CN104268733B - A kind of lean logistics system based on billboard - Google Patents
A kind of lean logistics system based on billboard Download PDFInfo
- Publication number
- CN104268733B CN104268733B CN201410532375.2A CN201410532375A CN104268733B CN 104268733 B CN104268733 B CN 104268733B CN 201410532375 A CN201410532375 A CN 201410532375A CN 104268733 B CN104268733 B CN 104268733B
- Authority
- CN
- China
- Prior art keywords
- demand
- billboard
- order
- expect
- day
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000463 material Substances 0.000 claims abstract description 185
- 238000000034 method Methods 0.000 claims abstract description 114
- 230000008569 process Effects 0.000 claims abstract description 95
- 238000012545 processing Methods 0.000 claims abstract description 13
- 238000013439 planning Methods 0.000 claims abstract description 9
- 238000004519 manufacturing process Methods 0.000 claims description 106
- 238000007726 management method Methods 0.000 claims description 47
- 230000008859 change Effects 0.000 claims description 35
- 238000013461 design Methods 0.000 claims description 28
- 238000009826 distribution Methods 0.000 claims description 21
- 238000012423 maintenance Methods 0.000 claims description 18
- 238000012384 transportation and delivery Methods 0.000 claims description 12
- 238000012546 transfer Methods 0.000 claims description 2
- 230000007257 malfunction Effects 0.000 claims 1
- 238000003780 insertion Methods 0.000 abstract 1
- 230000037431 insertion Effects 0.000 abstract 1
- 239000000047 product Substances 0.000 description 17
- 230000004075 alteration Effects 0.000 description 15
- 230000000694 effects Effects 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 6
- 230000007246 mechanism Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 239000013067 intermediate product Substances 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000002372 labelling Methods 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000012163 sequencing technique Methods 0.000 description 1
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a kind of lean logistics system based on billboard, including:For the material that will be produced in order or three daily plannings, by process and teams and groups' information, demand billboard will be expected using parallel processing technique generation, the data volume that the present invention calculates as needed defines 20 30 operations, for each operational definition job name, and distribute all order processes to job name according to the operation number of cycles of definition, when running operation, only take the job title identical data with currently running;Meanwhile in order to utilize server resource to greatest extent, weight is distributed according to work centre, weight is directlyed proportional to work centre data volume to total quantity;When operation generates billboard detail, because data volume is larger, the data insertion and calculating of billboard are all that background job performs calculating, so, there is the time difference to also imply that there is variance data with practical business, and the present invention once to have added computing mark for the data to be generated that expect demand billboard.
Description
Technical field
The invention belongs to motor-car manufacturing technology field, more particularly to a kind of lean based on billboard in motor-car manufacturing process
Logistics system.
Background technology
The two of material allocation are big, and foundation is exactly MRP and billboard.
MRP refers to the subordinate and quantitative relation according to each level article of product structure, using each article as plan object, with complete
Phase in man-hour is time reference back scheduling, and the sequencing for time of being assigned plans by each material of time in advance length difference, is one
Plan management of materials and quipment pattern in the industrial manufacturing enterprise of kind, MRP can help people that MPS is converted to ability need meter
Draw, generate load report, then according to load report analysis result and feedback adjustment MPS, but should be noted
Artificial to participate in being many during feedback adjustment, currently there are no MRP systems can be with super in autobalance ability need
Load or underload situation;In addition, it is the pass of production control that whether the beat of each operation production activity of production scene, which is in step with,
Key, if managed using MRP systems, just occur and assign production ordering respectively to each operation by MRP systems, each operation according to
It instructs the production that each goes into operation, and the demand for the later process that preceding working procedure goes out according to system-computed carries out production activity, not necessarily
Matched with the actual demand of later process, because, MRP's plans time zone typically in units of week or day, and real
The enterprise of many enterprises especially production line balance mode on border, the process time of each operation are to do unit with even second minute.
The chronomere of system is inconsistent with reality, is easy for causing the time difference between the demand of system and actual demand, so as to
Easily cause production scene product overstock and production activity confusion.
Billboard mode derives from TPS (Toyota Production System Toyota's production systems), and billboard mode is
Realization rate under JIT production planning mode, it is exactly that dispatching, logistics tally-man understand basis on time for Enterprise Logistic System
Material billboard, specific time, delivery place and the delivery material of feeding are determined, according to matching somebody with somebody for the specific detailed progress material of billboard
Send, according to the experience of Toyota Motor company, the reasonable of production process merely can not possibly be realized comprehensively using kanban system
Change.
Therefore, MRP and kanban system have his own strong points, and respectively have shortage, if only selection one kind is made in both for enterprise
For the manufacturing management system of enterprise, the defects of respective is inevitably run into.
The content of the invention
The shortcomings that in order to overcome MRP and kanban system each, the invention provides the lean logistics system based on billboard, i.e.,
Either network, maintenance order and production order, no matter in establishment or change, all directly update lean logistics banner system
Material requirement table, be easy to system by hand or backstage calculate billboard data automatically, realize lean logistics kanban system, so as to
The flow of logistics distribution is improved, emphasis solves the disparities between supply and demand for manufacturing live material, to produce order-driven market logistics, before making
The requirement command that the production and materials procurement of procedure are transmitted in strict accordance with later process is carried out, and makes whole logistics distribution
Flow becomes MRP " pushing away " " drawing " of kanban system.
