CN104268741A - 一种换流站升降功率操作的闹钟设定方法 - Google Patents
一种换流站升降功率操作的闹钟设定方法 Download PDFInfo
- Publication number
- CN104268741A CN104268741A CN201410483220.4A CN201410483220A CN104268741A CN 104268741 A CN104268741 A CN 104268741A CN 201410483220 A CN201410483220 A CN 201410483220A CN 104268741 A CN104268741 A CN 104268741A
- Authority
- CN
- China
- Prior art keywords
- power
- alarm
- bell
- time
- quarter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/109—Time management, e.g. calendars, reminders, meetings or time accounting
Abstract
本发明涉及一种换流站升降功率操作的闹钟设定方法,包括以下步骤:1)根据功率曲线文件设定闹铃;2)监控计算机系统时间,判断是否与上个周期记录的时间产生差值,若为是,则根据现在的系统时间检查之前设定闹铃的有效性,并且重新设定闹钟时间,然后后继续执行步骤2),若为否,则执行步骤3);3)在设定的闹铃时刻点进行闹铃提醒:4)判断铃响是否在设定时间内被确认,若为是,执行步骤6),若为否,则执行步骤5);5)电脑蜂鸣器进行提醒,然后执行步骤6);6)用户确认停止提醒并且自动填写功率升降记录卡。与现有技术相比,本发明具有设定方便简洁、降低错误、安全可靠等优点。
Description
技术领域
本发明涉及一闹钟设定方法,尤其是涉及一种换流站升降功率操作的闹钟设定方法。
背景技术
高压直流输电具有功率快速可控的特点,在换流站实际工作中,每日的手动升降功率操作十分频繁,每15分钟为一个功率操作时刻点,2013年年初开始华新换流站每日的升降操作最多时有近30次,且功率升降时刻分布较散,并不全部在连续的时间段内。为了避免出现遗漏操作的情况,值班运行人员通常会在收到次日或之后连续几天的功率曲线后,查找功率变化时刻点并填写功率升降记录卡、手动进行每个操作时间点的闹铃的设定工作,传统的闹铃设定软件针对的是大众用户,只能人工手动一个个设定闹铃,重复工作量大、耗时久,在此过程中极易出现遗漏、错误的情况,不能有效适应现场工作的需要。人工查找功率变化时刻点并填写功率升降记录卡,也同样存在这种问题。为了改变这种状况,把有限的人力资源从耗时、易错且需要每日不断重复的工作中解脱出来,需要一种能根据调度下发的功率计划曲线文件来自动生成每个操作时间点闹铃提醒列表,并准确、可靠进行闹铃提醒,同时可以自动输出功率升降记录卡文件的方法。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种设定方便简洁、降低错误、安全可靠的换流站升降功率操作的闹钟设定方法。
本发明的目的可以通过以下技术方案来实现:
一种换流站升降功率操作的闹钟设定方法,其特征在于,包括以下步骤:
1)根据功率曲线文件设定闹铃;
2)监控计算机系统时间,判断是否与上个周期记录的时间产生差值,若为是,则根据现在的系统时间检查之前设定闹铃的有效性,并且重新设定闹钟时间,然后后继续执行步骤2),若为否,则执行步骤3);
3)在设定的闹铃时刻点进行闹铃提醒:
4)判断铃响是否在设定时间内被确认,若为是,执行步骤6),若为否,则执行步骤5);
5)电脑蜂鸣器进行提醒,然后执行步骤6);
6)用户确认停止提醒并且自动填写功率升降记录卡。
所述的根据功率曲线文件设定闹铃具体为:
闹钟读取下发的功率计划曲线文件,获得该日每15分钟的功率数值,判断功率变化时刻点即全天要进行功率升降操作的时刻点,一次性完成在时刻点的闹铃设定工作。
所述的步骤6)中填写功率升降记录卡根据换流站工作现场模版格式记录。
与现有技术相比,本发明具有以下优点:
1、软件读取调度功率计划曲线文件,找出所有功率变化时刻,生成所有闹铃列表,摆脱了人工查找功率变化时刻点、再逐个设定闹铃的大量重复性工作、避免了人员疲劳产生的遗漏、错误情况,杜绝了因人的因素而产生的工作事故,减少每日工作量,把有限的人力资源从易错、耗时且需要每日不断重复的工作中解脱出来,提高了生产效率;
2、软件按照换流站工作现场模板格式输出功率升降记录卡文件,和上条一样由软件来完成查找、填写类重复性工作,解放了人力,同时避免了错误的发生;
3、软件会监控闹铃响起时长,当闹铃响起1分钟后,若用户仍未点击确认,软件使电脑蜂鸣器响起,可防止因音箱故障等原因造成用户未听到闹铃声响、遗漏功率升降操作情况的发生。
