A kind of pipeline hydraulic cuts dirty valve automatically
Technical field
The utility model relates to a kind of pipeline hydraulic and automatically cuts dirty valve.
Background technique
Building pipeline comprises the balcony pipeline of resident family and is positioned at the storm sewer on roof, pipeline in community on balcony is directly to access storm sewer and be finally disposed to river course in design, but in actual life, the resident family that has community removes washing machine to balcony, causes washing machine discharge to send out sewage and directly enters storm sewer; Dissolved the pollution gas such as airborne a large amount of sour gas, vehicle exhaust, plant gas due to early-stage rainwater, early-stage rainwater directly enters and is positioned at roof rain water pipeline final discharge river course, thereby pollutes.
For the problem of sewage, solution mainly contains two kinds at present: the one, the pipeline on balcony or roof is directly accessed in sewage network, finally flow to sewage treatment works, but also flow to sewage treatment works by having a large amount of rainwater when the rainy day thereupon, thereby cause unnecessary processing cost, also can impact sewage treatment works simultaneously; The outlet of Er Shi community storm sewer arranges intercepting well, these sewage is dammed to sewage conduct, but be conventionally inconvenient to construct and excavate in community.
Model utility content
The purpose of this utility model is to provide a kind of pipeline hydraulic and automatically cuts dirty valve, the problem that the sewage that the storm sewer of solution community gives off pollutes river course.
The technical solution adopted in the utility model is: a kind of pipeline hydraulic cuts dirty valve automatically, comprise pipeline body, it is characterized in that pipeline body is provided with effluent discharge pipe and the storm-water drainage pipe being fixed with one with pipeline body, in described effluent discharge pipe and storm-water drainage pipe, be provided with mortor operated valve and flowmeter, on described pipeline body, be fixed with PLC controller, described PLC controller is connected with flow meter signal, and described flowmeter is connected with mortor operated valve signal.
The beneficial effect that the utility model adopts is: after having adopted this structure, pollution cutting device can make sewage enter the sewage pipe in community, and in the time of the rainy day, can avoid a large amount of rainwater to enter sewage pipe, and need in community, not construct and excavate, deployment scenarios to the dirty pipe of the rain in community has no requirement, and is convenient to implement, reduced cost.
Accompanying drawing explanation
Fig. 1 is the utility model schematic diagram.
Shown in figure: 1, pipeline body, 2, effluent discharge pipe, 3, storm-water drainage pipe, 4, mortor operated valve, 5, flowmeter, 6, PLC controller.
Embodiment
Below in conjunction with Fig. 1, the utility model is described further.
As shown in Figure 1, preference of the present utility model is: a kind of pipeline hydraulic cuts dirty valve automatically, comprise pipeline body 1, pipeline body 1 is provided with the effluent discharge pipe 2 and the storm-water drainage pipe 3 that are fixed with one with pipeline body, in described effluent discharge pipe 2 and storm-water drainage pipe 3, be provided with mortor operated valve 4 and flowmeter 5, on described pipeline body 1, be fixed with PLC controller 6, described PLC controller 6 is connected with flowmeter 5 and mortor operated valve 4 signals.
In the utility model, wherein the axis of two pipelines on same horizontal line, the axis form that make entirety be three-way pipe vertical with this horizontal line of another one pipeline, pipeline hydraulic automatically cuts dirty valve and is installed in automatic-control intercepting well, accept by PLC controller 6 signal that flowmeter 5 beams back and control the keying of mortor operated valve 4, thereby realize the shunting of rain sewage.The original state that equipment is installed is that the mortor operated valve 4 in effluent discharge pipe 2 is opened, and the mortor operated valve 4 in storm-water drainage pipe 3 cuts out, and the whole domestic sewages in confluence of rainwater and sewage pipe finally enter into sewage network after entering into equipment; When rainy day, along with entering of rainwater, flow increases gradually, and in the time increasing to setting value, the mortor operated valve that the mortor operated valve in effluent discharge pipe cuts out in the pipe of storm-water drainage is simultaneously opened, and now a large amount of rainwater will discharge by storm-water drainage mouth, can not be blended into sewage network; After rainfall stops, the flow that enters into equipment reduces gradually, and in the time being reduced to setting value, PLC controller is opened the mortor operated valve of controlling in effluent discharge pipe, and the mortor operated valve in storm-water drainage pipe cuts out, and now sewage all enters into sewage network.So circulation has realized the shunting of rainwater and sewage, has avoided a large amount of rainwater to enter into sewage network simultaneously.
In sum, after having adopted this structure, pollution cutting device can make sewage enter the sewage pipe in community, and in the time of the rainy day, can avoid a large amount of rainwater to enter sewage pipe, and need in community, not construct and excavate, deployment scenarios to the dirty pipe of the rain in community has no requirement, and is convenient to implement, reduced cost.
Those skilled in the art should know; protection scheme of the present utility model is not limited only to the above embodiments; in addition; can also on the basis of above-described embodiment, carry out various permutation and combination and conversion; under the prerequisite without prejudice to the utility model spirit, the various conversion that the utility model is carried out all drop in protection domain of the present utility model.