The technical solution adopted for the present invention to solve the technical problems is a kind of system of lean logistics realization side based on billboard
System, including:Basic information management, order management, process management, to expect demand management, wherein
Basic information management:Including work centre, material information, the order product structure BOM tables to be produced;
Order management:Including product information, product quantity, target date;
The BOM tables include:The quantity of material, the material;
The process, including:The material that produces/purchase, related work centre, production/procurement cycle;
Expect demand management:For the BOM tables according to the order product, and the material being related in the BOM and institute
State the related process of material needs the situation of certain material using parallel processing technique generation in certain time;
Stock control:For recording the real time data of material in warehouse, and according to the material that expect in demand management
Required time plan, it would be desirable to the material generation outbound list of outbound.
It is described to expect that demand management also includes:Job management, the job management, including:Job title, the working pipe
Manage for the quantity according to all process steps in the BOM tables, be that each process of the BOM tables distributes an operation;
The preferable operation is 20-30, and the job management is used for, and all process steps in the BOM tables are divided into
20-30 parts, one operation of every part of distribution;
Work centre also includes weight, the weight, refers to that material that the work centre uses accounts for the percentage of total material
Than;The job management is additionally included in when distributing operation for the BOM, in the process in BOM corresponding to every part of operation, category
The quantity that all process steps of the operation are accounted in the data of the work centre is the weight of the work centre;
Preferably, the work centre includes:General assembly material, bogie is set and car body design;
Preferably, the weight of the general assembly material is 50% to 60%, when distributing operation for the general assembly material, each
The BOM data for having 50% to 60% in operation belongs to the general assembly material;The weight that the bogie is set for 10% to
20%, when setting distribution operation for the bogie, the BOM data for having 10% to 20% in each operation belongs to described
Bogie is set;The weight of the car body design is 20% to 30%, when distributing operation for the car body design, each operation
In have 20% to 30% the BOM data belong to the car body design.
It is described to expect that demand management also includes computing and indicated, the computing sign, need to give birth to for marking in the BOM tables
Into the data that expect demand;
Preferably, the computing of each node of the related BOM tables of newly-built order is identified as sky;
Preferably, the initial value of the computing sign is " X ", and the execution end value of the computing sign is " Z ".
Also include log management, the log management includes log sheet, when demand error is expected described in generation for storing
Data;When to expect demand error described in generation, the wrong data is stored in the log sheet, when generation next time will expect to need
When asking, the wrong data in log sheet is generated into demand to be expected again, and will expect that the daily record data of demand is deleted described in generation
Remove;
The log sheet includes:Order number, plan stream day, process, material, quantity, plan stock day, warehouse compartment, work
Center, Log Types;
Preferably, when expecting demand billboard described in generation every time, all the wrong data generation in the log management is seen
Plate data;
Preferably, the Log Types include:Order change, three daily planning changes or process change
Preferably, the log management also includes show log information, deletes log information.
The work centre also includes logistics center, and the logistics center will expect that demand generates the outbound according to
It is single;The material is sent to the feeding place by the tally-man according to the outbound list from the goods yard, and is performed and be sent to work
Sequence;The process that is sent to is exactly that the material information that expect described in demand billboard is set into completion status, while is sent out
Goods is transferred items registration;
Preferably, the material type includes whether to expect for recoil, if the material is recoil material, the tally-man will
The stock movement remembers that logistics stockpile number is reduced to the work centre;The hair is then carried out if not recoil material
Goods is transferred items registration, and note stock material is reduced.
The lean logistics system based on billboard, applied to motor-car manufacturing;
Preferably, the order includes:Order number, completion date, material, quantity, Order Type;
Preferably, the Order Type includes:Produce order, maintenance order and the production schedule on the three;
Preferably, the order also includes:Plan stream day, the plan stream day of the maintenance order is after current date
Any one day in three days;
Preferably, described process also includes:Process title, material, quantity, delivery/production cycle, work centre, class
Group;
Preferably, it is described to expect that demand is to include:Order number, process, material, quantity, plan stock day;
Preferably, it is described to expect demand generation after, stocked up day, the work centre, process and/or class by the plan
Group display is multiple will to expect demand;
Preferably, the plan that be described in material demand is stocked up day, be the data of current date one day after, generation institute
State outbound list;
Preferably, the material includes material type, warehouse compartment, goods yard, tally-man, procurement cycle;
Preferably, it is described to expect demand to expect demand billboard;
Preferably, the process also includes process type, and the process type is:Buying or production;
Preferably, the process also includes:Subordinate's material that the material needs is produced, when the process type is buying
When, described subordinate's material is sky;
Preferably, the process corresponds with the material in BOM tables.
For BOM tables node distribution operation the step of it is as follows:
1) quantity of all nodes of the BOM tables is calculated;
2) quantity of all nodes divided by the quantity of operation calculated with step 1), the institute for each operation distribution is obtained
State the number of nodes of BOM tables;
3) it is current work by first operational definition;
4) it is the title of all node distribution current works in the BOM tables since the root node of BOM tables, is every time
During the node distribution job title, the number of nodes of the BOM tables of the operation distribution is recorded as, when the quantity reaches
It is current work by next operational definition after each operation defined in step 2) allows the operation quantity of distribution;Repetition is held
All nodes of the row step 4) in for the BOM tables all distribute job title.