附图说明
图1为本发明的流程示意图。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。
下面结合附图和具体实施例对本发明进行详细说明。本实施例以本发明技术方案为前提进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。
实施例:
1)软件读取所选择的功率计划曲线文件,获得今日每15分钟的功率数值,判断并记录功率变化时刻点即全天要进行功率升降操作的时刻点;对于前一日最后一个时刻点,结合今日第一个功率数值进行判断;2)显示所有闹铃提醒时刻及闹铃有效性状态列表,该列表在闹铃提醒事件发生后自动更新闹铃有效性状态;3)周期性检查闹铃时刻是否到达,若达到则播放声音文件进行响铃提醒;4)监控闹铃响起时长,若超过1分钟则使电脑蜂鸣器响起,该方式作为通过音箱播放声音进行提醒的后备提醒方式;5)软件周期性记录一次计算机系统时间,并与上个周期记录的系统时间进行比较,若差值不等于周期,则认为计算机系统时间发生了更改,此时在新的系统时间下,重新检查之前设置的所有闹铃的有效性,再次进行新的闹铃提醒。6)软件判断并记录每个功率变化时刻点,根据功率变化值和实际操作时长尽量控制在12分钟,算出功率变化速率推荐值及相应变化时长,将这些数据按照换流站工作现场模板格式输出功率升降记录卡文件。
Claims (3)
1.一种换流站升降功率操作的闹钟设定方法,其特征在于,包括以下步骤;
1)根据功率曲线文件设定闹铃;
2)监控计算机系统时间,判断是否与上个周期记录的时间产生差值,若为是,则根据现在的系统时间检查之前设定闹铃的有效性,并且重新设定闹钟时间,然后后继续执行步骤2),若为否,则执行步骤3);
3)在设定的闹铃时刻点进行闹铃提醒:
4)判断铃响是否在设定时间内被确认,若为是,执行步骤6),若为否,则执行步骤5);
5)电脑蜂鸣器进行提醒,然后执行步骤6);
6)用户确认停止提醒并且自动填写功率升降记录卡。
2.根据权利要求1所述的一种换流站升降功率操作的闹钟设定方法,其特征在于,所述的根据功率曲线文件设定闹铃具体为:
闹钟读取下发的功率计划曲线文件,获得该日每15分钟的功率数值,判断功率变化时刻点即全天要进行功率升降操作的时刻点,一次性完成在时刻点的闹铃设定工作。
3.根据权利要求1所述的一种换流站升降功率操作的闹钟设定方法,其特征在于,所述的步骤6)中填写功率升降记录卡根据换流站工作现场模版格式记录。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410483220.4A CN104268741B (zh) | 2014-09-19 | 2014-09-19 | 一种换流站升降功率操作的闹钟设定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410483220.4A CN104268741B (zh) | 2014-09-19 | 2014-09-19 | 一种换流站升降功率操作的闹钟设定方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104268741A true CN104268741A (zh) | 2015-01-07 |
CN104268741B CN104268741B (zh) | 2018-07-20 |
Family
ID=52160261
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410483220.4A Active CN104268741B (zh) | 2014-09-19 | 2014-09-19 | 一种换流站升降功率操作的闹钟设定方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104268741B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101242099A (zh) * | 2007-12-05 | 2008-08-13 | 国网直流工程建设有限公司 | 背靠背直流输电系统多单元功率协调控制的实现方法 |
CN102916423A (zh) * | 2011-12-25 | 2013-02-06 | 许继集团有限公司 | 一种高压直流输电系统中自动功率控制方法 |
CN103458091A (zh) * | 2012-05-28 | 2013-12-18 | 上海北鸥信息科技有限公司 | 电子设备中基于事件序列集合实现主题闹钟控制的方法 |
CN103618339A (zh) * | 2013-11-21 | 2014-03-05 | 大连理工大学 | 自动发电控制中总调节功率分配方法 |
