CN104279693B - The quick start method of air-conditioner - Google Patents

The quick start method of air-conditioner Download PDF

Info

Publication number
CN104279693B
CN104279693B CN201310319809.6A CN201310319809A CN104279693B CN 104279693 B CN104279693 B CN 104279693B CN 201310319809 A CN201310319809 A CN 201310319809A CN 104279693 B CN104279693 B CN 104279693B
Authority
CN
China
Prior art keywords
outdoor unit
indoor set
conditioner
air
startup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310319809.6A
Other languages
Chinese (zh)
Other versions
CN104279693A (en
Inventor
韩晓明
梁国强
陈首敏
李大林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GD Midea Air Conditioning Equipment Co Ltd
Original Assignee
Guangdong Midea Refrigeration Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Midea Refrigeration Equipment Co Ltd filed Critical Guangdong Midea Refrigeration Equipment Co Ltd
Priority to CN201310319809.6A priority Critical patent/CN104279693B/en
Publication of CN104279693A publication Critical patent/CN104279693A/en
Application granted granted Critical
Publication of CN104279693B publication Critical patent/CN104279693B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The present invention proposes a kind of quick start method of air-conditioner, and air-conditioner includes indoor set and outdoor unit, and startup method is comprised the following steps:Indoor set is controlled electric on outdoor unit and initialized after startup control signal is received, while controlling indoor set load to be initialized;After outdoor unit completes initialization, the compressor start of outdoor unit is controlled;And while compressor start or after startup, start the blower fan of outdoor unit.In addition, after machine sends the control signal of predeterminated frequency value indoors outdoor unit again to indoor set back-to-back running parameter, and using the initialization of shared micro-control unit MCU control indoor set loads.The startup method of air-conditioner according to embodiments of the present invention, can greatly shorten the startup time of air-conditioner, the comfort level that lifting user uses.