After considering the weight of each work centre be BOM tables node distribution operation the step of it is as follows:
1) quantity of all nodes of BOM tables is calculated;
2) quantity of all nodes divided by the quantity of operation calculated with step 1), the institute for each operation distribution is obtained
State the number of nodes of BOM tables;
3) number of nodes for the BOM tables distributed for each operation being calculated according to the step 2) and every
The weight calculation of individual work centre obtains:Belong to the quantity of the BOM table nodes of each work centre in each operation;
4) it is current work by first operational definition;
5) first job center is defined as work at present center;
6) a certain amount of data that operation is not yet distributed in work at present center are obtained from affiliated BOM tables, distribute to institute
State current work;It is described a certain amount of to be:What step 3) was calculated, the BOM table sections of each work centre are belonged in each operation
The quantity of point;
7) the latter work centre is defined as work at present center, and performs step 6), until all working in BOM tables
The data at center are all assigned with current work;
8) it is work at present center by next operational definition, performs step 5) until going to last operation;
9) it is not yet to distribute the data distribution of operation last operation in remaining all BOM tables.
The invention has the advantages that the pattern based on information technology, in the guidance of lean production Advanced Idea and technology
Under, be combined with MRP and logistics billboard theory, with actual lean logistics dispatching be target information system, the application of the system,
Logistics distribution flow effectively is improved, solves the problems, such as the disparities between supply and demand for manufacturing live material, stock clerk's root emphatically
Match somebody with somebody station information according to the process in logistics electronic system, station material, the material requirement of production team can be inquired about at any time.It is even if raw
Production subsidiary factory does not propose billboard, also can check stock information according to MPS and MRP, accomplish material in storehouse
Match somebody with somebody platform in advance in room, the demand for making the production of preceding working procedure and materials procurement work strictly be transmitted according to later process
Instruction is carried out.It is most short so to also ensure that the material allocation time tapers to, and be effectively reduced material storage overstock and fund
Take.
Design alteration is an important service in company's production and operating activities, when user's request change, supplier occur
When change, product occur deviation occur in quality problems, and production manufacturing process, wanting for design alteration may be all proposed
Ask, the well-regulated enterprise of design alteration, the support of enterprise information system can be relied on, quickly and efficiently organize people from all departments
Member's complete design redirection activity.Comprehensive quality management is the key business of business administration work, and controls design alteration
It is the core work of quality management.The main and most difficult task of design alteration activity is to maintain the complete of product data
Property, uniformity and trackability.Lean logistics banner system can guarantee that a series of modification of product data caused by design alteration
With version evolving uniformity, i.e., the complete consistent product number for describing product unique technical state can be all obtained at any time
According to;The version relationship being able to record between data, ensure the trackability of data.Lean logistics banner system has reached following effect
Fruit:
1) design alteration related products data relationship is complicated, establishes a complete product data mould for supporting design alteration
Type is basis.
2) the workflow drive system of automation is provided, controls the progress of change procedure.Workflow defining tool is advance
The standard workflow journey of all kinds of changes is defined, coordinated scheduling task, personnel, data under the control of workflow, completes product
The orderly change of data.
3) the file structure pattern of design alteration is complicated and changeable, and system provides the user interface function of processing complex data.
4) following functions are supported in design alteration:Design alteration request slip, modified application, change file management;Design alteration
Flow definition and examination & approval control;Uniformity integrity checking and the version upgrade control of product data;Parts in design alteration
Change inquiry;The integrated Event Service of information process.
In motor-car manufacturing, up to ten thousand production orders can be monthly produced, that is, have hundreds of thousands even road works up to a million
The material issuing of sequence, these materials are allowed to be dealt into corresponding production team in suitable time, place, it is ensured that the need of company's lean production
Ask, the lean logistics system based on billboard have also been devised tally-man, goods yard, the one-to-one function of material;Ensure that billboard is transported
After row, each material, corresponding goods yard, unique tally-man can be all corresponded to;Refine the granularity of logistics management.
Brief description of the drawings
The lean logistics system of the present invention based on billboard is specifically described below in conjunction with the accompanying drawings.
Fig. 1 is the structural representation of the lean logistics system of the invention based on billboard;
Fig. 2 is the structural representation of BOM tables;
Fig. 3 is the structural representation that subsidiary factory is produced in the present invention;
Fig. 4 is lean billboard data flowchart of the present invention;
Fig. 5 is the network topological diagram that the present invention realizes.
Embodiment
Billboard is formed:Electronic board is formed by coming back with detailed (namely project), and it is the bag in units of order that billboard, which comes back,
The number of collecting containing demand, process route, sequence, record type, work centre, production order number, production order status etc.;Because of billboard
To dispense unit using process as minimum, so detail is in units of process, comprising the demand number of collecting, process route, platform position,
Demand material, factory, stock locations, recoil identify, to expect the specifying informations such as time.The requirement of lean production dispatching is met,
In lean logistics banner system, the new line of billboard is connected with detail by the demand number of collecting.
Work centre in the present invention includes production subsidiary factory and logistics center.
First, billboard generates:
1st, the production schedule of motor-car manufacture is mainly derived from production order and maintenance order (being also maintenance work order), in view of dynamic
The complexity of the car manufacture production schedule and change that may be present, and inevitably engineering design change influences, in logistics
The heart is not taken based on the active means of distribution of stable production schedule arrangement, but take and dispense on demand to the material issuing of production subsidiary factory
Mode proposes to expect demand, it is necessary to produce subsidiary factory based on the production schedule in three days, subsequent production subsidiary factory submit demand personnel according to
According to demand inventory to be expected, with process and/or teams and groups' node, it will expect that the release of demand inventory is submitted to logistics center, and these are given birth to
The transmission of production instruction is all completed by billboard, and the production schedule from maintenance work order directly generates billboard number here
According to, and there was only a pen data from the billboard of maintenance order.
In lean logistics system based on billboard, if multiple billboard, it can write in the table of backstage, be concentrated by background job
Processing.