US20140207455A1 (en) * | 2009-02-10 | 2014-07-24 | You Everywhere Now, Llc | Automated Communication Techniques |
-
2014
- 2014-09-19 CN CN201410483220.4A patent/CN104268741B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101242099A (zh) * | 2007-12-05 | 2008-08-13 | 国网直流工程建设有限公司 | 背靠背直流输电系统多单元功率协调控制的实现方法 |
US20140207455A1 (en) * | 2009-02-10 | 2014-07-24 | You Everywhere Now, Llc | Automated Communication Techniques |
CN102916423A (zh) * | 2011-12-25 | 2013-02-06 | 许继集团有限公司 | 一种高压直流输电系统中自动功率控制方法 |
CN103458091A (zh) * | 2012-05-28 | 2013-12-18 | 上海北鸥信息科技有限公司 | 电子设备中基于事件序列集合实现主题闹钟控制的方法 |
CN103618339A (zh) * | 2013-11-21 | 2014-03-05 | 大连理工大学 | 自动发电控制中总调节功率分配方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104268741B (zh) | 2018-07-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105160407A (zh) | 一种基于设备专业化服务工单的自动创建方法 | |
EP2983048A3 (en) | Wind power plant management system and method thereof | |
CN107784447B (zh) | 一种基于三重预警的全过程监造闭环管理系统及方法 | |
KR101475632B1 (ko) | 에너지 관리 시스템의 운전 기록 재생 방법 | |
CN103217286A (zh) | 基于故障数据的风电机组传动系统故障识别方法和系统 | |
CN109473945B (zh) | 一种继电保护模型数据校验及自动配置方法 | |
CN103186830A (zh) | 一种根据邮件智能分析生成工单的方法及装置 | |
CN104407959A (zh) | 基于应用的监控方法及监控装置 | |
CN110611371A (zh) | 一种配电自动化设备对时与守时测试系统及方法 | |
WO2014040488A1 (zh) | 一种规划数据一致性保证的方法和装置 | |
CN104317263A (zh) | 混凝土施工振捣轨迹控制方法 | |
CN106375291A (zh) | 一种基于原始报文监测的变电站故障排查系统及排查方法 | |
CN104268741A (zh) | 一种换流站升降功率操作的闹钟设定方法 | |
CN104156888A (zh) | 基于风险综合评价模型的电力系统运营风险监测方法 | |
CN113552857A (zh) | 一种自主可控智慧变电站中自动激励检测方法及系统 | |
CN109802487B (zh) | 一种主厂站源端维护功能实现方法及装置 | |
CN107524562A (zh) | 用于风力发电机组的程序升级方法及装置 | |
CN104615038A (zh) | 智能型负荷预警测控管理装置及其监控方法 | |
CN116383061A (zh) | 变电站站控系统基础平台接口测试方法及相关装置 | |
CN102499429B (zh) | 用于密集烤房控制器的实时时钟判断装置及其方法 | |
CN202466183U (zh) | 花边染色机语音报警系统 | |
CN114531439A (zh) | 一种基于图像识别的仪表数据云边协同采集处理系统及方法 | |
CN109976269B (zh) | 一种卷包车间制造执行过程信息监管的方法 | |
CN111008787A (zh) | 基于计量终端告警技术的计划停电主动监控及调度方法 | |
Ma et al. | Design of a Metronome Based on the Idea of" ANDON" |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |