CN104278668A - Embedded iron member and anchor bar connecting structure - Google Patents

Embedded iron member and anchor bar connecting structure Download PDF

Info

Publication number
CN104278668A
CN104278668A CN201410555759.6A CN201410555759A CN104278668A CN 104278668 A CN104278668 A CN 104278668A CN 201410555759 A CN201410555759 A CN 201410555759A CN 104278668 A CN104278668 A CN 104278668A
Authority
CN
China
Prior art keywords
dowel
connecting structure
anchor bolt
embedded iron
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410555759.6A
Other languages
Chinese (zh)
Other versions
CN104278668B (en
Inventor
顾孙平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410555759.6A priority Critical patent/CN104278668B/en
Publication of CN104278668A publication Critical patent/CN104278668A/en
Application granted granted Critical
Publication of CN104278668B publication Critical patent/CN104278668B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles

Abstract

The invention relates to the technical field of construction, in particular to an embedded iron member and anchor bar connecting structure. In order to overcome inconvenience caused by an existing embedded iron member and anchor bar welding connection technology, the technical scheme includes that the embedded iron member and anchor bar connecting structure comprises an embedded iron member and an anchor bar, the embedded iron member is a pile tip plate arranged at the end of a pile bar, and the pile tip plate is provided with tensioning nuts. The embedded iron member and anchor bar connecting structure is characterized by comprising anchor bolts, and the outer walls of the anchor bolts are provided with external threads. Compared with the prior art, the embedded iron member and anchor bar connecting structure has the advantages of high efficiency, stable quality, material saving and capability of shortening a construction period due to the fact that anchor bars with threads can be produced in factories.