2nd, billboard generates, and can be divided into backstage automatic running and foreground is formulated by hand
2.1 for priority level it is high, need the billboard of emergent management, foreground can be used to manually enter mode and submit and seen
Plate.When being formulated by hand on foreground, system can judge the quantity of user's input, if the billboard quantity to be run of user's input surpasses
Mistake can be prompted by crossing 100 systems, and this act as being avoided artificial input error, improves the operational efficiency of system.
In process of production, each production order is related to material processing up to ten thousand to 2.2 motor-cars, so dotes on for quantity
Big material, system use the mechanism of parallel processing, are defining method for splitting from the background, system determines generation billboard according to process
Quantity, such as:There are 23 operations on backstage, there is 10 work orders, and each work order has 20 processes, and system can calculate process,
I.e. how many individual billboard quantity, it is that the process in work order calculates, such as each process has 100 kinds of materials, i.e., each work order has
2000 billboard, by all order process data, that is, the data for calculating billboard quantity are needed to carry out cycle labeling into A, B, C, D etc.
23 names (wherein A, B, C, D etc. are job name), during first job run, only take the data that mark is A, second operation
During operation, the data run that mark is B is only taken, by that analogy, because new and old calculating that will be repeatedly per procedure, in ERP, table
Data storage is fewer, and efficiency is higher, so using this mechanism, substantially increases the operational efficiency of billboard, substantially more than ten minutes
Substantial amounts of data run can be made complete;The quantity that certain operation is split is set according to the portfolio of reality, when portfolio
When changing greatly, it can adjust again.Here it is possible to using can perform a plurality of instruction simultaneously or handle multiple data item simultaneously
Single central processing unit computer can also use multiple processor system.
Meanwhile need to calculate weight when mark, this weight is distinguished according to production subsidiary factory, as shown in figure 3,
Because general assembly material accounts for 60% or so of total ratio, so system in background process, can distribute to 60% operation always
Dress, bogie are arranged to 15%, car body design 25%, server resource can be so utilized to greatest extent, with most fast
Speed calculates the quantity of billboard.The distribution of this certain accounting can be adjusted according to the business datum of reality, such as marked
When job name when, if the data of A operation bogie subsidiary factory exceed total amount 25%, the operation that system can automatically to bogie
Next job name is moved on to go to mark.So, effectively by data distribution into 23 background jobs, and reasonably control each
The operation quantity of operation subsidiary factory.The billboard data distribution for ensuring to run out is rational.
2.3 when operation generates billboard detail, and because data volume is larger, the data of billboard are inserted and calculated after being all
Platform Job execution calculates, and so, with practical business there is the time difference, also implies that system is to be generated there is variance data
A computing mark is added in the table detailed into billboard, when operation generates billboard detail, system first can take this, will
The computing mark for generating the data of billboard is set to " X ", after the complete generation billboard detail of system operations, then by computing mark again
It is empty.Using this mechanism, the data for effectively avoiding billboard are calculated by crawl is repeated, the phenomenon hair of generation billboard Data duplication
It is raw.Meanwhile system avoids hash from running to improve the speed of service of billboard, during each run, for production work order
Data are read in again, and are also repeatedly to read in again when reading process data, it is ensured that the data take every time, calculated are all
It is newest, most real-time data, it is ensured that the degree of accuracy that billboard data calculate.
3rd, demand billboard is expected
Production subsidiary factory is submitted according to process and/or teams and groups' node in lean logistics system in the form of billboard to be expected will expect to need
Inventory is sought, is discharged into logistics center.There is the following two kinds form:
1) discrete piece will expect demand inventory:User cannot change quantity required, and the background job of discrete piece is by process
Calculated to be grouped;
2) recoil material will expect demand inventory:User can change quantity required, and simultaneity factor can also simulate calculating and suggest
Quantity required.Here recoil material refers to the unit of materials and the material that forwarding unit is inconsistent, for example paint etc,
The unit of material issuing is tank/bucket, but unit when producing consumption is gram that the actual consumption quantity of usual this material is in life
Production is difficult statistics before completing, therefore the material that recoils is managed in the subsidiary factory storehouse of production subsidiary factory.Logistics billboard operationally, root
The characteristics of expecting according to recoil carries out collecting material issuing.
2nd, the production schedule changes
Produce order, three daily plannings and the possibility of change unavoidably be present, therefore demand billboard to be expected can be caused to produce change
More, system can see if there is outbound record, while original outbound number and demand number are compared according to original material data
Compared with if without outbound, needing quantity to carry out outbound by new material;If outbound records, i.e., cancelling stocks is carried out to raw material,
New materiel warehouse-out, produce one and move back a neck.
The time point that change occurs is probably submit will be before or after material demand.After expecting that demand is submitted, also may be used
It can be picked and match somebody with somebody or done outbound list.
Processing mode is as follows:
The first situation:If concerned process steps node will expect that demand inventory is not submitted or had been filed on but do not pick to match somebody with somebody,
The automatic original that is appended to will expect demand odd numbers (reserved number+record type+process ID+ submits demand sequence number);
Second of situation:If concerned process steps node to expect demand inventory be submitted and picked with (containing part pick
With), then automatically generate it is new to expect in demand odd numbers (reserved number+record type+process ID+ submits demand sequence number+serial number),
Now, submission will expect demand sequence number, and+1 on the basis of original will expect demand sequence number, to expect demand sequence number initial value here is 1.
