described acquisition local operating path step comprises following steps:
Determine service direction step, determine the service direction of described locomotive based on described yards design data file according to the record data of described current demand signal machine and described front signal machine;
Setting current road segment step, determine according to the record data of described current demand signal machine the section that described current demand signal machine is corresponding based on described yards design data file, setting section corresponding to described current demand signal machine is current road segment;
Setting stops section step, determines the section that described front signal machine is corresponding based on described yards design data file according to the record data of described front signal machine, sets section corresponding to described front signal machine as stopping section;
Determine section, front step, determine the section, front be connected with described current road segment on the service direction of described locomotive according to described current road segment;
Stop section determining step, judge that whether section, described front is consistent with described termination section;
Upgrade current road segment step, when section, described front and described termination section are inconsistent, section, described front are set as current road segment also performs again and describedly determine section, front step;
Combination local operating path step, when section, described front is consistent with described termination section, connect section corresponding to described current demand signal machine successively and in the described section, all fronts determining to determine in the step of section, front, thus obtain the local operating path between described current demand signal machine and described front signal machine.
8. method as claimed in claim 5, it is characterized in that, described operating path also comprises initial path, described initial path by described locomotive from cycling start position row sail to described locomotive process first signal between path.
9. method as claimed in claim 5, it is characterized in that, described operating path also comprises transition path, and described transition path is the path of described locomotive between the entrance of the field, next one station that last signal when place, next stop process sails into described locomotive.
10. method as claimed in claim 3, it is characterized in that, described step 4 also comprises carry over determining step, judge whether the position of described locomotive crosses described yards design base map based on described shunting movement record, when described yards design base map is crossed in the position of described locomotive, obtain the data file of next yards design corresponding based on described shunting movement record.
CN201410490076.7A 2014-09-23 2014-09-23 A kind of method of playback shunting movement record Active CN104290777B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410490076.7A CN104290777B (en) 2014-09-23 2014-09-23 A kind of method of playback shunting movement record

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410490076.7A CN104290777B (en) 2014-09-23 2014-09-23 A kind of method of playback shunting movement record

Publications (2)

Publication Number Publication Date
CN104290777A true CN104290777A (en) 2015-01-21
CN104290777B CN104290777B (en) 2016-06-08

Family

ID=52310793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410490076.7A Active CN104290777B (en) 2014-09-23 2014-09-23 A kind of method of playback shunting movement record

Country Status (1)

Country Link
CN (1) CN104290777B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110858223A (en) * 2018-08-24 2020-03-03 比亚迪股份有限公司 Playback method, system, server and client based on database
CN112307135A (en) * 2020-11-20 2021-02-02 卡斯柯信号(成都)有限公司 Analysis method for station yard graph playback file route

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101513890A (en) * 2008-12-29 2009-08-26 卡斯柯信号有限公司 Method for automatically processing reverse replay of a train monitoring system
CN201338640Y (en) * 2008-12-29 2009-11-04 卡斯柯信号有限公司 Railway system reverse playback processing device
CN101722972A (en) * 2009-12-24 2010-06-09 卡斯柯信号有限公司 Processing method for playing back ATS subsystem

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101513890A (en) * 2008-12-29 2009-08-26 卡斯柯信号有限公司 Method for automatically processing reverse replay of a train monitoring system
CN201338640Y (en) * 2008-12-29 2009-11-04 卡斯柯信号有限公司 Railway system reverse playback processing device
CN101722972A (en) * 2009-12-24 2010-06-09 卡斯柯信号有限公司 Processing method for playing back ATS subsystem

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110858223A (en) * 2018-08-24 2020-03-03 比亚迪股份有限公司 Playback method, system, server and client based on database
CN110858223B (en) * 2018-08-24 2023-09-05 比亚迪股份有限公司 Playback method, system, server and client based on database
CN112307135A (en) * 2020-11-20 2021-02-02 卡斯柯信号(成都)有限公司 Analysis method for station yard graph playback file route

Also Published As

Publication number Publication date
CN104290777B (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN104228884B (en) Method and the device of automatic vehicle identification and tracing and positioning is realized in rail yard
CN102647766B (en) Method and device for migrating user in high-speed rail communication network
CN106547271B (en) AGV traffic control method and apparatus
CN107563004B (en) Train interval data design method based on station route conflict
CN104290777B (en) A kind of method of playback shunting movement record
CN107672628A (en) Locking sheet automatic generation method and locking sheet automatically generating device
US20150249948A1 (en) Mobile communication system, mobile communication method, mobile station, program, and recording medium
CN113002592B (en) General processing method for train route approaching locking logic
CN113536454B (en) TACS system performance simulation method, device, electronic equipment and medium
CN103514751A (en) Vehicle information identification apparatus
CN109253733A (en) Real-time navigation method, device, equipment and medium
CN109299404B (en) LKJ line data-based train operation path searching method, device and system
CN111776017B (en) Method and device for controlling temporary speed limit of train
CN110406567A (en) The train control system and method for long-short route
CN105761533B (en) A kind of pilotless automobile parking stall planing method
CN107985342A (en) A kind of train nobody turn back automatically method
CN112307135A (en) Analysis method for station yard graph playback file route
WO2021103903A1 (en) Vehicle data communication interaction system and method for construction thereof
CN109945880A (en) Paths planning method, relevant device and readable storage medium storing program for executing
CN110858223B (en) Playback method, system, server and client based on database
CN114435433B (en) Method and device for verifying automatic trigger route conflict
CN114734886B (en) Heavy-duty train and automatic passing neutral section method and device thereof
CN111661112B (en) Opposite dispersion type train running direction adapting method and system
CN102951145B (en) Parking aid
CN204801691U (en) Car and separation and reunion footboard assembly, separation and reunion footboard detection device thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: The age of 412001 in Hunan Province, Zhuzhou Shifeng District Road No. 169

Patentee after: ZHUZHOU CRRC TIMES ELECTRIC Co.,Ltd.

Address before: The age of 412001 in Hunan Province, Zhuzhou Shifeng District Road No. 169

Patentee before: ZHUZH CSR TIMES ELECTRIC Co.,Ltd.