Description

The connecting structure of a kind of embedded iron parts and dowel
Technical field
The present invention relates to technical field of buildings, particularly relate to the connecting structure of a kind of embedded iron parts and dowel.
Background technology
The reliable connection of embedded iron parts and dowel is requisite in modern construction engineering.At present, embedded iron parts and dowel, especially pile end plate and dowel, pre-embedded steel slab and dowel, the most frequently used method of attachment is welded on embedded iron parts by dowel, a lot of problem is there is: one is the distortion that welding can cause embedded iron parts in welding process, make the air spots of embedded iron parts, difficulty is caused to subsequent construction; Two is weld easily to damage dowel, reduces the tensile strength of dowel, have impact on connection effect; Three is pernicious gases that welding produces, and affects occupational health, is also unfavorable for environmental protection; Four is consumption and costs that welding method not only increases material, also add the site work time, reduces the efficiency of installation.
In prior art, the connection of embedded iron parts and dowel, the particularly connection of pile end plate and dowel, most employing Fig. 1, mode shown in Fig. 2, stake rod member D top is provided with pile end plate B, first one piece of junction plate C is welded on pile end plate B, again dowel A is welded on junction plate, will through twice welding, just can complete the installation work of stake top dowel, and, in Specific construction process, the quantity of junction plate C is no less than 4 pieces, like this, not only time-consuming, consumable material is many, and due to stake top protrude junction plate C, concrete E(cushion cap, base plate or beam) reinforcing bar be difficult to colligation and put in place, if first colligation concrete E(cushion cap, base plate or beam) reinforcing bar, add to the difficulties then to welding dowel.The Site Welding quality of another III grade of steel is difficult to ensure, and junction plate C is different from the steel grade of dowel A, also can affect the effect of welding.
In the connection of embedded iron parts and dowel, the particularly connected mode of pre-embedded steel slab F and dowel A, as shown in Figure 3, usually by position and the dowel diameter of designing requirement, perforate G on pre-embedded steel slab F, then by dowel A implant holes G, the end of dowel A is lower than pre-embedded steel slab F plane certain altitude, weld in the hole G in pre-embedded steel slab F front and around the dowel A at the back side again, the connection of pre-embedded steel slab F and dowel A can be completed.If adopt one-level steel as dowel, see Fig. 4, at pre-embedded steel slab F tapping, dowel A is bent, and be welded on pre-embedded steel slab F.This connected mode of built-in fitting and dowel, mainly contains three shortcomings, and one is increase Site Welding workload, and two is because welding deformation causes built-in fitting air spots, when installation accuracy requires higher, must polish to welding position, time-consumingly takes a lot of work; Three is the welding around dowel, easily causes undercut, and dowel is also different from the steel type of embedded board, causes dowel cross section to diminish, reduces the intensity of dowel.
Summary of the invention
In order to solve the inconvenience that embedded iron parts and the existing welded connection technology of dowel bring, the invention provides the connecting structure of a kind of embedded iron parts and dowel.
Technical scheme of the present invention is achieved in that the connecting structure of a kind of embedded iron parts and dowel, comprise: embedded iron parts, dowel, and described embedded iron parts is the pile end plate being arranged on a Rod end, described pile end plate is provided with tensioning nut, it is characterized in that: described connecting structure also comprises anchor bolt, the outer wall of described anchor bolt is provided with the external screw thread cooperatively interacted with tensioning nut (211), the external screw thread of described anchor bolt is threaded with tensioning nut, the center of described anchor bolt one end, inwardly also internal thread is provided with by end, size and the dowel of described internal thread cooperatively interact, one end of described dowel is provided with the external screw thread with anchor bolt screw-internal thread fit, and dowel is threaded with anchor bolt by external screw thread.
The diameter of described dowel is less than or equal to φ 18mm, and the diameter of described anchor bolt is φ 23mm to φ 33mm, and its length is 25mm to 35mm.
The depth of internal thread of described anchor bolt is 20mm to 30mm.
The diameter of described dowel is greater than φ 18mm, and the diameter of described anchor bolt is φ 27mm to φ 37mm, and its length is 55mm to 65mm.
The depth of internal thread of described anchor bolt is 20mm to 30mm.
The external thread length of described anchor bolt is 25mm to 35mm.
The material of described anchor bolt is HRB400.
The connecting structure of a kind of embedded iron parts and dowel, comprise: embedded iron parts, dowel, and described embedded iron parts is pre-embedded steel slab, it is characterized in that: described pre-embedded steel slab is provided with boring, and boring is provided with the internal thread cooperatively interacted with dowel size, dowel end is provided with the external screw thread with screw-internal thread fit of holing, and pre-embedded steel slab is threaded with dowel.
The quantity of described boring is at least 1.