Description

The quick start method of air-conditioner
Technical field
The present invention relates to air-conditioner technical field, more particularly to a kind of quick start method of air-conditioner.
Background technology
Traditional air-conditioner is from start to compressor start then comparatively long to having cold wind or hot blast discharge to need Time, air-conditioner carries out the initialization of indoor set, outdoor unit and various communications using this period.As shown in figure 1, being existing There is the start-up course of the air-conditioner of technology, it is comprised the following steps:
S101, receives the control signal of remote control.
After the control signal that air-conditioner receives remote control, into step S102.
S102, indoor set load is initialized.
After the control signal that air-conditioner receives remote control, indoor set load is initialized, such as indoor set it is aobvious Show plate and master board load initialized, and display board MCU(Micro-Control Unit, micro-control unit)With The MCU of master board is to control to set up communication between display board and master board respectively by two MCU, if use time is T1, general t1 are more than 1 second.
S103, judges whether indoor set load completes initialization.
If it is, into step S104, if not, return to step S102.
S104, indoor set is initialized to electricity on outdoor unit, outdoor unit.
After machine completes initialization indoors, the relay of closure control outdoor unit, is that outdoor unit is powered, and outdoor unit waits electricity Source stabilization, used time t21, general t21 is more than 1 second.After outdoor unit power good, outdoor unit is initialized, used time t22, one As t22 be more than 2 seconds, after indoor set completes initialization, carry out communication delay treatment, used time t23, general t23 is more than 5 seconds.So The initialization use time t21+t22+t23 of indoor set>8 seconds.
S105, indoor set and outdoor unit set up communication.
After outdoor unit completes initialization, communication is set up between indoor set and indoor set.
S106, indoor set and outdoor unit enter line parameter transmission.
Indoor set and outdoor unit set up the laggard line parameter transmission of communication, and completing parameter transmission needs used time t3, and general t3 is big In 6 seconds.
S107, indoor set sends target frequency and instructs to outdoor unit.
After machine and outdoor unit complete parameter transmission indoors, indoor set sends target frequency instruction to start to outdoor unit Compressor.Enter step S108.
S108, blower fan and compressor carry out parameter configuration respectively.
After the target frequency instruction that outdoor unit receives indoor set transmission, the blower fan and compressor of outdoor unit are configured Start-up parameter, and the successively startup of time delay t4 times blower fan and compressor, in order to ensure system pressure stabilization, after blower fan starts Allow to start compressor.Specifically, outdoor unit enters the compressor stage to be opened after receiving target frequency instruction, carries out blower fan Parameter configuration is, it is necessary to used time t41, general t41 was more than 6 seconds.Blower fan configures and compressor parameter configuration is carried out after completing, used time t42, General t42 is more than 4 seconds.
S109, control blower fan starts.
After the completion for the treatment of that the parameter of blower fan and compressor is configured, blower fan is controlled to start to ensure the radiating of compressor first.
S110, controls compressor start.
After blower fan starts, compressor is opened with fixed frequency, Normal squeezing machine is started with relatively low frequency, in order to protect The reliability of compressor start is demonstrate,proved, initiation culture is generally less than 30HZ.
Above as can be seen that delay time of the air-conditioner in start-up course is excessive, the time is started altogether more than 25 seconds, and And initiation culture is relatively low, the effect of influence air-conditioner start cooling and warming.In order to change air-conditioner start refrigeration, heating effect compared with Slow situation, existing method has certain improvement, although some methods can obtain preferable leaving air temp, but cost Higher, generalization is poor, is of limited application.Although some methods can be such that air-conditioner quickly starts, initiation culture is relatively low, goes out Air temperature change is slow, influences the cooling or heating effect of air-conditioner, user's comfortableness is lifted limited.
The content of the invention
The purpose of the present invention is intended at least solve one of above-mentioned technical problem to a certain extent.
Therefore, it is an object of the invention to propose a kind of quick start method of air-conditioner, the quick start method can be with The startup time of air-conditioner is greatly shortened, can also be started with FREQUENCY CONTROL air-conditioner higher in addition, lifting user's is comfortable Sexual experience.
To reach above-mentioned purpose, the embodiment of the present invention proposes a kind of quick start method of air-conditioner, the quick startup side Method is comprised the following steps:The indoor set is controlled electric on the outdoor unit and carried out initial after startup control signal is received Change, while controlling the indoor set load to be initialized;After the outdoor unit completes initialization, the outdoor unit is controlled Compressor start;And while the compressor start or after startup, start the blower fan of the outdoor unit.
The quick start method of air-conditioner according to embodiments of the present invention, by the optimization of process that starts to air-conditioner and Improve, such as control indoor set load to be initialized while outdoor unit is initialized, and starting the same of compressor When or start blower fan afterwards, the time of air-conditioner startup can be greatly shortened, improve the comfort level that uses of user.
In one embodiment of the invention, the indoor set sends the control signal with predeterminated frequency value to the room Outer machine is controlling the compressor start of the outdoor unit.
In another embodiment of the present invention, the outdoor unit sends the control signal of the predeterminated frequency value to control The compressor start.
Wherein, the predeterminated frequency value is less than 100HZ more than 10Hz.
In one embodiment of the invention, the control signal with predeterminated frequency value is sent to described in the indoor set After outdoor unit, the indoor set sends parameter transmission instruction to the outdoor unit, so that the outdoor unit is to the indoor set Back-to-back running parameter.
Further, the indoor set sends has the control signal of predeterminated frequency value described to control to the outdoor unit The compressor start of outdoor unit is specifically included:N number of temperature range is divided into according to outdoor temperature, each outdoor temperature is set interval Upper frequency limit value, and the predeterminated frequency sent according to the indoor set and selects the predeterminated frequency with corresponding outdoor temperature Relatively small frequency in the interval upper frequency limit value is controlling the compressor start.
In addition, in one embodiment of the invention, the startup method of above-mentioned air-conditioner also includes:By one shared Micro-control unit MCU drives the indoor set load to be initialized.
Wherein, the load is the display board of the indoor set and master board load.
In one embodiment of the invention, the Switching Power Supply of output predeterminated voltage/electric current is used for the outdoor unit enters Row powers to shorten the startup stand-by period of the outdoor unit.
