CN104278736A - Rainwater-sewage splitting device - Google Patents

Rainwater-sewage splitting device Download PDF

Info

Publication number
CN104278736A
CN104278736A CN201410610112.9A CN201410610112A CN104278736A CN 104278736 A CN104278736 A CN 104278736A CN 201410610112 A CN201410610112 A CN 201410610112A CN 104278736 A CN104278736 A CN 104278736A
Authority
CN
China
Prior art keywords
pipeline
button
flow arrangement
pipe
part flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410610112.9A
Other languages
Chinese (zh)
Inventor
朱琴华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGSU HAOTONG WATER CONSERVANCY PROJECT Co Ltd
Original Assignee
CHANGSU HAOTONG WATER CONSERVANCY PROJECT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGSU HAOTONG WATER CONSERVANCY PROJECT Co Ltd filed Critical CHANGSU HAOTONG WATER CONSERVANCY PROJECT Co Ltd
Priority to CN201410610112.9A priority Critical patent/CN104278736A/en
Publication of CN104278736A publication Critical patent/CN104278736A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • E03F5/105Accessories, e.g. flow regulators or cleaning devices

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The invention discloses a rainwater-sewage splitting device comprising a first pipeline, a sewage well, a second pipeline and a third pipeline, wherein the sewage well is arranged among the first pipeline, the second pipeline and the third pipeline and is used for connecting the first, second and third pipelines together, the second pipeline is arranged above the third pipeline, and the sewage well internally comprises a sewage interception pipe at the bottom of the sewage well. Due to the adoption of the manner, the rainwater-sewage splitting device disclosed by the invention is capable of controlling a water level intelligently as comprising a water level measurement device, a signal receiving device and a receiving button, and a useful effect can be achieved as the two pipelines are used for draining differently.

Description

The dirty part flow arrangement of a kind of rain
Technical field
The present invention relates to a kind of part flow arrangement, particularly relate to the dirty part flow arrangement of a kind of rain.
Background technology
Once run into rainwater many seasons in city, usually there will be draining, effluent pressure, in order to head it off, in sewerage pipeline network, also occurred various sewage trainage apparatus, but effect is not clearly, can not the discharge of control sewage of intelligence.
Summary of the invention
The technical problem that the present invention mainly solves is: can by arranging level measurement device, signal receiving device and reception button, can the controlling water level of intelligence, and carries out different blowdowns by two pipelines, can play measured effect.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: provide a kind of rain dirty part flow arrangement, comprise: the first pipeline, sink hole, second pipe and the 3rd pipeline, described sink hole is at the first pipeline, between second pipe and the 3rd pipeline, for connecting the first pipeline, second pipe and the 3rd pipeline, described second pipe is positioned at above the 3rd pipeline, and also include in described sink hole and cut dirty pipe, described section of dirty pipe is positioned at the bottom of sink hole.
In a preferred embodiment of the present invention, the dirty part flow arrangement of described rain also includes level measurement device, and described level measurement device is connected with bottom with the top of sink hole.
In a preferred embodiment of the present invention, the dirty part flow arrangement of described rain includes signal receiving device and receives button, and the measuring-signal sent for receiving level measurement device also controls the switch receiving button.
In a preferred embodiment of the present invention, described reception button is set to the first reception button and second and receives button, and described first receives the top that button is positioned at second pipe, and described second receives the top that button is positioned at the 3rd pipeline.
In a preferred embodiment of the present invention, the dirty part flow arrangement of described rain is also provided with and receives button and second with first and receive button and distinguish the first valve and the second valve that communication is connected.
In a preferred embodiment of the present invention, described level measurement device outside also includes receiving system containment vessel.
The invention has the beneficial effects as follows: can by arranging level measurement device, signal receiving device and reception button, can intelligence water level be controlled, and carry out different blowdowns by two pipelines, measured effect can be played.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the embodiment of the present invention, below the accompanying drawing used required in describing embodiment is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings, wherein:
Fig. 1 is the structural representation of dirty part flow arrangement one preferred embodiment of a kind of rain of the present invention.
In accompanying drawing, the mark of each parts is as follows: 1, the first pipeline; 2, sink hole; 3, second pipe; 4, the 3rd pipeline; 5, dirty pipe is cut; 6, level measurement device; 7, signal receiving device; 8, containment vessel; 9, first button is received; 10, second button is received; 11, the first valve; 12, the second valve.
Detailed description of the invention
Be clearly and completely described to the technical scheme in the embodiment of the present invention below, obviously, described embodiment is only a part of embodiment of the present invention, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making other embodiments all obtained under creative work prerequisite, belong to the scope of protection of the invention.
Refer to Fig. 1, the embodiment of the present invention provides following technical scheme.
In one embodiment, there is provided a kind of rain dirty part flow arrangement, comprise: the first pipeline 1, sink hole 2, second pipe 3 and the 3rd pipeline 4, described sink hole 2 is at the first pipeline 1, between second pipe 3 and the 3rd pipeline 4, for connecting the first pipeline 1, second pipe 3 and the 3rd pipeline 4, described second pipe 3 is positioned at above the 3rd pipeline 4, and also include in described sink hole 2 and cut dirty pipe 5, described section of dirty pipe 5 is positioned at the bottom of sink hole 2.
The dirty part flow arrangement of described rain also includes level measurement device 6, and described level measurement device 6 is connected with bottom with the top of sink hole 2.
The dirty part flow arrangement of described rain includes signal receiving device 7 and receives button, and the measuring-signal sent for receiving level measurement device 6 also controls the switch receiving button.
Described reception button is set to the first reception button 9 and second and receives button 10, and described first receives the top that button 9 is positioned at second pipe 3, and described second receives the top that button 10 is positioned at the 3rd pipeline 4.
Described reception button adopts infrared receiver.
The dirty part flow arrangement of described rain is also provided with and receives button 9 and second with first and receive button 10 and distinguish the first valve 11 and the second valve 12 that communication is connected.
Described level measurement device 6 outside also includes receiving system containment vessel 8, effectively can protect level measurement device 6 not by external interference.
The invention has the beneficial effects as follows:
(1) can by arrange level measurement device 6, signal receiving device 7 and receive button, can intelligence water level is controlled;
(2) carry out different blowdowns by two pipelines, measured effect can be played.
The foregoing is only embodiments of the invention; not thereby the scope of the claims of the present invention is limited; every utilize manual of the present invention and accompanying drawing content to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical field, be all in like manner included in scope of patent protection of the present invention.