3rd, the material returned in demand billboard to be expected is handled
Because producing the change of order, material returned request can be produced, be also developed in system because of practical business demand, Logistics Department
Door actively carries out the function of the material returned and neck material to the material of hair;System supports that one moves back a neck function, that is, applies for the material returned of certain material, can
Apply for the neck material of material mutually tackled simultaneously, also support the material returned of single material, production subsidiary factory needs the production need according to reality
Ask and change and propose report material returned request, logistics tally-man confirms the material returned according to the material issuing situation of reality, such as one moves back a neck, the material returned it is same
When, allot new material, it is ensured that production subsidiary factory, logistics delivery, receive unanimously.
Expect that the material returned in demand billboard there are three kinds of states:Expect the non-outbound of demand, to expect the outbound of demand part, to expect to need
Ask complete outbound, in systems with different fields, different values come accurately calculate in practical business may occur it is various
Material returned demand, such as following table:
Note:For lean logistics system by 6 fields of upper table, three states handle all materials returned being likely to occur
Request, for example,
Represented for ZDSTS_ASS=0:Expect the non-outbound of demand;
Represented for ZDSTS_ISS=1:There is material returned request, material returned request key value and demand to be expected are inconsistent.
There is no this state for " (nothing) " system in upper table, system will not also carry out ZDSTS_ISS=2 or ZDSTS_
CIS=2 is such to be set.
4th, mistake billboard adjustment function
When producing order, maintenance order preservation, the generation of demand schedule to be expected can be triggered, but in the actual industry of motor-car production
, can be because design alteration cause to produce the change of process teams and groups, material, platform position in order in business, the data of billboard want root
Factually border will expect that need state is changed or locked, and billboard data will not be generated after locking, but generate daily record data, note
Record in log sheet, here, the type of daily record includes:Produce work order change, three daily planning changes and MRP change etc..
System is in design, it is contemplated that and all situations of production order variation are specific detailed as follows:
Note:
1) order status is that " X " represents locked, and locked data can not generate billboard data, and be stored in daily record
In table, further processing is waited;
2) it is for the type of order demand change:The state of " increase material " is " (single) ", represents there was only a kind of shape
State, system are directly handled according to need state to be expected,;
3) there are two kinds in the state of " change of process teams and groups ":" mode one " and " mode two ", system are according to circumstances held respectively
OK,
Such as:It is for need state to be expected:" do not submit/or have been filed on but cancel ", " having been filed on not cancelling ", system
Treating method is:Directly change;
It is " completely or partially transferring items " for state to be expected:For what is transferred items, system selection approach one, the work is locked
Sequence, billboard data are not generated, but generate daily record data (subsequent treatment:The material returned request application material returned is first submitted by Ling Liao departments,
After rechange);For what is do not transferred items, system selection approach two, directly change.
Artificial maintenance mistake that system can will identify that automatically, the locking of production order, material locking, Material Cost are not tieed up
Wrong material billboard data are saved in log sheet caused by the reasons such as shield, design alteration, and when next time is run, system can be automatic right
The data of mistake perform the generation of billboard again, untill this wrong data generation billboard, can just be recorded in error log
This record is deleted in table, it is therefore desirable to periodically start wrong billboard adjustment function, the information flow according to newest production order
Adjust wrong billboard, it is ensured that the promptness of billboard adjustment.
But be not all wrong data for generating daily record, billboard data finally can be all generated, such as:Change recoil
Setting, change material type, change MRP groups, these may cause data run mistake, strictly forbid in systems,
, it is necessary to artificially check when there is this kind of wrong log information.In addition, to expect the project that demand is closed, also will not generation again
Expect billboard, these need to delete by hand.
5th, billboard uses:
Due to can monthly produce up to ten thousand production orders, that is, have the hundreds of thousands even material issuing of procedures up to a million, allow this
A little materials are dealt into corresponding production team in suitable time, place, it is ensured that the demand of lean production, billboard logistics platform are set
Tally-man, goods yard, the one-to-one function of material are counted;After ensuring billboard operation, each material, it can all correspond to corresponding
Goods yard, unique tally-man, it is ensured that responsibility clearly, can trace, tally-man can see oneself need at what time, feeding
Point, process is sent to, accomplishes to dispense on demand;Refine the granularity of logistics management.System establishes material, tally-man, pair in goods yard
According to relation, it is ensured that each material have tally-man be responsible for, each material correspond to shipment goods yard.Tally-man daily can be by
Material program is put forward according to project or material operation logistics billboard, by the detailed generation logistics billboard of billboard to be refreshed, and to billboard
Printed, it is detailed according to the material of printing, specific time, delivery place and the delivery material of feeding are determined, production is carried out and matches somebody with somebody
Material, material issuing.Herein, delivery place is generally each production subsidiary factory, but the characteristics of based on motor-car production, partial material volume compared with
Greatly, therefore the place material issuing specified of production subsidiary factory can be sent to.This place specified is middle database.It so ensure that having for scene
Sequence produces, and also ensure that logistics dispensing on time.
Due to the billboard data for producing subsidiary factory can be embodied with the three daily planning data according to actual production, therefore produce subsidiary factory
According to the detail of the condition of production of oneself, in advance one day production material for assigning latter three days, system is according to MRP, production
The generations such as product structural information will expect demand billboard, the material to then producing subsidiary factory, by produce subsidiary factory according to expect request billboard
Outbound list is printed, carries out production dispensing, material issuing processing.Here the material for producing subsidiary factory refers to:Recoil material either produces subsidiary factory
The intermediate products of oneself production.Here intermediate products may give oneself subsidiary factory to use, it is also possible to give next point as material
Station-service.
6th, billboard flow, as shown in Figure 4:
1st, produce subsidiary factory planner and assign within one day the production schedule on the three in advance according to production order and maintenance are single, produce within 3rd
It is detailed including the production material of three days in the works.
2nd, system can will expect demand billboard according to generations such as MRP, product structure information, stock material information,
Expect that demand billboard includes:Produce the information such as order, process, material, quantity, warehouse compartment.
3rd, all subsidiary factories will expect that demand billboard data summarization gets up to generate lean logistics billboard.
4th, after the generation of lean logistics billboard, number as desired according to item number, teams and groups, process, row, an automatic packing,
Each production subsidiary factory billboard is generated, each subsidiary factory's billboard that produces is, production subsidiary factory billboard detailed according to the material of project, row, a generation
Include following information:Produce the information such as order, process, work centre, platform position, production team, material, quantity, warehouse compartment.
5th, logistics center tally-man will expect that demand is carried out according to what lean logistics billboard and production subsidiary factory planner provided:Thing
Flow center distribution, pick and match somebody with somebody, fill out storehouse list, deliver and transfer items and produce a series of processing such as subsidiary factory's material issuing, the content of processing includes:
Produce the information such as order, process, material, quantity, warehouse compartment.
6th, whether logistics center tally-man is that recoil material is further processed according to material type, if material is recoil
Material remembers that logistics stockpile number is reduced then by stock movement to production subsidiary factory;If not recoil material, then outbound is kept accounts, and remembers thing
Expect that stock is reduced.
7th, the hardware equipment information that billboard management system is realized
A kind of lean logistics billboard management system provided by the invention is realized, in design, exploitation, test and production system
In need at least to operate in following equipment, can be only achieved relatively good effect.
Described above is only presently preferred embodiments of the present invention, not makees any formal limitation to the present invention, though
So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any technology people for being familiar with this patent
Member without departing from the scope of the present invention, when the technology contents using above-mentioned prompting make it is a little change or be modified to
The equivalent embodiment of equivalent variations, as long as being the content without departing from technical solution of the present invention, the technical spirit pair according to the present invention
Any simple modification, equivalent change and modification that above example is made, in the range of still falling within the present invention program.
Claims (15)
- A kind of 1. lean logistics system based on billboard, it is characterised in that including:Basic information management, order management, process pipe Reason, to expect demand management, whereinBasic information management:Including work centre, material information, the order product structure BOM tables to be produced;Order management:Including product information, product quantity, target date;The BOM tables include:The quantity of material, the material;The process, including:The material that produces/purchase, related work centre, production/procurement cycle;Expect demand management:For the BOM tables according to the order product, and the material being related in the BOM and the thing The related process of material needs the situation of certain material using parallel processing technique generation in certain time;Stock control:For recording the real time data of material in warehouse, and according to the material requirement that expect in demand management Period planning, it would be desirable to the material generation outbound list of outbound;The work centre also includes logistics center, and the logistics center will expect that demand generates the outbound list according to;Reason The material is sent to feeding place by goods person according to the outbound list from goods yard, and is performed and be sent to process;It is described to be sent to process just It is that will expect that the material information in demand billboard is set to completion status, while carries out delivery and transfer items registration;Material type is included whether to expect for recoil, expected if the material is recoil, the tally-man is by stock movement described in Work centre, while remember that logistics stockpile number is reduced;The registration of transferring items of delivering then is carried out if not recoil material, remembers material library Deposit reduction.
- 2. a kind of lean logistics system based on billboard according to claim 1, it is characterised in that also include:Working pipe Reason, the job management, including:Job title, processor, the job management are used for according to all process steps in the BOM tables Quantity, be the BOM tables each process distribute an operation.
- 3. a kind of lean logistics system based on billboard according to claim 2, it is characterised in that the operation is 20- 30, the job management is used for, and all process steps in the BOM tables are divided into 20-30 parts, one operation of every part of distribution.
- 4. a kind of lean logistics system based on billboard according to claim 2, it is characterised in that the work centre is also Including weight, the weight, refer to that material that the work centre uses accounts for the percentage of total material;The job management is also wrapped Include when distributing operation for the BOM, in the process in BOM corresponding to every part of operation, belong to the number of the work centre Quantity according to all process steps for accounting for the operation is the weight of the work centre.
- A kind of 5. lean logistics system based on billboard according to claim 4, it is characterised in that the work centre bag Include:General assembly material, bogie is set and car body design.
- 6. a kind of lean logistics system based on billboard according to claim 5, it is characterised in that the general assembly material Weight is 50% to 60%, when distributing operation for the general assembly material, there is 50% to the 60% BOM numbers in each operation According to belonging to the general assembly material;The weight that the bogie is set is 10% to 20%, is setting distribution to make for the bogie During industry, there is 10% to 20% BOM data to belong to the bogie in each operation and set;The weight of the car body design For 20% to 30%, when distributing operation for the car body design, there is 20% to the 30% BOM data category in each operation In the car body design.
- 7. according to a kind of any described lean logistics systems based on billboard of claim 1-6, it is characterised in that described to expect Demand management also includes computing and identified, and the computing mark, needs to expect demand described in generation in the BOM tables for marking Data.
- A kind of 8. lean logistics system based on billboard according to claim 7, it is characterised in that the correlation of newly-built order The computing of each node of BOM tables is identified as sky.
- 9. a kind of lean logistics system based on billboard according to claim 7, it is characterised in that the computing mark Initial value is " X ", and the execution end value of the computing mark is " Z ".