In another embodiment of the present invention, on the outdoor unit after electricity, the indoor set and the outdoor unit reality Shi Jinhang communicates with shortening the connection setup time.
In yet another embodiment of the present invention, the communication baud rate of the indoor set and the outdoor unit is improved to pre- If baud rate scope with shorten between the indoor set and the outdoor unit per frame data call duration time.
The additional aspect of the present invention and advantage will be set forth in part in the description, and will partly become from the following description Obtain substantially, or recognized by practice of the invention.
Brief description of the drawings
The above-mentioned and/or additional aspect of the present invention and advantage will become from the following description of the accompanying drawings of embodiments Substantially and be readily appreciated that, wherein:
Fig. 1 is the flow chart of the startup of the air-conditioner of prior art;
Fig. 2 is the flow chart of the startup method of the air-conditioner according to the embodiment of the present invention;
Fig. 3 be the air-conditioner according to one embodiment of the present of invention startup method in air-conditioner electric-control system signal Figure;And
Fig. 4 is the flow chart of the startup method of the air-conditioner according to a specific embodiment of the invention.
Specific embodiment
Embodiments of the invention are described below in detail, the example of the embodiment is shown in the drawings, wherein from start to finish Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached It is exemplary to scheme the embodiment of description, is only used for explaining the present invention, and is not construed as limiting the claims.
Following disclosure provides many different embodiments or example is used for realizing different structure of the invention.For letter Change disclosure of the invention, hereinafter the part and setting to specific examples are described.Certainly, they are only merely illustrative, and Purpose does not lie in the limitation present invention.Additionally, the present invention can in different examples repeat reference numerals and/or letter.It is this heavy It is again the relation between itself not indicating discussed various embodiments and/or setting for purposes of simplicity and clarity.This Outward, the invention provides various specific technique and material example, but those of ordinary skill in the art can be appreciated that The use of the applicable property and/or other materials of other techniques.In addition, fisrt feature described below second feature it " on " structure can include that the first and second features be formed as the embodiment of directly contact, it is also possible to including other feature shape Into the embodiment between the first and second features, such first and second feature may not be directly contact.
In the description of the invention, it is necessary to explanation, unless otherwise prescribed and limit, term " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be mechanically connect or electrical connection, or two connections of element internal, can Being to be joined directly together, it is also possible to be indirectly connected to by intermediary, for the ordinary skill in the art, can basis Concrete condition understands the concrete meaning of above-mentioned term.
The startup method of air-conditioner according to embodiments of the present invention is described with reference to the accompanying drawings.
Air-conditioner in embodiments of the present invention includes indoor set and outdoor unit, as shown in Fig. 2 the sky of the embodiment of the present invention The startup method of device is adjusted to comprise the following steps:
S201, indoor set is controlled electric on outdoor unit and initialized, while control after startup control signal is received Indoor set load is initialized.
After machine receives the startup control signal of remote control indoors, the relay that the outdoor unit of closure control immediately is powered, It is i.e. electric on control outdoor unit immediately, and after electricity on outdoor unit, control outdoor unit is initialized, and initialization here can be managed The necessary initialization content of the compressor start for outdoor unit is solved, and non-essential other of compressor start are initialized It is same in the main circulating program that content such as air-conditioner of the content such as time delay stand-by period after compressor start communicated, is driven Shi Jinhang, to shorten initialization time when air-conditioner starts.In addition, in one embodiment of the invention, it is pre- using output If the Switching Power Supply of voltage/current is powered to shorten the startup stand-by period of outdoor unit for outdoor unit.Here default electricity The Switching Power Supply of pressure/electric current can be the Switching Power Supply for being capable of fast and stable output, to solve when outdoor unit just goes up electricity power supply not Stable problem, to shorten the power good time.
In addition, after electricity on control indoor set, indoor set is to be initialized that for example wait power good, program initial Change etc., indoor set had completed initialization before startup control signal is received.Machine receives startup control signal indoors Afterwards, control indoor set load is initialized such as wind guide strip, indoor fan, initialization action of electric auxiliary heat load etc..Room Interior machine is closed at outdoor relay and is powered to outdoor unit carrying out load initialization, and control outdoor unit is initialized, and is not required to Enter line delay wait.In one embodiment of the invention, can be by a shared micro-control unit MCU drive chamber Machine load is initialized.Wherein, load can be the display board and master board load such as wind guide strip, indoor wind of indoor set Mechanical, electrical auxiliary heat load.It should be noted that driving indoor set display board and master board negative using a micro-control unit MCU Carry, so as to eliminate the communication between the display board of indoor set and indoor master board, shorten display board and master board is negative The initialization of load, connection setup delay time T1, such as general T1 are less than 1 second more than 200 milliseconds.
In one embodiment of the invention, after electricity on outdoor unit, indoor set and outdoor unit are communicated with contracting in real time The short connection setup time.I.e. indoor set does not carry out communication delay wait, as long as electricity on outdoor unit, with regard to carrying out handshake communication always, Indoor set and outdoor unit connection setup time can be shortened.
After outdoor unit completes initialization, into step S202.
S202, after outdoor unit completes initialization, controls the compressor start of outdoor unit.
In one embodiment of the invention, air-conditioner can include surface structure part, coolant circulating system and automatically controlled control System processed, wherein, as shown in figure 3, automatically controlled control system can include that display board 301, indoor driving plate 302 are indoor main control Plate and outdoor driving plate 303.Display board 301 is received after the startup control signal of remote control, display board 301 and indoor driving Plate 302 is initialized carries out step S201, and is in communication with each other, after communicating successfully, the transmission frequency of indoor driving plate 302 Request controls compressor start to outdoor driving plate 303 by outdoor driving plate 303.In other words, room is completed in step s 201 After interior machine load and the initialization of outdoor unit, parameter configuration is carried out to compressor, indoor set is sent with predeterminated frequency value Control signal to outdoor unit to control the compressor start of outdoor unit, in addition, in one embodiment of the invention, it is also possible to logical Outdoor unit itself is crossed to send the control signal of predeterminated frequency value to control the compressor start of outdoor unit.Wherein, predeterminated frequency value 100HZ can be less than more than 10HZ, what the frequency request or outdoor unit that preferably 20HZ~80HZ, i.e. indoor set send sent Predeterminated frequency value can be more than the initiation culture of existing compressor of outdoor unit, it is believed that the air-conditioner in the embodiment of the present invention Quick start method in can using upper frequency control compressor start.Specifically, in one embodiment of the invention, Compressor can be controlled to start with different frequencies according to the different frequency request of outdoor environment temperature and indoor set.Specifically Ground, indoor set sends the control signal with predeterminated frequency value to outdoor unit to control the compressor start of outdoor unit specifically can be with Including:N number of temperature range is divided into according to outdoor temperature, the interval upper frequency limit value of each outdoor temperature is set, and according to room The predeterminated frequency that interior machine sends, selects predeterminated frequency with the relatively small frequency in the upper frequency limit value of corresponding outdoor temperature range to control Compressor start processed.For example, outdoor environment temperature is divided into four i.e. N=5 in region, respectively 0~10 DEG C, 10~20 DEG C, 20 ~30 DEG C, 30~40 DEG C, 40~50 DEG C, and the corresponding frequency of each temperature range for setting higher limit as 30HZ, 50HZ, 70HZ, 90HZ and 50HZ, if now outdoor environment temperature is 32 DEG C, in 30~40 DEG C of temperature ranges, the temperature Interval corresponding upper frequency limit is 90HZ, if the predeterminated frequency value that now indoor set sends is 80HZ, selects less frequency Rate value is 80HZ control compressor starts, if now outdoor environment temperature is 28 DEG C, i.e., in 20~30 DEG C of temperature ranges Interior, the corresponding higher limit of the temperature range is 70HZ, then select the i.e. 70HZ of less frequency values to control compressor start.General temperature Under degree such as 28 DEG C~35 DEG C can control compressor with more than 57HZ frequency start, i.e., speech can control compressor with compared with High-frequency starts, and thereby may be ensured that the cooling or heating effect of air-conditioner, lifts the comfort level of user.
It should be noted that in one embodiment of the invention, machine sends the control with predeterminated frequency value indoors After signal to outdoor unit, indoor set sends parameter transmission instruction to outdoor unit so that outdoor unit is joined to indoor set back-to-back running Number.Indoor set is first to outdoor unit transmission frequency information, that is to say, that the first frame traffic information between indoor set and outdoor unit With regard to transmission frequency information, and carry out the transmission of parameter information again after the compressor start of outdoor unit, indoor set further according to Relevant parameter is corrected to the initiation culture of compressor, substantially reduces frequency and sends the time, and then shorten compressor and opens The dynamic time.Furthermore it is also possible to be improved to default baud rate scope to shorten by by the communication baud rate of indoor set and outdoor unit Call duration time per frame data.
In one embodiment of the invention, while compressor start is controlled, into step S203.
S203, while compressor start or after startup, starts the blower fan of outdoor unit.
While compressor start is controlled by step S202, parameter configuration is carried out to blower fan, to control the wind of outdoor unit Machine starts.Say, in one embodiment of the invention, first start compressor, while compressor start or after startup, Control blower fan starts, and the pressure change that the coolant circulating system according to existing air-conditioner can bear can reach and first start pressure Restart the purpose of blower fan after contracting machine Preset Time, or, the refrigeration system to existing air-conditioner is improved, so as to have leisure Adjusting the system of device can bear larger pressure change, to be better achieved first start after compressor to start and blower fan or while start wind Machine is shortening startup time of compressor.Furthermore it is possible to the configuration of non-essential blower fan, the parameter of compressor is entered in air-conditioner Carried out while row communication, driving, non-essential blower fan here, the parameter of compressor can be understood as not influenceing blower fan, pressure The configuration of the parameter that contracting machine starts.
As can be seen that the quick start method of the air-conditioner of the embodiment of the present invention, each step started to existing air-conditioner Suddenly optimize, so as to shorten the startup time of air-conditioner.Briefly, a MCU by sharing controls the display of indoor set The load of plate 301 and indoor driving plate 302 is initialized, when shortening load initialization and saving connection setup time delay Between;By the Switching Power Supply using fast and stable and by the non-essential initialization content of outdoor unit in air-conditioner communication, driving work Carried out in journey and after electricity on outdoor unit, indoor set and outdoor unit are communicated in real time, substantially reduce indoor set and outdoor unit The delay time of connection setup;In addition, indoor set and outdoor unit carry out Frequency Transfer first, outdoor unit compressor start with Transfer Parameters information again afterwards, and communication baud rate is improved, the delivery time of frequency is substantially reduced, and then shorten compressor The startup time;In addition, first carrying out parameter configuration to compressor, while machine to be compressed starts or after startup, then blower fan is entered Line parameter is configured, and control blower fan starts, and will not influence the parameter configuration content that compressor and blower fan start in compressor start Carried out simultaneously during communication, the driving of air-conditioner afterwards, further shorten the time of compressor start.And noted by high frequency Enter control algolithm and the high frequency start-up parameter of compressor is set with upper frequency such as 80HZ control compressor starts.
In one particular embodiment of the present invention, as shown in figure 4, the startup method of above-mentioned air-conditioner includes following step Suddenly:
S401, indoor set receives the startup control signal of remote control.
After machine receives the startup control signal of remote control indoors, into step S402.
S402, the outdoor relay of closure is powered for outdoor unit.
After machine receives the startup control signal of remote control indoors, the outdoor relay closure of control thinks that outdoor unit is supplied Electricity on electricity, i.e. outdoor unit.On indoor set after electricity, step S403 and step S404 is respectively enterd.
S403, indoor set load is initialized.
On outdoor unit while electricity, indoor set load is initialized, the display board 301 of such as indoor set, indoor drive Dynamic plate 302 loads such as wind guide strip, indoor fan, electric auxiliary heat load etc. and is initialized, and an individually shared MCU Display board 301 and indoor driving plate 302 are driven respectively, so as to save the communication delay time, if use time is T1, general T1 1s is less than more than 200ms (millisecond)(Second).
S404, outdoor unit waits the stabilization of outdoor power.
While machine is initialized indoors, outdoor unit waits the stabilization of outdoor power.After outdoor relay closure, Regular hour wait power good is generally required, uses the Switching Power Supply of fast and stable for outdoor unit is powered, electricity can be shortened The stand-by period of source stabilization, set power good time T21.After outdoor power stabilization, into step S405.