Compared with prior art, the invention has the beneficial effects as follows: threaded dowel can be produced in factory, efficiency is high, steady quality, saves material, save the duration, compared with welding method, simplify and cut off reinforcing bar, be welded to connect steel plate, weld the construction sequences such as dowel, on-the-spot installation work is exactly mainly clear up screw, screw in dowel, simple to operate.With regard to the welding method of existing stake top anchor bar, need first to weld one piece of junction steel plate, calculate by reinforcing bar length 5d, diameter is the dowel calculating being respectively φ 16, φ 18, φ 20, φ 22mm, the junction plate thickness of welding is by specifying at least 10mm, width is 50mm, length is more than or equal to 100mm, the weight of junction plate is 0.10*1.0*0.5*7.85=0.3925kg, anchor bolt weight is only 0.13kg, every root dowel can saving steel 0.2625kg, and every pile is at least by 4 reinforcing rib meters, and every pile can saving steel 1.05kg.Decrease the workload of twice welding, accelerating construction progress, decrease the impact of junction steel plate on cushion cap or base plate steel bar binding, convenient construction, ensure that the anchoring quality on stake and basis.Ensure that and the quality that dowel is installed prevent Welding undercut that the effective diameter of damage dowel avoids local welding to reduce reinforced steel bar strength, avoid the generation of the integral solder distortion of pre-embedded steel slab, also avoid surperficial overlap simultaneously, improve built-in fitting surface finish; Dowel and pre-embedded steel slab can transport respectively, arrive to in-site installation, convenient transport, improve transport work efficiency, facilitate installation of embedded parts, do not have Site Welding workload, and installation exercise is not subject to the impact of rainy weather, further accelerating construction progress.
Accompanying drawing explanation
Fig. 1 is prior art stake top and basic connecting structure schematic diagram;
Fig. 2 is that prior art end plate dowel arranges schematic diagram;
Fig. 3 is prior art built-in fitting anchor bar scheme of installation ();
Fig. 4 is prior art built-in fitting anchor bar scheme of installation (two);
Fig. 5 is anchor bolt structural representation () of the present invention;
Fig. 6 is anchor bolt structural representation (two) of the present invention;
Fig. 7 is dowel structural representation of the present invention;
Fig. 8 is pile end plate of the present invention and dowel syndeton schematic diagram;
Fig. 9 is pre-embedded steel slab of the present invention and dowel syndeton schematic diagram.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is further described.
Embodiment one: the syndeton of pile end plate and dowel and technique thereof
As shown in Fig. 5, Fig. 6, Fig. 7, Fig. 8, the present embodiment comprises: dowel 1, stake rod member 2, anchor bolt 3, and described stake rod member 2 end is provided with pile end plate 21, and pile end plate 21 is provided with 12 tensioning nuts 211.
Described anchor bolt 3 is divided into two groups, first group: be applicable to the dowel that diameter is less than or equal to 18mm, as shown in Figure 5, the base material of anchor bolt 3 selects diameter to be the HRB400 reinforcing bar of φ 23mm to φ 33mm, and reinforcing bar length is 25mm to 35mm, at the external screw thread that the outer wall processing of reinforcing bar is overlapped with stake top tensioning nut 211 matching size, in the center of reinforcing bar one end, the internal thread of inside processing and dowel 1 dimensional fits, the degree of depth is 20mm to 30mm, and namely anchor bolt 3 makes complete, second group: be applicable to the dowel that diameter is greater than 18mm, as shown in Figure 6, the base material of anchor bolt 3 selects diameter to be the HRB400 reinforcing bar of φ 27mm to φ 37mm, length is 55mm to 65mm, select one end of reinforcing bar and from then on hold, long 25mm to 35mm is processed at outer wall, and the external screw thread that diameter and tensioning nut 211 cooperatively interact, other end center is inside, the internal thread of processing diameter and dowel 1 dimensional fits, the degree of depth is 20mm to 30mm, namely anchor bolt 3 makes complete, foregoing description makes anchor bolt 3 become by bolt part 31 and the integral structure expanding nut portion 32.
As shown in Figure 7, in one end of dowel 1 processing, the external screw thread 11 that diameter matches with anchor bolt 3 internal thread, dowel 1 is connected with anchor bolt 3 by external screw thread 11.The length of dowel 1 is according to specifically using needs.
See Fig. 5, Fig. 6, Fig. 7, Fig. 8, the concrete technology flow process of embodiment one is as follows:
1. by the dowel 1 needed for size Selection, at one end threading 11 of dowel 1;
2. anchor bolt 3 is made, according to the customization of dowel 1 size or buying base material reinforcing bar, processing base material reinforcing bar, at the outer wall threading of reinforcing bar 1, in the center of reinforcing bar one end, machining internal thread, namely anchor bolt 3 makes complete;
3. carry out pile sinking or the excavation of a rod member, and the tensioning nut 211 of pile end plate 21 is suitably protected;
4. after pile sinking or excavation complete, cleaning tensioning nut 211, screws in anchor bolt 3 along tensioning nut 211 and tightens, and along the internal thread of anchor bolt 3, screws in dowel 1 and tightens;
5. installation.
Embodiment two: the syndeton of pre-embedded steel slab and dowel and technique thereof
As shown in Fig. 5, Fig. 6, Fig. 7, Fig. 9, the present embodiment comprises: dowel 1, pre-embedded steel slab 4.On pre-embedded steel slab 4, bore 4 holes 41, size and the dowel 1 in hole 41 cooperatively interact, in hole 41, internal thread is set, hole 41 is nut, at one end threading 11 of dowel 1, and the screw-internal thread fit in external screw thread 11 and hole 41, dowel 1 is bolt, and dowel 1 is threaded with pre-embedded steel slab 4 by external screw thread 11.
See Fig. 5, Fig. 6, Fig. 7, Fig. 9, the concrete technology flow process of embodiment two is as follows:
1. pre-embedded steel slab 4 is cut into the size of designing requirement, select the hole size in 41 holes 41 and dowel 1 of desired location to cooperatively interact, at boring 41 inwall machining internal thread;
2. the dowel 1 needed for selecting by size, specification, by one end threading 11 of dowel 1;
3. screw in dowel 1 along boring 41 and tighten;
4. installation.
Upper display and describe the advantage of the general principle of invention, principal character and invention.The technician of the industry should understand; the present invention is not restricted to the described embodiments; the just principle of the present invention described in above-described embodiment and manual; the present invention also has various changes and modifications without departing from the spirit and scope of the present invention, and these changes and improvements all fall in claimed scope of the present invention.The protection domain of application claims is defined by appending claims and equivalent thereof.