- 10. according to a kind of any described lean logistics systems based on billboard of claim 1-6, it is characterised in that also include Log management, the log management include log sheet, for storing data when demand error is expected described in generation;In generation institute When stating demand error to be expected, wrong data is stored in the log sheet, when generation will expect demand next time, by the mistake in log sheet Data generate demand to be expected again by mistake, and the daily record data that demand is expected described in generation is deleted;The log sheet includes:Order number, plan stream day, process, material, quantity, plan stock day, warehouse compartment, work centre, Log Types;When generation will expect demand billboard every time, the wrong data in the log management is all generated into billboard data;The Log Types include:Order change, three daily planning changes or process change;The log management also includes show log information, deletes log information.
- 11. a kind of lean logistics system based on billboard according to claim 7, it is characterised in that also including daily record pipe Reason, the log management include log sheet, for storing data when demand error is expected described in generation;To expect described in generation When demand malfunctions, wrong data is stored in the log sheet, when generation will expect demand next time, by the wrong data in log sheet Generation will expect demand again, and the daily record data that demand is expected described in generation is deleted;The log sheet includes:Order number, plan stream day, process, material, quantity, plan stock day, warehouse compartment, work centre, Log Types;When generation will expect demand billboard every time, the wrong data in the log management is all generated into billboard data;The Log Types include:Order change, three daily planning changes or process change;The log management also includes show log information, deletes log information.
- 12. according to a kind of any described lean logistics systems based on billboard of claim 1-6, it is characterised in that the base In the lean logistics system of billboard, applied to motor-car manufacturing;The order includes:Order number, completion date, material, quantity, Order Type;The Order Type includes:Produce order, maintenance order and the production schedule on the three;The order also includes:Plan stream day, the plan stream day of the maintenance order is appointing in three days after current date Meaning one day;Described process also includes:Process title, material, quantity, delivery/production cycle, work centre, teams and groups;It is described to expect that demand includes:Order number, process, material, quantity, plan stock day;It is described to expect demand generation after, by the plan stock up day, the work centre, process and/or teams and groups show it is multiple Expect demand;By the data of the plan stock day that will be described in material demand, the outbound list is generated, the plan stock day is works as The preceding date is one day after;The material includes material type, warehouse compartment, goods yard, tally-man, procurement cycle;It is described to expect demand to expect demand billboard;The process also includes process type, and the process type is:Buying or production;The process corresponds with the material in BOM tables.
- 13. a kind of lean logistics system based on billboard according to claim 7, it is characterised in that described to be based on billboard Lean logistics system, applied to motor-car manufacturing;The order includes:Order number, completion date, material, quantity, Order Type;The Order Type includes:Produce order, maintenance order and the production schedule on the three;The order also includes:Plan stream day, the plan stream day of the maintenance order is appointing in three days after current date Meaning one day;Described process also includes:Process title, material, quantity, delivery/production cycle, work centre, teams and groups;It is described to expect that demand includes:Order number, process, material, quantity, plan stock day;It is described to expect demand generation after, by the plan stock up day, the work centre, process and/or teams and groups show it is multiple Expect demand;By the data of the plan stock day that will be described in material demand, the outbound list is generated, the plan stock day is works as The preceding date is one day after;The material includes material type, warehouse compartment, goods yard, tally-man, procurement cycle;It is described to expect demand to expect demand billboard;The process also includes process type, and the process type is:Buying or production;The process corresponds with the material in BOM tables.
- 14. a kind of lean logistics system based on billboard according to claim 10, it is characterised in that described to be based on billboard Lean logistics system, applied to motor-car manufacturing;The order includes:Order number, completion date, material, quantity, Order Type;The Order Type includes:Produce order, maintenance order and the production schedule on the three;The order also includes:Plan stream day, the plan stream day of the maintenance order is appointing in three days after current date Meaning one day;Described process also includes:Process title, material, quantity, delivery/production cycle, work centre, teams and groups;It is described to expect that demand includes:Order number, process, material, quantity, plan stock day;It is described to expect demand generation after, by the plan stock up day, the work centre, process and/or teams and groups show it is multiple Expect demand;By the data of the plan stock day that will be described in material demand, the outbound list is generated, the plan stock day is works as The preceding date is one day after;The material includes material type, warehouse compartment, goods yard, tally-man, procurement cycle;It is described to expect demand to expect demand billboard;The process also includes process type, and the process type is:Buying or production;The process corresponds with the material in BOM tables.