S405, outdoor unit is initialized.
After outdoor power stabilization, outdoor unit is initialized.In this step, compressor start will can not be influenceed Initialization content after compressor start, with the communication of air-conditioner, driving process simultaneously carry out, such that it is able to shorten outdoor unit Initialization time, the initialization time for for example setting outdoor unit is T22.After outdoor unit completes initialization, into step S406.
S406, indoor set and outdoor unit are communicated.
After machine load indoors and outdoor unit complete initialization, indoor set and outdoor unit are communicated.And indoor set takes The communication delay that disappears is waited, as long as electricity then carries out the handshake communication with predeterminated frequency value order always on outdoor unit, so as to shorten The connection setup time, if the connection setup time is T23.
The delay time T2 of indoor set and outdoor unit connection setup, i.e. T2 can be shortened by step S404 to step S406 =T21+T22+T23, general T2 are less than 2s more than 500ms.
After machine and outdoor unit set up communication indoors, into step S407.
S407, outdoor unit receives the control signal with predeterminated frequency value that indoor set sends or outdoor unit sends and has The control signal of predeterminated frequency value.
After indoor set and outdoor unit set up communication, indoor set sends predeterminated frequency instruction to start compression to outdoor unit first Machine, or the control signal with predeterminated frequency value is sent by outdoor unit itself, and enter step S408.
S408, parameter configuration is carried out to compressor.
After outdoor unit receives the preset instructions of indoor set, parameter configuration is carried out to outdoor unit, and compressor will not be influenceed The parameter configuration of startup is carried out simultaneously during air-conditioner communication, driving after compressor start, can shorten the ginseng of compressor Number setup time T42, after the completion of parameter configuration, into step S409.
S409, controls compressor start.
After the completion of compressor parameter configuration, according to presetting that outdoor environment temperature and indoor set or outdoor unit itself send Frequency instruction controls compressor start with upper frequency.Enter step S410 while compressor start or after starting.
S410, carries out parameter configuration, and start blower fan to blower fan.
After compressor start, parameter configuration is carried out to blower fan, and will not influence the parameter configuration that blower fan starts, opened in blower fan Carried out after dynamic, fan parameter setup time T41 can be shortened, usually, the parameter configuration time T4=T41+ of blower fan and compressor T42, T4 are generally higher than 1s less than 2s.Fan parameter configuration enters step and starts blower fan after completing, and enters step S411.
S411, outdoor unit is to indoor set back-to-back running parameter.
After machine and outdoor unit set up communication indoors, transmission frequency information first waits compressor and blower fan to be carried out after starting Parameter is transmitted, and can shorten the delivery time T31 of frequency, and can improve communication baud rate, to shorten the logical of every frame data Letter time T32, usually, T3=T31+T32 is less than 1s more than 500ms.Now, the related ginseng that indoor set is transmitted according to outdoor unit Numerical example such as outdoor environment temperature etc. is corrected to the frequency of compressor, and compressor has been started up, so not interfering with air-conditioner Startup.
From embodiments above as can be seen that the start-up course of air-conditioner is greatly simplified, the startup time greatly shortens, tool The startup time of body ground air-conditioner can reach 6s.
In sum, the quick start method of air-conditioner according to embodiments of the present invention, by the startup to air-conditioner Each step is optimized and improved, and the time of air-conditioner startup can be greatly shortened, in addition, simultaneously can be with frequency higher Control air-conditioner starts, it is ensured that cooling or heating effect when air-conditioner is started shooting, and improves the comfort level that user uses.
Any process described otherwise above or method description in flow chart or herein is construed as, and expression includes It is one or more for realizing specific logical function or process the step of the module of code of executable instruction, fragment or portion Point, and the scope of the preferred embodiment of the present invention includes other realization, wherein can not press shown or discussion suitable Sequence, including function involved by basis by it is basic simultaneously in the way of or in the opposite order, carry out perform function, this should be of the invention Embodiment person of ordinary skill in the field understood.
Represent in flow charts or logic and/or step described otherwise above herein, for example, being considered use In the order list of the executable instruction for realizing logic function, in may be embodied in any computer-readable medium, for Instruction execution system, device or equipment(As computer based system, including the system of processor or other can be held from instruction The system of row system, device or equipment instruction fetch and execute instruction)Use, or with reference to these instruction execution systems, device or set It is standby and use.For the purpose of this specification, " computer-readable medium " can any can be included, store, communicate, propagate or pass The dress that defeated program is used for instruction execution system, device or equipment or with reference to these instruction execution systems, device or equipment Put.The more specifically example of computer-readable medium(Non-exhaustive list)Including following:With the electricity that one or more are connected up Connecting portion(Electronic installation), portable computer diskette box(Magnetic device), random access memory(RAM), read-only storage (ROM), erasable edit read-only storage(EPROM or flash memory), fiber device, and portable optic disk is read-only deposits Reservoir(CDROM).In addition, computer-readable medium can even is that the paper that can thereon print described program or other are suitable Medium, because optical scanner for example can be carried out by paper or other media, then enters edlin, interpretation or if necessary with it His suitable method is processed electronically to obtain described program, is then stored in computer storage.
It should be appreciated that each several part of the invention can be realized with hardware, software, firmware or combinations thereof.Above-mentioned In implementation method, the software that multiple steps or method can in memory and by suitable instruction execution system be performed with storage Or firmware is realized.If for example, realized with hardware, and in another embodiment, can be with well known in the art Any one of row technology or their combination are realized:With the logic gates for realizing logic function to data-signal Discrete logic, the application specific integrated circuit with suitable combinational logic gate circuit, programmable gate array(PGA), scene Programmable gate array(FPGA)Deng.
Those skilled in the art are appreciated that to realize all or part of step that above-described embodiment method is carried The rapid hardware that can be by program to instruct correlation is completed, and described program can be stored in a kind of computer-readable storage medium In matter, the program upon execution, including one or a combination set of the step of embodiment of the method.