Claims (9)

1. the connecting structure of an embedded iron parts and dowel, comprise: embedded iron parts, dowel (1), and described embedded iron parts is the pile end plate (21) being arranged on a rod member (2) end, described pile end plate (21) is provided with tensioning nut (211), it is characterized in that: described connecting structure also comprises anchor bolt (3), the outer wall of described anchor bolt (3) is provided with the external screw thread cooperatively interacted with tensioning nut (211), the external screw thread of described anchor bolt (3) is threaded with tensioning nut (211), the center of described anchor bolt (3) one end, inwardly also internal thread is provided with by end, the size of described internal thread and dowel (1) cooperatively interact, one end of described dowel (1) is provided with the external screw thread (11) with anchor bolt (3) screw-internal thread fit, and dowel (1) is threaded with anchor bolt (3) by external screw thread (11).
2. connecting structure according to claim 1, is characterized in that: the diameter of described dowel (1) is less than or equal to φ 18mm, and the diameter of described anchor bolt (3) is φ 23mm to φ 33mm, and its length is 25mm to 35mm.
3. connecting structure according to claim 2, is characterized in that: the depth of internal thread of described anchor bolt (3) is 20mm to 30mm.
4. connecting structure according to claim 1, is characterized in that: the diameter of described dowel (1) is greater than φ 18mm, and the diameter of described anchor bolt (3) is φ 27mm to φ 37mm, and its length is 55mm to 65mm.
5. connecting structure according to claim 4, is characterized in that: the depth of internal thread of described anchor bolt (3) is 20mm to 30mm.
6. connecting structure according to claim 1, is characterized in that: the external thread length of described anchor bolt (3) is 25mm to 35mm.
7. the connecting structure according to claim 1 or 2 or 3 or 4 or 5 or 6, is characterized in that: the material of described anchor bolt (3) is HRB400.
8. the connecting structure of an embedded iron parts and dowel, comprise: embedded iron parts, dowel (1), and described embedded iron parts is pre-embedded steel slab (4), it is characterized in that: described pre-embedded steel slab (4) is provided with boring (41), and boring (41) is provided with the internal thread cooperatively interacted with dowel (1) size, dowel (1) end is provided with the external screw thread with (41) screw-internal thread fit of holing, and pre-embedded steel slab (4) is threaded with dowel (1).
9. connecting structure according to claim 8, is characterized in that: the quantity of described boring (41) is at least 1.
CN201410555759.6A 2014-10-20 2014-10-20 The syndeton of a kind of embedded iron parts and dowel Expired - Fee Related CN104278668B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410555759.6A CN104278668B (en) 2014-10-20 2014-10-20 The syndeton of a kind of embedded iron parts and dowel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410555759.6A CN104278668B (en) 2014-10-20 2014-10-20 The syndeton of a kind of embedded iron parts and dowel

Publications (2)

Publication Number Publication Date
CN104278668A true CN104278668A (en) 2015-01-14
CN104278668B CN104278668B (en) 2016-04-13

Family

ID=52253976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410555759.6A Expired - Fee Related CN104278668B (en) 2014-10-20 2014-10-20 The syndeton of a kind of embedded iron parts and dowel

Country Status (1)

Country Link
CN (1) CN104278668B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040826A (en) * 2015-08-05 2015-11-11 中国电建集团贵阳勘测设计研究院有限公司 Standard embedded assembly for structure concrete construction and construction method of standard embedded assembly
CN107254873A (en) * 2017-07-25 2017-10-17 连云港建筑设计研究院有限责任公司 Mechanical connecting structure of cushion cap anchor rib and stake top and attaching method thereof
CN107725055A (en) * 2017-10-16 2018-02-23 中国恩菲工程技术有限公司 The fixed structure and its construction method of vertical shaft