- 15. a kind of lean logistics system based on billboard according to claim 11, it is characterised in that described to be based on billboard Lean logistics system, applied to motor-car manufacturing;The order includes:Order number, completion date, material, quantity, Order Type;The Order Type includes:Produce order, maintenance order and the production schedule on the three;The order also includes:Plan stream day, the plan stream day of the maintenance order is appointing in three days after current date Meaning one day;Described process also includes:Process title, material, quantity, delivery/production cycle, work centre, teams and groups;It is described to expect that demand includes:Order number, process, material, quantity, plan stock day;It is described to expect demand generation after, by the plan stock up day, the work centre, process and/or teams and groups show it is multiple Expect demand;By the data of the plan stock day that will be described in material demand, the outbound list is generated, the plan stock day is works as The preceding date is one day after;The material includes material type, warehouse compartment, goods yard, tally-man, procurement cycle;It is described to expect demand to expect demand billboard;The process also includes process type, and the process type is:Buying or production;The process corresponds with the material in BOM tables.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410532375.2A CN104268733B (en) | 2014-10-11 | 2014-10-11 | A kind of lean logistics system based on billboard |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410532375.2A CN104268733B (en) | 2014-10-11 | 2014-10-11 | A kind of lean logistics system based on billboard |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104268733A CN104268733A (en) | 2015-01-07 |
CN104268733B true CN104268733B (en) | 2018-02-27 |
Family
ID=52160253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410532375.2A Active CN104268733B (en) | 2014-10-11 | 2014-10-11 | A kind of lean logistics system based on billboard |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104268733B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110032154A (en) * | 2019-03-29 | 2019-07-19 | 中车青岛四方机车车辆股份有限公司 | A kind of production control method and system of be pilot |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111080145A (en) * | 2019-12-20 | 2020-04-28 | 南京同赢信息科技有限公司 | Method and device for realizing delivery of production orders based on billboard pulling |
CN112001587A (en) * | 2020-07-16 | 2020-11-27 | 中车青岛四方机车车辆股份有限公司 | Data extraction method and system |
CN112758572A (en) * | 2020-12-09 | 2021-05-07 | 中航星(西安)智能系统有限公司 | Delivery center system and method thereof |
CN115526491B (en) * | 2022-09-28 | 2023-11-17 | 惠州市海葵信息技术有限公司 | Data processing method, equipment and storage medium for material demand planning |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101546393A (en) * | 2008-03-27 | 2009-09-30 | 北京卫星环境工程研究所 | Billboard management system and method |
CN102262757A (en) * | 2011-08-11 | 2011-11-30 | 王圣亮 | Advanced planning system (APS)/manufacturing execution system (MES) lean manufacturing management system |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130065841A (en) * | 2011-12-02 | 2013-06-20 | 한양디지텍 주식회사 | Management system and method based integrated system for inventory control |
-
2014
- 2014-10-11 CN CN201410532375.2A patent/CN104268733B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101546393A (en) * | 2008-03-27 | 2009-09-30 | 北京卫星环境工程研究所 | Billboard management system and method |
CN102262757A (en) * | 2011-08-11 | 2011-11-30 | 王圣亮 | Advanced planning system (APS)/manufacturing execution system (MES) lean manufacturing management system |
Non-Patent Citations (3)
Title |
---|
基于MRPII/JIT混合模式的中小型企业综合MIS系统的研究;陶孙杰 等;《机电一体化》;20020430(第4期);第27-30页 * |
精益模式看板管理下物流配送系统的改善;杨文帮 等;《铁路采购与供应》;20101130(第11期);第40-42页 * |
面向机械产品装配过程的物料配送方法研究;钱芳 等;《机械工程师》;20110531(第5期);第34-36页 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110032154A (en) * | 2019-03-29 | 2019-07-19 | 中车青岛四方机车车辆股份有限公司 | A kind of production control method and system of be pilot |
CN110032154B (en) * | 2019-03-29 | 2020-10-27 | 中车青岛四方机车车辆股份有限公司 | Production control method and system for small-batch products |
CN110032154B8 (en) * | 2019-03-29 | 2021-01-19 | 中车青岛四方机车车辆股份有限公司 | Production control method and system for small-batch products |
Also Published As
Publication number | Publication date |
---|---|
CN104268733A (en) | 2015-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104268733B (en) | A kind of lean logistics system based on billboard | |
Cimorelli | Kanban for the supply chain: fundamental practices for manufacturing management | |
Arbulu et al. | Kanban in construction | |
Wortman et al. | A review of capacity planning techniques within standard software packages | |
CN104252671B (en) | A kind of lean logistics implementation method based on billboard | |
JP2010269867A (en) | Transportation schedule planning support system and transportation schedule planning support method | |
CN108665284A (en) | Supply chain cloud platform system | |
Wiers et al. | Designing, selecting, implementing and using aps systems | |
Kabadurmus et al. | Design of pull production control systems using axiomatic design principles | |
US11455594B2 (en) | Load tracking computing platform and user interface | |
Sampat et al. | Multisite supply planning for drug products under uncertainty | |
Selcuk | Dynamic performance of hierarchical planning systems: modeling and evaluation with dynamic planned lead times | |
GB2428316A (en) | Supply scheduling | |
US11488100B2 (en) | Load tracking computing platform and user interface | |
Kumar et al. | Integrated production distribution problem in a partial backorder and order refusal environment | |
De Snoo et al. | The interconnectivity of planning and shop floor: case description and relocation analysis | |
CN113806684B (en) | Material management method and system for power grid major repair technical improvement project | |
CN215526674U (en) | Information processing device, handheld radio frequency terminal and electronic screen | |
Gokaram Narayana Murthy | Production ramp-up of a hardware startup: developing inventory management strategies and establishing a framework for vendor selection | |
Rossetti et al. | Simulating backlog and load building processes in a two-echelon inventory system | |
JP2000322483A (en) | Method and device for managing plant | |
CN102609815A (en) | Implementation method achieving automatic location of Bills of Materials (BOMs) and supporting a plurality of planning strategies | |
JP6713963B2 (en) | Method and apparatus for generating initial inventory information for supply chain operation simulation | |
Braun | Breaking the Mold on Job Shops | |
Candea et al. | Effects of Using Kanban System in Automotive Industry. A Case Study |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: Jihongtan town Chengyang District Shandong city Qingdao province Jinhong road 266111 No. 88 Applicant after: CRRC QINGDAO SIFANG CO., LTD. Address before: Jihongtan town Chengyang District Shandong city Qingdao province Jinhong road 266111 No. 88 Applicant before: CSR Qingdao Sifang Locomotive and Rolling Stock Co., Ltd. |
|
COR | Change of bibliographic data | ||
GR01 | Patent grant | ||
GR01 | Patent grant |