Claims (8)

1. a kind of quick start method of air-conditioner, it is characterised in that the air-conditioner includes indoor set and outdoor unit, described to open Dynamic method is comprised the following steps:
The indoor set is controlled electric on the outdoor unit and initialized, while control after startup control signal is received The indoor set load is initialized;
After the outdoor unit completes initialization, the indoor set sends the control signal with predeterminated frequency to the outdoor Machine or the outdoor unit send the control signal with the predeterminated frequency, and N number of temperature range is divided into according to outdoor temperature, The interval upper frequency limit value of each outdoor temperature is set, and according to the predeterminated frequency, selects the predeterminated frequency and respective chamber/chambers Relatively small frequency in the upper frequency limit value of outer temperature range is controlling the compressor start of the outdoor unit;And
While the compressor start or after startup, start the blower fan of the outdoor unit.
2. the quick start method of air-conditioner as claimed in claim 1, it is characterised in that
After the indoor set sends control signal to the outdoor unit with predeterminated frequency value, the indoor set sends ginseng Number transmission is instructed to the outdoor unit, so that the outdoor unit is to the indoor set back-to-back running parameter.
3. the quick start method of air-conditioner as claimed in claim 1, it is characterised in that
The predeterminated frequency value is less than 100Hz more than 10Hz.
4. the quick start method of air-conditioner as claimed in claim 1, it is characterised in that also include:
Control the indoor set to load by the micro-control unit MCU for sharing to be initialized.
5. the quick start method of air-conditioner as claimed in claim 4, it is characterised in that
The load is the display board of the indoor set and master board load.
6. the quick start method of air-conditioner as claimed in claim 1, it is characterised in that
The Switching Power Supply for using output predeterminated voltage/electric current is that the outdoor unit is powered to shorten the startup of the outdoor unit Stand-by period.
7. the quick start method of air-conditioner as claimed in claim 1, it is characterised in that
After electricity on the outdoor unit, the indoor set and the outdoor unit are communicated with shortening the connection setup time in real time.
8. the quick start method of air-conditioner as claimed in claim 1, it is characterised in that
The communication baud rate of the indoor set and the outdoor unit is improved to default baud rate scope to shorten the indoor set The call duration time and outdoor unit between per frame data.
CN201310319809.6A 2013-07-01 2013-07-26 The quick start method of air-conditioner Active CN104279693B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310319809.6A CN104279693B (en) 2013-07-01 2013-07-26 The quick start method of air-conditioner