Claims (6)

1. the dirty part flow arrangement of rain, it is characterized in that, comprise: the first pipeline (1), sink hole (2), second pipe (3) and the 3rd pipeline (4), described sink hole is at the first pipeline, between second pipe and the 3rd pipeline, for connecting the first pipeline, second pipe and the 3rd pipeline, described second pipe is positioned at above the 3rd pipeline, and also include in described sink hole and cut dirty pipe (5), described section of dirty pipe is positioned at the bottom of sink hole.
2. the dirty part flow arrangement of rain according to claim 1, is characterized in that, the dirty part flow arrangement of described rain also includes level measurement device (6), and described level measurement device is connected with bottom with the top of sink hole.
3. the dirty part flow arrangement of rain according to claim 2, is characterized in that, the dirty part flow arrangement of described rain includes signal receiving device (7) and receives button, and the measuring-signal sent for receiving level measurement device also controls the switch receiving button.
4. the dirty part flow arrangement of rain according to claim 3, it is characterized in that, described reception button is set to the first reception button (9) and second and receives button (10), and described first receives the top that button is positioned at second pipe, and described second receives the top that button is positioned at the 3rd pipeline.
5. the dirty part flow arrangement of rain according to claim 4, is characterized in that, the dirty part flow arrangement of described rain is also provided with and receives button and second with first and receive button and distinguish the first valve (11) and the second valve (12) that communication is connected.
6. the dirty part flow arrangement of rain according to claim 2, it is characterized in that, described level measurement device outside also includes receiving system containment vessel (8).
CN201410610112.9A 2014-11-04 2014-11-04 Rainwater-sewage splitting device Pending CN104278736A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410610112.9A CN104278736A (en) 2014-11-04 2014-11-04 Rainwater-sewage splitting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410610112.9A CN104278736A (en) 2014-11-04 2014-11-04 Rainwater-sewage splitting device

Publications (1)

Publication Number Publication Date
CN104278736A true CN104278736A (en) 2015-01-14

Family

ID=52254040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410610112.9A Pending CN104278736A (en) 2014-11-04 2014-11-04 Rainwater-sewage splitting device

Country Status (1)

Country Link
CN (1) CN104278736A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105756182A (en) * 2016-04-19 2016-07-13 武汉圣禹排水系统有限公司 Bidirectionally hydraulically driven cutoff device
CN106836437A (en) * 2017-02-07 2017-06-13 深圳汇通智能化科技有限公司 A kind of system for reclaiming rainwater of power plant
CN109457783A (en) * 2018-11-13 2019-03-12 安徽泓济环境科技有限公司 Sewage treatment rain dirt separator