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004124495A (en) * 2002-10-02 2004-04-22 Geotop Corp Pile head structure of prefabricated pile
CN102689358A (en) * 2012-06-21 2012-09-26 江苏建华管桩有限公司 Tensioning component and tensioning method of prestressed endless sheet pile and pile including component
CN203007939U (en) * 2012-12-21 2013-06-19 江苏东浦管桩有限公司 Pipe pile end plate
CN103266595A (en) * 2013-06-03 2013-08-28 建华建材(中国)投资有限公司 Rigid pile for composite foundation treatment and production method thereof
CN103556624A (en) * 2013-11-01 2014-02-05 建华建材(中国)投资有限公司 Connecting sleeve, prefabricated part comprising same as well as production method and connecting method thereof
CN203768893U (en) * 2014-03-21 2014-08-13 李全民 End plate-reusable mechanical connecting pile head of prefabricated concrete pile

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004124495A (en) * 2002-10-02 2004-04-22 Geotop Corp Pile head structure of prefabricated pile
CN102689358A (en) * 2012-06-21 2012-09-26 江苏建华管桩有限公司 Tensioning component and tensioning method of prestressed endless sheet pile and pile including component
CN203007939U (en) * 2012-12-21 2013-06-19 江苏东浦管桩有限公司 Pipe pile end plate
CN103266595A (en) * 2013-06-03 2013-08-28 建华建材(中国)投资有限公司 Rigid pile for composite foundation treatment and production method thereof
CN103556624A (en) * 2013-11-01 2014-02-05 建华建材(中国)投资有限公司 Connecting sleeve, prefabricated part comprising same as well as production method and connecting method thereof
CN203768893U (en) * 2014-03-21 2014-08-13 李全民 End plate-reusable mechanical connecting pile head of prefabricated concrete pile

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040826A (en) * 2015-08-05 2015-11-11 中国电建集团贵阳勘测设计研究院有限公司 Standard embedded assembly for structure concrete construction and construction method of standard embedded assembly
CN105040826B (en) * 2015-08-05 2018-03-13 中国电建集团贵阳勘测设计研究院有限公司 A kind of standardization fastener inserts and its construction method for structural concrete construction
CN107254873A (en) * 2017-07-25 2017-10-17 连云港建筑设计研究院有限责任公司 Mechanical connecting structure of cushion cap anchor rib and stake top and attaching method thereof
CN107725055A (en) * 2017-10-16 2018-02-23 中国恩菲工程技术有限公司 The fixed structure and its construction method of vertical shaft

Also Published As

Publication number Publication date
CN104278668B (en) 2016-04-13

Similar Documents

Publication Publication Date Title
CN104278668B (en) The syndeton of a kind of embedded iron parts and dowel
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN203096942U (en) Pre-cast nut for fabricated structure
CN103015735A (en) Construction method for planting wall lacing bars after pre-burying of sleeve assemblies
CN104695558A (en) Pre-buried sleeve component for lacing wire of secondary structural wall
CN103967042B (en) Mounting correction tool for protection corner angle of frame column and manufacturing method thereof
CN104805910A (en) Embedded part for cast-in-place concrete component and construction method of embedded part
CN202430980U (en) Detachably movable type steel pipe fixing insertion column for cantilever scaffold
CN203795825U (en) Scaffold and wall connector and scaffold and wall connecting structure
CN203034804U (en) Three-section type water-sealing screw for basement exterior wall
CN203307931U (en) Embedded part positioning screw connecting structure
CN207314850U (en) A kind of split bolt continued access combination unit
CN202990111U (en) Embedded sleeve component
CN202611223U (en) Recyclable bolt type scaffold wall connection piece
CN204728475U (en) A kind of secondary structure steel tie bar embedded part device
CN204645582U (en) Girder steel assembly is chosen outside one is complete
CN204590257U (en) A kind of embedded sleeve barrel assembly for secondary structure wall lacing wire
CN205134188U (en) Bury ground tackle deeply
CN205116422U (en) Connection structure of shaped steel roof beam and drawknot stirrup
CN204876349U (en) Steel bar anchoring device
CN107386457A (en) A kind of built-in fitting in cast-in-situ concrete member
CN203361677U (en) Partial hollowing reinforcing device of integrated floor
CN203729587U (en) Horizontal tie fixing device of high-low spanned side die of building structure
CN202055528U (en) Embedded sleeve for reinforcing and supporting surface of concrete
CN2516650Y (en) Recovery and reused sealing end for mould connecting bolt drivepipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160413

Termination date: 20211020

CF01 Termination of patent right due to non-payment of annual fee