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201310272334X 2013-07-01
CN201310272334 2013-07-01
CN201310272334.X 2013-07-01
CN201310319809.6A CN104279693B (en) 2013-07-01 2013-07-26 The quick start method of air-conditioner

Publications (2)

Publication Number Publication Date
CN104279693A CN104279693A (en) 2015-01-14
CN104279693B true CN104279693B (en) 2017-06-27

Family

ID=52254840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310319809.6A Active CN104279693B (en) 2013-07-01 2013-07-26 The quick start method of air-conditioner

Country Status (1)

Country Link
CN (1) CN104279693B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105222277B (en) * 2015-10-09 2018-05-08 Tcl空调器(中山)有限公司 A kind of frequency-variable air conditioner outdoor machine quickly starts the control method and system of compressor
CN106091298B (en) * 2016-08-19 2020-03-06 广东美的暖通设备有限公司 Control method and control device of air conditioner and air conditioner
CN109323386A (en) * 2017-07-31 2019-02-12 广东美的制冷设备有限公司 The detection method and device of cooler compressor starting time under heating mode
CN107576031B (en) * 2017-09-22 2020-11-03 青岛海尔空调器有限总公司 Control method and system of air conditioner under low-temperature high-humidity heating working condition
CN107576029B (en) * 2017-09-22 2020-11-03 青岛海尔空调器有限总公司 Control method and system of air conditioner under low-temperature low-humidity heating working condition
CN110686358B (en) * 2018-07-06 2021-06-08 青岛海尔空调器有限总公司 Variable frequency air conditioner fault diagnosis method based on detection tool
CN111336643B (en) * 2018-12-18 2021-06-25 青岛海尔空调器有限总公司 Air conditioner and control method thereof
CN110356425B (en) * 2019-08-02 2021-04-23 石家庄国祥运输设备有限公司 Starting method of rail transit air conditioner compressor
CN112254299B (en) * 2020-09-29 2021-10-29 青岛海尔空调器有限总公司 Method and device for controlling refrigeration equipment and refrigeration equipment
CN112503713B (en) * 2020-12-02 2021-11-16 珠海格力电器股份有限公司 Starting method and device of air conditioner