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004027701A (en) * 2002-06-27 2004-01-29 Tokyo Metropolis Water level control device for drainage system
DE202009010367U1 (en) * 2009-07-31 2009-11-26 Medam, Jürgen Device for separating rainwater from chemically, biologically and / or toxic polluted wastewater
CN101956420A (en) * 2010-09-14 2011-01-26 香港华艺设计顾问(深圳)有限公司 Rainwater split-flow well device for collecting and recycling site rainwater
CN102304940A (en) * 2011-07-02 2012-01-04 安徽汉威智能科技有限公司 Novel automatic-control intercepting well
CN102808448A (en) * 2012-08-14 2012-12-05 上海市城市建设设计研究总院 Dry weather flow and initial rainwater multifunctional catch basin for combined network
CN103628560A (en) * 2013-11-29 2014-03-12 重庆大学 Flow cutoff control device with memory function and flow cutoff control method thereof
CN203821564U (en) * 2014-02-21 2014-09-10 武汉圣禹排水系统有限公司 Electric combined system pipe network shutoff well
CN203878648U (en) * 2014-04-18 2014-10-15 长江航运规划设计院 Multifunctional rainwater collecting system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004027701A (en) * 2002-06-27 2004-01-29 Tokyo Metropolis Water level control device for drainage system
DE202009010367U1 (en) * 2009-07-31 2009-11-26 Medam, Jürgen Device for separating rainwater from chemically, biologically and / or toxic polluted wastewater
CN101956420A (en) * 2010-09-14 2011-01-26 香港华艺设计顾问(深圳)有限公司 Rainwater split-flow well device for collecting and recycling site rainwater
CN102304940A (en) * 2011-07-02 2012-01-04 安徽汉威智能科技有限公司 Novel automatic-control intercepting well
CN102808448A (en) * 2012-08-14 2012-12-05 上海市城市建设设计研究总院 Dry weather flow and initial rainwater multifunctional catch basin for combined network
CN103628560A (en) * 2013-11-29 2014-03-12 重庆大学 Flow cutoff control device with memory function and flow cutoff control method thereof
CN203821564U (en) * 2014-02-21 2014-09-10 武汉圣禹排水系统有限公司 Electric combined system pipe network shutoff well
CN203878648U (en) * 2014-04-18 2014-10-15 长江航运规划设计院 Multifunctional rainwater collecting system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105756182A (en) * 2016-04-19 2016-07-13 武汉圣禹排水系统有限公司 Bidirectionally hydraulically driven cutoff device
CN106836437A (en) * 2017-02-07 2017-06-13 深圳汇通智能化科技有限公司 A kind of system for reclaiming rainwater of power plant
CN109457783A (en) * 2018-11-13 2019-03-12 安徽泓济环境科技有限公司 Sewage treatment rain dirt separator

Similar Documents

Publication Publication Date Title
CN104278736A (en) Rainwater-sewage splitting device
CN201068627Y (en) Large area roof rainwater intelligentized drainage apparatus
CN103229697A (en) Soil spraying device
WO2010128283A3 (en) Rainwater harvesting system
CN205100088U (en) Bridge watering curing means
CN204311547U (en) A kind of rainwater sinks mud manhole
CN203905206U (en) Outdoor green wall with rainwater collecting, supplying and spraying device
CN203686253U (en) Automatic sewage stopping valve based on pipeline waterpower
CN105016499A (en) Rainwater filter
CN204826169U (en) Take floor drain lid of bead plate rail
CN203686465U (en) Detachable silencing single riser
CN204180651U (en) Sapling irrigation rig
CN205005740U (en) Automatic water changing device for fish tank
CN204590223U (en) Novel drain
CN204883399U (en) Quick drainage system of intelligence building
CN203167745U (en) Automatic flower watering device
CN204181478U (en) Boiling courage and drinking equipment
CN204107933U (en) Bright beer tank difference gauge pressure guiding pipe purging system
CN104843150A (en) Ship wastewater discharger
CN202069524U (en) Ground tile foot control shower
CN205781585U (en) A kind of scupper hose pipe fitting joint
EP3831782B8 (en) Septic water distribution pipe
CN105351622A (en) Faucet with voice function
CN205000421U (en) Waste water secondary leak protection discharging equipment of building
CN204299058U (en) Construction drainage device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150114