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008016227A1 (en) * 2006-08-04 2008-02-07 Daewoo Electronics Corporation Method for controlling start-up operation of air conditioner
CN201527068U (en) * 2009-09-30 2010-07-14 四川虹视显示技术有限公司 Air conditioning remote controller
CN201589373U (en) * 2009-10-15 2010-09-22 山东瑞斯高创股份有限公司 Electricity-saving control device for air conditioner
CN102538141A (en) * 2012-01-18 2012-07-04 广东美的电器股份有限公司 Starting control method for direct-current fan motor of air conditioner
CN102748815A (en) * 2012-07-28 2012-10-24 Tcl空调器(中山)有限公司 Air conditioner and control method thereof
CN102788405A (en) * 2012-08-03 2012-11-21 宁波奥克斯电气有限公司 Start control method of fast refrigerating and fast heating for direct current variable frequency air conditioner
CN103017294A (en) * 2012-12-05 2013-04-03 宁波奥克斯电气有限公司 Heating start method of multi-split air conditioner

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008016227A1 (en) * 2006-08-04 2008-02-07 Daewoo Electronics Corporation Method for controlling start-up operation of air conditioner
CN201527068U (en) * 2009-09-30 2010-07-14 四川虹视显示技术有限公司 Air conditioning remote controller
CN201589373U (en) * 2009-10-15 2010-09-22 山东瑞斯高创股份有限公司 Electricity-saving control device for air conditioner
CN102538141A (en) * 2012-01-18 2012-07-04 广东美的电器股份有限公司 Starting control method for direct-current fan motor of air conditioner
CN102748815A (en) * 2012-07-28 2012-10-24 Tcl空调器(中山)有限公司 Air conditioner and control method thereof
CN102788405A (en) * 2012-08-03 2012-11-21 宁波奥克斯电气有限公司 Start control method of fast refrigerating and fast heating for direct current variable frequency air conditioner
CN103017294A (en) * 2012-12-05 2013-04-03 宁波奥克斯电气有限公司 Heating start method of multi-split air conditioner

Also Published As

Publication number Publication date
CN104279693A (en) 2015-01-14

Similar Documents

Publication Publication Date Title
CN104279693B (en) The quick start method of air-conditioner
EP3683086B1 (en) Vehicle air conditioner control method
EP3919320A1 (en) Thermal management method for battery pack
CN105383441B (en) Remote vehicle engine start
CN103940050B (en) The control method of electric automobile air conditioner compressor and system
CN105546756B (en) Air conditioner control method and device
CN103098339B (en) Battery charging control device
CN104728926B (en) Temperature adjusting method and device of floor heating system
CN108361924A (en) Air conditioner control method for frequency
CN103940045A (en) Solar air conditioner and control method and device thereof
CN110345544B (en) Control method of warmer
CN110785313A (en) Method for preheating a battery of an electrically operated motor vehicle and charging device
CN110500719A (en) Wireless temperature controller control method, device, storage medium and system
CN107289590A (en) A kind of air conditioning operating mode switching method and system
CN104864542A (en) Method for controlling electric heating of air conditioner, control device and air conditioner
CN112537180A (en) Thermal management system, control method and device and automobile
CN108418408A (en) A kind of charge control method, device and air conditioner
CN110398030A (en) Air conditioner air supply amount adjusting method, device and equipment and air conditioning system
CN107796167A (en) Refrigerator and its control device, control method
CN110030709A (en) Drive control circuit, air conditioner, control method and computer readable storage medium
CN112524756A (en) Intelligent temperature-regulating electric appliance and temperature-regulating control method thereof
US20150102119A1 (en) Vehicle
CN108344125A (en) The control method of air-conditioning power supply
CN103836738B (en) Solar air conditioner and control method thereof
CN106918114A (en) The communication means and device of multi-online air-conditioning system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant